Mechanical Splice-3M
 General :
 The 3M™ Fibrlok™ II Splice/ Holder 2539 enables fast, on-site
installation of Fiber-to-the Premises (FTTP) connections with a
built-in actuation feature. 3M Fibrlok II Universal Optical Splices
provide permanent mechanical splices using either single-mode or
multimode 125 ^m fibers with any combination of 250^m and
900^m coating diameters.
 All 2529 universal optical fiber splices are gray in color and are
marked with 3M Fibrlok II logo on the splice cap.
 Safety and Helpful Hints :
 Use 99% pure reagent-grade isopropyl alcohol to clean the fibers
and other components. When splicing any cable containing grease,
ensure that all grease is wiped away and the buffer coating and
fiber are thoroughly cleaned with isopropyl alcohol.
 Note: Carefully follow safety, health and environmental information
on the label or MSDS for isopropyl alcohol. Storage, use and
disposal of isopropyl alcohol per your company health, safety and
environmental instructions.
 CAUTION :
 The gel inside the splice may cause minimal eye irritation. Avoid
eye contact. Wash hands before eating or smoking. Immediately
flush eyes with plenty of water while holding eyelids open. Do not
view fiber ends if they are illuminated with a laser.
 Carefully follow safety, health and environmental information on
3M Fibrlok II Splice label or Material Safety Data Sheet.
 Tools and Materials required :
 3M Fibrlok II Splice Holder 2539
 Buffer Stripper
 Scissors (Snips)
 Reagent Grade Isopropyl Alcohol
 Lint-free Wipes
 Cleaver
 Splicing Set-Up :
 The splicing area should be clean, dry and well lit. A clean, well
organized splicing area will improve splice efficiency and minimize
the risk of contamination of fibers or splices.
 Open buffer tubes, expose and clean the fibers per your company
practice.
 Remove the Fibrlok II Splice/Holder from its protective package
 Secure the Fibrlok II Splice/Holder 2539
 Before proceeding, attach the splice/holder to its final location. If
there is not enough space to work, then attach the splice/holder
after completing the splice. Clean surface of dirt and debris with
alcohol and a lint-free cloth. To attach, remove the 3M VHB ™ (Very
High Bond) Tape release liner (red) and press the splice/holder
base firmly for several seconds onto the surface of its final
location.
 Lift the buffer clamps at both ends of the splice/holder and lift the
actuation lever to the "up" position
 Fiber Preparation :
 Note: The 3M Fibrlok II Splice/Holder is designed for 900pm tight
buffer and 250pm primary coated fiber. To splice 900pm loose tube,
semi-tight, or release layered fiber remove the 900pm coating
within the last four inches or more from the fiber end to be cleaved.
 Remove the minimum length of the cable outer jacket needed to
prepare and splice fibers.
 Strip 1.5 to 1.75 inches (38mm to 45mm) of plastic coating from
the fiber using a clean mechanical stripper.
 Clean the bare glass by pulling the fiber through an alcohol soaked
lint-free wipe. ( Note: Do not wipe the fibers more than two times,
and limit the time that the bare fiber is exposed to the atmosphere.)
 Cleave the fiber to 12.5mm +/- 0.5mm (0.49+/0.02 inches) for both
250^m and 900^m tight buffer coated fibers. ( Note: Do not clean
fibers again after they have been cleaved or allow cleaved ends to
contact tools.) . ( Note: Cleavers must be in good operating
condition and used per the manufacturer's instructions. They
should provide consistent cleave-to-coating lengths within +/-
0.5mm. Acceptable cleavers will produce cleaved ends within 0.5°
of perpendicular (typical always <1 °), free from major defects.)
 6.0 3M Fibrlok II Splice/Holder Pigtail Assembly
2539APC and 2539 SC/UPC :
 Cut off rubber band, position actuation lever over splice, and lift
both buffer clamps to the "up" position.
 Confirm that buffer on pigtail is fully inserted inside splice and
follow steps 7.2 through 7.9.
 Splice/Holder Assembly 2539 :
 Note: Always insert the fiber first on the right (actuation lever side)
of the splice/holder.
 Holding the fiber approximately V inch (13mm) from the bare glass,
insert cleaved fiber into the guide on the right (actuation leverside)
of the splice/holder until it stops inside the Fibrlok II splice.( Note:
Push fiber straight into the fiber alignment guide, not at an angle.
Bare glass should not be visible outside of the splice. If bare glass
is visible, pull back slightly on the fiber and continue insertion until
resistance is met. Do not fully remove fibers from splice after initial
insertion.)
 Carefully mark the buffer at the right edge of the base.
 Prepare second fiber (strip, clean and cleave) as described in
section 5.
 Holding the fiber approximately V inch (13mm) from the bare glass,
insert second fiber into the guide on the left side (opposite
actuation lever) of the splice/holder until it stops inside the Fibrlok
II splice.
 While sliding the second fiber into the splice, the mark on the first
fiber should move outwards 1/8 inch (3mm) showing the fiber ends
are in contact. If this is not observed, one or both fibers has a
bad/short cleave. Remove one fiber and re-strip, clean, re-cleave
and insert back into the splice. If contact is still not correct, repeat
procedure for second fiber.(Note: To prevent contamination, never
fully remove and re-insert a cleaved end back into a splice without
first re-stripping and re-cleaving.)
 Center both fiber cleaves by repositioning the mark on the first
fiber half way back to its original position.
 Once the fibers are centered, fully close the right buffer clamp. You
will hear an audible snap.
 Grasp the left fiber about 2 inches from the holder and push the
fiber in until it bows about 1/8 to 1/4 inch (3mm to 6mm). Push down
on the actuation lever until the Fibrlok II Splice is actuated. An
audible click can be heard and you should feel the splice cap snap
down into place when completely closed. The cap should be level
with the Fibrlok splice top surface.
 Release the bow in the fiber and fully close the left buffer clamp.
Again, you will hear an audible snap.
Mechanical splice 3 m
 Fiber Repositioning :
 If high loss is observed after the splice has been actuated, it is
possible that the fiber ends are separated. In this case, lift the
splice cap and reposition the fiber ends, as instructed below.
 While the splice is still in the holder assembly, lift the actuation
lever and insert the cap removal tool over the splice cap. Grasp
both sides of the splice holder base and lift the cap up and off the
splice while gently rocking lengthwise. Replace the cap parallel to
the top, but raised about 1mm (0.04 inch) as it snaps into place.
 Carefully reposition fiber. Refer to section 7.0 for proper fiber
centering and splice actuation.
 Place splice cap back on the Fibrlok splice and push down the
actuation lever until cap has been fully actuated.
 If after two attempts, an acceptable splice loss is not obtained,
remove fibers and replace the Fibrlok splice with a new splice.
Redo fiber preparation (section 5) by re-stripping, cleaning, and
cleaving both fibers. Then repeat steps in section 7.
 Upon completion, the actuation lever can be removed and
discarded if desired.

More Related Content

PDF
Urunler
PDF
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...
PDF
Ruisen ®hvic high voltageinsulatorcoating
PDF
ARM Tungsten Coating
PPTX
Failure of composites
PDF
Car Park Protection - Mariseal 250 Flash
PDF
FiloSlim cable repair datasheet
PDF
Agricultural Hose / Farm Hose / Agricultural Tubing / Agricultural Hose Assem...
Urunler
UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontr...
Ruisen ®hvic high voltageinsulatorcoating
ARM Tungsten Coating
Failure of composites
Car Park Protection - Mariseal 250 Flash
FiloSlim cable repair datasheet
Agricultural Hose / Farm Hose / Agricultural Tubing / Agricultural Hose Assem...

What's hot (20)

PDF
321R Application for Bolts
PDF
Soft armor
PDF
FiloSeal+HD FIRE
PDF
uniproducts UNITEX carpet tile ,carpet,wooden flooring All product cataloge
PDF
Korolozyon Kontrol Teknolojileri
PDF
Kammprofile serrated gaskets
PDF
3M Temflex 2155 Rubber Splicing Tape - Rubber Vinyl Insulating Splicing Tape
PDF
RIW Cementjoint Datasheet
PDF
3M Scotchcast Resin - 2131 Flame Retardant & Flexible Resin
PDF
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hose
PDF
A6-Nylon_Film_Handling_Guide_v1
PPT
Dope And Fabric
PDF
Viper Mini MKII - Direct
PPT
Carpet Install and re-install 101
PDF
SMR-110
PDF
orion installation illuminated
PDF
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
PDF
3M - Electrical Tape - Corrosion & Protection, Electrical Insulation, Glass C...
PPTX
Ethylene Expansion Joints
321R Application for Bolts
Soft armor
FiloSeal+HD FIRE
uniproducts UNITEX carpet tile ,carpet,wooden flooring All product cataloge
Korolozyon Kontrol Teknolojileri
Kammprofile serrated gaskets
3M Temflex 2155 Rubber Splicing Tape - Rubber Vinyl Insulating Splicing Tape
RIW Cementjoint Datasheet
3M Scotchcast Resin - 2131 Flame Retardant & Flexible Resin
Eagle Composite Hose - Petroleum Hose - Fluid Transfer hose
A6-Nylon_Film_Handling_Guide_v1
Dope And Fabric
Viper Mini MKII - Direct
Carpet Install and re-install 101
SMR-110
orion installation illuminated
5. Heat Shrink Cable Joint (HV) - 11kV Triplex BS7870 Cables
3M - Electrical Tape - Corrosion & Protection, Electrical Insulation, Glass C...
Ethylene Expansion Joints
Ad

Similar to Mechanical splice 3 m (18)

PDF
VHO-Splice-fusion - CopyCopyCopyCopy.pdf
PDF
A guide for fiber optic terminations, beyondtech
PDF
VHO-Splice-mech - CopyCopyCopyCopy-Copy.pdf
PDF
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
PDF
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
PDF
Birkett Cable Jointing Kits - Jointers Instruction
PDF
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
PDF
soloLAB operation and build maintenance manual
PDF
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
PDF
11kV Heat Shrink Cable Terminations - Prysmian HIT3XC11 3 Core 95-240sqmm 11k...
PDF
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
PDF
Mitsubishi FB16KT Forklift Trucks (Controller) Service Repair Manual SN: EFB4...
PDF
Mitsubishi FB20KT Forklift Trucks (Controller) Service Repair Manual SN: EFB5...
PDF
FTTX Expanding our Reach with Fiber
PDF
Mitsubishi fb18 kt forklift trucks (controller) service repair manual sn efb5...
PDF
Mitsubishi fb16 kt forklift trucks (controller) service repair manual sn efb4...
PDF
Mitsubishi fb20 kt forklift trucks (controller) service repair manual sn efb5...
VHO-Splice-fusion - CopyCopyCopyCopy.pdf
A guide for fiber optic terminations, beyondtech
VHO-Splice-mech - CopyCopyCopyCopy-Copy.pdf
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
Birkett Cable Jointing Kits - Jointers Instruction
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
soloLAB operation and build maintenance manual
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XC11 3 Core 95-240sqmm 11k...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Mitsubishi FB16KT Forklift Trucks (Controller) Service Repair Manual SN: EFB4...
Mitsubishi FB20KT Forklift Trucks (Controller) Service Repair Manual SN: EFB5...
FTTX Expanding our Reach with Fiber
Mitsubishi fb18 kt forklift trucks (controller) service repair manual sn efb5...
Mitsubishi fb16 kt forklift trucks (controller) service repair manual sn efb4...
Mitsubishi fb20 kt forklift trucks (controller) service repair manual sn efb5...
Ad

More from Jiafu fiber optic cable Co., Ltd (20)

PDF
Jft 13-desktop-optical-power-meter-jfopt
PDF
Jft 12-pon-optical-power-meter-jfopt
PDF
Jft 09-handheld-optical-power-meter-jfopt
PDF
Jft 08-handheld-optical-power-meter-jfopt
PDF
Jft 04-handheld-optical-power-meter-jfopt
PDF
Sc apc sm fast connector
PDF
Pm patch cord specification
PDF
Mtp pc-fiber-optic-patch-cord-specification
PDF
Mtp apc-fiber-optic-patch-cord-specification
PDF
Mpo apc fiber optic patch cord specification
PDF
Mode conditioning-patch-cord-specification
PDF
Escon patch-cord-specification
PDF
Lx.5 fiber-optic-patch-cord-specification
PDF
Patch cord-armored-inside-specification
PDF
Optical patch cord st st simplex
PDF
Optical patch cord st fc simplex
PDF
Optical patch cord sc st simplex
PDF
Optical patch cord sc sc simplex
PDF
Optical patch cord sc lc simplex
PDF
Optical patch cord sc fc simplex
Jft 13-desktop-optical-power-meter-jfopt
Jft 12-pon-optical-power-meter-jfopt
Jft 09-handheld-optical-power-meter-jfopt
Jft 08-handheld-optical-power-meter-jfopt
Jft 04-handheld-optical-power-meter-jfopt
Sc apc sm fast connector
Pm patch cord specification
Mtp pc-fiber-optic-patch-cord-specification
Mtp apc-fiber-optic-patch-cord-specification
Mpo apc fiber optic patch cord specification
Mode conditioning-patch-cord-specification
Escon patch-cord-specification
Lx.5 fiber-optic-patch-cord-specification
Patch cord-armored-inside-specification
Optical patch cord st st simplex
Optical patch cord st fc simplex
Optical patch cord sc st simplex
Optical patch cord sc sc simplex
Optical patch cord sc lc simplex
Optical patch cord sc fc simplex

Recently uploaded (20)

PPTX
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
PDF
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
PDF
NEW - FEES STRUCTURES (01-july-2024).pdf
PPTX
Slide gioi thieu VietinBank Quy 2 - 2025
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PPTX
Astra-Investor- business Presentation (1).pptx
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PDF
Daniels 2024 Inclusive, Sustainable Development
PDF
Robin Fischer: A Visionary Leader Making a Difference in Healthcare, One Day ...
PPTX
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
PDF
Keppel_Proposed Divestment of M1 Limited
PDF
Chapter 2 - AI chatbots and prompt engineering.pdf
PPTX
CTG - Business Update 2Q2025 & 6M2025.pptx
PDF
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
DOCX
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
DOCX
FINALS-BSHhchcuvivicucucucucM-Centro.docx
PDF
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
PDF
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
PDF
ICv2 White Paper - Gen Con Trade Day 2025
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
NEW - FEES STRUCTURES (01-july-2024).pdf
Slide gioi thieu VietinBank Quy 2 - 2025
Lecture 3344;;,,(,(((((((((((((((((((((((
Astra-Investor- business Presentation (1).pptx
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
Daniels 2024 Inclusive, Sustainable Development
Robin Fischer: A Visionary Leader Making a Difference in Healthcare, One Day ...
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
Keppel_Proposed Divestment of M1 Limited
Chapter 2 - AI chatbots and prompt engineering.pdf
CTG - Business Update 2Q2025 & 6M2025.pptx
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
Solaris Resources Presentation - Corporate August 2025.pdf
FINALS-BSHhchcuvivicucucucucM-Centro.docx
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
ICv2 White Paper - Gen Con Trade Day 2025

Mechanical splice 3 m

  • 1. market@jfopt.com For detailed inquiry please contact our sales team at: MODEL:Fibrlok™ II Splice/Holder 2539 Instructions Mechanical Splice-3M
  • 2.  General :  The 3M™ Fibrlok™ II Splice/ Holder 2539 enables fast, on-site installation of Fiber-to-the Premises (FTTP) connections with a built-in actuation feature. 3M Fibrlok II Universal Optical Splices provide permanent mechanical splices using either single-mode or multimode 125 ^m fibers with any combination of 250^m and 900^m coating diameters.  All 2529 universal optical fiber splices are gray in color and are marked with 3M Fibrlok II logo on the splice cap.
  • 3.  Safety and Helpful Hints :  Use 99% pure reagent-grade isopropyl alcohol to clean the fibers and other components. When splicing any cable containing grease, ensure that all grease is wiped away and the buffer coating and fiber are thoroughly cleaned with isopropyl alcohol.  Note: Carefully follow safety, health and environmental information on the label or MSDS for isopropyl alcohol. Storage, use and disposal of isopropyl alcohol per your company health, safety and environmental instructions.  CAUTION :  The gel inside the splice may cause minimal eye irritation. Avoid eye contact. Wash hands before eating or smoking. Immediately flush eyes with plenty of water while holding eyelids open. Do not view fiber ends if they are illuminated with a laser.  Carefully follow safety, health and environmental information on 3M Fibrlok II Splice label or Material Safety Data Sheet.  Tools and Materials required :  3M Fibrlok II Splice Holder 2539  Buffer Stripper  Scissors (Snips)  Reagent Grade Isopropyl Alcohol  Lint-free Wipes  Cleaver
  • 4.  Splicing Set-Up :  The splicing area should be clean, dry and well lit. A clean, well organized splicing area will improve splice efficiency and minimize the risk of contamination of fibers or splices.  Open buffer tubes, expose and clean the fibers per your company practice.  Remove the Fibrlok II Splice/Holder from its protective package  Secure the Fibrlok II Splice/Holder 2539  Before proceeding, attach the splice/holder to its final location. If there is not enough space to work, then attach the splice/holder after completing the splice. Clean surface of dirt and debris with alcohol and a lint-free cloth. To attach, remove the 3M VHB ™ (Very High Bond) Tape release liner (red) and press the splice/holder base firmly for several seconds onto the surface of its final location.  Lift the buffer clamps at both ends of the splice/holder and lift the actuation lever to the "up" position
  • 5.  Fiber Preparation :  Note: The 3M Fibrlok II Splice/Holder is designed for 900pm tight buffer and 250pm primary coated fiber. To splice 900pm loose tube, semi-tight, or release layered fiber remove the 900pm coating within the last four inches or more from the fiber end to be cleaved.  Remove the minimum length of the cable outer jacket needed to prepare and splice fibers.  Strip 1.5 to 1.75 inches (38mm to 45mm) of plastic coating from the fiber using a clean mechanical stripper.  Clean the bare glass by pulling the fiber through an alcohol soaked lint-free wipe. ( Note: Do not wipe the fibers more than two times, and limit the time that the bare fiber is exposed to the atmosphere.)  Cleave the fiber to 12.5mm +/- 0.5mm (0.49+/0.02 inches) for both 250^m and 900^m tight buffer coated fibers. ( Note: Do not clean fibers again after they have been cleaved or allow cleaved ends to contact tools.) . ( Note: Cleavers must be in good operating condition and used per the manufacturer's instructions. They should provide consistent cleave-to-coating lengths within +/- 0.5mm. Acceptable cleavers will produce cleaved ends within 0.5° of perpendicular (typical always <1 °), free from major defects.)
  • 6.  6.0 3M Fibrlok II Splice/Holder Pigtail Assembly 2539APC and 2539 SC/UPC :  Cut off rubber band, position actuation lever over splice, and lift both buffer clamps to the "up" position.  Confirm that buffer on pigtail is fully inserted inside splice and follow steps 7.2 through 7.9.  Splice/Holder Assembly 2539 :  Note: Always insert the fiber first on the right (actuation lever side) of the splice/holder.  Holding the fiber approximately V inch (13mm) from the bare glass, insert cleaved fiber into the guide on the right (actuation leverside) of the splice/holder until it stops inside the Fibrlok II splice.( Note: Push fiber straight into the fiber alignment guide, not at an angle. Bare glass should not be visible outside of the splice. If bare glass is visible, pull back slightly on the fiber and continue insertion until resistance is met. Do not fully remove fibers from splice after initial insertion.)  Carefully mark the buffer at the right edge of the base.  Prepare second fiber (strip, clean and cleave) as described in section 5.  Holding the fiber approximately V inch (13mm) from the bare glass, insert second fiber into the guide on the left side (opposite actuation lever) of the splice/holder until it stops inside the Fibrlok II splice.
  • 7.  While sliding the second fiber into the splice, the mark on the first fiber should move outwards 1/8 inch (3mm) showing the fiber ends are in contact. If this is not observed, one or both fibers has a bad/short cleave. Remove one fiber and re-strip, clean, re-cleave and insert back into the splice. If contact is still not correct, repeat procedure for second fiber.(Note: To prevent contamination, never fully remove and re-insert a cleaved end back into a splice without first re-stripping and re-cleaving.)  Center both fiber cleaves by repositioning the mark on the first fiber half way back to its original position.  Once the fibers are centered, fully close the right buffer clamp. You will hear an audible snap.  Grasp the left fiber about 2 inches from the holder and push the fiber in until it bows about 1/8 to 1/4 inch (3mm to 6mm). Push down on the actuation lever until the Fibrlok II Splice is actuated. An audible click can be heard and you should feel the splice cap snap down into place when completely closed. The cap should be level with the Fibrlok splice top surface.  Release the bow in the fiber and fully close the left buffer clamp. Again, you will hear an audible snap.
  • 9.  Fiber Repositioning :  If high loss is observed after the splice has been actuated, it is possible that the fiber ends are separated. In this case, lift the splice cap and reposition the fiber ends, as instructed below.  While the splice is still in the holder assembly, lift the actuation lever and insert the cap removal tool over the splice cap. Grasp both sides of the splice holder base and lift the cap up and off the splice while gently rocking lengthwise. Replace the cap parallel to the top, but raised about 1mm (0.04 inch) as it snaps into place.  Carefully reposition fiber. Refer to section 7.0 for proper fiber centering and splice actuation.  Place splice cap back on the Fibrlok splice and push down the actuation lever until cap has been fully actuated.  If after two attempts, an acceptable splice loss is not obtained, remove fibers and replace the Fibrlok splice with a new splice. Redo fiber preparation (section 5) by re-stripping, cleaning, and cleaving both fibers. Then repeat steps in section 7.  Upon completion, the actuation lever can be removed and discarded if desired.