Continuous miner is a mining machine that produces a constant
flow of coal from the working face of the mine. The machine
continuously extracts as it is loading coal with a cutting steel
drum and conveyor system. The continuous miner has been
available in some form since the late 1800s. The first machine to
resemble a continuous miner was known as the English Channel
Machine.
Continuous miner
 Speed
 Efficiency
 Constant flow of coal
 No blasting
WHY continuous miner?
Cost of production/tonne(SCCL)
Method of working of     continuous miner in underground coal
DIFFERENT TYPES
• Auger head continuous miner
• Borer-type continuous miner
• Drum head type continuous miner
• Oscillating head ripper miner
• Remote-controlled or robotic miner
o Ripper-type continuous miner
Continuous Miner’s parts
Though there are many variations in design, continuous miners mostly consist of five
main elements:
A central body to carry all other components mounted on some type of drive
mechanism to provide mobility (most commonly caterpillar tracks).
 A "cutting head" usually rotating drum(s) and/or chains with cutting picks
attached.
A loading mechanism to pick up cut coal and deliver it into the central part of the
machine.
A conveying system, usually a chain conveyor running in a steel trough from front to
rear of the miner.
A rear jib section capable of a degree of vertical and horizontal movement to enable
the coal to be delivered into a transport or loaded at a desired point.
How it works?
Continuous miners consist of a large rotating drum comprising steel
and tungsten carbide teeth, a material with enough strength to
scrape coal from the seam or face of the mine. Used in room and
pillar mining operations, the mine is often series of rooms, usually
20 to 30 feet (6.1 to 9.1 m) in length. The continuous miner rotates
the oscillating steel drum to cut a way designated sections of the coal
bed. When the coal is extracted, a conveyor system is utilized to
transport and load the coal from the seam.
The most commonly employed type of continuous miner is the milling
head miner .
This type of miner has a rotating drum that rips the coal from the seam.
The fallen coal is then collected by gathering arms and moved toward
the back of the miner by an onboard chain conveyor. This conveyor runs
up an adjustable boom that is used to load a shuttle car, which
carries the coal to the main belt. A typical system uses two shuttle cars
traveling sequentially between the continuous miner and the loading
point on to a belt conveyor.
Method of working of     continuous miner in underground coal
.3
Technical parameters
•Depth-can be used for greater depths (more than 300).
• Gradient-1 in 4.
• Floor Pressure or Ground Pressure-varies from 0.11 MPa (16 Psi) to 0.22 MPa
(32 Psi).
• Cut out Distance –depends on geo mining condition . For CMRI RMR 48,the cut
out dist.- 12 m, and for 62 it is 15 m.
• Number of Entries-generally 5 entries panels are preffered.
• Angle between entries and crosscuts –depends on machinery.
Operational parameters
• Floor Condition
• Watery condition
• Cables handling & Equipment Rerouting
• Damage of Cables & Tyres.
• Bolter & Miner Compatibility
• Fire problem
• Ventilation
• Roadway Maintenance
• Extraction of Developed Pillars
Method of working of     continuous miner in underground coal
Method of working of     continuous miner in underground coal
Common manufactures
• Bucyrus International
•
• Joy Mining Machinery
•
• Siemens
•
• Sandvik
•
• Eickhoff
Advantages
•Continuous Miner can extract the coal to full seam
thickness of 4.5m to 5.0m in a single lift.
•Strata control problems can be minimized by avoiding
blasting operations as the depth is increasing 350m and
more.
• It gives higher production rates.
• Remote operation leads to safety.
• Risk of spontaneous heating can be reduced due to faster
rate of extraction.
• Moderate Capital cost when compared to Longwall
mining.
Content of study
 Production
 Problems
 Performance
 Cost analysis and
 conclusion
WORKING WITH CONTINUOUS
MINER AT GDK-11 INCLINE / RAMAGUNDAM-
A CASE STUDY(AT PANEL B1,B2 AND B3)
Method of working of     continuous miner in underground coal
Method of working of     continuous miner in underground coal
Method of working of     continuous miner in underground coal
PROBLEMS SOLUTIONS
1. While working with Continuous Miner
and Roof Bolter, appox. 30 GPM of water
is consumed, which is damaging the floor
causing slush and resulting in skidding
and jamming of the machinery at
junctions.
Ditches made at every junction and water
is diverted into that ditches. Bucket
pumps installed to pump out the water.
2. Soft coal floor getting broken away due
to heavy weight of machinery
CM : 72 T
Roof Bolter : 30.513 T
Ram Car : 25 T (without load)
Ram Car : 40 T (with load)
Instead of air fill tyres foam filled tyres
were introduced and also applied chains
to the tyres.
3. Ram cars / Continuous Miner jamming
in slush, sometimes causing more delay.
Installed the Feeder Breaker at the
junction due to which the Ram cars can
unload from three directions. This
arrangement successfully prevented
bogging down of the Ram cars at the
junctions.
PROBLEMS & SOLUTIONS IMPLEMENTED WHICH
RESULTED IN HIGHER PRODUCTION FROM B2 PANEL
CONTINUE….
4. Problem at B1 panel.
a. Two faults occurred at B1 panel,
which deteriorated the roof
condition.
b. Blogging of ram car and CM at
floor.
a. Cut out distance reduced from 3 to
4m.
5.Problems at B2 panel.
a. The problems are almost the same as
B1 Panel (roof & floor problems).
A . Most of the falls have occurred only
in dip galleries.
B . Due to the above, it was decided to re
orient the dip galleries since the level
galleries were found to be stable.
C . After reorientation of dip galleries,
the roof was stable and the cut out
distance could be increased from 4m to
about 12m.
D . At present the strata problems are
reduced.
6. Mis-Match of CM and Roof bolter.
 The production in B1 panel from 02.01.2009 to 22.01.2009 is 4279 Tonnes
only at an average of 183 Tonnes / day.
 The production in the Continuous Miner district has increased from 9000
tonnes to 31000 tonnes / month with an average daily production 1100
tonnes.
 The Continuous Miner was idle many times for want of supported roof.
 Mis– match of Continuous Miner and Dual Boom roof bolter during
development. (CM idle at least 6 hours in a day).
PERFORMANCE OF CONTINUOUS MINER
 During the year 2010 – 2011, 81,341 tonnes of production was
achieved against the targeted 1, 04,000 tonnes.
 Up to June 2010 Rs. 13.80 Crores Capital expenditure has
been incurred on Continuous Miner Technology.
COST ANALYSIS
The details of different cost components
and profit earned are as follows:-
DESRCIPTION AMOUNT IN RS.LAKH
WAGES 373.85
STORES 172.98
POWER 45.14
OTHER EXPENSES 537.82
DEPRICIATION 163.97
OPERATIONAL COST 1293.77
WORKSHOP 18.46
AREA OVER HEADS 67.02
TOTAL COST OF
PRODUCTION
1379.25
SALES REALIZATION 1404.09
PROFIT/LOSS 24.84
CONTINUED….
 The experience gained in working the three panels – B1, B2
& B3, would be very useful in future, in successful extraction
with CM technology.
 After reorientation of dip galleries there is an increasing
trend in production.
CONCLUSION
THANK YOU

More Related Content

PPT
CONTINUOUS MINERS
PPT
Continuous miner
PPT
Development and depillaring with continuous miner
PDF
First Aid Training
PPT
types and properties of salts
PPTX
Shuttle car
PDF
Techniques of Controlled Blasting
PPTX
Tunneling
CONTINUOUS MINERS
Continuous miner
Development and depillaring with continuous miner
First Aid Training
types and properties of salts
Shuttle car
Techniques of Controlled Blasting
Tunneling

What's hot (20)

PPTX
Transportation in underground mines
PDF
Haulage system in Mines
PPTX
Bord and pillar working with LHD/SDL
PPTX
Blasting Gallery Method
PPTX
Bucket wheel excavator ppt
PDF
Side discharge loader
PPTX
The productivity of lhd in underground coal mines
PDF
Highwall mining – a new approach in india
PDF
Selection of longwall powered roof support
PPTX
Longwall mining
PPTX
Shovel and Dumper Combinatio by Auqib Javed.pptx
PPTX
Road Header and Bolter Miner
PPT
Underground metal mining methods
PPTX
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
PDF
Differnt technologies in oc mines
PDF
Oc mechanical excavation
DOCX
Mining Machinery Learning Material for DEegree and Diploma
PDF
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
PPTX
Mine machinery - Wire ropes
PDF
Surface miner
Transportation in underground mines
Haulage system in Mines
Bord and pillar working with LHD/SDL
Blasting Gallery Method
Bucket wheel excavator ppt
Side discharge loader
The productivity of lhd in underground coal mines
Highwall mining – a new approach in india
Selection of longwall powered roof support
Longwall mining
Shovel and Dumper Combinatio by Auqib Javed.pptx
Road Header and Bolter Miner
Underground metal mining methods
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Differnt technologies in oc mines
Oc mechanical excavation
Mining Machinery Learning Material for DEegree and Diploma
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
Mine machinery - Wire ropes
Surface miner
Ad

Similar to Method of working of continuous miner in underground coal (20)

DOCX
ppt- shiva major (old).docx method of working of continuous miner
PDF
Design and Performance of Highwall Mining
PPTX
Coal Lectures Series Mining Technology
PPTX
Coal Lectures Series Mining Technology Presentation
PPTX
Presentation on Highwall Mining
PPTX
highwall mining technologybnjdfyfgaewfhqewfqewf
PPTX
Continuous miner
PPT
Advanced Automation and Technology in Coal Handling Plants
PPTX
Thin seam mining
PDF
Underground Coal Mining Study
DOCX
report for tunnelling by tunnel boring machine
PPTX
Ankittttttttttttttttttttttt.pptx
PPTX
Tunnel boring machine
PPTX
Extending Open Cast Mine to Underground Mine Planning
PPTX
Develpoment and extraction of coal pillar by continuous
PPTX
Conventional shaft sinking by manual means
DOCX
DOCX
DMC piling
PDF
Tunnel PDF.pdf
ppt- shiva major (old).docx method of working of continuous miner
Design and Performance of Highwall Mining
Coal Lectures Series Mining Technology
Coal Lectures Series Mining Technology Presentation
Presentation on Highwall Mining
highwall mining technologybnjdfyfgaewfhqewfqewf
Continuous miner
Advanced Automation and Technology in Coal Handling Plants
Thin seam mining
Underground Coal Mining Study
report for tunnelling by tunnel boring machine
Ankittttttttttttttttttttttt.pptx
Tunnel boring machine
Extending Open Cast Mine to Underground Mine Planning
Develpoment and extraction of coal pillar by continuous
Conventional shaft sinking by manual means
DMC piling
Tunnel PDF.pdf
Ad

More from Safdar Ali (20)

PPT
Safety in mines
PPT
Explosives and accesories
PPTX
Role of management information systems in a mine.
PPTX
Basting
PPT
Pre requisites of marine operations
PPTX
Nuclear devices for mining
PPTX
Mining of manganese nodules from sea floor
PPTX
Mine water risk in open pit slope stability
PPT
Innovations and trend in metal mining & tunnellng
PPT
Lighting terminlologyand their units
PPTX
Evaluation of slope stability for waste rock dumps in a mine
PPTX
Final grouting freezing
PPTX
Digitization and 3d modelling of a mine plan
PPTX
Variety of mine plans and sections & second schedule
PPTX
Statutory provisions for the preaparation of mine plans and sections
PPT
Gps & its applications in opencast mine surveying
PPTX
Laser and its mining applications
PPTX
Gyrotheodolite
PPTX
PPTX
Safety in mines
Explosives and accesories
Role of management information systems in a mine.
Basting
Pre requisites of marine operations
Nuclear devices for mining
Mining of manganese nodules from sea floor
Mine water risk in open pit slope stability
Innovations and trend in metal mining & tunnellng
Lighting terminlologyand their units
Evaluation of slope stability for waste rock dumps in a mine
Final grouting freezing
Digitization and 3d modelling of a mine plan
Variety of mine plans and sections & second schedule
Statutory provisions for the preaparation of mine plans and sections
Gps & its applications in opencast mine surveying
Laser and its mining applications
Gyrotheodolite

Recently uploaded (20)

PDF
RMMM.pdf make it easy to upload and study
PPTX
PPH.pptx obstetrics and gynecology in nursing
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
102 student loan defaulters named and shamed – Is someone you know on the list?
PDF
01-Introduction-to-Information-Management.pdf
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
Basic Mud Logging Guide for educational purpose
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Cell Structure & Organelles in detailed.
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PDF
Microbial disease of the cardiovascular and lymphatic systems
PDF
Insiders guide to clinical Medicine.pdf
PDF
TR - Agricultural Crops Production NC III.pdf
PPTX
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PDF
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
RMMM.pdf make it easy to upload and study
PPH.pptx obstetrics and gynecology in nursing
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
Pharmacology of Heart Failure /Pharmacotherapy of CHF
102 student loan defaulters named and shamed – Is someone you know on the list?
01-Introduction-to-Information-Management.pdf
STATICS OF THE RIGID BODIES Hibbelers.pdf
Basic Mud Logging Guide for educational purpose
Final Presentation General Medicine 03-08-2024.pptx
Cell Structure & Organelles in detailed.
human mycosis Human fungal infections are called human mycosis..pptx
O5-L3 Freight Transport Ops (International) V1.pdf
Microbial disease of the cardiovascular and lymphatic systems
Insiders guide to clinical Medicine.pdf
TR - Agricultural Crops Production NC III.pdf
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf

Method of working of continuous miner in underground coal

  • 2. Topic –Method of working of continuous miner in underground coal.
  • 3. Continuous miner is a mining machine that produces a constant flow of coal from the working face of the mine. The machine continuously extracts as it is loading coal with a cutting steel drum and conveyor system. The continuous miner has been available in some form since the late 1800s. The first machine to resemble a continuous miner was known as the English Channel Machine. Continuous miner
  • 4.  Speed  Efficiency  Constant flow of coal  No blasting WHY continuous miner?
  • 7. DIFFERENT TYPES • Auger head continuous miner • Borer-type continuous miner • Drum head type continuous miner • Oscillating head ripper miner • Remote-controlled or robotic miner o Ripper-type continuous miner
  • 8. Continuous Miner’s parts Though there are many variations in design, continuous miners mostly consist of five main elements: A central body to carry all other components mounted on some type of drive mechanism to provide mobility (most commonly caterpillar tracks).  A "cutting head" usually rotating drum(s) and/or chains with cutting picks attached. A loading mechanism to pick up cut coal and deliver it into the central part of the machine. A conveying system, usually a chain conveyor running in a steel trough from front to rear of the miner. A rear jib section capable of a degree of vertical and horizontal movement to enable the coal to be delivered into a transport or loaded at a desired point.
  • 9. How it works? Continuous miners consist of a large rotating drum comprising steel and tungsten carbide teeth, a material with enough strength to scrape coal from the seam or face of the mine. Used in room and pillar mining operations, the mine is often series of rooms, usually 20 to 30 feet (6.1 to 9.1 m) in length. The continuous miner rotates the oscillating steel drum to cut a way designated sections of the coal bed. When the coal is extracted, a conveyor system is utilized to transport and load the coal from the seam.
  • 10. The most commonly employed type of continuous miner is the milling head miner . This type of miner has a rotating drum that rips the coal from the seam. The fallen coal is then collected by gathering arms and moved toward the back of the miner by an onboard chain conveyor. This conveyor runs up an adjustable boom that is used to load a shuttle car, which carries the coal to the main belt. A typical system uses two shuttle cars traveling sequentially between the continuous miner and the loading point on to a belt conveyor.
  • 12. .3
  • 13. Technical parameters •Depth-can be used for greater depths (more than 300). • Gradient-1 in 4. • Floor Pressure or Ground Pressure-varies from 0.11 MPa (16 Psi) to 0.22 MPa (32 Psi). • Cut out Distance –depends on geo mining condition . For CMRI RMR 48,the cut out dist.- 12 m, and for 62 it is 15 m. • Number of Entries-generally 5 entries panels are preffered. • Angle between entries and crosscuts –depends on machinery.
  • 14. Operational parameters • Floor Condition • Watery condition • Cables handling & Equipment Rerouting • Damage of Cables & Tyres. • Bolter & Miner Compatibility • Fire problem • Ventilation • Roadway Maintenance • Extraction of Developed Pillars
  • 17. Common manufactures • Bucyrus International • • Joy Mining Machinery • • Siemens • • Sandvik • • Eickhoff
  • 18. Advantages •Continuous Miner can extract the coal to full seam thickness of 4.5m to 5.0m in a single lift. •Strata control problems can be minimized by avoiding blasting operations as the depth is increasing 350m and more. • It gives higher production rates. • Remote operation leads to safety. • Risk of spontaneous heating can be reduced due to faster rate of extraction. • Moderate Capital cost when compared to Longwall mining.
  • 19. Content of study  Production  Problems  Performance  Cost analysis and  conclusion WORKING WITH CONTINUOUS MINER AT GDK-11 INCLINE / RAMAGUNDAM- A CASE STUDY(AT PANEL B1,B2 AND B3)
  • 23. PROBLEMS SOLUTIONS 1. While working with Continuous Miner and Roof Bolter, appox. 30 GPM of water is consumed, which is damaging the floor causing slush and resulting in skidding and jamming of the machinery at junctions. Ditches made at every junction and water is diverted into that ditches. Bucket pumps installed to pump out the water. 2. Soft coal floor getting broken away due to heavy weight of machinery CM : 72 T Roof Bolter : 30.513 T Ram Car : 25 T (without load) Ram Car : 40 T (with load) Instead of air fill tyres foam filled tyres were introduced and also applied chains to the tyres. 3. Ram cars / Continuous Miner jamming in slush, sometimes causing more delay. Installed the Feeder Breaker at the junction due to which the Ram cars can unload from three directions. This arrangement successfully prevented bogging down of the Ram cars at the junctions. PROBLEMS & SOLUTIONS IMPLEMENTED WHICH RESULTED IN HIGHER PRODUCTION FROM B2 PANEL
  • 24. CONTINUE…. 4. Problem at B1 panel. a. Two faults occurred at B1 panel, which deteriorated the roof condition. b. Blogging of ram car and CM at floor. a. Cut out distance reduced from 3 to 4m. 5.Problems at B2 panel. a. The problems are almost the same as B1 Panel (roof & floor problems). A . Most of the falls have occurred only in dip galleries. B . Due to the above, it was decided to re orient the dip galleries since the level galleries were found to be stable. C . After reorientation of dip galleries, the roof was stable and the cut out distance could be increased from 4m to about 12m. D . At present the strata problems are reduced. 6. Mis-Match of CM and Roof bolter.
  • 25.  The production in B1 panel from 02.01.2009 to 22.01.2009 is 4279 Tonnes only at an average of 183 Tonnes / day.  The production in the Continuous Miner district has increased from 9000 tonnes to 31000 tonnes / month with an average daily production 1100 tonnes.  The Continuous Miner was idle many times for want of supported roof.  Mis– match of Continuous Miner and Dual Boom roof bolter during development. (CM idle at least 6 hours in a day). PERFORMANCE OF CONTINUOUS MINER
  • 26.  During the year 2010 – 2011, 81,341 tonnes of production was achieved against the targeted 1, 04,000 tonnes.  Up to June 2010 Rs. 13.80 Crores Capital expenditure has been incurred on Continuous Miner Technology. COST ANALYSIS
  • 27. The details of different cost components and profit earned are as follows:- DESRCIPTION AMOUNT IN RS.LAKH WAGES 373.85 STORES 172.98 POWER 45.14 OTHER EXPENSES 537.82 DEPRICIATION 163.97 OPERATIONAL COST 1293.77
  • 28. WORKSHOP 18.46 AREA OVER HEADS 67.02 TOTAL COST OF PRODUCTION 1379.25 SALES REALIZATION 1404.09 PROFIT/LOSS 24.84 CONTINUED….
  • 29.  The experience gained in working the three panels – B1, B2 & B3, would be very useful in future, in successful extraction with CM technology.  After reorientation of dip galleries there is an increasing trend in production. CONCLUSION