Network Proposal
Introduction
The scope of this proposal is to create a
better network for the Preston University
that will allow them flexibility in the
following categories:
• Security
• Data Backup
• Network Scalability
Prepared By hamza khan
Campus Details (2015)
• 1 buildings on campus
• 1computer lab
• 4 administration / support facilities
• Population (2015)
• Total 2015 Population – approx 560
• 380 Full time Students, 120 Part time
Students, 500 Total Students , 25 Academic
Staff, 35 Support Staff / Management
Inventory of Network Devices
Devices Need
• 2Switches
• 2Routers
• 57 computers (50 for lab ,7 for
Support Staff /
Management Server Equipment
• coaxial cable roll 1000 ft
• 3 Print Servers
• 1 Web Server
• 1 Application Server
• 1 Server (Linux OS)
Server Equipment Continue:
• 1 Directory Server for the
Windows Server 2003/2008
• 1 Database Server
Workstations
• 3 Workstations
• 3 Printers
We are using mesh topology
Software Requirements
• All workstation will be configured in the same
manner. An image disk will be created to allow
greater flexibility when troubleshooting.
• All workstations will be running Virus Scan,
Microsoft Office and Microsoft Live for email
solutions.
• Applications such as Medical Management,
Windows Server 2003, SQL and Fedora 8 will be
hosted at the City Center location via VPN.
Disaster Recovery
Disaster Recovery
• Being able to recover fast
is key to the continuation
of a business.
• Fixing or Replacing
hardware
• Backups
• Software errors
• Knowing the legal
ramifications
Planning before it happens
saves time and prevents the
company from losing
generated income. The scope
of the Disaster Recovery Plan
is to give the IT Admin a
general idea of what to do in
the event of an emergency.
Cost Analysis
After examining the Disaster Recovery Plan, lets take a look
at the cost of a disaster from an extreme point of view. The
most valued components of the Preston University is its
servers to do business with the insurance companies.
Example: 3 Servers are down and none operational. Each
server costs 6000rs and it will take 4 hours each to get new
servers online and operational.
Cost Analysis Continue
Now, I have created a percentage in which is more important to the company or
should be of importance.
Application Server 20% of the business
Web Server 10% of the business
Database Server 30% of the preston university
Total cost required to develop this network is 60000rs
Testing New Network
• Through using a
Network Testing
Script, many areas
of the network can
be tested at once.
This will ensure that
there are no
problems once the
network is in place
for business.

More Related Content

PDF
LAN Proposal
PDF
CMIT/265 FINAL PROJECT NETWORK DESIGN PROPOSAL
PPT
WAN Design Project
PDF
A University Network Design Exercise
PDF
Network upgrade
DOCX
Comprehensive AAP
DOCX
Lis 4482 final report
PPTX
Network Infrastructure Upgrade - Nextrio
LAN Proposal
CMIT/265 FINAL PROJECT NETWORK DESIGN PROPOSAL
WAN Design Project
A University Network Design Exercise
Network upgrade
Comprehensive AAP
Lis 4482 final report
Network Infrastructure Upgrade - Nextrio

What's hot (20)

PDF
Network assignment on project design
PDF
Proposal to Manage the Upgrade of the IT Infrastructure for PPESA
PDF
Sonali Bank Network Design Project Report
DOC
Wan Ii Final Project
PPTX
Design of network
PPTX
Building an Enterprise Fiber Network for a Local Government, An Architectural...
DOCX
NT2799 FINAL CAPSTONE PROJECT.DOCX
PPT
Network Trends
PPT
Capstone Presentation For Five Rivers Medical Centers
PDF
Install network cable module CSS NC2
PPTX
Swl9
PPTX
Seamlessly Optimize Remote Network Performance
PPTX
Amdlrmo needs
DOC
Avinash_Mishra
PPT
PPT
Dasar komputer chapter8
PDF
Realise the Value in modern Data Center Infrastructure
PPTX
Topic 3.2 internet service provider
PPTX
Internet Architecture and Design Philosophy
PDF
IntraVUE: Providing advanced analytics for Industrial Ethernet Applications
Network assignment on project design
Proposal to Manage the Upgrade of the IT Infrastructure for PPESA
Sonali Bank Network Design Project Report
Wan Ii Final Project
Design of network
Building an Enterprise Fiber Network for a Local Government, An Architectural...
NT2799 FINAL CAPSTONE PROJECT.DOCX
Network Trends
Capstone Presentation For Five Rivers Medical Centers
Install network cable module CSS NC2
Swl9
Seamlessly Optimize Remote Network Performance
Amdlrmo needs
Avinash_Mishra
Dasar komputer chapter8
Realise the Value in modern Data Center Infrastructure
Topic 3.2 internet service provider
Internet Architecture and Design Philosophy
IntraVUE: Providing advanced analytics for Industrial Ethernet Applications
Ad

Viewers also liked (17)

PPT
Group 3 (Revised) Network Design Proposal Presentation
PPTX
Network proposal ppt
PPTX
Bie tans network proposal
PPT
Network Design
PDF
Growth Philanthropy Network Case Study Proposal
PPT
Networkdesign ppts
PDF
Acme Network Proposal
PDF
The campus cabling system solutions
PDF
Ms 200 network interface
PDF
Proposal for Hotel Managment System
PPT
Network Design for HS3.pptx
PDF
It 200 project 2 - group 4 - final
PPTX
UNC315 3
PPTX
Software Developement Proposal (Hotel Manager 1.0)
PPTX
Capstone Powerpoint
Group 3 (Revised) Network Design Proposal Presentation
Network proposal ppt
Bie tans network proposal
Network Design
Growth Philanthropy Network Case Study Proposal
Networkdesign ppts
Acme Network Proposal
The campus cabling system solutions
Ms 200 network interface
Proposal for Hotel Managment System
Network Design for HS3.pptx
It 200 project 2 - group 4 - final
UNC315 3
Software Developement Proposal (Hotel Manager 1.0)
Capstone Powerpoint
Ad

Similar to Networkproposalppt 101202160050-phpapp01 (20)

PPTX
Share point disaster avoidance architecture for large scale enterprises
PPTX
1-Introduction.pptx computer Networking
PPT
Disaster Recovery NTC 2010
PPT
Quantum Networks[1] Power Point
PPT
Infrastructure Strategy Plan
DOCX
Cilent to server network plan
PPT
UAEU - IT All Hands Meeting (Fall 2005)
PDF
Jonathan Frappier – Challenge 2 Design Solution
PDF
5 Ways to Avoid Server and Application Downtime
PPTX
Maintenance of Hospital Information System
DOC
Resume.doc
PDF
Disaster Recovery: Develop Efficient Critique for an Emergency
PDF
Summit 2010 Infra Ratios Positionning Integrators
PDF
Inside the PostgreSQL Project Infrastructure
PDF
FISL: Content Management Primer
PDF
Parallel and Distributed Computing: BOINC Grid Implementation Paper
PDF
"Parallel and Distributed Computing: BOINC Grid Implementation" por Rodrigo N...
PPTX
Indusrial trainning Report presentation
PPTX
online ambulance service.pptx
Share point disaster avoidance architecture for large scale enterprises
1-Introduction.pptx computer Networking
Disaster Recovery NTC 2010
Quantum Networks[1] Power Point
Infrastructure Strategy Plan
Cilent to server network plan
UAEU - IT All Hands Meeting (Fall 2005)
Jonathan Frappier – Challenge 2 Design Solution
5 Ways to Avoid Server and Application Downtime
Maintenance of Hospital Information System
Resume.doc
Disaster Recovery: Develop Efficient Critique for an Emergency
Summit 2010 Infra Ratios Positionning Integrators
Inside the PostgreSQL Project Infrastructure
FISL: Content Management Primer
Parallel and Distributed Computing: BOINC Grid Implementation Paper
"Parallel and Distributed Computing: BOINC Grid Implementation" por Rodrigo N...
Indusrial trainning Report presentation
online ambulance service.pptx

Recently uploaded (20)

PPTX
DS-40-Pre-Engagement and Kickoff deck - v8.0.pptx
PDF
Jean-Georges Perrin - Spark in Action, Second Edition (2020, Manning Publicat...
PPTX
IMPACT OF LANDSLIDE.....................
PDF
Best Data Science Professional Certificates in the USA | IABAC
PPTX
Crypto_Trading_Beginners.pptxxxxxxxxxxxxxx
PPTX
ai agent creaction with langgraph_presentation_
PPTX
sac 451hinhgsgshssjsjsjheegdggeegegdggddgeg.pptx
PPT
expt-design-lecture-12 hghhgfggjhjd (1).ppt
PDF
Systems Analysis and Design, 12th Edition by Scott Tilley Test Bank.pdf
PPTX
1 hour to get there before the game is done so you don’t need a car seat for ...
PDF
Loose-Leaf for Auditing & Assurance Services A Systematic Approach 11th ed. E...
PPTX
FMIS 108 and AISlaudon_mis17_ppt_ch11.pptx
PDF
CS3352FOUNDATION OF DATA SCIENCE _1_MAterial.pdf
PPTX
Lesson-01intheselfoflifeofthekennyrogersoftheunderstandoftheunderstanded
PDF
©️ 01_Algorithm for Microsoft New Product Launch - handling web site - by Ale...
PPTX
Phase1_final PPTuwhefoegfohwfoiehfoegg.pptx
PPT
statistics analysis - topic 3 - describing data visually
PPTX
statsppt this is statistics ppt for giving knowledge about this topic
PPTX
The Data Security Envisioning Workshop provides a summary of an organization...
PDF
Global Data and Analytics Market Outlook Report
DS-40-Pre-Engagement and Kickoff deck - v8.0.pptx
Jean-Georges Perrin - Spark in Action, Second Edition (2020, Manning Publicat...
IMPACT OF LANDSLIDE.....................
Best Data Science Professional Certificates in the USA | IABAC
Crypto_Trading_Beginners.pptxxxxxxxxxxxxxx
ai agent creaction with langgraph_presentation_
sac 451hinhgsgshssjsjsjheegdggeegegdggddgeg.pptx
expt-design-lecture-12 hghhgfggjhjd (1).ppt
Systems Analysis and Design, 12th Edition by Scott Tilley Test Bank.pdf
1 hour to get there before the game is done so you don’t need a car seat for ...
Loose-Leaf for Auditing & Assurance Services A Systematic Approach 11th ed. E...
FMIS 108 and AISlaudon_mis17_ppt_ch11.pptx
CS3352FOUNDATION OF DATA SCIENCE _1_MAterial.pdf
Lesson-01intheselfoflifeofthekennyrogersoftheunderstandoftheunderstanded
©️ 01_Algorithm for Microsoft New Product Launch - handling web site - by Ale...
Phase1_final PPTuwhefoegfohwfoiehfoegg.pptx
statistics analysis - topic 3 - describing data visually
statsppt this is statistics ppt for giving knowledge about this topic
The Data Security Envisioning Workshop provides a summary of an organization...
Global Data and Analytics Market Outlook Report

Networkproposalppt 101202160050-phpapp01

  • 2. Index • Introduction • Campus details (2015) • Inventory of Hardware & Network Devices • Software Requirement • Disaster Recovery & Cost Analysis
  • 3. Network Proposal Introduction The scope of this proposal is to create a better network for the Preston University that will allow them flexibility in the following categories: • Security • Data Backup • Network Scalability Prepared By hamza khan
  • 4. Campus Details (2015) • 1 buildings on campus • 1computer lab • 4 administration / support facilities • Population (2015) • Total 2015 Population – approx 560 • 380 Full time Students, 120 Part time Students, 500 Total Students , 25 Academic Staff, 35 Support Staff / Management
  • 5. Inventory of Network Devices Devices Need • 2Switches • 2Routers • 57 computers (50 for lab ,7 for Support Staff / Management Server Equipment • coaxial cable roll 1000 ft • 3 Print Servers • 1 Web Server • 1 Application Server • 1 Server (Linux OS) Server Equipment Continue: • 1 Directory Server for the Windows Server 2003/2008 • 1 Database Server Workstations • 3 Workstations • 3 Printers We are using mesh topology
  • 6. Software Requirements • All workstation will be configured in the same manner. An image disk will be created to allow greater flexibility when troubleshooting. • All workstations will be running Virus Scan, Microsoft Office and Microsoft Live for email solutions. • Applications such as Medical Management, Windows Server 2003, SQL and Fedora 8 will be hosted at the City Center location via VPN.
  • 7. Disaster Recovery Disaster Recovery • Being able to recover fast is key to the continuation of a business. • Fixing or Replacing hardware • Backups • Software errors • Knowing the legal ramifications Planning before it happens saves time and prevents the company from losing generated income. The scope of the Disaster Recovery Plan is to give the IT Admin a general idea of what to do in the event of an emergency.
  • 8. Cost Analysis After examining the Disaster Recovery Plan, lets take a look at the cost of a disaster from an extreme point of view. The most valued components of the Preston University is its servers to do business with the insurance companies. Example: 3 Servers are down and none operational. Each server costs 6000rs and it will take 4 hours each to get new servers online and operational.
  • 9. Cost Analysis Continue Now, I have created a percentage in which is more important to the company or should be of importance. Application Server 20% of the business Web Server 10% of the business Database Server 30% of the preston university Total cost required to develop this network is 60000rs
  • 10. Testing New Network • Through using a Network Testing Script, many areas of the network can be tested at once. This will ensure that there are no problems once the network is in place for business.

Editor's Notes

  • #2: Please use the left mouse button, no animation has been installed in this presentation.
  • #3: Please use the left mouse button, no animation has been installed in this presentation.
  • #6: Please use the left mouse button, no animation has been installed in this presentation.