INDIAN HUMAN SPACEFLIGHT PROGRAM – DREAM OF 1.25 BILLION
INDIANS
INTRODUCTION
• India plans to build a crew vehicle that can accommodate 2 or 3 astronauts and
human rate its GLSV Mk-III launcher
• Initially, a manned space flight was proposed before 2017, at a budget of Rs
12.4 billion ($242 million), using a fully autonomous orbital vehicle carrying
two or three crew members to 400-km (250 miles) low Earth orbit for up to 7
days and back.
• The planning commission approved the mission and the government
sanctioned Rs 95 crore to study all aspects of the manned space mission.
• Following the back-to-back failure of two GSLV flights in 2010, India dropped
definitive manned space flight plans. ISRO is instead concentrating on
capability building.
New microsoft power point presentation (18)
CREW VEHICLE
• The modified Soyuz will be carried atop a GSLV II / GSLV III launcher that will lift off from a
new (third) launch pad at ISRO's Satish Dhawan Space Center in Sriharikota.
• ISRO's concept is to accommodate two, with an option for a third traveler, in a three ton
capsule.
• The spacecraft is being designed for a seven day mission on completion of which it will splash
down either in the Arabian Sea or the Bay of Bengal.
• On May 1, 2013, ISRO posted a new drawing of its CM (above), which is different from the
drawing released during Aero India 2009 (Top).
• The CM design has evolved but conceptually remains the same.
• The service module now looks much larger than CM, which could be because ISRO has settled
on a 2 man spacecraft.
New microsoft power point presentation (18)
CREW ESCAPE SYSTEM
• As part of its HSP, ISRO is developing a Crew Escape System (CES) which would allow
astronauts in their crew module to safely separate from the launch vehicle and parachute down to
safety in the event of an emergency on the launch pad, or during the initial ascent phase of
launch.
• The CES is powered by a Low altitude Escape Motor (LEM), a reverse flow solid propellant rocket
engine with multiple nozzles mounted on the forward end.
• The LEM will be stacked above the CM in an arrangement that keeps its exhaust gases clear of
the crew.
• The design of reverse flow solid rocket motor with multiple nozzles is a first for ISRO.
• ISRO plans to conduct a Launch Pad abort test in 2014.
New microsoft power point presentation (18)
CREW MODULE RE-ENTRY SYSTEM
• In April 2013 ISRO conducted a Plasma wind tunnel test on a 1:28 scaled model of the Human
Spaceflight Program (HSP) Crew Module (CM) at the 6 MW high enthalpy facility at VSSC to
check the performance and evaluate the erosion characteristics of the Thermal Protection
System (TPS) material of the CM.
• The CM would encounter temperatures in the range of 6,000 K to 10,000 K during re-entry.
• At such temperatures, the air gets dissociated and ionised and gets into a hyper reactive state.
• Light weight, high performance TPS is employed to protect the vehicle in such a hostile
environment.
• The Plasma wind tunnel facility simulates the re-entry thermal regimes for the qualification of
TPS.
New microsoft power point presentation (18)
HUMAN SPACE FLIGHT LAUNCH PAD
• A new launch pad is being built for use with the Human Rated Launcher. Later, the new
launch pad will be also used with the Reusable Launch Vehicle (RLV).
• It will be located 1 km south of Launch Pad 2, which was first used to launch the Chadrayaan-
1 mission.
• In January 2010 an ISRO official said design work on the third launch pad had been
completed.
• It will be able to take care of all future programmes of the ISRO, including the Human Space
Flight Mission and the Reusable Launch Vehicle," the officials said.
New microsoft power point presentation (18)
ENVIRONMENTAL CONTROL & LIFE SUPPORT
SYSTEMS (ECLSS)
• A chamber has been built to simulate a space environment and facilitate testing of of ECLSS
and Flight Suit.
• ISRO built five development Flight Suit variants and based on a review of their functioning
finalized the final configuration.
• It built two engineering modes based on the final configuration and these have undergone
functional acceptance tests.
• Flight Suit has been tested to assess leak and material compatibility under vacuum conditions.
• ISRO plans to commission an Environmental Simulation Chamber (ESC) before the end of
2014 to test engineering model of subsystems of ECLSS and the flight suit.
REFERENCES
• http://isp.justthe80.com/human-spaceflight-programme-hsp/Human-Spaceflight-
Program
• http://isp.justthe80.com/human-spaceflight-programme-hsp/Human-Spaceflight-
Program/indianmannedspacecraft.jpg?attredirects=0
• https://lh6.googleusercontent.com/-
hEqu3sLDycM/UYEBqZHqG0I/AAAAAAAAAPk/n3F4BMybi1I/w383-
h480/ISRO_HSP_Crew_Module.jpg
• http://3.bp.blogspot.com/_Pw3o81q_AMY/SZRYWmkerPI/AAAAAAAAAD8/_YQXOt7
ajVI/s320/ISRO-HSF-Capsule.jpg
THANK YOU

More Related Content

PPTX
Spaceplanes
PPTX
REUSABLE LAUNCH VEHICLE
PPTX
satellite launcher
PDF
Satellite launch science activity
DOCX
India successfully tests winged reusable launch vehicle
PPTX
Isro’s advanced technology vehicle (atv) – light rockets for many experiments
PDF
Indian space launch vehicle
PPTX
Indian satellite lunch vehicles
Spaceplanes
REUSABLE LAUNCH VEHICLE
satellite launcher
Satellite launch science activity
India successfully tests winged reusable launch vehicle
Isro’s advanced technology vehicle (atv) – light rockets for many experiments
Indian space launch vehicle
Indian satellite lunch vehicles

What's hot (20)

PPTX
India’s launch vehicles
PDF
Reference Guide To The International Space Station
PDF
Orbit design for exoplanet discovery spacecraft dr dora musielak 1 april 2019
PDF
Spacecraft orbits for exoplanets discovery lecture dr dora musielak 11 june 2021
PPTX
INDIA'S MARS ORBITER MISSION
PPTX
Gslv mk iii crew module
PPT
The Ares Projects: Back to the Future
PPTX
Mangalyaan
PPTX
Satellite launching vehicles
PPTX
Mangalyaan presentation
PPTX
Mangalyaan
PPTX
Indian Satellite Program(2001-2020)
PPTX
MARS ORBITER MISSION (MOM) (MANGALYAN)
PPTX
MANGALYAAN
PPTX
ISRO PSLV C-37 The pride of INDIA.
DOCX
Gslv mk3 report
PPT
space technology
PPTX
DOCX
CASE STUDY ON MANGALYAAN Final
India’s launch vehicles
Reference Guide To The International Space Station
Orbit design for exoplanet discovery spacecraft dr dora musielak 1 april 2019
Spacecraft orbits for exoplanets discovery lecture dr dora musielak 11 june 2021
INDIA'S MARS ORBITER MISSION
Gslv mk iii crew module
The Ares Projects: Back to the Future
Mangalyaan
Satellite launching vehicles
Mangalyaan presentation
Mangalyaan
Indian Satellite Program(2001-2020)
MARS ORBITER MISSION (MOM) (MANGALYAN)
MANGALYAAN
ISRO PSLV C-37 The pride of INDIA.
Gslv mk3 report
space technology
CASE STUDY ON MANGALYAAN Final
Ad

Viewers also liked (7)

PDF
Ipcs india and the rafale abhijit mitra-iyer
PPT
Tejas light combat aircraft
PPTX
Indian Air Force
PPT
INDIAN AIR FORCE
PPTX
Inspiring motivational ppt of indian army.
PPT
Presentation On Fighter Planes
PPTX
Indian army
Ipcs india and the rafale abhijit mitra-iyer
Tejas light combat aircraft
Indian Air Force
INDIAN AIR FORCE
Inspiring motivational ppt of indian army.
Presentation On Fighter Planes
Indian army
Ad

More from hindujudaic (20)

PPTX
Zulfiquar Class Frigates
PPTX
XA-200, Finland - Wheeled Armoured Vehicle
PPTX
Military Decisions Gone WRONG (Part 5)
PPTX
Military Decisions Gone WRONG - Part iv
PPTX
Military Decisions Gone WRONG (Part 3)
PPTX
Worst military decisions ever made – part ii
PPTX
Military Decisions Gone WRONG (Part 1)
PPTX
Mysteries of Wars (Part 2)
PPTX
Mysteries of Wars (Part 1)
PPTX
Vega 4x4 Multi Purpose Armoured Vehicle, Czech Republic
PPTX
uxv Combatant, UK - Royal Navy's Warship Concept of 21st Century
PPTX
Unit 101, Israel - Bane of Israel's Enemies
PPTX
Tsunami Bomb - Weapons Getting Nasty
PPT
Top ten Diamond Producing Countries
PPT
Top ten Coal Producing Countries
PPTX
The Israeli-palestinian-conflict-historical-review
PPT
The top ten most expensive watches in the world
PPTX
Top Ten Richest Terror Networks
PPTX
History of Telephone
PPTX
Tatra, India - All Terrain Vehicles for Indian Armed Forces
Zulfiquar Class Frigates
XA-200, Finland - Wheeled Armoured Vehicle
Military Decisions Gone WRONG (Part 5)
Military Decisions Gone WRONG - Part iv
Military Decisions Gone WRONG (Part 3)
Worst military decisions ever made – part ii
Military Decisions Gone WRONG (Part 1)
Mysteries of Wars (Part 2)
Mysteries of Wars (Part 1)
Vega 4x4 Multi Purpose Armoured Vehicle, Czech Republic
uxv Combatant, UK - Royal Navy's Warship Concept of 21st Century
Unit 101, Israel - Bane of Israel's Enemies
Tsunami Bomb - Weapons Getting Nasty
Top ten Diamond Producing Countries
Top ten Coal Producing Countries
The Israeli-palestinian-conflict-historical-review
The top ten most expensive watches in the world
Top Ten Richest Terror Networks
History of Telephone
Tatra, India - All Terrain Vehicles for Indian Armed Forces

New microsoft power point presentation (18)

  • 1. INDIAN HUMAN SPACEFLIGHT PROGRAM – DREAM OF 1.25 BILLION INDIANS
  • 2. INTRODUCTION • India plans to build a crew vehicle that can accommodate 2 or 3 astronauts and human rate its GLSV Mk-III launcher • Initially, a manned space flight was proposed before 2017, at a budget of Rs 12.4 billion ($242 million), using a fully autonomous orbital vehicle carrying two or three crew members to 400-km (250 miles) low Earth orbit for up to 7 days and back. • The planning commission approved the mission and the government sanctioned Rs 95 crore to study all aspects of the manned space mission. • Following the back-to-back failure of two GSLV flights in 2010, India dropped definitive manned space flight plans. ISRO is instead concentrating on capability building.
  • 4. CREW VEHICLE • The modified Soyuz will be carried atop a GSLV II / GSLV III launcher that will lift off from a new (third) launch pad at ISRO's Satish Dhawan Space Center in Sriharikota. • ISRO's concept is to accommodate two, with an option for a third traveler, in a three ton capsule. • The spacecraft is being designed for a seven day mission on completion of which it will splash down either in the Arabian Sea or the Bay of Bengal. • On May 1, 2013, ISRO posted a new drawing of its CM (above), which is different from the drawing released during Aero India 2009 (Top). • The CM design has evolved but conceptually remains the same. • The service module now looks much larger than CM, which could be because ISRO has settled on a 2 man spacecraft.
  • 6. CREW ESCAPE SYSTEM • As part of its HSP, ISRO is developing a Crew Escape System (CES) which would allow astronauts in their crew module to safely separate from the launch vehicle and parachute down to safety in the event of an emergency on the launch pad, or during the initial ascent phase of launch. • The CES is powered by a Low altitude Escape Motor (LEM), a reverse flow solid propellant rocket engine with multiple nozzles mounted on the forward end. • The LEM will be stacked above the CM in an arrangement that keeps its exhaust gases clear of the crew. • The design of reverse flow solid rocket motor with multiple nozzles is a first for ISRO. • ISRO plans to conduct a Launch Pad abort test in 2014.
  • 8. CREW MODULE RE-ENTRY SYSTEM • In April 2013 ISRO conducted a Plasma wind tunnel test on a 1:28 scaled model of the Human Spaceflight Program (HSP) Crew Module (CM) at the 6 MW high enthalpy facility at VSSC to check the performance and evaluate the erosion characteristics of the Thermal Protection System (TPS) material of the CM. • The CM would encounter temperatures in the range of 6,000 K to 10,000 K during re-entry. • At such temperatures, the air gets dissociated and ionised and gets into a hyper reactive state. • Light weight, high performance TPS is employed to protect the vehicle in such a hostile environment. • The Plasma wind tunnel facility simulates the re-entry thermal regimes for the qualification of TPS.
  • 10. HUMAN SPACE FLIGHT LAUNCH PAD • A new launch pad is being built for use with the Human Rated Launcher. Later, the new launch pad will be also used with the Reusable Launch Vehicle (RLV). • It will be located 1 km south of Launch Pad 2, which was first used to launch the Chadrayaan- 1 mission. • In January 2010 an ISRO official said design work on the third launch pad had been completed. • It will be able to take care of all future programmes of the ISRO, including the Human Space Flight Mission and the Reusable Launch Vehicle," the officials said.
  • 12. ENVIRONMENTAL CONTROL & LIFE SUPPORT SYSTEMS (ECLSS) • A chamber has been built to simulate a space environment and facilitate testing of of ECLSS and Flight Suit. • ISRO built five development Flight Suit variants and based on a review of their functioning finalized the final configuration. • It built two engineering modes based on the final configuration and these have undergone functional acceptance tests. • Flight Suit has been tested to assess leak and material compatibility under vacuum conditions. • ISRO plans to commission an Environmental Simulation Chamber (ESC) before the end of 2014 to test engineering model of subsystems of ECLSS and the flight suit.
  • 13. REFERENCES • http://isp.justthe80.com/human-spaceflight-programme-hsp/Human-Spaceflight- Program • http://isp.justthe80.com/human-spaceflight-programme-hsp/Human-Spaceflight- Program/indianmannedspacecraft.jpg?attredirects=0 • https://lh6.googleusercontent.com/- hEqu3sLDycM/UYEBqZHqG0I/AAAAAAAAAPk/n3F4BMybi1I/w383- h480/ISRO_HSP_Crew_Module.jpg • http://3.bp.blogspot.com/_Pw3o81q_AMY/SZRYWmkerPI/AAAAAAAAAD8/_YQXOt7 ajVI/s320/ISRO-HSF-Capsule.jpg