SlideShare a Scribd company logo
Curriculum Vitae – Mechanical Superintendent, Oil and
Gas, Power, Petrochemical – Refinery
ABINASH SUNDAR ROUTRAY
routray_abinash@rediffmail.com, routrayabinash@yahoo.com
Mobile: +91 8895802143®, +91 9777442158
Date of Birth: 24th
June, 1966, Place of Birth: Balarampur, Keonjhar, Orissa (India)
Objective:
Continuous Improvement - look forward to work with MNCs where there is always a team-work
environment and possibility to grow by putting hard work with honesty and with always learning and
positive attitude.
PASSPORT DETAIL-G3007457 (valid up to 16th
October 2017)
Permanent Address:
S/O : Sri Anadi Charan Routray
At/p.o : Balarampur
P.S : Ghashipura
Dist : Keonjhar,
Pin code: 758025.
State : Orissa.
Educational Background:
 Diploma in Mechanical -1987 U.C.P Berhampur, Orissa, India.
Professional Trainings received:
 Level II in Non Destructive Testing for different methods (RT, UT, MPT, and DPT).
Computer Exposure:
M.S-Office, Excel & Out look
Languages Known:
. English, Hindi, & Oriya
Summary Of Experience:
A certified mechanical engineer with more than 20 years experience in the field of engineering,
management, supervision, coordination and inspection of process piping for petrochemical,
Refinery,LNG, Chemical, Steel plant, Compressor Station, for clients such as IOCL,Y-LNG,RIL, Deepak
Steel & Power. Ensuring all phases of project are completed on agreed schedule with safety and
quality requirements.
Work Experience Track Record:
Current Employment: Jindal Steel And Power Limited (Angul, Odisha, India.)
7th
October 2014 and Continuing.
Mechanical In charge for Shop Fabrication.
Experience : Essar Construction Oversease Limited .Borouge CGC -1 Project Ruwiese Abu Dhabi.
Mechanical Lead- Excuting Piping, Equipments Like Silos Erection and Installation.
Coordinating with Client for Tie-In Jobs Etc.
22nd
jan to 10th
June 2014.
Current Employment:
Petron Engineering and Construction limited
R.C.M for GAIL PETROCHEMICAL COMPLEX (GPU UNIT)
PATA, U.P, INDIA.
25th
June 2012 to 8th
oct 2013
Resposible- Site Incharge for GPU phase –II expansion.
Experience: Uhde India Pvt. Ltd.(Thyssen Krupp Group) for IOCL VGO/HDT and DHDT Project
(PARADEEP ORISSA, INDIA)
16th
November to 20th
June
Construction Manager
 Fire Heater for VGO/HDT and DHDT unit.
 Regularly report to the Client IOCL on all activities status.
 Monitored the performance of contractor (Heurtey Petrochem and Petron), reviewed the
method statement and job safety analysis and implement safely.
 Implemented and planned the execution strategies, resource planning, contractors
monitoring and oversight programs.
 Attend and anticipate in site meetings as Owner’s representative.
 Review and comment on EPC Monthly Progress Report and provide input directly to the
Client for further consolidation and feedback to EPC progress.
 Managed to check all the incoming materials for the units.
 Managed and supervised all piping fabrication, erection, fit-up, welding inspection, hydro
testing, pneumatic testing, bolt tensioning and torque as required, cleanliness check, air
blowing and tightness test.
 Supervised and inspected the erection/installation and pre-commissioning of Process piping
for VGO/HDT project.
 Committed for the implementation of a safe working environment for the contractor team
without any incident and injury free culture.
 Acting as a key interface with the contractor to coordinate progress, priorities and change
management and assure quality in design work.
 Working closely with the contractor teams to assure quality and compliance with
specifications for the Overall designs and the construction execution plan.
 Verify achievement of project milestones and progress versus plan
Experience: Uhde India Pvt. Ltd. (Thyssen Krupp Group) for IOCL VGO/HDT Project.
(Vadodara, Gujrat)
25th
Jan 2010 to 13th
November 2010
Construction Manager
 Supervised and overviewed the contractor (GDCL) to implement the requirements of the
contract including the drawings and specifications.
 Reviewed the construction procedure and job safety analysis.
 Planned the overall activities and coordinated with other discipline in the same area.
 Maintained the quality control records and work safely.
 Closely monitoring the Erection of Equipments, installation of package units with related to
unit piping for VGO unit.
 Monitored the flow of all work with the objective of improving the contractor’s productivity,
schedule performance, and safety.
 Ensured all Piping quality control records required are completed prior to final Inspection.
 Supervised the implementation of approved commissioning procedure as applicable for the
Piping. Generated & managed the mechanical completion punch list for the Piping prior to
final acceptance.
 Attended the weekly progress and coordination meeting as required. Achieved the
milestone of piping progress.
 Managed and supervised all piping fabrication, erection, fit-up, welding inspection, hydro
testing, pneumatic testing, bolt tensioning and torque as required, cleanliness check, air
blowing and tightness test.
 Supervised and inspected the erection/installation and pre-commissioning of Process piping
 To assist pre commissioning and commissioning activities of systems completed include
flange joint leak test, air flushing, water flushing, nitrogen purging etc.
To execute overall on plot piping fabrication and erection works include identification of
materials, coordination for the qualification of welders, inspection of site as per isometric,
GAD and P&ID, fabrication of pipe spool, organize inspection of welding, coordination for
the NDT, installation of piping, preparation of as built drawing and test pack, preparation of
mechanical punch list, hydro testing, Flange Management and box up activities as per
applicable codes, procedure and standards
Experience: Punj Lloyd Ltd. For Y-LNG, PMC-YEMGAS (YENEN) LNG-Project
7th
Jan 2009 to 10th
Sept 2009
Deputy Manager
 BOG compressor, Sea water intake system and ETP unit erection and commissioning
with piping.
 Supervision and monitoring the construction activities such as Fabrication of pipes and
supports and its erection.
 Ensure that Field Quality Control Plan (FQCP) is implemented and drawings are updated at
workshop to avoid rework on site.
 Managed and supervised all pipe rack and related steel structures erection, fit-up, welding
inspection, bolt tensioning and torque as required, cleanliness check, and tightness test.
 Performed other duties such as supervision for Pipe Erection, Installation, Fit-up, welding,
Testing etc.
 Prepare internal construction punch list for clearing before final inspection of client.
Experience: Punj Lloyd Ltd.For RIL, EWPL Project (Compressor Station-7&8)
5th
January 2008 to 3rd
January 2009.
Deputy Manager Piping
 Ensure that construction activities are carried out to the highest HSE standards.
 Monitors and coordinates Equipments and Pipe erection, Installation of various valves at
position.
 Coordinate, plan and schedule day-to-day inspection related work activities and directions of
existing plant operation units.
 Monitors and coordinates fabrication of spools and welding as per drawings.
 Allocation of work to various groups as per priority.
 Conducting Hydro Test As Per Given RFI to QA/ QC.
 Conducting Cleaning and Gauging For Piping And Pipelines As Per Given Requirements.
 Monitors and coordinates all necessary testing procedures such as visual inspection,
radiography, magnetic particle examination, ultrasonic testing, and dye penetrate testing,
pressure testing and hydro testing.
 Generated & managed the mechanical completion punch list for the piping prior to final
acceptance.
Experience: L & T ECC Division for Reliance, Project- Reliance Export Refinery (SEZ)
Jamnagar, Gujarat.
24th
October 2006 to 22nd
December 2007
Sr. Engineer Piping
 Monitors and coordinates fabrication of spools and welding as per drawings.
 Ensure that construction activities are carried out to the highest HSE standards.
 Monitors and coordinates Pipe erection.
 Allocation of work to various groups as per priority.
 Conducting Hydro Test As Per Given RFI to QA/QC.
 Conducting Cleaning and Gauging For Piping And Pipelines As Per Given Requirements.
 Monitors and coordinates all necessary testing procedures such as visual inspection,
radiography, magnetic particle examination, ultrasonic testing, dye penetrate testing,
pressure testing and hydro testing.
 To supervise and monitor the piping fabrication and installation at different pipe racks in
OSBL units including welder qualification, identification of material, preparation of weld
production reports, coordination with NDT.
Experience: M/S Shree Baba Vishwanath Iron pvt.ltd. Varanasi.
10th
September 2004 to 20th
August 2006
Mechanical In-Charge (Projects & Maintenance)
 Monitoring of Fabrication of structures, and Equipments erection by contractors.
 Managed and supervised all pipe rack steel structures erection.
 Performed other duties such as supervision for Pipe Erection, Installation, Fit-up, welding.
 To check the Bill of Material (Material Take Off) as per drawing for ensuring requirements
are realistically quantified as per scope and budget and follow up the delivery of the
project/construction materials.
 To liaise with procurement and material management team to ensure the project materials
and equipments delivery are in time as per planned schedule to site.
 To study the vendor manuals for monitoring the materials delivery and ensuring all
inspection of equipments and material as per vendor specification
 Ensure that contractors will comply with HSE requirements at site.
Experience: M/S Deepak Steel & Power ltd. Barbil, Orissa
5th
July 2002 to 08th
August 2004.
Mechanical Engineer (Project)
 Looking after overall extension of raw material handling system.
 E.g. Fabrication & Erection of Mechanical Building structures, Equipments.
 Monitoring of Fabrication of structures, and Equipments erection by contractors.
 Performed other duties such as supervision for Pipe Erection, Installation, Fit-up, welding.
 Visual Inspection of Fit-up & welding activity.
 Assist and support Line Management and Supervision in all.
 Involved in preparation of Material take off and manpower supervision.
Experience: M/S Grewal Associates.Barbil, Orissa.
1st
June 2000 to 3rd
July 2002. Company
Mechanical Engineer
 Looking after overall extension of raw material handling system.
 E.g. Fabrication & Erection of Mechanical Building structures, Equipments.
 Preparation of daily progress report.
 Preparation of estimation based on AFC drawing and prepare procurement schedule for
complete the project on schedule time.
 Guidance to junior related to construction, quality control and how to maintain the work
schedule.
 Responsible for ensuring the works are carried out with commitment to health and safety
legislation and company and site regulation.
Experience: M/S Indfab with NINL- Dubri, NTPC- Kaniha, NALCO- Anugul, Super Thermal
power plant Talcher under Bridge & Roof (I) ltd. L&T ltd.
1st
June 1990 to 25th
May 2000.
Engineer
 Involves in Project works of Mechanical Construction.
 Visual Inspection of Fit-up & Welding activity.
 Man power planning & Mobilization of different project sites. Assist and support
Management and Supervision in all.
 Involved in preparation of Material take off and manpower supervision.
 Looking after client Billing & Follow up.
 Arrangement of Resources.
routray_abinash@rediffmail.com, routrayabinash@gmail.com, AT/PO-BALARAMPUR,
VIA-KUSHALESWAR, DIST-KEONJHAR, ORISSA, PIN-758025

More Related Content

DOCX
hatata cv 2015
DOC
Construction Engineer(Oil&GasResume
DOCX
Rudyard Ejercito - Resume
DOC
AKRAM CV QC Supervisor Mechanical
PDF
RESUME
DOCX
00 resume of site supervisor (Pipeline & welding)
DOC
mechanical_engineer-raman-cv.
DOCX
CV of Mohammed Uzair
hatata cv 2015
Construction Engineer(Oil&GasResume
Rudyard Ejercito - Resume
AKRAM CV QC Supervisor Mechanical
RESUME
00 resume of site supervisor (Pipeline & welding)
mechanical_engineer-raman-cv.
CV of Mohammed Uzair

What's hot (20)

DOC
Bannichan Savier CV
DOC
Lory Francis Navor - CV
DOCX
DOC
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
DOCX
Jordan Cv
DOCX
QAQC MEP HVAC INSPECTOR
DOCX
CV_Suhail
DOC
Renie CV Mechanical and Piping
DOC
Cv precast concrete
PDF
Civil QA&QC Inspector Updated Resume
DOC
Resume - NATARAJAN SIVASUBRAMANI
DOCX
AZHAR ZAHOOR mech supervisor
PDF
venkatesh QC resume.
DOC
CV Dodo NEW
PDF
Mohammed Moosa CV
DOCX
OMIJIE ehinomen prince Reviewed cv
DOCX
OMIJIE ehinomen prince Reviewed cv
DOC
Ghullam murtaza cv (1)
DOC
Sr. QA/QC Mechanical Engineer
DOCX
QC Supervisor Saji M
Bannichan Savier CV
Lory Francis Navor - CV
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Jordan Cv
QAQC MEP HVAC INSPECTOR
CV_Suhail
Renie CV Mechanical and Piping
Cv precast concrete
Civil QA&QC Inspector Updated Resume
Resume - NATARAJAN SIVASUBRAMANI
AZHAR ZAHOOR mech supervisor
venkatesh QC resume.
CV Dodo NEW
Mohammed Moosa CV
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
Ghullam murtaza cv (1)
Sr. QA/QC Mechanical Engineer
QC Supervisor Saji M
Ad

Viewers also liked (15)

ODP
La bruixa i el gat presentación
ODP
Paraula de gos presentació
PPTX
Rectangle 2
PPTX
Using Social Media to make club life easier 2016
PDF
Conceptes matematics
ODP
Alphabet
ODP
El rossinyol
PPTX
Conte triangle
PPTX
Studying abroad in usa - Concordia in India
PPT
Shapes and colours
DOC
SANJAY__B
ODP
El pallasso que no volia fer
DOCX
TheOfficeofSustainabilityProposal
ODP
La bruixa altagràcia
PDF
Worldwide Logistics Group[PDF].2014
La bruixa i el gat presentación
Paraula de gos presentació
Rectangle 2
Using Social Media to make club life easier 2016
Conceptes matematics
Alphabet
El rossinyol
Conte triangle
Studying abroad in usa - Concordia in India
Shapes and colours
SANJAY__B
El pallasso que no volia fer
TheOfficeofSustainabilityProposal
La bruixa altagràcia
Worldwide Logistics Group[PDF].2014
Ad

Similar to MS-Abinash (20)

DOC
curr. vitae
PDF
Nadeem kumar cv
DOC
PIPING SUPERVISOR RESUME
DOCX
Ravi Resume
DOC
cv_piping engineer updated
DOCX
DEEPES - Copy (2)
DOC
abhinav rawat resume
DOCX
A.Manigandan -CV 24-06-15
DOCX
Piping Engineer
PDF
RESUME PIPING SUPERVISOR
DOCX
Manish Ray - CV
DOC
SRIMANIVANNAN UPDATED RESUME - 12.04.2015
DOCX
Resume for Mechanical Engineer (1)
DOC
abhinav rawat
DOCX
Piping Welding Engineer
DOCX
@RAJENDRA YADAV Resume_1
DOC
TARIQUE ALSTOM
DOC
Allen Schmitgen pushkar resume'
DOCX
updated CV
DOC
Pipe fabricator cv venkata ratna kumar yarrapragada
curr. vitae
Nadeem kumar cv
PIPING SUPERVISOR RESUME
Ravi Resume
cv_piping engineer updated
DEEPES - Copy (2)
abhinav rawat resume
A.Manigandan -CV 24-06-15
Piping Engineer
RESUME PIPING SUPERVISOR
Manish Ray - CV
SRIMANIVANNAN UPDATED RESUME - 12.04.2015
Resume for Mechanical Engineer (1)
abhinav rawat
Piping Welding Engineer
@RAJENDRA YADAV Resume_1
TARIQUE ALSTOM
Allen Schmitgen pushkar resume'
updated CV
Pipe fabricator cv venkata ratna kumar yarrapragada

MS-Abinash

  • 1. Curriculum Vitae – Mechanical Superintendent, Oil and Gas, Power, Petrochemical – Refinery ABINASH SUNDAR ROUTRAY routray_abinash@rediffmail.com, routrayabinash@yahoo.com Mobile: +91 8895802143®, +91 9777442158 Date of Birth: 24th June, 1966, Place of Birth: Balarampur, Keonjhar, Orissa (India) Objective: Continuous Improvement - look forward to work with MNCs where there is always a team-work environment and possibility to grow by putting hard work with honesty and with always learning and positive attitude. PASSPORT DETAIL-G3007457 (valid up to 16th October 2017) Permanent Address: S/O : Sri Anadi Charan Routray At/p.o : Balarampur P.S : Ghashipura Dist : Keonjhar, Pin code: 758025. State : Orissa. Educational Background:  Diploma in Mechanical -1987 U.C.P Berhampur, Orissa, India. Professional Trainings received:  Level II in Non Destructive Testing for different methods (RT, UT, MPT, and DPT). Computer Exposure: M.S-Office, Excel & Out look Languages Known: . English, Hindi, & Oriya
  • 2. Summary Of Experience: A certified mechanical engineer with more than 20 years experience in the field of engineering, management, supervision, coordination and inspection of process piping for petrochemical, Refinery,LNG, Chemical, Steel plant, Compressor Station, for clients such as IOCL,Y-LNG,RIL, Deepak Steel & Power. Ensuring all phases of project are completed on agreed schedule with safety and quality requirements. Work Experience Track Record: Current Employment: Jindal Steel And Power Limited (Angul, Odisha, India.) 7th October 2014 and Continuing. Mechanical In charge for Shop Fabrication. Experience : Essar Construction Oversease Limited .Borouge CGC -1 Project Ruwiese Abu Dhabi. Mechanical Lead- Excuting Piping, Equipments Like Silos Erection and Installation. Coordinating with Client for Tie-In Jobs Etc. 22nd jan to 10th June 2014. Current Employment: Petron Engineering and Construction limited R.C.M for GAIL PETROCHEMICAL COMPLEX (GPU UNIT) PATA, U.P, INDIA. 25th June 2012 to 8th oct 2013 Resposible- Site Incharge for GPU phase –II expansion. Experience: Uhde India Pvt. Ltd.(Thyssen Krupp Group) for IOCL VGO/HDT and DHDT Project (PARADEEP ORISSA, INDIA) 16th November to 20th June Construction Manager  Fire Heater for VGO/HDT and DHDT unit.  Regularly report to the Client IOCL on all activities status.  Monitored the performance of contractor (Heurtey Petrochem and Petron), reviewed the method statement and job safety analysis and implement safely.  Implemented and planned the execution strategies, resource planning, contractors monitoring and oversight programs.  Attend and anticipate in site meetings as Owner’s representative.  Review and comment on EPC Monthly Progress Report and provide input directly to the Client for further consolidation and feedback to EPC progress.  Managed to check all the incoming materials for the units.
  • 3.  Managed and supervised all piping fabrication, erection, fit-up, welding inspection, hydro testing, pneumatic testing, bolt tensioning and torque as required, cleanliness check, air blowing and tightness test.  Supervised and inspected the erection/installation and pre-commissioning of Process piping for VGO/HDT project.  Committed for the implementation of a safe working environment for the contractor team without any incident and injury free culture.  Acting as a key interface with the contractor to coordinate progress, priorities and change management and assure quality in design work.  Working closely with the contractor teams to assure quality and compliance with specifications for the Overall designs and the construction execution plan.  Verify achievement of project milestones and progress versus plan Experience: Uhde India Pvt. Ltd. (Thyssen Krupp Group) for IOCL VGO/HDT Project. (Vadodara, Gujrat) 25th Jan 2010 to 13th November 2010 Construction Manager  Supervised and overviewed the contractor (GDCL) to implement the requirements of the contract including the drawings and specifications.  Reviewed the construction procedure and job safety analysis.  Planned the overall activities and coordinated with other discipline in the same area.  Maintained the quality control records and work safely.  Closely monitoring the Erection of Equipments, installation of package units with related to unit piping for VGO unit.  Monitored the flow of all work with the objective of improving the contractor’s productivity, schedule performance, and safety.  Ensured all Piping quality control records required are completed prior to final Inspection.  Supervised the implementation of approved commissioning procedure as applicable for the Piping. Generated & managed the mechanical completion punch list for the Piping prior to final acceptance.  Attended the weekly progress and coordination meeting as required. Achieved the milestone of piping progress.  Managed and supervised all piping fabrication, erection, fit-up, welding inspection, hydro testing, pneumatic testing, bolt tensioning and torque as required, cleanliness check, air blowing and tightness test.  Supervised and inspected the erection/installation and pre-commissioning of Process piping  To assist pre commissioning and commissioning activities of systems completed include flange joint leak test, air flushing, water flushing, nitrogen purging etc. To execute overall on plot piping fabrication and erection works include identification of materials, coordination for the qualification of welders, inspection of site as per isometric, GAD and P&ID, fabrication of pipe spool, organize inspection of welding, coordination for the NDT, installation of piping, preparation of as built drawing and test pack, preparation of mechanical punch list, hydro testing, Flange Management and box up activities as per applicable codes, procedure and standards Experience: Punj Lloyd Ltd. For Y-LNG, PMC-YEMGAS (YENEN) LNG-Project 7th Jan 2009 to 10th Sept 2009
  • 4. Deputy Manager  BOG compressor, Sea water intake system and ETP unit erection and commissioning with piping.  Supervision and monitoring the construction activities such as Fabrication of pipes and supports and its erection.  Ensure that Field Quality Control Plan (FQCP) is implemented and drawings are updated at workshop to avoid rework on site.  Managed and supervised all pipe rack and related steel structures erection, fit-up, welding inspection, bolt tensioning and torque as required, cleanliness check, and tightness test.  Performed other duties such as supervision for Pipe Erection, Installation, Fit-up, welding, Testing etc.  Prepare internal construction punch list for clearing before final inspection of client. Experience: Punj Lloyd Ltd.For RIL, EWPL Project (Compressor Station-7&8) 5th January 2008 to 3rd January 2009. Deputy Manager Piping  Ensure that construction activities are carried out to the highest HSE standards.  Monitors and coordinates Equipments and Pipe erection, Installation of various valves at position.  Coordinate, plan and schedule day-to-day inspection related work activities and directions of existing plant operation units.  Monitors and coordinates fabrication of spools and welding as per drawings.  Allocation of work to various groups as per priority.  Conducting Hydro Test As Per Given RFI to QA/ QC.  Conducting Cleaning and Gauging For Piping And Pipelines As Per Given Requirements.  Monitors and coordinates all necessary testing procedures such as visual inspection, radiography, magnetic particle examination, ultrasonic testing, and dye penetrate testing, pressure testing and hydro testing.  Generated & managed the mechanical completion punch list for the piping prior to final acceptance. Experience: L & T ECC Division for Reliance, Project- Reliance Export Refinery (SEZ) Jamnagar, Gujarat. 24th October 2006 to 22nd December 2007 Sr. Engineer Piping  Monitors and coordinates fabrication of spools and welding as per drawings.  Ensure that construction activities are carried out to the highest HSE standards.  Monitors and coordinates Pipe erection.  Allocation of work to various groups as per priority.  Conducting Hydro Test As Per Given RFI to QA/QC.  Conducting Cleaning and Gauging For Piping And Pipelines As Per Given Requirements.  Monitors and coordinates all necessary testing procedures such as visual inspection, radiography, magnetic particle examination, ultrasonic testing, dye penetrate testing, pressure testing and hydro testing.
  • 5.  To supervise and monitor the piping fabrication and installation at different pipe racks in OSBL units including welder qualification, identification of material, preparation of weld production reports, coordination with NDT. Experience: M/S Shree Baba Vishwanath Iron pvt.ltd. Varanasi. 10th September 2004 to 20th August 2006 Mechanical In-Charge (Projects & Maintenance)  Monitoring of Fabrication of structures, and Equipments erection by contractors.  Managed and supervised all pipe rack steel structures erection.  Performed other duties such as supervision for Pipe Erection, Installation, Fit-up, welding.  To check the Bill of Material (Material Take Off) as per drawing for ensuring requirements are realistically quantified as per scope and budget and follow up the delivery of the project/construction materials.  To liaise with procurement and material management team to ensure the project materials and equipments delivery are in time as per planned schedule to site.  To study the vendor manuals for monitoring the materials delivery and ensuring all inspection of equipments and material as per vendor specification  Ensure that contractors will comply with HSE requirements at site. Experience: M/S Deepak Steel & Power ltd. Barbil, Orissa 5th July 2002 to 08th August 2004. Mechanical Engineer (Project)  Looking after overall extension of raw material handling system.  E.g. Fabrication & Erection of Mechanical Building structures, Equipments.  Monitoring of Fabrication of structures, and Equipments erection by contractors.  Performed other duties such as supervision for Pipe Erection, Installation, Fit-up, welding.  Visual Inspection of Fit-up & welding activity.  Assist and support Line Management and Supervision in all.  Involved in preparation of Material take off and manpower supervision. Experience: M/S Grewal Associates.Barbil, Orissa. 1st June 2000 to 3rd July 2002. Company Mechanical Engineer  Looking after overall extension of raw material handling system.  E.g. Fabrication & Erection of Mechanical Building structures, Equipments.  Preparation of daily progress report.  Preparation of estimation based on AFC drawing and prepare procurement schedule for complete the project on schedule time.
  • 6.  Guidance to junior related to construction, quality control and how to maintain the work schedule.  Responsible for ensuring the works are carried out with commitment to health and safety legislation and company and site regulation. Experience: M/S Indfab with NINL- Dubri, NTPC- Kaniha, NALCO- Anugul, Super Thermal power plant Talcher under Bridge & Roof (I) ltd. L&T ltd. 1st June 1990 to 25th May 2000. Engineer  Involves in Project works of Mechanical Construction.  Visual Inspection of Fit-up & Welding activity.  Man power planning & Mobilization of different project sites. Assist and support Management and Supervision in all.  Involved in preparation of Material take off and manpower supervision.  Looking after client Billing & Follow up.  Arrangement of Resources. routray_abinash@rediffmail.com, routrayabinash@gmail.com, AT/PO-BALARAMPUR, VIA-KUSHALESWAR, DIST-KEONJHAR, ORISSA, PIN-758025