Description:
The Overly Drive Flood Mitigation was substantially completed on 6/28/2013, on time and within the budget. An existing
54” RCP located south of the junction box gets inundated and overflows, flooding five (5) houses located on Overly Drive.
This project provided an overland relief channel that conveys water to an existing modified junction box and a 6’x6’ box
culvert that is located at the north of the site along the backyard of the houses on the west side of Overly Drive.
Project Overview:
• An overland relief channel was constructed using natural stream channel design techniques to bypass water from water
ponding area to an outlet structure under I-495, without flooding the adjacent private properties.
• The following channel natural features were constructed: Four (4) rock steps, one (1) imbricated rock wall, four (4) rock
cross vanes, one (1) rock weir structure and reinforced bed material was placed in the bottom of the proposed channel.
• Re-graded the area on both side of the channel to direct the flow toward the channel and away from the adjacent
houses.
• Completely restored the disturbed area with selective seed mix, planting the site with selected mix of trees is scheduled
to be in the Fall, 2013
DPWES Project Team:
• Project Manager: Ratna S Pottumuthu
• Construction Manager: Mannan Qureshi
• Project Inspectors: Paul Thaler
• Land Acquisition Agent: Vicki Johnson
• Survey Analyst: Gregory Harper
54” RCP
6’ x 6’ Box Culvert
Gunnell
Pond
Project
Location
Unnamed
Tributary to
Cameron Run
OVERLY DRIVE FLOOD MITIGATION PROJECT
Lee District - Tax Map No. 81-1
Gunnell
Pond
County:
54” RCP
Inlet
VDOT
6’ x 6’ Box
Culvert Inlet
County:
Yard Inlet
Current
Overland Relief
Flow Paths
5622
OVERLY DRIVE FLOOD MITIGATION PROJECT
Pre-existing Conditions
Pre-existing Condition
Flooding during September 8, 2011 storm event
After Construction
Existing Water Ponding Area
New Overland Relief Channel
Post Construction: Newly Constructed Four Rock
Steps and Imbricated Rock Wall
Imbricated Rock Wall
Rock Steps
Reinforced Bed Material
For additional Information, please call
Irene Haske, Public Information Officer
703-324-5821, TTY 711
SWPDmail@fairfaxcounty.gov
www.fairfaxcounty.gov/dpwes

More Related Content

PPTX
Bradley Acres Pond Retrofit Project
PPTX
Miller Heights Outfall Rehabilitation Project 2014
PPTX
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
PDF
Government Center Pond Retrofit - May 2013
PDF
9499 Beach Mill Road Channel Restoration Project
PPTX
Columbia Road/Randolph Court Stream Restoration July 2015
PPTX
Pike Branch at Wilton Road Stream Stabilization Project
PPTX
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Bradley Acres Pond Retrofit Project
Miller Heights Outfall Rehabilitation Project 2014
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Government Center Pond Retrofit - May 2013
9499 Beach Mill Road Channel Restoration Project
Columbia Road/Randolph Court Stream Restoration July 2015
Pike Branch at Wilton Road Stream Stabilization Project
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...

What's hot (20)

PPTX
Oakton Swim and Racquet Water Quality Retrofit
PPTX
Cameron Run Tributary At La Vista Drive: Stream Restoration
PPTX
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
PPTX
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
PPTX
Accotink Tributary at Oakford Drive Stream Restoration
PDF
Autumnwood Park Pond Retrofit Project
PPTX
Difficult Run Tributary at Oakton Estates
PPTX
Flatlick Branch - Phase 1 Stream Restoration
PPTX
Coon Branch at Annandale Community Park-Stream Restoration Project
PPTX
Paul Spring Branch Stream Restoration
PPTX
Indian Run at Indian Run Court Stream Restoration
PDF
Big Rocky Run Phase II Stream Restoration
PPTX
Broyhill McLean Estates BMP Neighborhood Improvement Project
PDF
Tripps Run Stream Improvement
PPTX
Banks Property Stream Restoration (DC9218)
PPTX
Dead Run Stream Restoration Public Meeting April 23, 2014
PPTX
Accotink Creek Watershed Project Wakefield Park North
PPTX
Huntington Levee Community Meeting: Oct. 26. 2016
PPTX
Sunset Hills Road Drainage Improvement Project
PPTX
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Oakton Swim and Racquet Water Quality Retrofit
Cameron Run Tributary At La Vista Drive: Stream Restoration
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
Accotink Tributary at Oakford Drive Stream Restoration
Autumnwood Park Pond Retrofit Project
Difficult Run Tributary at Oakton Estates
Flatlick Branch - Phase 1 Stream Restoration
Coon Branch at Annandale Community Park-Stream Restoration Project
Paul Spring Branch Stream Restoration
Indian Run at Indian Run Court Stream Restoration
Big Rocky Run Phase II Stream Restoration
Broyhill McLean Estates BMP Neighborhood Improvement Project
Tripps Run Stream Improvement
Banks Property Stream Restoration (DC9218)
Dead Run Stream Restoration Public Meeting April 23, 2014
Accotink Creek Watershed Project Wakefield Park North
Huntington Levee Community Meeting: Oct. 26. 2016
Sunset Hills Road Drainage Improvement Project
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Ad

Viewers also liked (20)

PPTX
Land Development Update: Oct. 8, 2015
PPTX
Contractor Awareness Training Stormwater Facilities Introduction 2016
PPTX
Habitat Improvement for Cleaner Water
PPTX
Crosspointe Pond Retrofit 2014
PPTX
Contractor Awareness Training Below Ground Facilities 2016
PPTX
Community Gypsy Moth Management
PPTX
Wakefield Park South Stream Restoration
PPTX
Huntington Levee Community Meeting
PPTX
Contractor Awareness Training Vegetative Practices 2016
PPTX
Mason Neck West Park Pond Retrofit July 2015
PPTX
Hunter Mill District Community Outreach Meeting
PPTX
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
PPTX
Towlston Meadows Restoration Project
PPTX
Contractor Awareness Training Above Ground Facilities Part 1 2016
PPTX
Huntington Levee Community Meeting: Feb. 23, 2016
PPTX
Dead Run Stream Restoration Public Meeting May 19, 2015
PPTX
Sequoia Park Pond Retrofit Project
PPTX
Dead Run Stream Restoration Public Meeting June 9, 2015
PPTX
Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015
PPTX
Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016
Land Development Update: Oct. 8, 2015
Contractor Awareness Training Stormwater Facilities Introduction 2016
Habitat Improvement for Cleaner Water
Crosspointe Pond Retrofit 2014
Contractor Awareness Training Below Ground Facilities 2016
Community Gypsy Moth Management
Wakefield Park South Stream Restoration
Huntington Levee Community Meeting
Contractor Awareness Training Vegetative Practices 2016
Mason Neck West Park Pond Retrofit July 2015
Hunter Mill District Community Outreach Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Towlston Meadows Restoration Project
Contractor Awareness Training Above Ground Facilities Part 1 2016
Huntington Levee Community Meeting: Feb. 23, 2016
Dead Run Stream Restoration Public Meeting May 19, 2015
Sequoia Park Pond Retrofit Project
Dead Run Stream Restoration Public Meeting June 9, 2015
Land Development Update-NAIOP/NVBIA Joint Meeting: Dec. 10, 2015
Land Development Update-NAIOP/NVBIA Joint Meeting: May 12, 2016
Ad

More from Fairfax County (20)

PPTX
Merrifield Nursery Emergency Gravity Sewer Replacement
PPTX
SULLY BASINS STORMWATER POND RETROFITS
PPTX
Clarks Crossing Road Improvements 05-13-22
PPTX
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
PPTX
Lorton Volunteer Fire Station #19
PPTX
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
PPTX
Sully Community Center Construction Progress
PPTX
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
PPTX
Burke VRE Connector Phase IV
PPTX
Long Branch Public Meeting - FINAL - 04-11-2022
PPTX
Workhouse Arts Stakeholder Kick Offpptx
PPTX
Workhouse Arts Affordable Housing Council
PPTX
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
PPTX
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
PPTX
Reston Arts Community Center Feasibility - Wrap Up
PDF
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
PPTX
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
PPTX
Oak Marr Pump Station Rehabilitation – Construction Project
PPTX
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
PPTX
Reston Arts Center Feasibility - Focus Group Visual Arts
Merrifield Nursery Emergency Gravity Sewer Replacement
SULLY BASINS STORMWATER POND RETROFITS
Clarks Crossing Road Improvements 05-13-22
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Lorton Volunteer Fire Station #19
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Sully Community Center Construction Progress
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Burke VRE Connector Phase IV
Long Branch Public Meeting - FINAL - 04-11-2022
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Affordable Housing Council
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
Reston Arts Community Center Feasibility - Wrap Up
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Oak Marr Pump Station Rehabilitation – Construction Project
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Reston Arts Center Feasibility - Focus Group Visual Arts

Recently uploaded (20)

PDF
Samaya Jyothi Live News Telugu | Breaking & Trusted Updates
PDF
9th-President-of-the-Philippines_lecture .pdf
PDF
Pancasila & Citizen Resume PPT - Guest lecture
PDF
Mindanao Debate Lecture Presentation Outline 1.General Facts 2.Mindanao Histo...
PDF
POLITICAL IDEOLOGIES of SOUTH KOREA vs NORTH KOREA.pdf
 
PDF
Jim Stone Freelance Voterig August 13, 2025.pdf
PDF
4th-president-of-the-Philippines-_20250 812_103637_0000.pdf
PPTX
Beige and Black Vintage Floral Border Project Presentation_20250818_091954_00...
DOCX
End Of The Age TV Program: Depicting the Actual Truth in a World of Lies
PPTX
7th-president-Ramon-Magsaysay-Presentation.pptx
PDF
Naidu Pushes for Rs 36 Crore Subsidy to Support Farmers in Need
PPTX
Elias Salame Uses Fake Trades to Make Real Money Disappear.pptx
DOC
BU毕业证学历认证,阿什兰大学毕业证文凭证书
DOCX
Memecoin memecoinist news site for trends and insights
PPTX
Pakistan movement part 2: story about Pakistan Movement
PDF
How India’s First AI-Powered Anganwadi in Nagpur is Changing Education – As F...
PPTX
Rhythms of Freedom_ India Day Shines at Battery Dance Festival 2025.
PDF
19082025_First India Newspaper Jaipur.pdf
PPTX
Thailand Crowned Asia’s Most Culturally Influential Country in 2025 by U.S. N...
PDF
History ppt on World War 2 and its consequences
Samaya Jyothi Live News Telugu | Breaking & Trusted Updates
9th-President-of-the-Philippines_lecture .pdf
Pancasila & Citizen Resume PPT - Guest lecture
Mindanao Debate Lecture Presentation Outline 1.General Facts 2.Mindanao Histo...
POLITICAL IDEOLOGIES of SOUTH KOREA vs NORTH KOREA.pdf
 
Jim Stone Freelance Voterig August 13, 2025.pdf
4th-president-of-the-Philippines-_20250 812_103637_0000.pdf
Beige and Black Vintage Floral Border Project Presentation_20250818_091954_00...
End Of The Age TV Program: Depicting the Actual Truth in a World of Lies
7th-president-Ramon-Magsaysay-Presentation.pptx
Naidu Pushes for Rs 36 Crore Subsidy to Support Farmers in Need
Elias Salame Uses Fake Trades to Make Real Money Disappear.pptx
BU毕业证学历认证,阿什兰大学毕业证文凭证书
Memecoin memecoinist news site for trends and insights
Pakistan movement part 2: story about Pakistan Movement
How India’s First AI-Powered Anganwadi in Nagpur is Changing Education – As F...
Rhythms of Freedom_ India Day Shines at Battery Dance Festival 2025.
19082025_First India Newspaper Jaipur.pdf
Thailand Crowned Asia’s Most Culturally Influential Country in 2025 by U.S. N...
History ppt on World War 2 and its consequences

Flood Mitigation Project on Overly Drive

  • 1. Overly Drive Flood Mitigation Project Lee District Project No. SD-000031-022
  • 2. Project Details Description: The Overly Drive Flood Mitigation was substantially completed on 6/28/2013, on time and within the budget. An existing 54” RCP located south of the junction box gets inundated and overflows, flooding five (5) houses located on Overly Drive. This project provided an overland relief channel that conveys water to an existing modified junction box and a 6’x6’ box culvert that is located at the north of the site along the backyard of the houses on the west side of Overly Drive. Project Overview: • An overland relief channel was constructed using natural stream channel design techniques to bypass water from water ponding area to an outlet structure under I-495, without flooding the adjacent private properties. • The following channel natural features were constructed: Four (4) rock steps, one (1) imbricated rock wall, four (4) rock cross vanes, one (1) rock weir structure and reinforced bed material was placed in the bottom of the proposed channel. • Re-graded the area on both side of the channel to direct the flow toward the channel and away from the adjacent houses. • Completely restored the disturbed area with selective seed mix, planting the site with selected mix of trees is scheduled to be in the Fall, 2013 DPWES Project Team: • Project Manager: Ratna S Pottumuthu • Construction Manager: Mannan Qureshi • Project Inspectors: Paul Thaler • Land Acquisition Agent: Vicki Johnson • Survey Analyst: Gregory Harper
  • 3. 54” RCP 6’ x 6’ Box Culvert Gunnell Pond Project Location Unnamed Tributary to Cameron Run OVERLY DRIVE FLOOD MITIGATION PROJECT Lee District - Tax Map No. 81-1
  • 4. Gunnell Pond County: 54” RCP Inlet VDOT 6’ x 6’ Box Culvert Inlet County: Yard Inlet Current Overland Relief Flow Paths 5622 OVERLY DRIVE FLOOD MITIGATION PROJECT Pre-existing Conditions
  • 5. Pre-existing Condition Flooding during September 8, 2011 storm event
  • 6. After Construction Existing Water Ponding Area New Overland Relief Channel
  • 7. Post Construction: Newly Constructed Four Rock Steps and Imbricated Rock Wall Imbricated Rock Wall Rock Steps Reinforced Bed Material
  • 8. For additional Information, please call Irene Haske, Public Information Officer 703-324-5821, TTY 711 SWPDmail@fairfaxcounty.gov www.fairfaxcounty.gov/dpwes