Dear Mr. /Ms. HR Manager,
I am confident that I can help your company meet any challenges it faces in the future. I am
presently employed as a Project manager / Principal Architect with ECG., where I have
gained a reputation not only for my impressive work rate and integrity but also for my
technical and management skills.
The attached resume will provide a more complete overview of my accomplishments.
However what it may not show is that I am a self motivated individual, who is able to perform
well under pressure & who can bring to the table solid capabilities in areas such as
Management & Technical.
Those that may be of particular interest to you include:
• Manage a team .
• Technical coordinator .
• Work under stress.
Currently I am looking to join an exciting and ambitious organisation such as yours, therefore
I would like to arrange an interview with you so I can explain in more detail the contribution I
can make to your company.
I appreciate you taking the time to review my credentials and I would like to thank you for
your time and consideration.
Yours sincerely
Mohamed Salah
M. Salah Salem
RESUME
Last name : Salem First Name : Mohamed
Profession : Architucture Present Position : Principal Architect / Project Manager
Date of Birth : November 11th, 1972
Nationality : Egyptian
Marital Status : Married with two Childrens
Telephone : (H) +202 – 2263-5396 - (Mob) +2-01224583217
e-mail address : Arch.Mohamed.Ssalem@hotmail.com
Address : 15 Khalf El Obour Buildings, Heliopolis, Cairo, Egypt.
Profile:
Architect Mohamed was graduated from Cairo University in July 1994. Before his graduation, he
worked as a trainee designerat Al Nasr Civil Works Company, Medhat El Shazly Consulting Office,
and Sami Shafie’s Consulting Office.
After his graduation, he worked at Arab Company for Real Estate and Touristic Investment as an
architect, then he worked at ELLERBE BECKET in Cairo , then he worked at GHD in Doha office,
then he worked at A.O.A Consulting Office, then he worked atDar Al Handasah, then he worked
atSaudi oger and now he is working at ECG
Education:
1994 B.Sc. in Architectural Engineering, Cairo University.
Overall Grade : Good
Grad. Project : Good
Experience Record:
Sep. 2014 to date Principal Architect, ECG
Dec 2010 to Sep.2014 Principal Architect, Saudi Oger (KSA).
April 2007to Dec 2010 Senior Architect, Dar Al Handasah
June 2005 to March 2007 Senior Architect, A.O.A
June 2003to June 2005 Senior Architect, GHD (Doha office)
Feb. 2000 to May. 2003 Architect, ELLERBE BECKET. (Cairo office)
July. 1994 to Feb. 2000 Architect, Arab Company for Real Estate and Touristic Investment (Cairo)
Employment Record:
Sep. 2014 to date Principal Architect ECG
Working drawings for
 El Masa hotel (Admnsterative new capital)
o El Masa hotel contains 350 rooms, 20 suite and 15 Royal suites,Gym, Spa, all
day resturant and 3 special resturants etc… BUA of 81000 Square meter.
o My involvement as Principal architect is to manage my team to develop the
schematic design to prepare design development package…once we got the
client approval we start to provide the detailed design drawings (complete IFC
Drawings , specs.B.O.Q) for the a/m building.
o My involvement as a Principal architect is to coordination between architecture
and all other trades (MEC., ELEC., STRUC. ETC….) and all other
consultant.
o After submission the detailed Drawing (IFC) I’m responsible with my team for
reviewing all the shop drawings from the main contractor and the sub
contractors and answer all site T.Q.
 Cairo International Medical City (Madinaty)
o Medical City contain all departments with a 260 beds with BUA of 80295 square
meters.
o My involvement as a Principal architect is to manage my team to provide
detailed design drawings (complete IFC Drawings , specs. B.O.Q) for the a/m
building with P&W as a main consultant firm and several consultants for the
Medical Equipment, Kitchen, laundry.
o My involvement as a Principal architect is to coordination between architecture
and all other trades (MEC., ELEC., STRUC. ETC….) and all other consultant.
Desigen review of:
 Four Seasons Hotel - Jeddah,KSA.
o Four Seasons Hotel consists ofpodium (Car park-Retail areas) and 2 towers 34
floors (Branded apartments, Hotel rooms and Suites).
o My involvement as a Principal architect is to review for the project through
schematic - design development - detailed design this includes review of all code
and client requirements.
Dec. 2010 to Sep. 2014 Principal Architect Saudi Oger Riyadh office
Shop drawing preperation for:
 Al samriya compound.
o 4 villas and 1 main villa
o My involvement as a Principal architect is to manage my team to provide
schematic and detailed design drawings (complete IFC Drawings , specs. B.O.Q )
for the a/m building .
o My involvement as a Principal architect is to coordination between architecture
and all other trades (MEC., ELEC., STRUC. , ID ETC….) .
 Kap 01 ministry of interior officers compounds.
o Medical Center, clinics, convention center, dorms & administration building.
o I was responsible as a Principal architect is to manage my team to review all the
IFC documents and preparing shop drawings for the a/mbuildings with Aecom as
a main consultant firm.
 Kap 02 ministry of interior officers compounds.
o Medical Center, clinics, convention center, dorms & administration building.
o I was responsible as a Principal architect is to manage my team to review all the
IFC documents and preparing shop drawings for the a/mbuildings with Aecom as
a main consultant firm.
April 2007 to Dec. 2010 Senior Architect , Dar Al Handasah
Working drawings for
 PNU (Riyadh –K.S.A.)(conferece & convention center)
o Convention center with 2 theaters (large theater with 2833 seats & small theater
with 1150 seats), 10seminar rooms and experimental auditorium with all related
B.O.H with BUA of 32950 square meters.
o My involvement as a senior group leader architect is to manage my team to
provide schematic and detailed design drawings (complete IFC Drawings ,
specs. B.O.Q ) for the a/m building with Schuler Shook & P&W as a main
consultant firm and several consultants for the acoustics, AV, interior design,
lighting, Kit, .
o My involvement as a senior group leader architect is to coordination between
architecture and all other trades (MEC., ELEC., STRUC. ETC….) and all
other consultant.
o After submission the detailed Drawing (IFC) I was responsible with my team
for reviewing all the shop drawings from the main contractor and the sub
contractors and answer all site T.Q. .
 Club house (the pearl -Qatar)
o Club house includes squash court, boiling, lounges, swimming pool, restaurant &
4star hotel.
o My involvement as a senior group leader architect is to manage my team to
provide schematic and detailed design drawings (complete IFC Drawings , specs.
B.O.Q ) for the residential building.
o My involvement as a senior group leader architect is to coordination between
architecture and all other trades (MEC., ELEC., STRUC., ID., ETC….)
Design development for
 King Abd Allah universty (Research park)
 Makka hills (21 Tower and 11 Floor podium).
Design review for .
 Adminestratin bulidings for ministry of interior (dar –Riyadh)
 Al tadamon twin tower (Tripoli –libya)
June 2005 to March 2007 Senior Architect , A.O.A.
Working drawings for the following projects:
 Al Rajhi Event Palace (Riyadh –K.S.A.)
 Residential complex (Gardenia park 6 of October)
 Aloha Resort ‘Main Building’ ( Sharm Al Shekh)
 Several palaces.
June 2003 to JUNE 2005 Senior Architect , GHD. (Doha office)
Working drawings for the following projects:
 Al Sadd Executive apartments (2B+G+7)
 Biverlly Hills 3 Compound (Sports Club+76 Villas).
 Al Handasa Complex (Commercial Building +multi Story Garage & 5 Residential
buildings )
Feb. 2000 to MAY.2003 Architect , ELLERBE BECKET. (Cairo office)
Working drawings for the following projects:
 New Orleans Arena Improvement (Louisiana).
 Austin Hilton Hotel (Texas).
 St. Catherine’s School (Virginia).
 Spenser hospitalsurgery expansion (Iowa)
 Green bay.
 Hays Medical Center (kansas).
 Civista Medical Center (Maryland).
3dmodling & presentation
 Development of Khalifa Stadium Proposal (Qatar).
 Qatar national stadium (Qatar)
 Seattle Seahawks Stadium (Washington).
 Singapore LEAS 3D Modeling (Singapore).
 University of Maryland School of Business Model (Maryland).
 Columbia Union College
 Beijing Stadium Design Tender
 newport beach hotel
May. 1995 to Feb. 2000 Architect, Arab Co. for Real Estate & Touristic Investment. (Cairo)
Schematic Architectural and Interior Design for the following projects:
 Architectural Development of Dallah Tower. Corniche El-Nil, Cairo, Egypt
 Fayed Touristic Compound. Fayed, Ismailia, Egypt
 Renovation of Omam Restaurants Series, Cairo, Egypt
 Shk. Saleh Kamel Residential Complex. Guiza, Egypt.
 Sunrise District Project. (Hay El Moltaka El Arabi). Almaza, Cairo, Egypt.
July 1994 to Jan. 1996 Architect, Right Architects and Planning Consultants. (Cairo)
Schematic and working drawings for the following projects:
 Funny Sun Resort, Fayoum, Egypt
 Several Residential Buildings and Villas, Egypt
 Residential and Commercial Building. Mansoura,Egypt
 Renovation of Ramada Hotel. Alex-Cairo Road
 Residential Villas. Shorouk City, Egypt
 Renovation of El-Jawhara Restaurant.Alex, Egypt.
References Available upon Request
Membership ofProfessional Societies:
- Egyptian Syndicate of Engineers, Member since 1994.
- Member of Shooting Sporting Club. Cairo
- Member of Wadi Degla Sporting Club. Cairo
- Member of Tersana Sporting Club. Cairo
Languages:
Speak Read Write
Arabic …….. Native …….
English V. Good V. Good V. Good
Courses:
Project management professional(PMP) course
Project management ( AUC)
Introduction to Construction Economies. (Cairo University, 1994)
Introduction to Building Interior Design. (Cairo University, 1993)
Advanced Computer Aided Drafting Course (Cairo University, 1990)
Computer Skills:
CAD Programs: AutoCAD, ADCADD, ASG
Animation Programs: 3Dstudio, 3DSMAX, Freehand10
Presentation and Rendering Programs PhotoShop,Photostyler

More Related Content

PDF
Design and Presentation Portfolio
PDF
Alaa Tawfiq | Architect and Interior Designer | Portfolio 2014
DOC
CV - Ayman Hassan Mahmoud
PDF
Arch.Mahmoud Majdi- English only-sf
PDF
MOHAMED ROSHDI CV
PDF
My Portfolio - 2014 - updated
PDF
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
PDF
Khaled Essam portfolio
Design and Presentation Portfolio
Alaa Tawfiq | Architect and Interior Designer | Portfolio 2014
CV - Ayman Hassan Mahmoud
Arch.Mahmoud Majdi- English only-sf
MOHAMED ROSHDI CV
My Portfolio - 2014 - updated
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Khaled Essam portfolio

What's hot (20)

DOCX
Mohamed Sabry CV
PDF
Architect mohamed el-tarabily
PDF
Arch.Msaeed 2017
PDF
KIKLOP Construction & Contracting
PDF
CV Khaled-JULY 2014 Latest
PDF
emad_azab_CV
DOCX
abdelrazik ahmed CV
PDF
KIKLOP DESIGN & ENGINEERING AND CONSULTANCY PORTFOLIO
DOCX
Curriculum Vitae Iyad
PDF
Reham Ashry cv
PDF
Christina_2014 CV
PDF
Khaled essam portfolio
DOCX
AHMED MOHAMED AHMED
DOCX
PDF
Abdullah Qadry - Senior Site Architect
DOCX
AHMED MOHAMED AHMED
DOCX
DOCX
DOCX
Hesham Farran - CV june 2016
Mohamed Sabry CV
Architect mohamed el-tarabily
Arch.Msaeed 2017
KIKLOP Construction & Contracting
CV Khaled-JULY 2014 Latest
emad_azab_CV
abdelrazik ahmed CV
KIKLOP DESIGN & ENGINEERING AND CONSULTANCY PORTFOLIO
Curriculum Vitae Iyad
Reham Ashry cv
Christina_2014 CV
Khaled essam portfolio
AHMED MOHAMED AHMED
Abdullah Qadry - Senior Site Architect
AHMED MOHAMED AHMED
Hesham Farran - CV june 2016
Ad

Similar to Mohamed Salah (Project manager_Principal Architect)C.V. (20)

DOCX
Hala Resume
PDF
Mohamed Abdalla
PDF
Mohamed_Abd.Elkader
PDF
AHMED SAKR 2016
PDF
nevine ezzat c.v.
PDF
M.abdelwahab cv 2016 Design Director IPartner
PDF
NOHA ALI MAHMOUD EL KORDY CV
PDF
Mohamed Abou El Seoud Cv
PDF
CV.2016
PDF
C.V@ Haytham2015 final
PDF
Archi. REham hamed_C.V
PDF
Mohamed Raafat - Résumé
PDF
ARCHITECT Hany Afify C.V
PDF
Khaled sedky(Senior architect) cv
DOCX
ARC-HU_C.V-2014 en
DOCX
M.Abdelkader CV
PDF
Mohamed A Swedan Resume
PDF
cv 12-2015
PDF
March-2015
PDF
kareem zeyada CV
Hala Resume
Mohamed Abdalla
Mohamed_Abd.Elkader
AHMED SAKR 2016
nevine ezzat c.v.
M.abdelwahab cv 2016 Design Director IPartner
NOHA ALI MAHMOUD EL KORDY CV
Mohamed Abou El Seoud Cv
CV.2016
C.V@ Haytham2015 final
Archi. REham hamed_C.V
Mohamed Raafat - Résumé
ARCHITECT Hany Afify C.V
Khaled sedky(Senior architect) cv
ARC-HU_C.V-2014 en
M.Abdelkader CV
Mohamed A Swedan Resume
cv 12-2015
March-2015
kareem zeyada CV
Ad

Mohamed Salah (Project manager_Principal Architect)C.V.

  • 1. M. Salah Salem Cover Letter Name :Mohamed Salah El Den Salem Address : 15 Khalf El Obour Buildings, Heliopolis, Cairo, Egypt. e-mail : Arch.Mohamed.Ssalem@hotmail.com Profession : Principal Architect Present Position : Technical Office_Principal Architect / Project Manager Dear Mr. /Ms. HR Manager, I am confident that I can help your company meet any challenges it faces in the future. I am presently employed as a Project manager / Principal Architect with ECG., where I have gained a reputation not only for my impressive work rate and integrity but also for my technical and management skills. The attached resume will provide a more complete overview of my accomplishments. However what it may not show is that I am a self motivated individual, who is able to perform well under pressure & who can bring to the table solid capabilities in areas such as Management & Technical. Those that may be of particular interest to you include: • Manage a team . • Technical coordinator . • Work under stress. Currently I am looking to join an exciting and ambitious organisation such as yours, therefore I would like to arrange an interview with you so I can explain in more detail the contribution I can make to your company. I appreciate you taking the time to review my credentials and I would like to thank you for your time and consideration. Yours sincerely Mohamed Salah
  • 2. M. Salah Salem RESUME Last name : Salem First Name : Mohamed Profession : Architucture Present Position : Principal Architect / Project Manager Date of Birth : November 11th, 1972 Nationality : Egyptian Marital Status : Married with two Childrens Telephone : (H) +202 – 2263-5396 - (Mob) +2-01224583217 e-mail address : Arch.Mohamed.Ssalem@hotmail.com Address : 15 Khalf El Obour Buildings, Heliopolis, Cairo, Egypt. Profile: Architect Mohamed was graduated from Cairo University in July 1994. Before his graduation, he worked as a trainee designerat Al Nasr Civil Works Company, Medhat El Shazly Consulting Office, and Sami Shafie’s Consulting Office. After his graduation, he worked at Arab Company for Real Estate and Touristic Investment as an architect, then he worked at ELLERBE BECKET in Cairo , then he worked at GHD in Doha office, then he worked at A.O.A Consulting Office, then he worked atDar Al Handasah, then he worked atSaudi oger and now he is working at ECG Education: 1994 B.Sc. in Architectural Engineering, Cairo University. Overall Grade : Good Grad. Project : Good Experience Record: Sep. 2014 to date Principal Architect, ECG Dec 2010 to Sep.2014 Principal Architect, Saudi Oger (KSA). April 2007to Dec 2010 Senior Architect, Dar Al Handasah June 2005 to March 2007 Senior Architect, A.O.A June 2003to June 2005 Senior Architect, GHD (Doha office) Feb. 2000 to May. 2003 Architect, ELLERBE BECKET. (Cairo office) July. 1994 to Feb. 2000 Architect, Arab Company for Real Estate and Touristic Investment (Cairo) Employment Record: Sep. 2014 to date Principal Architect ECG Working drawings for  El Masa hotel (Admnsterative new capital) o El Masa hotel contains 350 rooms, 20 suite and 15 Royal suites,Gym, Spa, all day resturant and 3 special resturants etc… BUA of 81000 Square meter. o My involvement as Principal architect is to manage my team to develop the schematic design to prepare design development package…once we got the client approval we start to provide the detailed design drawings (complete IFC Drawings , specs.B.O.Q) for the a/m building. o My involvement as a Principal architect is to coordination between architecture and all other trades (MEC., ELEC., STRUC. ETC….) and all other consultant. o After submission the detailed Drawing (IFC) I’m responsible with my team for reviewing all the shop drawings from the main contractor and the sub contractors and answer all site T.Q.
  • 3.  Cairo International Medical City (Madinaty) o Medical City contain all departments with a 260 beds with BUA of 80295 square meters. o My involvement as a Principal architect is to manage my team to provide detailed design drawings (complete IFC Drawings , specs. B.O.Q) for the a/m building with P&W as a main consultant firm and several consultants for the Medical Equipment, Kitchen, laundry. o My involvement as a Principal architect is to coordination between architecture and all other trades (MEC., ELEC., STRUC. ETC….) and all other consultant. Desigen review of:  Four Seasons Hotel - Jeddah,KSA. o Four Seasons Hotel consists ofpodium (Car park-Retail areas) and 2 towers 34 floors (Branded apartments, Hotel rooms and Suites). o My involvement as a Principal architect is to review for the project through schematic - design development - detailed design this includes review of all code and client requirements. Dec. 2010 to Sep. 2014 Principal Architect Saudi Oger Riyadh office Shop drawing preperation for:  Al samriya compound. o 4 villas and 1 main villa o My involvement as a Principal architect is to manage my team to provide schematic and detailed design drawings (complete IFC Drawings , specs. B.O.Q ) for the a/m building . o My involvement as a Principal architect is to coordination between architecture and all other trades (MEC., ELEC., STRUC. , ID ETC….) .  Kap 01 ministry of interior officers compounds. o Medical Center, clinics, convention center, dorms & administration building. o I was responsible as a Principal architect is to manage my team to review all the IFC documents and preparing shop drawings for the a/mbuildings with Aecom as a main consultant firm.  Kap 02 ministry of interior officers compounds. o Medical Center, clinics, convention center, dorms & administration building. o I was responsible as a Principal architect is to manage my team to review all the IFC documents and preparing shop drawings for the a/mbuildings with Aecom as a main consultant firm. April 2007 to Dec. 2010 Senior Architect , Dar Al Handasah Working drawings for  PNU (Riyadh –K.S.A.)(conferece & convention center) o Convention center with 2 theaters (large theater with 2833 seats & small theater with 1150 seats), 10seminar rooms and experimental auditorium with all related B.O.H with BUA of 32950 square meters. o My involvement as a senior group leader architect is to manage my team to provide schematic and detailed design drawings (complete IFC Drawings , specs. B.O.Q ) for the a/m building with Schuler Shook & P&W as a main consultant firm and several consultants for the acoustics, AV, interior design, lighting, Kit, . o My involvement as a senior group leader architect is to coordination between architecture and all other trades (MEC., ELEC., STRUC. ETC….) and all other consultant.
  • 4. o After submission the detailed Drawing (IFC) I was responsible with my team for reviewing all the shop drawings from the main contractor and the sub contractors and answer all site T.Q. .  Club house (the pearl -Qatar) o Club house includes squash court, boiling, lounges, swimming pool, restaurant & 4star hotel. o My involvement as a senior group leader architect is to manage my team to provide schematic and detailed design drawings (complete IFC Drawings , specs. B.O.Q ) for the residential building. o My involvement as a senior group leader architect is to coordination between architecture and all other trades (MEC., ELEC., STRUC., ID., ETC….) Design development for  King Abd Allah universty (Research park)  Makka hills (21 Tower and 11 Floor podium). Design review for .  Adminestratin bulidings for ministry of interior (dar –Riyadh)  Al tadamon twin tower (Tripoli –libya) June 2005 to March 2007 Senior Architect , A.O.A. Working drawings for the following projects:  Al Rajhi Event Palace (Riyadh –K.S.A.)  Residential complex (Gardenia park 6 of October)  Aloha Resort ‘Main Building’ ( Sharm Al Shekh)  Several palaces. June 2003 to JUNE 2005 Senior Architect , GHD. (Doha office) Working drawings for the following projects:  Al Sadd Executive apartments (2B+G+7)  Biverlly Hills 3 Compound (Sports Club+76 Villas).  Al Handasa Complex (Commercial Building +multi Story Garage & 5 Residential buildings ) Feb. 2000 to MAY.2003 Architect , ELLERBE BECKET. (Cairo office) Working drawings for the following projects:  New Orleans Arena Improvement (Louisiana).  Austin Hilton Hotel (Texas).  St. Catherine’s School (Virginia).  Spenser hospitalsurgery expansion (Iowa)  Green bay.  Hays Medical Center (kansas).  Civista Medical Center (Maryland). 3dmodling & presentation  Development of Khalifa Stadium Proposal (Qatar).  Qatar national stadium (Qatar)  Seattle Seahawks Stadium (Washington).  Singapore LEAS 3D Modeling (Singapore).  University of Maryland School of Business Model (Maryland).  Columbia Union College  Beijing Stadium Design Tender  newport beach hotel May. 1995 to Feb. 2000 Architect, Arab Co. for Real Estate & Touristic Investment. (Cairo)
  • 5. Schematic Architectural and Interior Design for the following projects:  Architectural Development of Dallah Tower. Corniche El-Nil, Cairo, Egypt  Fayed Touristic Compound. Fayed, Ismailia, Egypt  Renovation of Omam Restaurants Series, Cairo, Egypt  Shk. Saleh Kamel Residential Complex. Guiza, Egypt.  Sunrise District Project. (Hay El Moltaka El Arabi). Almaza, Cairo, Egypt. July 1994 to Jan. 1996 Architect, Right Architects and Planning Consultants. (Cairo) Schematic and working drawings for the following projects:  Funny Sun Resort, Fayoum, Egypt  Several Residential Buildings and Villas, Egypt  Residential and Commercial Building. Mansoura,Egypt  Renovation of Ramada Hotel. Alex-Cairo Road  Residential Villas. Shorouk City, Egypt  Renovation of El-Jawhara Restaurant.Alex, Egypt. References Available upon Request Membership ofProfessional Societies: - Egyptian Syndicate of Engineers, Member since 1994. - Member of Shooting Sporting Club. Cairo - Member of Wadi Degla Sporting Club. Cairo - Member of Tersana Sporting Club. Cairo Languages: Speak Read Write Arabic …….. Native ……. English V. Good V. Good V. Good Courses: Project management professional(PMP) course Project management ( AUC) Introduction to Construction Economies. (Cairo University, 1994) Introduction to Building Interior Design. (Cairo University, 1993) Advanced Computer Aided Drafting Course (Cairo University, 1990) Computer Skills: CAD Programs: AutoCAD, ADCADD, ASG Animation Programs: 3Dstudio, 3DSMAX, Freehand10 Presentation and Rendering Programs PhotoShop,Photostyler