SlideShare a Scribd company logo
Positive Disruption to the Data Centre
Hardware Eco System
in the 21st Century
1John Laban 20th Oct 2016 - V2
John Laban
European Representative
Reset Catalyst
OCP Foundation
@rumperedis
2
Special thanks
3
&
OCP Positive Disruption of the Datacenter Hardware Ecosystem V2
OCP Positive Disruption of the Datacenter Hardware Ecosystem V2
Subject title for Paulo’s email was
Wilful Blindness !!
Laban’s job title is Reset Catalyst
Kubler-Ross Change Curve
Hold tight and get ready for my 21st century roller
coaster bare knuckle ride
at the
OCP Data Centre World
Discrediting 20th Century Data Centres
Why 19 inch racks ?
Why cabling interfaces on the rear of servers ?
Why access false floors in computer rooms ?
Why tight control on relative humidity and temperature ?
Why centralised UPS and battery rooms and mechanical chillers ?
Why rapid break fix and hardware redundancy ?
8
Why 19 inch relay racks ?
9
Module Container
Why 19 inch racks… are not sacrosanct
10
Module
see also Penguin 1/3 OCP servers Container
This human design makes sense
11
Module Container
Why are cabling interfaces on the rear of servers ?
12
LAN on front
Why access false floors in computer rooms ?
13
Why tight control on relative humidity and temperature ?
14
Heat aging and constrained air flows with 40mm fans
Why centralised UPS and battery rooms and mechanical chillers ?
15Thanks to Kushagra Vaid for graphics
16Thanks to Kushagra Vaid for graphics
17Thanks to Kushagra Vaid for graphics
18Thanks to Kushagra Vaid for graphicsLES = Local Energy Store
19Thanks to Kushagra Vaid for slide
Why rapid break fix and hardware redundancy ?
20
Screws x nuts x washers = tools x tools
Complex = infinite rack configurations
Complex = maximum materials
Resilience = hardware redundancy
Green Touch points = no tools
Simple = just six rack configurations
Simple = minimal materials
Resilience = software & chaos monkey proof
20th Century 21th Century
Open Source Ethernet Clos Fabrics & SDN
These remove the need for urgent break fix maintenance
ask these guys why I can fix the component next week ?
Laban’s job is to Reset Mindsets
Kubler-Ross Change Curve
OCP Positive Disruption of the Datacenter Hardware Ecosystem V2
24
Questions
?
Appendix
26
Website - http://www.opencompute.org/
Wiki - http://www.opencompute.org/wiki
Mailing Lists - http://www.opencompute.org/wiki/Mailing_Lists
OCP Web Links and more information
27
Ask
John Laban
+44 7710 124487
john.laban@opencompute.org
@rumperedis
CORD in Linux Foundation + TIP in OCP Foundation
Past Future
………..2019

More Related Content

PPTX
OCP Seminar Wellington New Zealand - John Laban - March 2017
PPTX
OCP presentation Revolution in Data Centre Innovation
PPTX
OCP Copenhagen presentation sept 2017
PPTX
Screws screws screws and why we do what we do in data processing centres issue03
PPTX
OCP Keynote @ 2017 ITroom Infra
PDF
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...
PPTX
Submer ocp webinar the future of power-efficient datacenters
PPTX
OpenUK open source tech and the circular economy laban nov 2020
OCP Seminar Wellington New Zealand - John Laban - March 2017
OCP presentation Revolution in Data Centre Innovation
OCP Copenhagen presentation sept 2017
Screws screws screws and why we do what we do in data processing centres issue03
OCP Keynote @ 2017 ITroom Infra
DCD London 2016 - OCP Data Center Project Engineering Workshop Presentation D...
Submer ocp webinar the future of power-efficient datacenters
OpenUK open source tech and the circular economy laban nov 2020

What's hot (12)

PDF
Open compute and future of data centers
PDF
Bulding a modern infrastructure & data center
PDF
PLNOG 22 - Marcin Kuczera - Open Compute Project by John Laban
PPTX
History of computer electromechanical age
PPTX
Computer history
PPTX
Rob Buckingham. OC Robotics. 28th January
PPTX
Super computers in_uk
PDF
New Technology 2014 L01 L02 A Journey Exploring Technology
PDF
Open Compute Project : Benefit and Challange
PDF
History of-computers513
PDF
HPC, the new normal‎: the Personal Computer is dead. Long live the Personal ...
PPTX
Vacuum Tubes to Silicon and beyond
Open compute and future of data centers
Bulding a modern infrastructure & data center
PLNOG 22 - Marcin Kuczera - Open Compute Project by John Laban
History of computer electromechanical age
Computer history
Rob Buckingham. OC Robotics. 28th January
Super computers in_uk
New Technology 2014 L01 L02 A Journey Exploring Technology
Open Compute Project : Benefit and Challange
History of-computers513
HPC, the new normal‎: the Personal Computer is dead. Long live the Personal ...
Vacuum Tubes to Silicon and beyond
Ad

Viewers also liked (9)

PPTX
A cloud technology based web portal
PDF
Universal Connectivity & Interoperability in the Open Ecosystem
PDF
MAAS & Ubuntu Core: OCP Tech Day, Facebook Menlo Park, Aug 30th
PDF
OCP Summit 2016 - Transforming Networks to All-IT Network with OCP and Open N...
PDF
[154] 데이터 센터의 오픈 소스 open compute project (ocp)
PDF
OSS on Azure ~事例と導入ポイント~
PDF
Activate Tech and Media Outlook 2017
PDF
インフラ野郎AzureチームOCP Summit US 2017号外
PDF
TEDx Manchester: AI & The Future of Work
A cloud technology based web portal
Universal Connectivity & Interoperability in the Open Ecosystem
MAAS & Ubuntu Core: OCP Tech Day, Facebook Menlo Park, Aug 30th
OCP Summit 2016 - Transforming Networks to All-IT Network with OCP and Open N...
[154] 데이터 센터의 오픈 소스 open compute project (ocp)
OSS on Azure ~事例と導入ポイント~
Activate Tech and Media Outlook 2017
インフラ野郎AzureチームOCP Summit US 2017号外
TEDx Manchester: AI & The Future of Work
Ad

Similar to OCP Positive Disruption of the Datacenter Hardware Ecosystem V2 (12)

PPTX
OpenUK seminar : open source tech and sustainability for data centres
PPTX
WTF is Open Source vanity free hardware and how is it causing rumperedis in M...
PPTX
The future of power-efficient datacenters
PDF
Data Centre Utopias: Open source collaboration and sharing
PPTX
1. OCP workshop
PPTX
Open19 9/2016
PPTX
OCP awareness course taster session 01
PPTX
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
PPTX
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
PDF
DCD London 2016 Open Compute Project data center project engineering worksho...
PDF
Bel Power Solutions: Applying Open Compute Rack (OCP) & Power Specifications ...
PDF
The trials and tribulations of providing engineering infrastructure
OpenUK seminar : open source tech and sustainability for data centres
WTF is Open Source vanity free hardware and how is it causing rumperedis in M...
The future of power-efficient datacenters
Data Centre Utopias: Open source collaboration and sharing
1. OCP workshop
Open19 9/2016
OCP awareness course taster session 01
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
DCD London 2016 Open Compute Project data center project engineering worksho...
Bel Power Solutions: Applying Open Compute Rack (OCP) & Power Specifications ...
The trials and tribulations of providing engineering infrastructure

OCP Positive Disruption of the Datacenter Hardware Ecosystem V2

  • 1. Positive Disruption to the Data Centre Hardware Eco System in the 21st Century 1John Laban 20th Oct 2016 - V2
  • 2. John Laban European Representative Reset Catalyst OCP Foundation @rumperedis 2
  • 6. Subject title for Paulo’s email was Wilful Blindness !!
  • 7. Laban’s job title is Reset Catalyst Kubler-Ross Change Curve Hold tight and get ready for my 21st century roller coaster bare knuckle ride at the OCP Data Centre World
  • 8. Discrediting 20th Century Data Centres Why 19 inch racks ? Why cabling interfaces on the rear of servers ? Why access false floors in computer rooms ? Why tight control on relative humidity and temperature ? Why centralised UPS and battery rooms and mechanical chillers ? Why rapid break fix and hardware redundancy ? 8
  • 9. Why 19 inch relay racks ? 9 Module Container
  • 10. Why 19 inch racks… are not sacrosanct 10 Module see also Penguin 1/3 OCP servers Container
  • 11. This human design makes sense 11 Module Container
  • 12. Why are cabling interfaces on the rear of servers ? 12 LAN on front
  • 13. Why access false floors in computer rooms ? 13
  • 14. Why tight control on relative humidity and temperature ? 14 Heat aging and constrained air flows with 40mm fans
  • 15. Why centralised UPS and battery rooms and mechanical chillers ? 15Thanks to Kushagra Vaid for graphics
  • 16. 16Thanks to Kushagra Vaid for graphics
  • 17. 17Thanks to Kushagra Vaid for graphics
  • 18. 18Thanks to Kushagra Vaid for graphicsLES = Local Energy Store
  • 19. 19Thanks to Kushagra Vaid for slide
  • 20. Why rapid break fix and hardware redundancy ? 20 Screws x nuts x washers = tools x tools Complex = infinite rack configurations Complex = maximum materials Resilience = hardware redundancy Green Touch points = no tools Simple = just six rack configurations Simple = minimal materials Resilience = software & chaos monkey proof 20th Century 21th Century
  • 21. Open Source Ethernet Clos Fabrics & SDN These remove the need for urgent break fix maintenance ask these guys why I can fix the component next week ?
  • 22. Laban’s job is to Reset Mindsets Kubler-Ross Change Curve
  • 24. 24
  • 27. Website - http://www.opencompute.org/ Wiki - http://www.opencompute.org/wiki Mailing Lists - http://www.opencompute.org/wiki/Mailing_Lists OCP Web Links and more information 27 Ask John Laban +44 7710 124487 john.laban@opencompute.org @rumperedis
  • 28. CORD in Linux Foundation + TIP in OCP Foundation Past Future ………..2019

Editor's Notes

  • #2: Initially developed for Oct 2016 Frankfurt which was the first OCP event in Germany
  • #3: Discrediting the traditional 20th century computer room practices ......a few teaser  questions.... Reset Catalyst has …..Nothing to do with resetting proprietary cisco catalyst switches..its about mindsets
  • #4: Ciara please stand up! And thanks to you all for coming ..talking to the rear wall is not so much fun !
  • #5: Had my eureka OCP moment had when working at the Facebook data centre in Lulea Sweden. My mission is to tell the data centre industry about OCP solutions and to be a Reset Catalyst to move the 20th century data centre industry into the 21st century.
  • #6: Email from Paulo (not his real name!) six days before the Frankfurt OCP event. Scribbled out his details to protect him. Paulo sells down flow CRAC cooling systems for enterprise data centres. He called his email “willfull blindness”
  • #7: Read the book willful blindness….you will then understand what Paulo means!
  • #8: Get ready for a 21st century roller coaster bare knuckle ride at Data Centre World I might be killing off your babies in the nest fifteen minutes!
  • #9: Discrediting the traditional 20th century computer room practices ......a few teaser  questions.... From the point of view of the 21st century what we did in the 20th century is lamentable and oh, oh, oh so wasteful and downright stupid.
  • #10: 19ich width great for telegraph and railway electromechanical relays. Show of hands …how many of you are fitting relays like these into your data centre computer room racks…yes a big no!
  • #11: OCP wide uses cabinet allows 25% increase in in HDDs . Width was more than optimising for 4inch wide HDD….see Amir email with reasons relating to the Freedom server. See the OCP third width servers on display outside of this room. Open Vault (old name Knox) offers high disk densities, holding 30 drives in a 2U chassis. Increasing rail widths does not increase overall width of rack so they would still fit a 2ft floor grid http://www.opencompute.org/blog/introducing-the-open-rack/
  • #12: See my “screws screws screws why we do the things we do” presentation from Data Centre Conference South at the Barbican in 2015. This presentation takes it to a Monty Pyhonist level of ridiculous humour with candles and chickens. When people laugh there mindsets become malleable Barbican presentation available on request from john.laban@jrlaban.com
  • #13: OCP server value engineering Cables on rear because started as a desk top PC befor being placed in a rack on a shelf.
  • #14: Used for water pipes and not air cooling. Water pipes below so when they leaked the mainframe did not go pop! Air buoyancy means its better practice to pour cool denser air down into warmer room, and not blow it up from the bottom. Note printers and seat/desk positions for people in room. Back then people did not use black racks!!!!
  • #15: Paper curls and jams printers in computer room if wide range of humidity. Paper today still has an up and down and should be placed in printers the right way up.
  • #16: 3D graphic and next few slide provided by OCP_US2015_KushagraVaid_Microsoft_Keynote_final.pdf Available from John Laban or the OCP web site wiki and YouTube channel
  • #19: LES uses Li-ion BBU (Battery Backup Unit) in white space rack/chassis
  • #20: Slide taken from Kushagra’s OCP Summit 2015 keynote. LES = Local Energy Storage ; UPS in the computer room rack. MS OCP solutions puts Li-ion in server and storage chassis and other OCP solutions collocate with rectifier shelves in OCP open V2 racks.
  • #22: Leads into their presentations at the Frankfurt event Mention impact of ocp on support staffing levels in data centres …a 99% reduction compared to 20th century designs and practices
  • #23: Acceptance of the death does not occur until one has been through the earlier emotions. Reset Catalyst ….resetting peoples 20th century data centre mindsets so they can move on into the 21st century’s open source data centres
  • #24: CE0 of a Black Box proprietary hardware solutions that lock-in the user and benefit the few at the expense of the majority
  • #25: Discrediting the traditional 20th century computer room practices ......a few teaser  questions.... Nothing to do with resetting proprietary cisco catalyst switches