Integrated Service Delivery: Maximising Asset Value Jason Fournier –  Associate Principal, Education Market Leader Chris Bond –  Associate, Facilities Management Consultancy
Contents Maximizing built asset performance Lifecycle approach Best practice comparisons Integrated project approach Key drivers & success factors Summary
Marlowe Academy, Kent, United Kingdom
Maximizing Built Asset performance Measures of performance: High space utilization Flexibility /  adaptability of space Efficiency of layout Low running costs (utilities, maintenance) Ability to re-use / refurbish / reconfigure to suit future needs Sustainability (energy, water, waste) Design life
Sharjah Library, University of Sharjah,  United Arab Emirates
Life Cycle Approach
Life Cycle approach  Evaluation of the total costs of procuring, owning and operating an asset
Life Cycle approach  Visibility of the total costs Long term financial viability Economic judgements Pay-back periods for investments Sinking fund requirements for future major maintenance spend Sustainability
University of Cape Town,  South Africa
Best Practice Comparisons
What are Best Practices?  Outline initial requirements Capital v operational costs Institutional legacy or “good soldier”? Approach suitable for respective markets
Institutional Legacy Buildings  Library, University of Virginia Designed as a significant  structure within the fabric of  the campus Not easily repurposed Historical value greater than  replacement value   
Fabric Building   Fine Arts Building,  Carnegie Mellon University Designed as a background or  supporting building that within  the fabric of the campus Has the ability to be  repurposed Historical value may or may  not be greater than  replacement value   
Integrated Project Approach
AECOM Integrated service from inception to use  PROGRAM x Use Construction Tender Detail design Scheme design Project brief Business case Inception Parametric cost modeling Benchmarking Financial profiling Financial KPI’s Option analysis Client / project structure advice  Business case Risk analysis Value mgt Space & workplace analysis Stakeholder mgt Client mgt Development mgt Develop brief Define needs & outcomes Detailed cost modeling Benchmarking ‘ Design to cost’ advice Procurement  strategy Change control Whole life cost estimating Legal structures Full business case Value & risk mgt FM Consulting Conditions for success planning Project execution planning Client / project team mgt Scheduling Design execution Design & change mgt Cost estimating ‘ Design to cost’ advice Market analysis Tender mgt Contract negotiations Change control Technical adviser Specification consulting Design reviews Value & risk mgt Project steering Scheduling Set project controls baseline Design execution Design & change mgt Supply chain mgt PMO functions Estimating cost of  change / change control Cost negotiation with constructor Cost reporting EAC prediction Final account Legal consulting – claims and delay analysis Value & risk mgt Construction Supervision FIDIC Engineer Contract admin Project controls Project reporting Client mgt Document control PMO functions COST QUALITY Energy analysis Building surveying FM Post occupancy studies Cost in use analysis Hand-over mgt Defects mgt Asset mgt Benefits analysis
Key drivers & success factors
Compton Union Building, Washington,  United States of America
Key Drivers Feasibility studies Existing space audits Test refurbishment / reconfiguration versus new-build options  Cost options and cash flow analysis Master programmes, logistics & phasing plans Procurement report for construction works Life Cycle cost analysis Academic issues  Curriculum & adjacency analysis Student uptake profiles Educational attainment
Success Factors Management of assets Develop a robust asset management plan Implement maintenance works schedules Set targets to minimise breakdowns and failures Conduct regular condition surveys  Develop asset replacement strategies based on life cycle cost analysis and condition survey data Obtain regular feedback from building users Respond to changing educational needs
NZi3 Innovation Institute,  University of Canterbury, New Zealand
Summary  Life cycle view - assets need to be adaptable Longevity requires an integrated approach Robust business case  Refurbishment can be more cost effective than new build Options appraisal AECOM can provide an integrated suite of services across the project lifecycle
Jane Foss Russell Building, University of Sydney, Australia
“ The quality remains long after the price is forgotten”
Thank you

More Related Content

PPT
Whole life performance lecture south bank university
PPTX
Website Learning Places
DOCX
Ketan Shah Resume const
PPTX
Enterprise- Project selection analysis
PDF
Economic value-added 2
PDF
Net Asset Value (NAV)
PPTX
EVA - Economic Value Added
Whole life performance lecture south bank university
Website Learning Places
Ketan Shah Resume const
Enterprise- Project selection analysis
Economic value-added 2
Net Asset Value (NAV)
EVA - Economic Value Added

Similar to Maximising Asset Value Aecom Bfe Mena 2011 (20)

PPT
High Performance Building Management System.Ppt
PPT
The Open University Construction Framework 2008 2011 Proving
PPT
Quality Based Road Program
PPT
Architecture presentation 9
PPTX
Operations & engineering presentation to sales meeting
PPT
Building Performance Evaluation - Post Occupancy Evaluation
PPTX
PROJECT MANAGEMENT FORURBAN DESIGN.pptx
PDF
Building Performance Evaluation - تقيم اداء المبانى
PDF
PetroSync - Successful Project Cost Estimation & Control
PPT
University Estate Management Systemsand Financial Management
PPT
GRE PM - proposal for MDDA
DOC
Forest Brent CV 2015 My Latest Resume
PDF
WHMcClendon Resume
PDF
PetroSync - Cost Engineering Risk Management-Earned Value Management
DOCX
Quantity surveying dissertation effectiveness of life cycle costing in sustai...
PPT
Ddm Workshop Summary 052810
PDF
The Study of Measurement of Over-Engineering in Construction Project
PPTX
Gregynog prolinx 170611
PPT
Human Performance Technology Case Study
PPTX
ABB - Sustainable Procurement by Philip Juneau at GIB Summit
High Performance Building Management System.Ppt
The Open University Construction Framework 2008 2011 Proving
Quality Based Road Program
Architecture presentation 9
Operations & engineering presentation to sales meeting
Building Performance Evaluation - Post Occupancy Evaluation
PROJECT MANAGEMENT FORURBAN DESIGN.pptx
Building Performance Evaluation - تقيم اداء المبانى
PetroSync - Successful Project Cost Estimation & Control
University Estate Management Systemsand Financial Management
GRE PM - proposal for MDDA
Forest Brent CV 2015 My Latest Resume
WHMcClendon Resume
PetroSync - Cost Engineering Risk Management-Earned Value Management
Quantity surveying dissertation effectiveness of life cycle costing in sustai...
Ddm Workshop Summary 052810
The Study of Measurement of Over-Engineering in Construction Project
Gregynog prolinx 170611
Human Performance Technology Case Study
ABB - Sustainable Procurement by Philip Juneau at GIB Summit
Ad

More from espie77 (13)

PPTX
Education Principles That Work Ncpsa Bfe Mena 2011
PPTX
Learning For All The World Bank Bfe Mena 2011
PPTX
Sustainability In Education Facilities Diac Bfe Mena 2011
PPT
Sportation Aecom Bfe Mena 2011
PPT
Affordable Innovative Education Elhaam Bfe Mena 2011
PPTX
Education For Employment Ifc Bfe Mena 2011
PPT
Special Education Needs Hlm Bfe Mena 2011
PPT
Human Capital Challenges In The 21st Century Rand Bfe Mena 2011
PPT
High Quality Learning Environments Ec Harris Bfe Mena 2011
PPT
Outstanding School Buildings Oecd Bfe Mena 2011
PPT
Private Investment Opportunities In Education Booz And Company Bfe Mena 2011
PPTX
21st Century Education Sis Bfe Mena 2011
PPTX
Outreach Support Service Zayed Higher Organisation Bfe Mena 2011
Education Principles That Work Ncpsa Bfe Mena 2011
Learning For All The World Bank Bfe Mena 2011
Sustainability In Education Facilities Diac Bfe Mena 2011
Sportation Aecom Bfe Mena 2011
Affordable Innovative Education Elhaam Bfe Mena 2011
Education For Employment Ifc Bfe Mena 2011
Special Education Needs Hlm Bfe Mena 2011
Human Capital Challenges In The 21st Century Rand Bfe Mena 2011
High Quality Learning Environments Ec Harris Bfe Mena 2011
Outstanding School Buildings Oecd Bfe Mena 2011
Private Investment Opportunities In Education Booz And Company Bfe Mena 2011
21st Century Education Sis Bfe Mena 2011
Outreach Support Service Zayed Higher Organisation Bfe Mena 2011
Ad

Maximising Asset Value Aecom Bfe Mena 2011

  • 1. Integrated Service Delivery: Maximising Asset Value Jason Fournier – Associate Principal, Education Market Leader Chris Bond – Associate, Facilities Management Consultancy
  • 2. Contents Maximizing built asset performance Lifecycle approach Best practice comparisons Integrated project approach Key drivers & success factors Summary
  • 3. Marlowe Academy, Kent, United Kingdom
  • 4. Maximizing Built Asset performance Measures of performance: High space utilization Flexibility / adaptability of space Efficiency of layout Low running costs (utilities, maintenance) Ability to re-use / refurbish / reconfigure to suit future needs Sustainability (energy, water, waste) Design life
  • 5. Sharjah Library, University of Sharjah, United Arab Emirates
  • 7. Life Cycle approach Evaluation of the total costs of procuring, owning and operating an asset
  • 8. Life Cycle approach Visibility of the total costs Long term financial viability Economic judgements Pay-back periods for investments Sinking fund requirements for future major maintenance spend Sustainability
  • 9. University of Cape Town, South Africa
  • 11. What are Best Practices? Outline initial requirements Capital v operational costs Institutional legacy or “good soldier”? Approach suitable for respective markets
  • 12. Institutional Legacy Buildings Library, University of Virginia Designed as a significant structure within the fabric of the campus Not easily repurposed Historical value greater than replacement value  
  • 13. Fabric Building Fine Arts Building, Carnegie Mellon University Designed as a background or supporting building that within the fabric of the campus Has the ability to be repurposed Historical value may or may not be greater than replacement value  
  • 15. AECOM Integrated service from inception to use PROGRAM x Use Construction Tender Detail design Scheme design Project brief Business case Inception Parametric cost modeling Benchmarking Financial profiling Financial KPI’s Option analysis Client / project structure advice Business case Risk analysis Value mgt Space & workplace analysis Stakeholder mgt Client mgt Development mgt Develop brief Define needs & outcomes Detailed cost modeling Benchmarking ‘ Design to cost’ advice Procurement strategy Change control Whole life cost estimating Legal structures Full business case Value & risk mgt FM Consulting Conditions for success planning Project execution planning Client / project team mgt Scheduling Design execution Design & change mgt Cost estimating ‘ Design to cost’ advice Market analysis Tender mgt Contract negotiations Change control Technical adviser Specification consulting Design reviews Value & risk mgt Project steering Scheduling Set project controls baseline Design execution Design & change mgt Supply chain mgt PMO functions Estimating cost of change / change control Cost negotiation with constructor Cost reporting EAC prediction Final account Legal consulting – claims and delay analysis Value & risk mgt Construction Supervision FIDIC Engineer Contract admin Project controls Project reporting Client mgt Document control PMO functions COST QUALITY Energy analysis Building surveying FM Post occupancy studies Cost in use analysis Hand-over mgt Defects mgt Asset mgt Benefits analysis
  • 16. Key drivers & success factors
  • 17. Compton Union Building, Washington, United States of America
  • 18. Key Drivers Feasibility studies Existing space audits Test refurbishment / reconfiguration versus new-build options Cost options and cash flow analysis Master programmes, logistics & phasing plans Procurement report for construction works Life Cycle cost analysis Academic issues Curriculum & adjacency analysis Student uptake profiles Educational attainment
  • 19. Success Factors Management of assets Develop a robust asset management plan Implement maintenance works schedules Set targets to minimise breakdowns and failures Conduct regular condition surveys Develop asset replacement strategies based on life cycle cost analysis and condition survey data Obtain regular feedback from building users Respond to changing educational needs
  • 20. NZi3 Innovation Institute, University of Canterbury, New Zealand
  • 21. Summary Life cycle view - assets need to be adaptable Longevity requires an integrated approach Robust business case Refurbishment can be more cost effective than new build Options appraisal AECOM can provide an integrated suite of services across the project lifecycle
  • 22. Jane Foss Russell Building, University of Sydney, Australia
  • 23. “ The quality remains long after the price is forgotten”