SlideShare a Scribd company logo
Modelling extreme conditions for
wave overtopping at Weymouth
Oliver Way
Project summary
• This study has been produced for Weymouth and Portland Borough
Council utilising the Environment Agency’s Water and Environment
Management (WEM) Framework. It forms part of a wider scope of
work, Weymouth Bay Coastal Processes Study, that includes the
following elements:
• Wave and tide modelling
• Wave overtopping analysis, flood modelling and flood
mapping
• Geomorphology review and cliff erosion assessment
• Flood defence option appraisals
• Gathering of environmental information
Wave model set up
• MIKE21 SW was used to investigate the nearshore wave conditions at
Weymouth Bay under extreme wave and water level boundary conditions.
Boundary conditions
• Extreme water level data: Environment Agency for Weymouth from the
Coastal flood boundary conditions for UK mainland and islands report
(Environment Agency, 2012).
• Extreme wave data: also from Environment Agency report at offshore
locations on the model boundary. Extreme wave conditions were
considered for three directional sectors: south west, south and south east.
Wave data format
• Swell and resultant wave data available
– Hs
– Tz
DIRECTIONS T1 T2 T5 T10 T20 T25 T50 T75 T100 T150 T200 T250 T300 T500 T1000
NORTH N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
NORTHEAST N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
SOUTHEAST 2.34 2.51 2.69 2.81 2.91 2.94 3.02 3.06 3.09 3.13 3.15 3.17 3.19 3.22 3.27
SOUTH 2.86 3.16 3.48 3.67 3.83 3.87 3.99 4.05 4.09 4.14 4.18 4.2 4.22 4.27 4.32
SOUTHWEST 3.61 3.82 4.07 4.24 4.4 4.45 4.59 4.67 4.72 4.79 4.84 4.88 4.91 4.99 5.09
NORTHWEST 1.91 2.15 2.37 2.48 2.57 2.59 2.65 2.67 2.69 2.71 2.72 2.73 2.73 2.75 2.76
Water level data format
Return period Water level Confidence
1 1.77 0.1
2 1.84 0.1
5 1.93 0.1
10 1.99 0.1
20 2.05 0.1
25 2.07 0.1
50 2.14 0.1
75 2.17 0.1
100 2.20 0.2
150 2.23 0.2
200 2.26 0.2
250 2.28 0.2
300 2.29 0.2
500 2.34 0.2
1000 2.40 0.3
10000 2.59 0.3
Sea level rise
• An adjustment for sea level rise to the extreme water levels was applied to
account for potential future coastal flooding. Projections of relative mean
sea level were provided by EA Guidance Note: Adapting to Climate
Change: Advice for Flood and Coastal Erosion Risk Management
Authorities (Environment Agency, 2011).
– 4 mm/yr up to 2025,
– 8 mm/yr for 2026 to 2050,
– 11 mm/yr for 2051 to 2080 and
– 15 mm/yr between 2081 and 2115.
• The return period values of extreme water level provided by the
Environment Agency are referenced from a base year of 2008. Therefore,
the extreme water levels have been adjusted to present day levels (2015)
and further projections are made for 2065, 2115 and 2126.
Joint probability
• Joint probability was estimated in accordance with EA/Defra guidance
contained within Use of Joint probability Methods in Flood Management, A
Guide to Best Practice, 2005. A “super” correlated relationship between
water level and wave conditions has been assumed using the guidance
Figures in EA/Defra 2005.
Simulations
• Joint probability
– 1, 2, 5, 10, 25, 50, 75, 100, 200, 1000
• Climate change
– 2015, 2065, 2115, 2126
• Total = 40 for each of the 3 directional sectors
– South west, south, south east
– For resultant and swell wave data
Simulation matrix
Joint
Probability
(yrs)
Climate
Change
(yrs) Degrees
Tide
return
(yrs)
Water
level
(mOD)
Wave
return
(yrs)
Wave
height
(m)
1 2015 120 1 1.80 1 4.25
1 2065 120 1 2.18 1 4.25
1 2115 120 1 2.87 1 4.25
1 2126 120 1 3.04 1 4.25
2 2015 120 2 1.87 1 4.25
2 2065 120 2 2.25 1 4.25
2 2115 120 2 2.94 1 4.25
2 2126 120 2 3.11 1 4.25
5 2015 120 5 1.95 1 4.25
5 2065 120 5 2.33 1 4.25
5 2115 120 5 3.02 1 4.25
5 2126 120 5 3.19 1 4.25
10 2015 120 10 2.02 1 4.25
10 2065 120 10 2.40 1 4.25
10 2115 120 10 3.09 1 4.25
10 2126 120 10 3.26 1 4.25
25 2015 120 25 2.10 1 4.25
25 2065 120 25 2.48 1 4.25
25 2115 120 25 3.17 1 4.25
25 2126 120 25 3.34 1 4.25
Joint
Probability
(yrs)
Climate
Change
(yrs) Degrees
Tide
return
(yrs)
Water
level
(mOD)
Wave
return
(yrs)
Wave
height
(m)
50 2015 120 50 2.16 1 4.25
50 2065 120 50 2.54 1 4.25
50 2115 120 50 3.23 1 4.25
50 2126 120 50 3.40 1 4.25
75 2015 120 75 2.20 2 4.40
75 2065 120 75 2.58 2 4.40
75 2115 120 75 3.27 2 4.40
75 2126 120 75 3.44 2 4.40
100 2015 120 100 2.22 2 4.40
100 2065 120 100 2.60 2 4.40
100 2115 120 100 3.29 2 4.40
100 2126 120 100 3.46 2 4.40
200 2015 120 200 2.28 3 4.45
200 2065 120 200 2.66 3 4.45
200 2115 120 200 3.35 3 4.45
200 2126 120 200 3.52 3 4.45
1000 2015 120 1000 2.42 10 4.64
1000 2065 120 1000 2.80 10 4.64
1000 2115 120 1000 3.49 10 4.64
1000 2126 120 1000 3.66 10 4.64
Model validation
• Time series wave data were not available
at the model boundary to make a direct
comparison with time series data further
inshore on the model domain.
• A 50 year storm event was identified
from the Channel Coastal Observatory
(CCO) report Review of south coast
beach response to wave conditions in
the winter of 2013-2014.
• Due to the limited availability of time
series wave data at the model boundary,
this was considered to be an appropriate
method of validation for the Weymouth
MIKE21 SW model.
Swell or resultant wave data
• Resultant wave data was determined to produce larger nearshore wave heights.
Wave results: south west
Wave results: south
Wave results: south east
Data output
Output results
Beach profiles
• Wave conditions extracted in the nearshore regions are used as input conditions
for wave overtopping calculations (EurOtop).
• Beach profiles from CCO profile data are used to determine the profile
characteristics for overtopping such as slope and crest height.
• Wave overtopping is calculated with a varying tidal water level.
• Conditions of normal and eroded beach profiles are considered with median and
95th percentile extreme water levels.
• Wave overtopping discharge rates are used as input boundary conditions for land
flood modelling (TUFLOW).
Wave overtopping and coastal flooding
• Many short runs for all return periods and climate change.
• Python used to create multiple steering files from boundary condition
matrix.
• MIKE21 SW run with batch file.
• Results extracted from MIKE data files using the .NET scripts (read_dfs0).
• This allows data to be extracted from multiple results files which can then
be plotted and/or used in python based EurOtop calculations.
Routine automation
Flooding extent
Any questions?

More Related Content

PDF
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
PDF
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
PDF
Undertaking Modelling of Flooding due to Wave Overtopping using the MIKE by D...
PDF
Sharing Experiences of Flood Modelling Using MIKE 21
PDF
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...
PDF
Teaching and research with MIKE by DHI - Dr Björn Elsäßer (Queen’s University...
PDF
2014 MIKE by DHI UK Symposium - Draft Agenda
PDF
TAKING THE COUPLED MODEL TO THE NEXT LEVEL: Introducing the MIKE 21 Shoreline...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Undertaking Modelling of Flooding due to Wave Overtopping using the MIKE by D...
Sharing Experiences of Flood Modelling Using MIKE 21
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...
Teaching and research with MIKE by DHI - Dr Björn Elsäßer (Queen’s University...
2014 MIKE by DHI UK Symposium - Draft Agenda
TAKING THE COUPLED MODEL TO THE NEXT LEVEL: Introducing the MIKE 21 Shoreline...

What's hot (20)

PDF
Integrating Flood Risk Into Catchment Management - Michael Butts (DHI)
PDF
DSD-INT 2015 - unique delft3 d applications in the usa- edwin elias
PDF
2014 MIKE by DHI UK Symposium Flyer
PPTX
Dam Breach Analysis: Large and Small
PDF
DSD-INT 2017 Morphodynamic analysis of intervention scenarios at the Belgian ...
PDF
DSD-INT 2018 Characterizing the drivers of coral reef hydrodynamics at the Ro...
PDF
DSD-INT 2018 Fish migration River Afsluitdijk (FMR) - Hydrodynamic evaluation...
PPTX
Roger Falconer and Chris Binnie - Sustainable Severn Forum 2017
PDF
DSD-INT 2021 Sea Level Rise Modeling Considerations in Land Use Planning
PDF
PPTX
Dannenbaum Engineering - River Update 9-19-2015
PDF
PPTX
Dirk Kassenaar Earthfx watertech 2016 presentation v1
PPTX
Improving Reservoir Simulation Modeling with Seismic Attributes
PDF
CWRA 2016 Assessing Cumulative Effects of SAGD Operations in the Mackay Water...
PDF
DSD-INT 2018 Tidal propagation and salt intrusion in the multi-channel estuar...
PDF
Huntsman Lake Dam Rehabilitation Project
PDF
DSD-INT 2016 Assessment of hydrologic alterations using floodplain connectivi...
PDF
C8 nov20 city council meeting 121120_final
PDF
C2VSim Workshop 6 - Closing
Integrating Flood Risk Into Catchment Management - Michael Butts (DHI)
DSD-INT 2015 - unique delft3 d applications in the usa- edwin elias
2014 MIKE by DHI UK Symposium Flyer
Dam Breach Analysis: Large and Small
DSD-INT 2017 Morphodynamic analysis of intervention scenarios at the Belgian ...
DSD-INT 2018 Characterizing the drivers of coral reef hydrodynamics at the Ro...
DSD-INT 2018 Fish migration River Afsluitdijk (FMR) - Hydrodynamic evaluation...
Roger Falconer and Chris Binnie - Sustainable Severn Forum 2017
DSD-INT 2021 Sea Level Rise Modeling Considerations in Land Use Planning
Dannenbaum Engineering - River Update 9-19-2015
Dirk Kassenaar Earthfx watertech 2016 presentation v1
Improving Reservoir Simulation Modeling with Seismic Attributes
CWRA 2016 Assessing Cumulative Effects of SAGD Operations in the Mackay Water...
DSD-INT 2018 Tidal propagation and salt intrusion in the multi-channel estuar...
Huntsman Lake Dam Rehabilitation Project
DSD-INT 2016 Assessment of hydrologic alterations using floodplain connectivi...
C8 nov20 city council meeting 121120_final
C2VSim Workshop 6 - Closing
Ad

Viewers also liked (20)

PPT
Mom was wrong: Do talk to strangers
PPTX
Profesor Jerzy Langer - inauguracja konferencji Climate-KIC
PPT
Mansfield main lodge presentationwords
PPT
Humanitarium. Ogrody Doświadczeń - prezentacja
PPS
0 cum dorm alpinistii
PPS
00 marketing pessoal
PDF
Pengukuran kinerja tahun 2012
PPTX
台東197馥園假期(197biketel)
PPT
Parllelizaion
PPTX
ภารกิจการเรียนรู้ บทที่ 5 by sirisit part3
PPS
0 victor molev
PPT
Engine performance measures
PPTX
Ortho Canada K-Tape For Me Gentle Pain Therapy
PDF
CSWP FALL LITERACY NEWSLETTER
PPS
00 piscina in-berlin
PDF
Social collaboration
PDF
PackeTV® Mobile Whitepaper
PDF
Korupsi puguh
PPTX
SlideShare Tarea
PPT
Bezpieczne przechowywanie materiału biologicznego i informacji medycznej w ba...
Mom was wrong: Do talk to strangers
Profesor Jerzy Langer - inauguracja konferencji Climate-KIC
Mansfield main lodge presentationwords
Humanitarium. Ogrody Doświadczeń - prezentacja
0 cum dorm alpinistii
00 marketing pessoal
Pengukuran kinerja tahun 2012
台東197馥園假期(197biketel)
Parllelizaion
ภารกิจการเรียนรู้ บทที่ 5 by sirisit part3
0 victor molev
Engine performance measures
Ortho Canada K-Tape For Me Gentle Pain Therapy
CSWP FALL LITERACY NEWSLETTER
00 piscina in-berlin
Social collaboration
PackeTV® Mobile Whitepaper
Korupsi puguh
SlideShare Tarea
Bezpieczne przechowywanie materiału biologicznego i informacji medycznej w ba...
Ad

Similar to Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (Hyder Consulting) (20)

PPTX
Presentation on Climate Resilience (05122015)
PPTX
Understanding Who is AT RISK - Flood extent modelling
PDF
ASBPA_2015_Presentation_BWang
PPTX
Beach samp stakeholder_tools_071415
PPTX
ASFPM 2016: The History of Coastal Flood Hazard Assessments in the Great Lakes
PPTX
The History of Coastal Flood Hazard Assessments in the Great Lakes
PDF
Sea level rise and storm surge tools and datasets supporting Municipal Resili...
PDF
An Introduction to the Environment Agency extreme offshore wave, water level ...
DOCX
Stream Temp Model Report
PDF
Effects of time-series data resolution on modelling shoreline change. Avidesh...
PDF
DSD-INT 2022 Salt intrusion modelling in Aveiro Lagoon under morphological an...
PPTX
GROUNDWATER FLOW SIMULATION IN GUIMARAS ISLAND, PHILIPPINE
PDF
SESSION 5_Rob Dellink_ Climate change- CIRCLE workshop Oct. 2014
PPTX
project presentation
PDF
DSD-INT 2019 Understanding impact of extreme sea levels under climate change ...
PPSX
Sea Level: Current knowledge, gaps, and challenges UFORIC
PPT
Ozwater 12 Presentation on Climate Change Impacts On Sydney S Water Supply
PPTX
Presentation: Unit 1 Introduction to the hydrological cycle
PDF
GeoTool_2015_Coastal_Data_Application_BWang_Final
PDF
Projected Climate Change Impacts for Rhode Island’s Coast: A Summary of the S...
Presentation on Climate Resilience (05122015)
Understanding Who is AT RISK - Flood extent modelling
ASBPA_2015_Presentation_BWang
Beach samp stakeholder_tools_071415
ASFPM 2016: The History of Coastal Flood Hazard Assessments in the Great Lakes
The History of Coastal Flood Hazard Assessments in the Great Lakes
Sea level rise and storm surge tools and datasets supporting Municipal Resili...
An Introduction to the Environment Agency extreme offshore wave, water level ...
Stream Temp Model Report
Effects of time-series data resolution on modelling shoreline change. Avidesh...
DSD-INT 2022 Salt intrusion modelling in Aveiro Lagoon under morphological an...
GROUNDWATER FLOW SIMULATION IN GUIMARAS ISLAND, PHILIPPINE
SESSION 5_Rob Dellink_ Climate change- CIRCLE workshop Oct. 2014
project presentation
DSD-INT 2019 Understanding impact of extreme sea levels under climate change ...
Sea Level: Current knowledge, gaps, and challenges UFORIC
Ozwater 12 Presentation on Climate Change Impacts On Sydney S Water Supply
Presentation: Unit 1 Introduction to the hydrological cycle
GeoTool_2015_Coastal_Data_Application_BWang_Final
Projected Climate Change Impacts for Rhode Island’s Coast: A Summary of the S...

More from Stephen Flood (20)

PDF
Models Done Better... - UDG2018 - Intertek and DHI
PPTX
DHI’s Digital Strategy and Future Technologies. Mark Britton, DHI.
PDF
Sediment mobility modelling and maerl habitat dynamics in Galway Bay. Siddhi ...
PDF
Using numerical modelling to regulate a growing aquaculture sector. Rebecca S...
PDF
Catchment-based Flood Risk Assessment & Management, CFRAM, programme. John Ma...
PDF
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
PDF
Some of our recent applications of the MIKE software. Oliver Way, WSP.
PDF
My experiences of learning to use MIKE. Jonathan Griffiths, ABPmer.
PDF
Using numerical modelling to regulate a growing aquaculture industry. Ted Sch...
PDF
Developments in pollution risk forecasting at the Environment Agency. Deborah...
PDF
FAST Danube – Hydraulic and sediment transport modelling with MIKE 21 FM mode...
PDF
DHI Ireland Symposium 2018
PDF
DHI UK Symposium 2018
PDF
DHI UK & Ireland Symposium 2017 Programme
PDF
DHI UK & Ireland Symposium 2017 Announcement Flyer
PDF
Ports & Navigation: Optimise Operability and Reduce Dredging Costs 20-50% wit...
PDF
Smart Real-time Control of Water Systems
PDF
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 4 - UDG EDITION - N...
PDF
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 3 - APR 2016
PPTX
Flood Forecasting Technology
Models Done Better... - UDG2018 - Intertek and DHI
DHI’s Digital Strategy and Future Technologies. Mark Britton, DHI.
Sediment mobility modelling and maerl habitat dynamics in Galway Bay. Siddhi ...
Using numerical modelling to regulate a growing aquaculture sector. Rebecca S...
Catchment-based Flood Risk Assessment & Management, CFRAM, programme. John Ma...
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
Some of our recent applications of the MIKE software. Oliver Way, WSP.
My experiences of learning to use MIKE. Jonathan Griffiths, ABPmer.
Using numerical modelling to regulate a growing aquaculture industry. Ted Sch...
Developments in pollution risk forecasting at the Environment Agency. Deborah...
FAST Danube – Hydraulic and sediment transport modelling with MIKE 21 FM mode...
DHI Ireland Symposium 2018
DHI UK Symposium 2018
DHI UK & Ireland Symposium 2017 Programme
DHI UK & Ireland Symposium 2017 Announcement Flyer
Ports & Navigation: Optimise Operability and Reduce Dredging Costs 20-50% wit...
Smart Real-time Control of Water Systems
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 4 - UDG EDITION - N...
DHI UK - BRIEFING FOR UK AND IRELAND WATER COMPANIES - NO 3 - APR 2016
Flood Forecasting Technology

Recently uploaded (20)

PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PPTX
CH1 Production IntroductoryConcepts.pptx
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PPTX
UNIT 4 Total Quality Management .pptx
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PDF
Arduino robotics embedded978-1-4302-3184-4.pdf
PPTX
Lesson 3_Tessellation.pptx finite Mathematics
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
composite construction of structures.pdf
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
DOCX
573137875-Attendance-Management-System-original
PPT
Project quality management in manufacturing
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PPTX
Geodesy 1.pptx...............................................
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PPTX
Lecture Notes Electrical Wiring System Components
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
CH1 Production IntroductoryConcepts.pptx
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
UNIT 4 Total Quality Management .pptx
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
Arduino robotics embedded978-1-4302-3184-4.pdf
Lesson 3_Tessellation.pptx finite Mathematics
Embodied AI: Ushering in the Next Era of Intelligent Systems
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
composite construction of structures.pdf
Model Code of Practice - Construction Work - 21102022 .pdf
573137875-Attendance-Management-System-original
Project quality management in manufacturing
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
Geodesy 1.pptx...............................................
Operating System & Kernel Study Guide-1 - converted.pdf
Lecture Notes Electrical Wiring System Components

Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (Hyder Consulting)

  • 1. Modelling extreme conditions for wave overtopping at Weymouth Oliver Way
  • 2. Project summary • This study has been produced for Weymouth and Portland Borough Council utilising the Environment Agency’s Water and Environment Management (WEM) Framework. It forms part of a wider scope of work, Weymouth Bay Coastal Processes Study, that includes the following elements: • Wave and tide modelling • Wave overtopping analysis, flood modelling and flood mapping • Geomorphology review and cliff erosion assessment • Flood defence option appraisals • Gathering of environmental information
  • 3. Wave model set up • MIKE21 SW was used to investigate the nearshore wave conditions at Weymouth Bay under extreme wave and water level boundary conditions.
  • 4. Boundary conditions • Extreme water level data: Environment Agency for Weymouth from the Coastal flood boundary conditions for UK mainland and islands report (Environment Agency, 2012). • Extreme wave data: also from Environment Agency report at offshore locations on the model boundary. Extreme wave conditions were considered for three directional sectors: south west, south and south east.
  • 5. Wave data format • Swell and resultant wave data available – Hs – Tz DIRECTIONS T1 T2 T5 T10 T20 T25 T50 T75 T100 T150 T200 T250 T300 T500 T1000 NORTH N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NORTHEAST N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SOUTHEAST 2.34 2.51 2.69 2.81 2.91 2.94 3.02 3.06 3.09 3.13 3.15 3.17 3.19 3.22 3.27 SOUTH 2.86 3.16 3.48 3.67 3.83 3.87 3.99 4.05 4.09 4.14 4.18 4.2 4.22 4.27 4.32 SOUTHWEST 3.61 3.82 4.07 4.24 4.4 4.45 4.59 4.67 4.72 4.79 4.84 4.88 4.91 4.99 5.09 NORTHWEST 1.91 2.15 2.37 2.48 2.57 2.59 2.65 2.67 2.69 2.71 2.72 2.73 2.73 2.75 2.76
  • 6. Water level data format Return period Water level Confidence 1 1.77 0.1 2 1.84 0.1 5 1.93 0.1 10 1.99 0.1 20 2.05 0.1 25 2.07 0.1 50 2.14 0.1 75 2.17 0.1 100 2.20 0.2 150 2.23 0.2 200 2.26 0.2 250 2.28 0.2 300 2.29 0.2 500 2.34 0.2 1000 2.40 0.3 10000 2.59 0.3
  • 7. Sea level rise • An adjustment for sea level rise to the extreme water levels was applied to account for potential future coastal flooding. Projections of relative mean sea level were provided by EA Guidance Note: Adapting to Climate Change: Advice for Flood and Coastal Erosion Risk Management Authorities (Environment Agency, 2011). – 4 mm/yr up to 2025, – 8 mm/yr for 2026 to 2050, – 11 mm/yr for 2051 to 2080 and – 15 mm/yr between 2081 and 2115. • The return period values of extreme water level provided by the Environment Agency are referenced from a base year of 2008. Therefore, the extreme water levels have been adjusted to present day levels (2015) and further projections are made for 2065, 2115 and 2126.
  • 8. Joint probability • Joint probability was estimated in accordance with EA/Defra guidance contained within Use of Joint probability Methods in Flood Management, A Guide to Best Practice, 2005. A “super” correlated relationship between water level and wave conditions has been assumed using the guidance Figures in EA/Defra 2005.
  • 9. Simulations • Joint probability – 1, 2, 5, 10, 25, 50, 75, 100, 200, 1000 • Climate change – 2015, 2065, 2115, 2126 • Total = 40 for each of the 3 directional sectors – South west, south, south east – For resultant and swell wave data
  • 10. Simulation matrix Joint Probability (yrs) Climate Change (yrs) Degrees Tide return (yrs) Water level (mOD) Wave return (yrs) Wave height (m) 1 2015 120 1 1.80 1 4.25 1 2065 120 1 2.18 1 4.25 1 2115 120 1 2.87 1 4.25 1 2126 120 1 3.04 1 4.25 2 2015 120 2 1.87 1 4.25 2 2065 120 2 2.25 1 4.25 2 2115 120 2 2.94 1 4.25 2 2126 120 2 3.11 1 4.25 5 2015 120 5 1.95 1 4.25 5 2065 120 5 2.33 1 4.25 5 2115 120 5 3.02 1 4.25 5 2126 120 5 3.19 1 4.25 10 2015 120 10 2.02 1 4.25 10 2065 120 10 2.40 1 4.25 10 2115 120 10 3.09 1 4.25 10 2126 120 10 3.26 1 4.25 25 2015 120 25 2.10 1 4.25 25 2065 120 25 2.48 1 4.25 25 2115 120 25 3.17 1 4.25 25 2126 120 25 3.34 1 4.25 Joint Probability (yrs) Climate Change (yrs) Degrees Tide return (yrs) Water level (mOD) Wave return (yrs) Wave height (m) 50 2015 120 50 2.16 1 4.25 50 2065 120 50 2.54 1 4.25 50 2115 120 50 3.23 1 4.25 50 2126 120 50 3.40 1 4.25 75 2015 120 75 2.20 2 4.40 75 2065 120 75 2.58 2 4.40 75 2115 120 75 3.27 2 4.40 75 2126 120 75 3.44 2 4.40 100 2015 120 100 2.22 2 4.40 100 2065 120 100 2.60 2 4.40 100 2115 120 100 3.29 2 4.40 100 2126 120 100 3.46 2 4.40 200 2015 120 200 2.28 3 4.45 200 2065 120 200 2.66 3 4.45 200 2115 120 200 3.35 3 4.45 200 2126 120 200 3.52 3 4.45 1000 2015 120 1000 2.42 10 4.64 1000 2065 120 1000 2.80 10 4.64 1000 2115 120 1000 3.49 10 4.64 1000 2126 120 1000 3.66 10 4.64
  • 11. Model validation • Time series wave data were not available at the model boundary to make a direct comparison with time series data further inshore on the model domain. • A 50 year storm event was identified from the Channel Coastal Observatory (CCO) report Review of south coast beach response to wave conditions in the winter of 2013-2014. • Due to the limited availability of time series wave data at the model boundary, this was considered to be an appropriate method of validation for the Weymouth MIKE21 SW model.
  • 12. Swell or resultant wave data • Resultant wave data was determined to produce larger nearshore wave heights.
  • 19. • Wave conditions extracted in the nearshore regions are used as input conditions for wave overtopping calculations (EurOtop). • Beach profiles from CCO profile data are used to determine the profile characteristics for overtopping such as slope and crest height. • Wave overtopping is calculated with a varying tidal water level. • Conditions of normal and eroded beach profiles are considered with median and 95th percentile extreme water levels. • Wave overtopping discharge rates are used as input boundary conditions for land flood modelling (TUFLOW). Wave overtopping and coastal flooding
  • 20. • Many short runs for all return periods and climate change. • Python used to create multiple steering files from boundary condition matrix. • MIKE21 SW run with batch file. • Results extracted from MIKE data files using the .NET scripts (read_dfs0). • This allows data to be extracted from multiple results files which can then be plotted and/or used in python based EurOtop calculations. Routine automation