Performance Verification Packet

                               Industrial Millwright V3




This performance verification is designed as one method to evaluate job skills and safe work habits of a participant. The
performance of the participant must be evaluated by an NCCER certified evaluator, at an NCCER authorized assessment
site and be approved by an NCCER accredited assessment center. For a Certified Plus credential, the version of the
assessment and performance verification must be the same.




                                       Last Updated: September 2009
                            National Center for Construction Education and Research
                                         rd
                             3600 NW 43 Street , Bldg. G • Gainesville, FL 32606
                                Telephone 352.334.0911 • Fax 352.334.0929
NCCER PERFORMANCE VERIFICATION HOW TO SHEET
                                                    INDUSTRIAL MILLWRIGHT V3


Participant

      1) Print your last name, first name, and social security number.
      2) Print your company name, current employer, and the state where your employer’s main
         office is located.
      3) In the space provided for “Participant Signature,” sign your name and enter the date you
         signed the form.


Performance Evaluator

      1) In the space provided for “Site Code,” enter the postal zip code of the location where the
         performance verification is being conducted.
      2) In the column provided for “Date,” enter the date the participant completed each of the
         tasks. This date is important because there may be times a participant does not complete
         the performance verification in one day.
      3) In the space provided for “Performance Evaluator,” sign your name.
      4) In the space provided for “Date,” next to your signature, list the date the participant
         successfully completed all of the tasks.

Administrator

      1) In the space provided for “Administrator,” sign your name. Your signature indicates that
         the performance evaluator is certified to conduct this performance verification and that it
         was conducted within the guidelines of the NCCER. Do not use a signature stamp.
      2) In the space provided for “Date”, next to your signature, list the date that this
         performance verification form is being sent to the NCCER for entry into the National
         Registry.
      3) In the space provided for “Accredited Assessment Center,” print the name of the
         accredited assessment center that is conducting this performance verification.




                                    Last Updated: September 2009
                         National Center for Construction Education and Research
                                      rd
                          3600 NW 43 Street , Bldg. G • Gainesville, FL 32606
                             Telephone 352.334.0911 • Fax 352.334.0929
NCCER PERFORMANCE VERIFICATION EVALUATOR CHECKLIST
                                              INDUSTRIAL MILLWRIGHT V3
Date
Completed       Task To Perform
__-__-__    1. Remove pump from casing
                •   Checked impeller condition
                •   Checked shaft and seal


__-__-__    2. Remove impeller backplate and seal
                •   Checked shaft run out
                •   Checked for seal failure
                •   Inspected back plate


__-__-__    3. Disassemble bearing housing
                •   Inspected shaft
                •   Checked for proper fit


__-__-__    4. Install shaft and bearings into housing
                •   Checked and verified proper fit
                •   Made sure all secondary seals, O-rings, etc., are in place

__-__-__    5. Install pump in casing
                •   Verified impeller clearance
                •   Verified seal setting after impeller clearance
                •   Proper specifications were met during installation




                            Last Updated: September 2009
               National Center for Construction Education and Research
                           rd
               36 00 NW 43    Street, Bldg. G• Gainesville, Florida 32606
                       Phone 352.334.0911 • Fax 352.334.0929
NCCER PERFORMANCE VERIFICATION CANDIDATE SUMMARY
                                                     INDUSTRIAL MILLWRIGHT V3
Objective
        The candidate will demonstrate the ability to remove, inspect, disassemble, rebuild, install and align a
        pump and record necessary information.
Scope
        This Performance Verification provides a means to observe and evaluate competencies in the
        following areas:
        • Removing pump from casing
        • Removing impeller back plate and seal
        • Disassembly of bearing housing
        • Installation of shafts and bearings into housing
        • Installation of a pump into casing

Materials Required
        •   PPE                                                     •   Machinist level
        •   Wrenches (combination)                                  •   Optical level
        •   Rigging equipment (i.e., sling,                         •   Shims (hard pack and precision shims)
            shackles, hoist, etc.)                                  •   Hand held mirror
        •   Pullers                                                 •   Dial indicators with chain or reverse
        •   Induction heater                                            alignment brackets
        •   250-degree temp-stick                                   •   Laser
        •   Various coupling types                                  •   Brass punch
        •   Emery cloth or Scotchbrite                              •   Pump Installed in Casing
        •   Flat file                                               •   Proper Measurement Tools
        •   Various bearing types                                   •   Pump Specification Sheet
        •   Allen wrenches                                          •   Hand / Power Tools
        •   Foundation and baseplates

Time Required
        Based on Job Site specifications and equipment

Tasks
•  Remove pump from casing
       Check condition
       Check shaft and seal
• Remove impeller backplate and seal
       Check shaft
       Check seal
Disassemble bearing housing
       Inspect shaft
       Check for proper fit
• Install shaft and bearings in housing
       Check for proper fit
       Make sure all secondary seals, O-rings, etc., are in place
• Install pump in casing
       Verify proper clearances

                                Last Updated: September 2009
                   National Center for Construction Education and Research
                               rd
                   36 00 NW 43    Street, Bldg. G• Gainesville, Florida 32606
                           Phone 352.334.0911 • Fax 352.334.0929
NCCER PERFORMANCE VERIFICATION SUBMISSION FORM
                                                                               INDUSTRIAL MILLWRIGHT V3
                                                                                  PVMLWR15_03 CRAFT



   Candidate information


   Last Name                                           First Name                    Social Security Number



   Employer/Company Name                               State                         Site Code

   Evaluator


   Last Name                                           First Name                    Social Security Number

   TASK        TASK                                                               DATE           START        END
  NUMBER                                                                        (MM/DD/YY)        TIME        TIME
     01        Remove pump from casing (15404-08)
       02      Remove impeller backplate and seal (15304-08)
       03      Disassemble bearing housing (15306-08)
       04      Install shaft and bearings in housing (15306-08)
       05      Install pump in casing (15405-08)




Consent/Release: I, the undersigned, do hereby authorize the National Center for Construction Education and
                 Research (NCCER) to release the information and results attained through the administration of
                 the National Craft Assessment and Certification Program (NCACP) to the organization
                 referenced below, and acknowledge that the employer noted above is my present employer.



Accredited Assessment Center: ___________________

Participant:                                                                        Date:

Performance Evaluator:                                                              Date:

Primary Administrator:                                                              Date:




                                   Last Updated: September 2009
                                      Return Completed Form To:
                                            NCCER Registry
                         36 00 NW 43rd St. Bldg . G • Gai nes vill e, Flor ida 32606
                                    Phone 352-334-0911 • Fax 352-334-0929

More Related Content

PDF
Complete Services Package Emailable
PDF
Nccer Millwright
PPTX
Millwright Local 1755: Who We Are
DOC
Qualified Millwright
PDF
Triangle Chart
PPT
Millwright Local 1755 Presentation
PDF
Tool Box Training-Operator Care
PDF
Tool Box Talk - World Class Maintenance Edited
Complete Services Package Emailable
Nccer Millwright
Millwright Local 1755: Who We Are
Qualified Millwright
Triangle Chart
Millwright Local 1755 Presentation
Tool Box Training-Operator Care
Tool Box Talk - World Class Maintenance Edited

Similar to Millwright Entire Packet (20)

PDF
2011 Maintenance and Reliability Workshop
PDF
Chris Resume II
DOCX
Resumes_20160910225901
PPT
Amist Luzerne County Community College
PPSX
NACFM Preventative Maintenance for Facilities Managers
PDF
8 Steps To Success In Maintenance Planning And Scheduling
PPTX
Electrical Installation and Maintenance NC II
PDF
Breaking down the barriers to effective maintenance | plant engineering
DOCX
Resume dave
PPTX
Dover 9th Reinventing Maint - Developing a Lean Maintenance Strategy
PPTX
Scma champ update 7.1.14
DOCX
Resume for Joshua Miller 1
PDF
TMEI Services and Case Studies-References 01232010
DOCX
Michael Carlin's Resume for the internet
DOC
Brian_sResume1
PDF
Tpm conference pdf_2010
PDF
Machine _Operator Resume
DOCX
wordresume
PDF
Tool Box Talk - Maintenance Wrench Time
DOC
VinceResume2016.7
2011 Maintenance and Reliability Workshop
Chris Resume II
Resumes_20160910225901
Amist Luzerne County Community College
NACFM Preventative Maintenance for Facilities Managers
8 Steps To Success In Maintenance Planning And Scheduling
Electrical Installation and Maintenance NC II
Breaking down the barriers to effective maintenance | plant engineering
Resume dave
Dover 9th Reinventing Maint - Developing a Lean Maintenance Strategy
Scma champ update 7.1.14
Resume for Joshua Miller 1
TMEI Services and Case Studies-References 01232010
Michael Carlin's Resume for the internet
Brian_sResume1
Tpm conference pdf_2010
Machine _Operator Resume
wordresume
Tool Box Talk - Maintenance Wrench Time
VinceResume2016.7
Ad

More from AmericanMillwright (20)

PDF
Steam Turbinesforcombinedcycle
PDF
10 Inch Diameter
PDF
How To Use A Transit Final2
PDF
Ge Steam Turbinesfor Industrial
PDF
Ge Steam Turbine Products
PDF
Inch To Millimeter Conversion Table
PDF
Layout Basics I Ne
PDF
Metric & Inch Equivalent
PDF
Millimeter Tap Drill Sizes
PDF
Millimeter To Inch Conversion Table
PDF
Siemens1000 Mw
PDF
Siemens Fuel Gasifier
PDF
Siemens Gas Turbine4000 F
PDF
PDF
Ge Combined Cycle
PDF
Easy Laser Shaft Alignment Worksheet
PDF
Decimal Equivalents Of Number Size Drills
PDF
Carbon Capture
PDF
Compressor Valves
PDF
Coal Reburning
Steam Turbinesforcombinedcycle
10 Inch Diameter
How To Use A Transit Final2
Ge Steam Turbinesfor Industrial
Ge Steam Turbine Products
Inch To Millimeter Conversion Table
Layout Basics I Ne
Metric & Inch Equivalent
Millimeter Tap Drill Sizes
Millimeter To Inch Conversion Table
Siemens1000 Mw
Siemens Fuel Gasifier
Siemens Gas Turbine4000 F
Ge Combined Cycle
Easy Laser Shaft Alignment Worksheet
Decimal Equivalents Of Number Size Drills
Carbon Capture
Compressor Valves
Coal Reburning
Ad

Millwright Entire Packet

  • 1. Performance Verification Packet Industrial Millwright V3 This performance verification is designed as one method to evaluate job skills and safe work habits of a participant. The performance of the participant must be evaluated by an NCCER certified evaluator, at an NCCER authorized assessment site and be approved by an NCCER accredited assessment center. For a Certified Plus credential, the version of the assessment and performance verification must be the same. Last Updated: September 2009 National Center for Construction Education and Research rd 3600 NW 43 Street , Bldg. G • Gainesville, FL 32606 Telephone 352.334.0911 • Fax 352.334.0929
  • 2. NCCER PERFORMANCE VERIFICATION HOW TO SHEET INDUSTRIAL MILLWRIGHT V3 Participant 1) Print your last name, first name, and social security number. 2) Print your company name, current employer, and the state where your employer’s main office is located. 3) In the space provided for “Participant Signature,” sign your name and enter the date you signed the form. Performance Evaluator 1) In the space provided for “Site Code,” enter the postal zip code of the location where the performance verification is being conducted. 2) In the column provided for “Date,” enter the date the participant completed each of the tasks. This date is important because there may be times a participant does not complete the performance verification in one day. 3) In the space provided for “Performance Evaluator,” sign your name. 4) In the space provided for “Date,” next to your signature, list the date the participant successfully completed all of the tasks. Administrator 1) In the space provided for “Administrator,” sign your name. Your signature indicates that the performance evaluator is certified to conduct this performance verification and that it was conducted within the guidelines of the NCCER. Do not use a signature stamp. 2) In the space provided for “Date”, next to your signature, list the date that this performance verification form is being sent to the NCCER for entry into the National Registry. 3) In the space provided for “Accredited Assessment Center,” print the name of the accredited assessment center that is conducting this performance verification. Last Updated: September 2009 National Center for Construction Education and Research rd 3600 NW 43 Street , Bldg. G • Gainesville, FL 32606 Telephone 352.334.0911 • Fax 352.334.0929
  • 3. NCCER PERFORMANCE VERIFICATION EVALUATOR CHECKLIST INDUSTRIAL MILLWRIGHT V3 Date Completed Task To Perform __-__-__ 1. Remove pump from casing • Checked impeller condition • Checked shaft and seal __-__-__ 2. Remove impeller backplate and seal • Checked shaft run out • Checked for seal failure • Inspected back plate __-__-__ 3. Disassemble bearing housing • Inspected shaft • Checked for proper fit __-__-__ 4. Install shaft and bearings into housing • Checked and verified proper fit • Made sure all secondary seals, O-rings, etc., are in place __-__-__ 5. Install pump in casing • Verified impeller clearance • Verified seal setting after impeller clearance • Proper specifications were met during installation Last Updated: September 2009 National Center for Construction Education and Research rd 36 00 NW 43 Street, Bldg. G• Gainesville, Florida 32606 Phone 352.334.0911 • Fax 352.334.0929
  • 4. NCCER PERFORMANCE VERIFICATION CANDIDATE SUMMARY INDUSTRIAL MILLWRIGHT V3 Objective The candidate will demonstrate the ability to remove, inspect, disassemble, rebuild, install and align a pump and record necessary information. Scope This Performance Verification provides a means to observe and evaluate competencies in the following areas: • Removing pump from casing • Removing impeller back plate and seal • Disassembly of bearing housing • Installation of shafts and bearings into housing • Installation of a pump into casing Materials Required • PPE • Machinist level • Wrenches (combination) • Optical level • Rigging equipment (i.e., sling, • Shims (hard pack and precision shims) shackles, hoist, etc.) • Hand held mirror • Pullers • Dial indicators with chain or reverse • Induction heater alignment brackets • 250-degree temp-stick • Laser • Various coupling types • Brass punch • Emery cloth or Scotchbrite • Pump Installed in Casing • Flat file • Proper Measurement Tools • Various bearing types • Pump Specification Sheet • Allen wrenches • Hand / Power Tools • Foundation and baseplates Time Required Based on Job Site specifications and equipment Tasks • Remove pump from casing Check condition Check shaft and seal • Remove impeller backplate and seal Check shaft Check seal Disassemble bearing housing Inspect shaft Check for proper fit • Install shaft and bearings in housing Check for proper fit Make sure all secondary seals, O-rings, etc., are in place • Install pump in casing Verify proper clearances Last Updated: September 2009 National Center for Construction Education and Research rd 36 00 NW 43 Street, Bldg. G• Gainesville, Florida 32606 Phone 352.334.0911 • Fax 352.334.0929
  • 5. NCCER PERFORMANCE VERIFICATION SUBMISSION FORM INDUSTRIAL MILLWRIGHT V3 PVMLWR15_03 CRAFT Candidate information Last Name First Name Social Security Number Employer/Company Name State Site Code Evaluator Last Name First Name Social Security Number TASK TASK DATE START END NUMBER (MM/DD/YY) TIME TIME 01 Remove pump from casing (15404-08) 02 Remove impeller backplate and seal (15304-08) 03 Disassemble bearing housing (15306-08) 04 Install shaft and bearings in housing (15306-08) 05 Install pump in casing (15405-08) Consent/Release: I, the undersigned, do hereby authorize the National Center for Construction Education and Research (NCCER) to release the information and results attained through the administration of the National Craft Assessment and Certification Program (NCACP) to the organization referenced below, and acknowledge that the employer noted above is my present employer. Accredited Assessment Center: ___________________ Participant: Date: Performance Evaluator: Date: Primary Administrator: Date: Last Updated: September 2009 Return Completed Form To: NCCER Registry 36 00 NW 43rd St. Bldg . G • Gai nes vill e, Flor ida 32606 Phone 352-334-0911 • Fax 352-334-0929