Engineering
FM/Defects Rate
Engineering Defect Rate
 Defect Cause
Identification and
Immediate
Reduction
Work orders
Change Controls
 Defect Prevention
and Future
Reduction
Equipment
Evaluation
Upgrades
Project Engineering
2 Prong Approach
Engineering Defect Rate
14% of all work orders can impact
defect rate.
Top 2 categories:
– Metal detectors
– Paint Chips
 Measurement
– Established Number, % Reoccurrence, Category
improvement before and after change.
Metal Detector
Metal Detector Defect Occurrences
0
2
4
6
8
10
12
January
February
M
arch
April
M
ay
June
July
August
Septem
ber
Number of
Occurrences
Goal
Replaced backup batteries
Upgraded repeat offenders
Maintenance focus on metal
detectors in Tableting
Paint Chip Defect Occurrences
0
5
10
15
20
25
30
January
February
M
arch
April
M
ay
June
July
AugustSeptem
ber
Paint Chips
Installed new wall covering
system
Compounding Team
participation
Focus on cleaning methods
in the modules
Foreign Matter
2005 Current FM Initiated QARs
0
5
10
15
20
FM
Black
Speck
FM
TabletsFM
O
therFM
M
etalFM
Fiber
FM
PlasticFM
PestFM
Bottle
FM
Desiccant
FM
G
lass
FM
G
love/rubber
FM
M
aterial
FM Type
NumberofQARs
Equipment FM Risk Assessment
Breakdown Analyses/Investigation
Site FM Action Item Current Listings
Embedding Engineering colleagues
Assigned Engineering colleagues to
support FM specific in specific areas
Coordination of FM teams
Participation in OPM Comstat
Path Forward

More Related Content

PPT
NO-DIG Markets in Germany and Testing of Products
PDF
RT Interpretation (ASME Sec. VIII, Div. I)
DOC
CV jayendra 1
PDF
Program - Google Docs
PPTX
Voorbeelden Succesvolle Employee Driven Innovation (EDI)
PPTX
05 cañas yurley teoria buscarv
PDF
Jolighting-Shoebox QC13100 Catalog
PDF
Dialnet la educacioninclusivacomoderechomarcodereferenciayp-3736956
NO-DIG Markets in Germany and Testing of Products
RT Interpretation (ASME Sec. VIII, Div. I)
CV jayendra 1
Program - Google Docs
Voorbeelden Succesvolle Employee Driven Innovation (EDI)
05 cañas yurley teoria buscarv
Jolighting-Shoebox QC13100 Catalog
Dialnet la educacioninclusivacomoderechomarcodereferenciayp-3736956

Similar to ORM CIP Presentation Defects Rate version 3 (7)

PPTX
4 Why materials fail, analysis.pptx
PPTX
Reliability Maintenance Engineering 1 - 3 Data and Decisions
PDF
F.M.E.C.A pdf
PPS
Best Damn D-FMEA Method!
PPT
Advanced Pfmea
PPTX
Abnormality tagging
4 Why materials fail, analysis.pptx
Reliability Maintenance Engineering 1 - 3 Data and Decisions
F.M.E.C.A pdf
Best Damn D-FMEA Method!
Advanced Pfmea
Abnormality tagging
Ad

ORM CIP Presentation Defects Rate version 3

  • 2. Engineering Defect Rate  Defect Cause Identification and Immediate Reduction Work orders Change Controls  Defect Prevention and Future Reduction Equipment Evaluation Upgrades Project Engineering 2 Prong Approach
  • 3. Engineering Defect Rate 14% of all work orders can impact defect rate. Top 2 categories: – Metal detectors – Paint Chips  Measurement – Established Number, % Reoccurrence, Category improvement before and after change.
  • 4. Metal Detector Metal Detector Defect Occurrences 0 2 4 6 8 10 12 January February M arch April M ay June July August Septem ber Number of Occurrences Goal Replaced backup batteries Upgraded repeat offenders Maintenance focus on metal detectors in Tableting
  • 5. Paint Chip Defect Occurrences 0 5 10 15 20 25 30 January February M arch April M ay June July AugustSeptem ber Paint Chips Installed new wall covering system Compounding Team participation Focus on cleaning methods in the modules
  • 6. Foreign Matter 2005 Current FM Initiated QARs 0 5 10 15 20 FM Black Speck FM TabletsFM O therFM M etalFM Fiber FM PlasticFM PestFM Bottle FM Desiccant FM G lass FM G love/rubber FM M aterial FM Type NumberofQARs
  • 7. Equipment FM Risk Assessment Breakdown Analyses/Investigation Site FM Action Item Current Listings Embedding Engineering colleagues Assigned Engineering colleagues to support FM specific in specific areas Coordination of FM teams Participation in OPM Comstat Path Forward

Editor's Notes

  • #3: During the 1st quarter of this year we were assigned the task of identifying how Engineering contributes to our Site’s defect rate. Using this 2 prong approach we were able to accomplish our goals. In line with the 1st prong is defect cause identification and immediate reduction. Surveying the Engineering Department’s work order system specifically reviewing corrective work orders and change controls we identified two major FM contributors and they were Paint chips and Metal detector malfunctions. In line with the 2nd prong is defect prevention and future reduction, to insure future reduction we modified equipment and install a new facilities system.
  • #6: Creating a strategy, focusing on the strategy and colleague involvement proved to be successful in reducing reoccurrences in both Metal detector and Paint chip issues. With that in mind we felt we can achieve the same results in focusing on all FM issues.