Aizell A. Bernal
BSBA 4
HRM 5
Dr. R. Robledo
• Pay for performance
plans signal a movement
away from
entitlements, sometimes
a very slow movement
toward pay that varies
with some measure of
individual or
organizational
performance.
• Pay will vary with some
measure of
individual, team, or
organizational
EXHIBIT 10.1

Uses of Different Variable Pay Plan Types
Percent of Companies With Plan

Type of Plan

1996

1998

1999

2002

2007

Special-recognition plans

44

51

59

34

72

Stock option plans

21

46

43

40

Individual incdntive plans

17

35

39

38

49

Cash profit sharing

22

22

23

18

16

Gainsharing plans

16

20

18

11

10

Team awards

13

17

15

8

32
EXHIBIT 10.2

BASE VERSUS VARIABLE PAY
Percent of Total Compensation Today
2004

Variable pay as percentage of payroll

2005

2009 (projected)

9.50%

11.40%

11.30%

• The greater interest in variable pay probably can be
traced to two trends:
1. The increasing competition from foreign
producers forces American firms to cut costs
and/or increase productivity.
2. Today’s fast-paced business environment
means that workers must be willing to adjust
what they do and how they do it.
• Pay-for-performance, those that introduce
variability into the level of pay you receive, seem
to have a positive impact on performance if
designed well. Notice that we have qualified out
statement that variable-pay plans can be
effective if they are designed well.
• Merit Pay
• Lump-Sum Bonuses
• Individual Spot Awards
• Individual Incentive Plans
• Individual Incentive Plans:
Advantages and Disadvantages
• Individual Incentive Plans: Examples
• Merit Pay
 a system links increases
in base pay to how highly
employees are rated on
an performance
evaluation.
Well Above

Average

Above

Below

Average Average Average

Well Below

Average

Performance rating

1

2

3

4

5

Merit pay increase

5%

4%

3%

1%

0%
• Lump-Sum Bonuses
 are thought to be a
substitute for merit pay.
 are earned at the end of
a specified time
period, such as
monthly, quarterly, or
annually, when an
employee achieves a
specific level of his work
or quota.
Pay-for-Performance Plan
• Individual Spot Awards/Spot
Awards
 An immediate recognition to
reward an employee for
exceptional performance beyond
the prescribed expectation of the
employee’s job. Spot awards are
given after the event has been
completed, usually without
pre‐determined goals or set
performance levels and paid as a
one‐time bonus.
• Individual Incentive Plans
 Incentive plans are part of an
employee's compensation or pay.
The incentive plan gives an
employee the opportunity to
increase his annual pay based upon
either company performance or
individual performance. Incentive
plans are a way for companies to
keep employees motivated to
perform to the best of their
abilities, thus increasing company
profit.
Pay-for-Performance Plan
There are four general categories of plan:
1. Cell 1
 The most frequently implemented incentive
system is a straight piecework system.
 Rate determination is based on units of
production per time period, and wages vary
directly as a function of production level.
 The major advantages of this type of system are
that it is easily understood by workers
and, perhaps consequently, is more readily
accepted than some of the other incentive
systems.
There are four general categories of plan:
2. Cell 2
 Two relatively common plans set standards based on
time per unit and tie incentives directly to level of
output:
a. Standard hour plan is a generic term for plans
setting the incentive rate based on completion of a
task in some expected time period.
b. Bedeaux plan provides a variation on straight
piecework and standard hour plans. It requires
division of a task into simple actions and
determination of the time required by an average
skilled worker to complete each action.
There are four general categories of plan:
3. Cell 3
 The two plans included in cell 3 provide for variable incentives
as a function of units of production per time period:
a. Taylor Plan – establishes two piecework rates:
1) Goes into effect when a worker exceeds the published
standard for a given time period.
2) Established for production below standard, and this
rate is lower than the regular wage.
b. Merrick Plan – operates in the same way, except that
three piecework rates are set:
1) High for production exceeding 100% of standard
2) Medium for production between 83 and 100% of
standard
3) Low for production less than 83% of standard
There are four general categories of plan:
4. Cell 4
 The three plans included in cell 4 provide for variable
incentives linked to a standard expressed as a time period
per unit of production:
a. Halsey 50-50 method – derives its name from the shared
split between worker and employer of any savings in
direct cost.
b. Rowan Plan – similar to the Halsey plan in that an
employer and employee both share in savings resulting
from work completed in less than standard time.
c. Gantt Plan – differs from both the Halsey and the Rowan
plans in that the standard time for a task is purposely set
at a level requiring high effort to complete.
Pay-for-Performance Plan
• Individual Incentive Plans: Advantages
 Substantial impact that raises productivity, lowers
production costs, and increases earnings of workers.
 Less direct supervision is required to maintain
reasonable levels of output than under payment by
time.
 In most cases, systems of payments by results, if
accompanied by improved organizational and work
measurement, enable labor costs to be estimated more
accurately than under payment by time. This helps
costing and budgetary control.
• Individual Incentive Plans: Disadvantages
 Greater conflict may emerge between employees seeking to maximize
output and managers concerned about deteriorating quality levels.
 Attempts to introduce new technology may be resisted by employees
concerned about the impact on production standards.
 Reduced willingness of employees to suggest new production
methods for fear of subsequent increases in production standards.
 Increased complaints that equipment is poorly maintained, hindering
employee efforts to earn larger incentives.
 Increased turnover among new employees discouraged by the
unwillingness of experienced workers to cooperate in on-the-job
training.
 Elevated levels of mistrust between workers and management.
• Individual Incentive Plans: Examples
• Comparing Group and Individual Incentive
Plans
• Large Group Incentive Plans
• Gain-Sharing Incentive Plans
• Profit-Sharing Incentive Plans
• Earnings-at-Risk Plans
• Group Incentive Plans: Advantages and
Disadvantages
• Group Incentive Plans: Examples
Failures of team incentives schemes can be
attributed to at least 5 causes:
1) Teams come in many varieties
2) Level problem
3) Complexity
4) Control
3 C’s
5) Communication
• Comparing Group and Individual Incentive Plans
• Large Group
Incentive Plans
 Two Types of Plans
1) Gain-Sharing
Plans – use
operating
measures
2) Profit-Sharing
Plans – use
financial
measures
• Gain-Sharing Plans
 looks at cost components of the income
ledger and identifies savings over which
employees have more impact.
 Key elements in designing a gain-sharing
plan:
1) Strength of reinforcement
2) Productivity standards
3) Sharing the gains split between
management and workers
4) Scope of the formula
5) Great care must be exercised with such
alternative measures
6) Perceived fairness of the formula
7) Ease of administration
8) Production variability
• Gain-Sharing Plans
 Three Gain-Sharing Formulas
1) Scanlon Plan – are designed
to lower labor costs without
lowering the level of a firm’s
activity.
2) Rucker Plan – involves more
complex formula than a
Scanlon plan for determining
worker incentive bonuses.
3) Improshare (Improved
Productivity through
Sharing) – is gain-sharing
plan that has proved easy to
administer and to
communicate.
Pay-for-Performance Plan
• Implementation of the Scanlon/Rucker Plans
 Two major components are vital to the implementation and success
of a Rucker/Scanlon Plan:
1) a productivity norm
2) effective worker committees

• Similarities and Contrasts Between Scanlon and Rucker Plans
 They differ from individual incentive plans which focus on using
wage incentives to motivate higher.
 There are two important differences between the two plans:
1) Rucker plans tie incentives to a wide variety of savings not just
the labor savings focused on Scanlon plans.
2) This greater flexibility may help explain why Rucker plans are
more amenable to linkages with individual incentive plans.
• Profit-Sharing Plans
 Profit sharing
continues to be
popular because the
focus is on the
measure that matters
most to be people, a
predetermined index
of profitability.
• Earnings-at-Risk Plans
 Two categories:
1) Success sharing plans
- employee base wages are
constant and variable pay
adds on during successful
years.
2) Risk sharing plans
- base pay is reduced by
some amount relative to
the level that would be
offered in a success-sharing
plan.
• Group Incentive Plans: Advantages
1) Positive impact on organization and
individual performance of about 5
to 10 percent per year.
2) Easier to develop performance
measure than it is for individual
plans.
3) Signals that cooperation, both
within and across groups, is a
desires behavior.
4) Teamwork meets with enthusiastic
support from most employees.
5) May increase participation of
employees in decision-making
process.
• Group Incentive Plans: Disadvantages
1) Line-of-sight may be lessened, that is
employees may find it more difficult to
see how their individual performance
affects their incentive payouts.
2) May lead to increased turnover among
top individual performers who are
discouraged because they must share
with lesser contribution.
3) Increases compensation risk to
employees because of lower income
stability. May influence some
applicants to apply for jobs in firms
where base pay is a larger
compensation component.
• Group Incentive Plans:
Examples
 Can be described by
common features:
1) the size of the group that
participates in the plan
2) the standard against
which performance is
compared
3) the payout schedule
Pay-for-Performance Plan
• Employee Stock Ownership Plans (ESOPs)
• Performance Plans (Performance Share and
Performance Unit)
• Broad-Based Option Plans (BBOPs)
• Combination Plans: Mixing Individual and
Group
• Employee Stock Ownership
Plans (ESOPs)
 It is a benefit or retirement-type
plan for employees of a company.
In an ESOP, employees receive
regular shares of the company’s
stock as a benefit for working at
the company. All employees are
eligible to participate in the ESOP
after a certain period of time
employed, usually one to two
years depending on the Plan.
• Performance Plans
(Performance Share and
Performance Unit)
 Performance plans typically
features corporate
performance objectives for a
time three years in the future.
They are driven by financial
earnings or return measures,
and they pay out for meeting
or exceeding specific goals.
• Broad-Based Option Plans
(BBOPs)
 BBOPs are stock grants. The
company gives employees shares
of stock over a designated time
period. The strength of BBOPs id
their versatility. Depending on the
way they are distributed to
employees, they can either
reinforce a strong emphasis on
performance (performance culture)
or inspire greater commitment and
retention (ownership culture) of
employees.
• Combination Plans: Mixing Individual and Group
 It’s not uncommon for companies to use both
individual and group incentives. The goal is to both
motivate individual behavior and to insure that
employees work together, where needed, to
promote team and corporate goals. These
combination programs start with standard individual
(e.g., performance appraisal, quantity of output)
and group measures (e.g., profit, operating income).
Pay-for-Performance Plan

More Related Content

PPTX
Pay for -performance
PPTX
Pay for performance- the evidence
PPTX
Compensation fhd
PPT
Incentives
PPTX
Rewards, Benefits and Incentives of an Organization
PPT
Legal framework on Compensation Structure
PPTX
Employee incentive scheme
PPTX
Compensation strategies
Pay for -performance
Pay for performance- the evidence
Compensation fhd
Incentives
Rewards, Benefits and Incentives of an Organization
Legal framework on Compensation Structure
Employee incentive scheme
Compensation strategies

What's hot (20)

PPTX
Pay For Performance ppt
PPT
New trends in compensation management
PPTX
Job enrichment & Job enlargement
PPTX
Hrd strategies
PPT
Compensation
PPTX
Economic theories of wages
PPTX
Executive compensation
PPTX
Incentives and Fringe benefits in HRM
PPTX
Productivity bargaining
PPTX
Collective bargaining case study
PPTX
Ethics in Performance Management
PPTX
Group incentive plans
PPTX
Incentives: types of incentives
PPTX
Compensation management
DOC
Wage components
PDF
STRATEGIC HUMAN RESOURCE MANAGEMENT NOTES
PPTX
Human resource evaluation
PDF
Promotions and Transfers
PPTX
Ethical issues in human resource
PPT
Chapter 5 international compensation
Pay For Performance ppt
New trends in compensation management
Job enrichment & Job enlargement
Hrd strategies
Compensation
Economic theories of wages
Executive compensation
Incentives and Fringe benefits in HRM
Productivity bargaining
Collective bargaining case study
Ethics in Performance Management
Group incentive plans
Incentives: types of incentives
Compensation management
Wage components
STRATEGIC HUMAN RESOURCE MANAGEMENT NOTES
Human resource evaluation
Promotions and Transfers
Ethical issues in human resource
Chapter 5 international compensation
Ad

Similar to Pay-for-Performance Plan (20)

PDF
Chapter 10 Pay for performance assignment.pdf
PPTX
Pay for performance
PPT
Pay-for- Performancech10 revision 1
PPTX
Incentive 120311235821-phpapp01
PPTX
HRM.PPT.pptx
PDF
3. incentives & benifits
PPTX
HR 202 Chapter 10
PPTX
Incentive plans
PPTX
Incentive Pay
PPT
Presentation on Short Term Incentives for Management
PPTX
Organisation wide incentive plans
PPTX
Incentive
PPT
CM - Short Term Incentives CM - JOB Eval updated.pptx
PPT
CM - Short Term Incentives CM - JOB Eval updated.pptx
PPT
CM - Short Term Incentives CM - JOB Eval updated.pptx
PPTX
presentation on hrm topic
PPTX
Organisationwideincentiveplans 131203054141-phpapp02 (1)
PDF
Deciding Incentive Schemes
PPTX
INCENTIVE COMPENSATION/human resource.pptx
PPTX
Mba ii hrm u-3.5 incentives and employee benefits
Chapter 10 Pay for performance assignment.pdf
Pay for performance
Pay-for- Performancech10 revision 1
Incentive 120311235821-phpapp01
HRM.PPT.pptx
3. incentives & benifits
HR 202 Chapter 10
Incentive plans
Incentive Pay
Presentation on Short Term Incentives for Management
Organisation wide incentive plans
Incentive
CM - Short Term Incentives CM - JOB Eval updated.pptx
CM - Short Term Incentives CM - JOB Eval updated.pptx
CM - Short Term Incentives CM - JOB Eval updated.pptx
presentation on hrm topic
Organisationwideincentiveplans 131203054141-phpapp02 (1)
Deciding Incentive Schemes
INCENTIVE COMPENSATION/human resource.pptx
Mba ii hrm u-3.5 incentives and employee benefits
Ad

More from aizellbernal (20)

DOCX
Strategic Human Resource
PPTX
Strategic HR
PPTX
Job Analysis
PPTX
Change Management
PPTX
Business Process Benchmarking
PPTX
Single Parenthood
PPTX
Learning: Theories and Program Design
PPTX
e-learning
PPTX
PPTX
Job Analysis and Rewards
PPT
Supply Chain Management
PPTX
Design of Work Systems
PPTX
Scramble King
PPTX
Belo Essentials
PPTX
Bejeweled
PPTX
Banapple
PPTX
Ownership and Organization
PPTX
The Struggle for Survival and Prosperity
PPTX
Employment and Security of Tenure
PPTX
The Human Element In An Iindustrial Organization
Strategic Human Resource
Strategic HR
Job Analysis
Change Management
Business Process Benchmarking
Single Parenthood
Learning: Theories and Program Design
e-learning
Job Analysis and Rewards
Supply Chain Management
Design of Work Systems
Scramble King
Belo Essentials
Bejeweled
Banapple
Ownership and Organization
The Struggle for Survival and Prosperity
Employment and Security of Tenure
The Human Element In An Iindustrial Organization

Recently uploaded (20)

PPTX
Slide gioi thieu VietinBank Quy 2 - 2025
PPTX
chapter 2 entrepreneurship full lecture ppt
PPTX
operations management : demand supply ch
PPTX
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
DOCX
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
PPTX
2 - Self & Personality 587689213yiuedhwejbmansbeakjrk
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PDF
Kishore Vora - Best CFO in India to watch in 2025.pdf
PDF
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
PDF
Chapter 2 - AI chatbots and prompt engineering.pdf
PDF
income tax laws notes important pakistan
PPTX
IITM - FINAL Option - 01 - 12.08.25.pptx
PDF
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
DOCX
Center Enamel Powering Innovation and Resilience in the Italian Chemical Indu...
PDF
533158074-Saudi-Arabia-Companies-List-Contact.pdf
PDF
ICv2 White Paper - Gen Con Trade Day 2025
PDF
Keppel_Proposed Divestment of M1 Limited
PDF
Nante Industrial Plug Factory: Engineering Quality for Modern Power Applications
PPT
Lecture notes on Business Research Methods
PDF
1911 Gold Corporate Presentation Aug 2025.pdf
Slide gioi thieu VietinBank Quy 2 - 2025
chapter 2 entrepreneurship full lecture ppt
operations management : demand supply ch
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
2 - Self & Personality 587689213yiuedhwejbmansbeakjrk
Lecture 3344;;,,(,(((((((((((((((((((((((
Kishore Vora - Best CFO in India to watch in 2025.pdf
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
Chapter 2 - AI chatbots and prompt engineering.pdf
income tax laws notes important pakistan
IITM - FINAL Option - 01 - 12.08.25.pptx
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
Center Enamel Powering Innovation and Resilience in the Italian Chemical Indu...
533158074-Saudi-Arabia-Companies-List-Contact.pdf
ICv2 White Paper - Gen Con Trade Day 2025
Keppel_Proposed Divestment of M1 Limited
Nante Industrial Plug Factory: Engineering Quality for Modern Power Applications
Lecture notes on Business Research Methods
1911 Gold Corporate Presentation Aug 2025.pdf

Pay-for-Performance Plan

  • 1. Aizell A. Bernal BSBA 4 HRM 5 Dr. R. Robledo
  • 2. • Pay for performance plans signal a movement away from entitlements, sometimes a very slow movement toward pay that varies with some measure of individual or organizational performance. • Pay will vary with some measure of individual, team, or organizational
  • 3. EXHIBIT 10.1 Uses of Different Variable Pay Plan Types Percent of Companies With Plan Type of Plan 1996 1998 1999 2002 2007 Special-recognition plans 44 51 59 34 72 Stock option plans 21 46 43 40 Individual incdntive plans 17 35 39 38 49 Cash profit sharing 22 22 23 18 16 Gainsharing plans 16 20 18 11 10 Team awards 13 17 15 8 32
  • 4. EXHIBIT 10.2 BASE VERSUS VARIABLE PAY Percent of Total Compensation Today 2004 Variable pay as percentage of payroll 2005 2009 (projected) 9.50% 11.40% 11.30% • The greater interest in variable pay probably can be traced to two trends: 1. The increasing competition from foreign producers forces American firms to cut costs and/or increase productivity. 2. Today’s fast-paced business environment means that workers must be willing to adjust what they do and how they do it.
  • 5. • Pay-for-performance, those that introduce variability into the level of pay you receive, seem to have a positive impact on performance if designed well. Notice that we have qualified out statement that variable-pay plans can be effective if they are designed well.
  • 6. • Merit Pay • Lump-Sum Bonuses • Individual Spot Awards • Individual Incentive Plans • Individual Incentive Plans: Advantages and Disadvantages • Individual Incentive Plans: Examples
  • 7. • Merit Pay  a system links increases in base pay to how highly employees are rated on an performance evaluation. Well Above Average Above Below Average Average Average Well Below Average Performance rating 1 2 3 4 5 Merit pay increase 5% 4% 3% 1% 0%
  • 8. • Lump-Sum Bonuses  are thought to be a substitute for merit pay.  are earned at the end of a specified time period, such as monthly, quarterly, or annually, when an employee achieves a specific level of his work or quota.
  • 10. • Individual Spot Awards/Spot Awards  An immediate recognition to reward an employee for exceptional performance beyond the prescribed expectation of the employee’s job. Spot awards are given after the event has been completed, usually without pre‐determined goals or set performance levels and paid as a one‐time bonus.
  • 11. • Individual Incentive Plans  Incentive plans are part of an employee's compensation or pay. The incentive plan gives an employee the opportunity to increase his annual pay based upon either company performance or individual performance. Incentive plans are a way for companies to keep employees motivated to perform to the best of their abilities, thus increasing company profit.
  • 13. There are four general categories of plan: 1. Cell 1  The most frequently implemented incentive system is a straight piecework system.  Rate determination is based on units of production per time period, and wages vary directly as a function of production level.  The major advantages of this type of system are that it is easily understood by workers and, perhaps consequently, is more readily accepted than some of the other incentive systems.
  • 14. There are four general categories of plan: 2. Cell 2  Two relatively common plans set standards based on time per unit and tie incentives directly to level of output: a. Standard hour plan is a generic term for plans setting the incentive rate based on completion of a task in some expected time period. b. Bedeaux plan provides a variation on straight piecework and standard hour plans. It requires division of a task into simple actions and determination of the time required by an average skilled worker to complete each action.
  • 15. There are four general categories of plan: 3. Cell 3  The two plans included in cell 3 provide for variable incentives as a function of units of production per time period: a. Taylor Plan – establishes two piecework rates: 1) Goes into effect when a worker exceeds the published standard for a given time period. 2) Established for production below standard, and this rate is lower than the regular wage. b. Merrick Plan – operates in the same way, except that three piecework rates are set: 1) High for production exceeding 100% of standard 2) Medium for production between 83 and 100% of standard 3) Low for production less than 83% of standard
  • 16. There are four general categories of plan: 4. Cell 4  The three plans included in cell 4 provide for variable incentives linked to a standard expressed as a time period per unit of production: a. Halsey 50-50 method – derives its name from the shared split between worker and employer of any savings in direct cost. b. Rowan Plan – similar to the Halsey plan in that an employer and employee both share in savings resulting from work completed in less than standard time. c. Gantt Plan – differs from both the Halsey and the Rowan plans in that the standard time for a task is purposely set at a level requiring high effort to complete.
  • 18. • Individual Incentive Plans: Advantages  Substantial impact that raises productivity, lowers production costs, and increases earnings of workers.  Less direct supervision is required to maintain reasonable levels of output than under payment by time.  In most cases, systems of payments by results, if accompanied by improved organizational and work measurement, enable labor costs to be estimated more accurately than under payment by time. This helps costing and budgetary control.
  • 19. • Individual Incentive Plans: Disadvantages  Greater conflict may emerge between employees seeking to maximize output and managers concerned about deteriorating quality levels.  Attempts to introduce new technology may be resisted by employees concerned about the impact on production standards.  Reduced willingness of employees to suggest new production methods for fear of subsequent increases in production standards.  Increased complaints that equipment is poorly maintained, hindering employee efforts to earn larger incentives.  Increased turnover among new employees discouraged by the unwillingness of experienced workers to cooperate in on-the-job training.  Elevated levels of mistrust between workers and management.
  • 20. • Individual Incentive Plans: Examples
  • 21. • Comparing Group and Individual Incentive Plans • Large Group Incentive Plans • Gain-Sharing Incentive Plans • Profit-Sharing Incentive Plans • Earnings-at-Risk Plans • Group Incentive Plans: Advantages and Disadvantages • Group Incentive Plans: Examples
  • 22. Failures of team incentives schemes can be attributed to at least 5 causes: 1) Teams come in many varieties 2) Level problem 3) Complexity 4) Control 3 C’s 5) Communication
  • 23. • Comparing Group and Individual Incentive Plans
  • 24. • Large Group Incentive Plans  Two Types of Plans 1) Gain-Sharing Plans – use operating measures 2) Profit-Sharing Plans – use financial measures
  • 25. • Gain-Sharing Plans  looks at cost components of the income ledger and identifies savings over which employees have more impact.  Key elements in designing a gain-sharing plan: 1) Strength of reinforcement 2) Productivity standards 3) Sharing the gains split between management and workers 4) Scope of the formula 5) Great care must be exercised with such alternative measures 6) Perceived fairness of the formula 7) Ease of administration 8) Production variability
  • 26. • Gain-Sharing Plans  Three Gain-Sharing Formulas 1) Scanlon Plan – are designed to lower labor costs without lowering the level of a firm’s activity. 2) Rucker Plan – involves more complex formula than a Scanlon plan for determining worker incentive bonuses. 3) Improshare (Improved Productivity through Sharing) – is gain-sharing plan that has proved easy to administer and to communicate.
  • 28. • Implementation of the Scanlon/Rucker Plans  Two major components are vital to the implementation and success of a Rucker/Scanlon Plan: 1) a productivity norm 2) effective worker committees • Similarities and Contrasts Between Scanlon and Rucker Plans  They differ from individual incentive plans which focus on using wage incentives to motivate higher.  There are two important differences between the two plans: 1) Rucker plans tie incentives to a wide variety of savings not just the labor savings focused on Scanlon plans. 2) This greater flexibility may help explain why Rucker plans are more amenable to linkages with individual incentive plans.
  • 29. • Profit-Sharing Plans  Profit sharing continues to be popular because the focus is on the measure that matters most to be people, a predetermined index of profitability.
  • 30. • Earnings-at-Risk Plans  Two categories: 1) Success sharing plans - employee base wages are constant and variable pay adds on during successful years. 2) Risk sharing plans - base pay is reduced by some amount relative to the level that would be offered in a success-sharing plan.
  • 31. • Group Incentive Plans: Advantages 1) Positive impact on organization and individual performance of about 5 to 10 percent per year. 2) Easier to develop performance measure than it is for individual plans. 3) Signals that cooperation, both within and across groups, is a desires behavior. 4) Teamwork meets with enthusiastic support from most employees. 5) May increase participation of employees in decision-making process.
  • 32. • Group Incentive Plans: Disadvantages 1) Line-of-sight may be lessened, that is employees may find it more difficult to see how their individual performance affects their incentive payouts. 2) May lead to increased turnover among top individual performers who are discouraged because they must share with lesser contribution. 3) Increases compensation risk to employees because of lower income stability. May influence some applicants to apply for jobs in firms where base pay is a larger compensation component.
  • 33. • Group Incentive Plans: Examples  Can be described by common features: 1) the size of the group that participates in the plan 2) the standard against which performance is compared 3) the payout schedule
  • 35. • Employee Stock Ownership Plans (ESOPs) • Performance Plans (Performance Share and Performance Unit) • Broad-Based Option Plans (BBOPs) • Combination Plans: Mixing Individual and Group
  • 36. • Employee Stock Ownership Plans (ESOPs)  It is a benefit or retirement-type plan for employees of a company. In an ESOP, employees receive regular shares of the company’s stock as a benefit for working at the company. All employees are eligible to participate in the ESOP after a certain period of time employed, usually one to two years depending on the Plan.
  • 37. • Performance Plans (Performance Share and Performance Unit)  Performance plans typically features corporate performance objectives for a time three years in the future. They are driven by financial earnings or return measures, and they pay out for meeting or exceeding specific goals.
  • 38. • Broad-Based Option Plans (BBOPs)  BBOPs are stock grants. The company gives employees shares of stock over a designated time period. The strength of BBOPs id their versatility. Depending on the way they are distributed to employees, they can either reinforce a strong emphasis on performance (performance culture) or inspire greater commitment and retention (ownership culture) of employees.
  • 39. • Combination Plans: Mixing Individual and Group  It’s not uncommon for companies to use both individual and group incentives. The goal is to both motivate individual behavior and to insure that employees work together, where needed, to promote team and corporate goals. These combination programs start with standard individual (e.g., performance appraisal, quantity of output) and group measures (e.g., profit, operating income).