OverviewA decentralized project management system for development and emergency programs
A common situation in management of large emergency and development projects:Operations at different geographical scales (e.g. local, district, national, regional, global)
Several organizational levels/units are involved (strategic, tactical and operational), arising different information requirements
Numerous implementation partners involved – inconsistent planning and reporting
Lack of proper analysis of information flows and of structured workflows
Large amount of unstructured information; normally the tools used to handle it are structurally inappropriate (e.g. Excel)‏
Several reporting formats to be followed at the same time (e.g. corporate, donor, partner, etc)
Considerable resources are spent for monitoring of operations, still lack of efficiency. Common Issues
The quantity and complexity of the information to be managed can increase considerably. The complexity of the project is the result of the combination of the following dimensions:Institutional: the partners involved in the implementation
Logical: the strategies and activities
Temporal: implementation period, reporting frequency
Geographic: where the implementation is taking place
Financial: resources and budgetGiven the prevailing conditions in which interventions are implemented, efficient but simple information management tools are neededNeed  for simple tools
 There are several project management software on the market The great majority is designed to manage business or construction projects and prove to be ineffective when applied to development and emergency interventions because:  too detailed and require a very fine level of planning and monitoring of project resources  follow a project cycle typical of commercial initiatives  do not explicitly use the Logical Framework and Objectively Verifiable Indicators (OVI) for planning and reporting The few existing software targeted specifically to development and emergency are focused on a central level (headquarter or government) rather than field level operations: e.g. AMP SPHERE is a unique tool for bridging the information gap between field operations and program managementNeed  for simple tools
SPHERE (Système de gestion de ProjetsHEbergésurRéseau – Online Project Management System) is an on line project management system specifically designed for development and emergency programs. Main features:A tool for project managers addressing most information management needs in one package
Ideal in projects where more implementing partners are involved
Based on the Logical Framework Approach
Focused on supporting all the phases of project
Several project can be managed at the same time
Easy to use – designed for challenging operating conditions
Web based – no software installation required for end users
Released as an open source product, licensed with GNU General Public License (GPL). Can be freely modified and adapted.About SPHERE
Facilitate, simplify and optimize management of projects:
Easier, safer standard planning and reporting
Authority over respective data delegated to implementing partners
No more time spent in compiling files or checking information
Secured data
Comprehensive historical information
Information updated in real time– easy to query and aggregate
Bottom line, no additional reporting burden – a service for more effective project management for the organization and implementing partners!Key Benefits
Developed in 2003/2005 in the framework of a large FAO project in Tunisia – Soil and water conservation program, Zaghuan, Siliana and Kairouan; successfully used to manage the whole project cycle.
Other main applications:
World Food Program of UN (WFP) – Nepal Protracted Relief and Recovery Operation (PRRO) 10676.0
FAO Project Land Degradation Assessment in Drylands -  Tunisia component
Project Himalayan Partnership for Ecosystem Management (HKKH) – IUCN History and applications
Project Management Functions
DemonstrationThe following slides will take you through a guided tour of the System.A demo Food Security Project will be used as an example.The tour is not covering the financial management modules.
This is the first screen before the user logs in. If required, SPHERE can be easily configured and used to display public information that can be viewed without log in.
Guided Tour – Create a Project
After logging in as a Project Manager we will start creating and configuring a new project.
In this screen and the next one a new project is added.Tip: it is always possible to know where you are located in the system looking at this bar. Click on any item to navigate there.
Overview Sphere M&E system
It is possible to link documents, maps, external hyperlinks and any type of electronic object to a project.In this way a useful repository will be created. No more confusion with different versions of the same document!!
Here it is possible to search the document linked to a project. Once documents are linked to activities, they will display here as well.
In this screen, the area of intervention of the project is defined. Using a standard coding system it will be possible to easily visualize on maps activities and progress information.
In this screen, the partners involved in project implementation are defined.
To keep information well organized, indicators can be arranged in categories defined by the user. Here the indicators categories are defined. In the next screen indicators are created and associated to an indicator category.
Here new indicators are added. Indicator can be numeric or qualitative; for qualitative indicators you can define a list of values to be used (e.g. Good, Average, Bad).Each indicator is classified in an indicator category.
SPHERE uses the Logical Framework as the reference tool for planning and implementation. The next screens show how the LF is built, how to add an activity to the Logical Framework and how to associate indicators to monitor it.
Here the indicator categories to be used in monitoring different levels of the Logical Framework are selected. For example you can select the indicators of the category “Impact assessment” to monitor the Outcome level.It is possible to browse though the structure of the LF and modify it depending on the requirements of the project. The upper part of the screen defines the structure: in some Organizations the structure is defined by Objectives, Results, Activities and SubActivities in others by Goals, Outcomes, Outputs, Activities. SPHERE provides the flexibility of creating the structure you need.
The lower part is used to define the actual contents of the LF: what are the Goals, Outcomes, Outputs and Activities that will be planned.
We are browsing through the LF data that was entered in the system. Clicking on the green button will allow to add a new item while clicking on the red one will delete an existing one.
Selecting an element, for example Activity A.1.1.1.1 will display…
…the activity properties over here. The name, code etc. are defined here.Clicking on “Assign indicators” will show…
…this window where the indicators to be used for monitoring and reporting are selected. The list of indicators is drawn from the indicators that were previously created.For each activity there must be at least a Main Indicator; “secondary” indicators can be either Mandatory (users will be obliged to enter data for them in the monitoring forms), or Optional (users can submit the form without data for these indicators)
Once the Logical Framework has been developed, it can be consulted and printed through this interface.
Also the indicators available in the project can be consulted and printed.

More Related Content

PPSX
Project Management an Introduction
PDF
OFTA Information Management System Part 2
PPT
Managing the information system project
DOCX
The project management information system
PDF
Product Brief – Plutora Release
PDF
Chapter 5
DOCX
How Should We Estimate Agile Software Development Projects and What Data Do W...
Project Management an Introduction
OFTA Information Management System Part 2
Managing the information system project
The project management information system
Product Brief – Plutora Release
Chapter 5
How Should We Estimate Agile Software Development Projects and What Data Do W...

Similar to Overview Sphere M&E system (20)

PDF
Unit 5.pdf
PPTX
Week 7 Github - SI- Architecture.pptx
PDF
Chaplowe - M&E Planning 2008 - shortcuts
PDF
Re sakss presentation on project management mburu 2
PPT
Project monitoring and evaluation by Samuel Obino Mokaya
PDF
Wb evaluation me_tools_2004_pdf
PPT
DRR Project Portal - An introduction
PDF
Data Visualisation
PPTX
10.3_Construction Management_Day 8.pptx
DOC
Module 8 presenter notes
PPTX
Project management & construction technique
PPTX
Project Management for IT-related Projects (Logitrain)
PPT
Disaster Risk Management
PPTX
Monitoring and Evaluation Unit 1.pptx
PDF
12 Terms You Should Know Project Management Fundamentals
PPT
Week 9-performance-management-1222266539427090-9
PPSX
Result Base Project Management
PPT
Ch02
PDF
Mand e tools_methods_approaches
Unit 5.pdf
Week 7 Github - SI- Architecture.pptx
Chaplowe - M&E Planning 2008 - shortcuts
Re sakss presentation on project management mburu 2
Project monitoring and evaluation by Samuel Obino Mokaya
Wb evaluation me_tools_2004_pdf
DRR Project Portal - An introduction
Data Visualisation
10.3_Construction Management_Day 8.pptx
Module 8 presenter notes
Project management & construction technique
Project Management for IT-related Projects (Logitrain)
Disaster Risk Management
Monitoring and Evaluation Unit 1.pptx
12 Terms You Should Know Project Management Fundamentals
Week 9-performance-management-1222266539427090-9
Result Base Project Management
Ch02
Mand e tools_methods_approaches
Ad

Recently uploaded (20)

PPTX
Chapter 5: Probability Theory and Statistics
PDF
A novel scalable deep ensemble learning framework for big data classification...
PDF
DASA ADMISSION 2024_FirstRound_FirstRank_LastRank.pdf
PDF
Hybrid model detection and classification of lung cancer
PDF
Unlock new opportunities with location data.pdf
PDF
Getting Started with Data Integration: FME Form 101
PDF
STKI Israel Market Study 2025 version august
PPTX
The various Industrial Revolutions .pptx
PDF
Assigned Numbers - 2025 - Bluetooth® Document
PDF
WOOl fibre morphology and structure.pdf for textiles
PDF
Enhancing emotion recognition model for a student engagement use case through...
PDF
CloudStack 4.21: First Look Webinar slides
PDF
Developing a website for English-speaking practice to English as a foreign la...
PDF
DP Operators-handbook-extract for the Mautical Institute
PDF
NewMind AI Weekly Chronicles – August ’25 Week III
PPTX
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
PPTX
observCloud-Native Containerability and monitoring.pptx
PDF
1 - Historical Antecedents, Social Consideration.pdf
PDF
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
PDF
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
Chapter 5: Probability Theory and Statistics
A novel scalable deep ensemble learning framework for big data classification...
DASA ADMISSION 2024_FirstRound_FirstRank_LastRank.pdf
Hybrid model detection and classification of lung cancer
Unlock new opportunities with location data.pdf
Getting Started with Data Integration: FME Form 101
STKI Israel Market Study 2025 version august
The various Industrial Revolutions .pptx
Assigned Numbers - 2025 - Bluetooth® Document
WOOl fibre morphology and structure.pdf for textiles
Enhancing emotion recognition model for a student engagement use case through...
CloudStack 4.21: First Look Webinar slides
Developing a website for English-speaking practice to English as a foreign la...
DP Operators-handbook-extract for the Mautical Institute
NewMind AI Weekly Chronicles – August ’25 Week III
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
observCloud-Native Containerability and monitoring.pptx
1 - Historical Antecedents, Social Consideration.pdf
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
Ad

Overview Sphere M&E system

  • 1. OverviewA decentralized project management system for development and emergency programs
  • 2. A common situation in management of large emergency and development projects:Operations at different geographical scales (e.g. local, district, national, regional, global)
  • 3. Several organizational levels/units are involved (strategic, tactical and operational), arising different information requirements
  • 4. Numerous implementation partners involved – inconsistent planning and reporting
  • 5. Lack of proper analysis of information flows and of structured workflows
  • 6. Large amount of unstructured information; normally the tools used to handle it are structurally inappropriate (e.g. Excel)‏
  • 7. Several reporting formats to be followed at the same time (e.g. corporate, donor, partner, etc)
  • 8. Considerable resources are spent for monitoring of operations, still lack of efficiency. Common Issues
  • 9. The quantity and complexity of the information to be managed can increase considerably. The complexity of the project is the result of the combination of the following dimensions:Institutional: the partners involved in the implementation
  • 10. Logical: the strategies and activities
  • 11. Temporal: implementation period, reporting frequency
  • 12. Geographic: where the implementation is taking place
  • 13. Financial: resources and budgetGiven the prevailing conditions in which interventions are implemented, efficient but simple information management tools are neededNeed for simple tools
  • 14. There are several project management software on the market The great majority is designed to manage business or construction projects and prove to be ineffective when applied to development and emergency interventions because: too detailed and require a very fine level of planning and monitoring of project resources follow a project cycle typical of commercial initiatives do not explicitly use the Logical Framework and Objectively Verifiable Indicators (OVI) for planning and reporting The few existing software targeted specifically to development and emergency are focused on a central level (headquarter or government) rather than field level operations: e.g. AMP SPHERE is a unique tool for bridging the information gap between field operations and program managementNeed for simple tools
  • 15. SPHERE (Système de gestion de ProjetsHEbergésurRéseau – Online Project Management System) is an on line project management system specifically designed for development and emergency programs. Main features:A tool for project managers addressing most information management needs in one package
  • 16. Ideal in projects where more implementing partners are involved
  • 17. Based on the Logical Framework Approach
  • 18. Focused on supporting all the phases of project
  • 19. Several project can be managed at the same time
  • 20. Easy to use – designed for challenging operating conditions
  • 21. Web based – no software installation required for end users
  • 22. Released as an open source product, licensed with GNU General Public License (GPL). Can be freely modified and adapted.About SPHERE
  • 23. Facilitate, simplify and optimize management of projects:
  • 24. Easier, safer standard planning and reporting
  • 25. Authority over respective data delegated to implementing partners
  • 26. No more time spent in compiling files or checking information
  • 29. Information updated in real time– easy to query and aggregate
  • 30. Bottom line, no additional reporting burden – a service for more effective project management for the organization and implementing partners!Key Benefits
  • 31. Developed in 2003/2005 in the framework of a large FAO project in Tunisia – Soil and water conservation program, Zaghuan, Siliana and Kairouan; successfully used to manage the whole project cycle.
  • 33. World Food Program of UN (WFP) – Nepal Protracted Relief and Recovery Operation (PRRO) 10676.0
  • 34. FAO Project Land Degradation Assessment in Drylands - Tunisia component
  • 35. Project Himalayan Partnership for Ecosystem Management (HKKH) – IUCN History and applications
  • 37. DemonstrationThe following slides will take you through a guided tour of the System.A demo Food Security Project will be used as an example.The tour is not covering the financial management modules.
  • 38. This is the first screen before the user logs in. If required, SPHERE can be easily configured and used to display public information that can be viewed without log in.
  • 39. Guided Tour – Create a Project
  • 40. After logging in as a Project Manager we will start creating and configuring a new project.
  • 41. In this screen and the next one a new project is added.Tip: it is always possible to know where you are located in the system looking at this bar. Click on any item to navigate there.
  • 43. It is possible to link documents, maps, external hyperlinks and any type of electronic object to a project.In this way a useful repository will be created. No more confusion with different versions of the same document!!
  • 44. Here it is possible to search the document linked to a project. Once documents are linked to activities, they will display here as well.
  • 45. In this screen, the area of intervention of the project is defined. Using a standard coding system it will be possible to easily visualize on maps activities and progress information.
  • 46. In this screen, the partners involved in project implementation are defined.
  • 47. To keep information well organized, indicators can be arranged in categories defined by the user. Here the indicators categories are defined. In the next screen indicators are created and associated to an indicator category.
  • 48. Here new indicators are added. Indicator can be numeric or qualitative; for qualitative indicators you can define a list of values to be used (e.g. Good, Average, Bad).Each indicator is classified in an indicator category.
  • 49. SPHERE uses the Logical Framework as the reference tool for planning and implementation. The next screens show how the LF is built, how to add an activity to the Logical Framework and how to associate indicators to monitor it.
  • 50. Here the indicator categories to be used in monitoring different levels of the Logical Framework are selected. For example you can select the indicators of the category “Impact assessment” to monitor the Outcome level.It is possible to browse though the structure of the LF and modify it depending on the requirements of the project. The upper part of the screen defines the structure: in some Organizations the structure is defined by Objectives, Results, Activities and SubActivities in others by Goals, Outcomes, Outputs, Activities. SPHERE provides the flexibility of creating the structure you need.
  • 51. The lower part is used to define the actual contents of the LF: what are the Goals, Outcomes, Outputs and Activities that will be planned.
  • 52. We are browsing through the LF data that was entered in the system. Clicking on the green button will allow to add a new item while clicking on the red one will delete an existing one.
  • 53. Selecting an element, for example Activity A.1.1.1.1 will display…
  • 54. …the activity properties over here. The name, code etc. are defined here.Clicking on “Assign indicators” will show…
  • 55. …this window where the indicators to be used for monitoring and reporting are selected. The list of indicators is drawn from the indicators that were previously created.For each activity there must be at least a Main Indicator; “secondary” indicators can be either Mandatory (users will be obliged to enter data for them in the monitoring forms), or Optional (users can submit the form without data for these indicators)
  • 56. Once the Logical Framework has been developed, it can be consulted and printed through this interface.
  • 57. Also the indicators available in the project can be consulted and printed.
  • 59. Here new activities areadded to the workplan: each activity is identified by its Duration, Location, Activity name and indicators.The 3 steps are shown in the next screens.
  • 64. The activity has been saved and is now part of the workplan.If needed, it can be modified through a different interface. One the planning is approved modifications can be disabled.
  • 65. Here it is possible to consult the workplan for a given period.The upper part of the screen provides several easy to use filters to query the planning and rearrange the information according to your needs.
  • 66. Guided Tour – Implement
  • 67. Once the planning is approved, implementation starts and we need to update the progress status of the activities.This interface allows to select the activity for which you want to update the progress. As an example we will focus on A.1.1.1.1.Clicking on Update will…
  • 68. …open this window where the staff in charge of implementing the activities will update the status of the indicators.The form is very simple to use. It is possible to add comments that explain possible deviation from the planning or provide further details about the implementation.Each user will be able to update the progress only for the component of the project for which he has editing rights. If there are several partners, each of them will be able to edit only the status of the activities of his component.
  • 69. Once the progress data is submitted, the form displays the cumulated progress for the activity. It is possible to link documents, pictures or other information to the activity. Using this function over time will build an extremely useful knowledge base that can be used for lesson learning, dissemination and historical analysis.A very valuable tool for corporate memory and value addition!!
  • 70. Guided Tour – Monitor and report
  • 71. The reporting module is very powerful: you can immediately view the overall situation of the project. By default progress information is aggregated for each activity at the most general level : for example if food is distributed in 100 villages, you can get the overall progress at country level.By default, only the main indicator is shown for each activity. If this box is unchecked…
  • 72. …all the indicators associated to the activity are displayed.
  • 73. If more details are required for a specific activity, It is possible to zoom in and assess the progress and possible issues using the functions of this section.
  • 74. As an example we will focus on A.1.1.1.1.
  • 75. We will perform a search on the activity...and zoom in at geographic level where the activity has been planned, the VDC level.
  • 76. Being able to focus on the desired level of aggregation simplifies the identification of problem areas.The activity has been planned in 2 VDCs. We can see that the level of progress is different for each activity.
  • 77. If we want to assess the status of the project by location, it is possible switch to the Geographic view. The report will display the place in the first row.
  • 78. Any report displayed can be easily printed clicking on the “Print View” button.
  • 79. Filter and aggregation criteria used are displayed in the header of the report. It will be very easy to produce reports by district, partner or project component.The report can be saved and opened in Excel for further analysis.
  • 80. The system can be easily configured through a control panel
  • 81. All or only some of the modules can be activated: other modules available at the moment are finance management, document management and web mapping.
  • 82. New modules can be developed or existing applications can be linked to the system
  • 83. User and group level administration is available
  • 84. The system is multi-language: all the interfaces and as well as the contents can be easily translated
  • 85. While we will not enter in the details of system administration, the next two slides show the interfaces for module management and translations.Configuration and system admin
  • 86. We are now logged in as system administrator. Modules can be easily added and deleted. Access rights for the modules are set at group level.
  • 87. Here it is possible to enter the translations for the interfaces and data for all the languages that are activated in the system.
  • 89. SPHERE is a unique tool for bridging the information gap between field operations and program management
  • 90. Based on the Logical Framework
  • 91. It is easy to use
  • 92. Successfully applied to manage large projects in different organizations
  • 93. Open source, can be modified and adapted
  • 94. Great strategic value for knowledge based organizations: project products and implementation info are stored and can be used for lesson learning, analysis of management effectiveness, design of new projects, etc.
  • 95. Useful to enhance management effectiveness, accountability and transparencyConclusions
  • 96. Thanks for taking the time of going through this presentation!For enquiries and more information write to:info@sphereworld.org