PDCA Cycle | Plan
Do Check Act |
Implementation
PDCA CYCLE
2
FREE
TUTORIAL
What is the PDCA cycle in TQM?
3
 The full name is the Plan-Do-Check-Act Cycle and it is one of the popular Problem
Solving Method and Continuous Improvement Methodology.
 It is often referred to as the Deming wheel or Deming cycle.
 Shewhart and Deming are recognized as pioneers in the Quality Management
movement.
 Shewhart introduced the PDSA cycle, (Plan-Do-Study-Act).
 He believed that data analysis is an essential part of any improvement effort and
checking does not necessarily imply an in-depth study.
What is the PDCA model of
continuous improvement?
4
 PDCA is widely recognized as the basis of continually improving the Quality of
Products processes, and services and also it is a simple structured approach
for solving quality-related problems. It may be necessary to solve the problem
permanently and reach the ultimate goal state.
 Used to verify the feasibility of a proposed idea whether it is an incremental or a
breakthrough improvement.
 Plan-Do-Check-Act approach is the base for TQM, ISO 9001:2015 Quality
Management System Standard, A3 thinking methodology, and IATF
16949:2016 Automotive QMS Standard.
 This methodology relies on trial and error, however, it keeps on improving until
it achieves excellence.
 It is one of the most popular Lean Manufacturing Tool across the manufacturing
industries.
Continuous Improvement Cycle
5
What are the four steps in the PDCA
cycle?
6
1. Plan – A change aimed at improvement
2. Do – Carry out the change
3. Check – Study the results
4. Act – Adopt, Adapt, or Abandon
Four Phases of PDCA Cycle
7
How to Implement the PDCA Cycle?
Example:
Implementation of Plan Phase:
8
There are four sub-phases are available in the planning phase which is explained
below in sequence:
1. Select Improvement Opportunity
2. Analyze Current Situation
3. Identify Root Causes
4. Generate and Choose Solution
[1] Select Improvement Opportunity:
9
 Generate a list and select
 Redefine team
 Write problem / opportunity / aim statement
 Describe the problem
 Management review
 The team selects the problem to be solved (to be improved)
 The problem and objectives are clearly identified
 The current situation is analyzed.
 Solution alternatives are identified, selected and scheduled
[2] Analyze Current Situation:
10
 Define the process/problem to be solved
 Identify the customer(s).
 Prepare Baseline data
 Check any Performance gaps are available?
 Look at benchmarks, standards, regulatory requirements
 Validate problem and statement
 Management review
[3] Identify Root Causes:
11
 This is a very very important step
 Utilize the Cause and Effect Diagram (Fishbone Diagram or Ishikawa Diagram, or Why-
Why analysis to identify the most likely cause(s).
 Use Genchi Gembutsu Method
 Select root cause
 Management review
[4] Generate and Choose Solutions:
12
 Generate a list and select solutions
 Directly linked to root cause & supported by data
 Team brainstorming and shared decision making
 Be honest about barriers
 Choose the best solution based on criteria
 Define and map out a solution
 Develop solution(s) to remove the root cause(s)
 Select the best solution(s) to remove the root cause(s)
 Verify that effectiveness of the selected solutions
 Verify that selected solutions do not cause any undesirable effects
 Set a Target that you want to achieve
Implementation of Do Phase:
[5] Map Out and Implement a Trial Run:
13
 Map out a trial run
 Communication and education/training are key factors
 Be specific
 Implement a trial run
 Ensure all the countermeasures are completed
 It involves collecting data for later analysis
 It ensures the solution is appropriately tested
Implementation of Check Phase:
 The check phase has two sub-phases which are mentioned below.
6. Analyze the Results
7. Draw Conclusions
[6] Analyze the Results:
14
 Evaluate results based on collected data
 Team-based analysis
 Objective and subjective data
 Revisit the process as it was mapped out
 Be honest!
 Evaluate both Results and Process
 Involves analyzing the collected data and comparing the actual results against the
planned objectives.
 Allows discussing whether further improvements are possible
 You may have to repeat the Do and Check a number of times until you get the optimum
results
[7] Draw Conclusions:
15
 Team-based discussion
 Was the root cause eliminated?
 What worked?
 Did the desired change occur?
 What didn’t work?
 What could be improved/changed?
 Implement the best solution(s) to remove the root cause(s)
 What did we learn?
 Implement the best solution(s) to address the escape point(s)
 Validate the effectiveness of the implemented solutions by Customer's perspective
 Monitor the effectiveness of the implemented solutions and assure that they do not
cause any undesirable effects
 Remove Interim Containment Actions
Implementation of Act Phase:
The last phase is the act phase and it has two sub-phases as mentioned below.
8. Adopt, Adapt, or Abandon the Intervention
9. Monitor; Hold the gains
[8] Adopt, Adapt, or Abandon the
Intervention:
16
 Team-based discussion and beyond
 Test again on a larger scale?
 Communication, education, and training
 Revise plan and repeat trial
 Communication, education, and training
 Revisit root cause analysis and/or list of solutions
 Need additional/new members on the team?
 Involves acting on the feedback and lessons learned and implementing the solution
 It is also concerned with: Standardizing, Documenting, Sustaining the improved
process
 Integrating it into the organization’s system.
[9] Monitor; Hold the gains:
17
 Standardize the change
 Change to department policy?
 Continue to monitor improvement
 Same data collection tools and process
 Continue reporting to staff and management
 Move to new improvement opportunity
 Standardize Success and Learn from Failures
Useful Tools for PDCA Cycle:
18
 There are several useful tools of the PDCA Cycle is mentioned in the below picture.
What are the benefits of the PDCA
cycle?
19
• PDCA approach encourages the way of problem-solving and implementing solutions
• PDCA (Plan-Do-Check-Act) approach ensures that you plan, test, and include
feedback before you start full-scale implementation
• Repeating the PDCA_Cycle frequently will help to implement Kaizen and other
continuous improvement initiatives.
• PDCA_approach brings you closer to your goals as knowledge is increased: from
solving problems, from failures, from the feedback received.
• This approach Improves the critical thinking skills of your team
THANKS!
Any questions?
You can find me at:
⦿ @username
⦿ user@mail.me
20

More Related Content

PDF
Lean Leadership _ ARMA 2015
PPTX
Lean Management System
PDF
PDCA Problem Solving Technique & Tools
PDF
Lean Leadership: Part 2 of 3
PDF
How to Run a Value Stream Mapping (VSM) Workshop
PPTX
Project Management Workshop
PPTX
Introduction to Pull system - November 2016
PPTX
Lean six sigma - Waste elimination (Yellow Belt)
Lean Leadership _ ARMA 2015
Lean Management System
PDCA Problem Solving Technique & Tools
Lean Leadership: Part 2 of 3
How to Run a Value Stream Mapping (VSM) Workshop
Project Management Workshop
Introduction to Pull system - November 2016
Lean six sigma - Waste elimination (Yellow Belt)

What's hot (20)

PDF
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
PDF
Lean Value Stream Mapping (VSM) Training Module
PPTX
Kanban - Back to Basics
PDF
PDCA: Plan-Do-Check-Act
PPTX
Kanban
PDF
Applying PDCA, A3 Thinking & Problem Solving
PPT
PDCA Cycle
PDF
Comment Oui.sncf a mis son agilité à l'échelle ?
PPT
Six sigma
PDF
The Outstanding Organization: The Power of Discipline
PDF
WEBINAR: Introduction to PDCA
PPTX
Project management essentials 3 day training program
PPT
Kaizen Training
PDF
Thomas Walenta - Implementing_change_in_organizations
PPT
Kaizen
PPTX
Shop floor management new flyer 1 day workshop - november 2016
PDF
Lean Manufacturing
PDF
Kaizen | Continuous Improvement for Organization
PPTX
Kanban
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Lean Value Stream Mapping (VSM) Training Module
Kanban - Back to Basics
PDCA: Plan-Do-Check-Act
Kanban
Applying PDCA, A3 Thinking & Problem Solving
PDCA Cycle
Comment Oui.sncf a mis son agilité à l'échelle ?
Six sigma
The Outstanding Organization: The Power of Discipline
WEBINAR: Introduction to PDCA
Project management essentials 3 day training program
Kaizen Training
Thomas Walenta - Implementing_change_in_organizations
Kaizen
Shop floor management new flyer 1 day workshop - november 2016
Lean Manufacturing
Kaizen | Continuous Improvement for Organization
Kanban
Ad

Similar to PDCA.pdf (20)

PDF
Dit yvol5iss28
PPTX
Structured approach to problem solving
PPT
Lean Six Sigma Leadership 062507
PDF
PDCA Cycle | Plan Do Check Act | ISO | Gaurav Singh Rajput
PPT
Six Sigma Process Improvement
PPTX
Quality improvement paradigm (QIP)
PPTX
Continous process improvement
PDF
Instant Download for Introduction to Six Sigma and Process Improvement 2nd Ed...
PDF
Introduction to Six Sigma and Process Improvement 2nd Edition Evans Solutions...
PPTX
6.1 Continuous Performance Improvement
PPTX
DOCX
Theories in total quality management
PPTX
PDCA-Based ELP Management 2023.pptx
PPTX
PPTX
PPT
Basic Six Sigma Presentation
PDF
Introduction to Six Sigma and Process Improvement 2nd Edition Evans Solutions...
PPT
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
PPTX
Pdca presentation
PDF
Sixsigmadtifactsheet
Dit yvol5iss28
Structured approach to problem solving
Lean Six Sigma Leadership 062507
PDCA Cycle | Plan Do Check Act | ISO | Gaurav Singh Rajput
Six Sigma Process Improvement
Quality improvement paradigm (QIP)
Continous process improvement
Instant Download for Introduction to Six Sigma and Process Improvement 2nd Ed...
Introduction to Six Sigma and Process Improvement 2nd Edition Evans Solutions...
6.1 Continuous Performance Improvement
Theories in total quality management
PDCA-Based ELP Management 2023.pptx
Basic Six Sigma Presentation
Introduction to Six Sigma and Process Improvement 2nd Edition Evans Solutions...
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Pdca presentation
Sixsigmadtifactsheet
Ad

Recently uploaded (20)

DOCX
Hand book of Entrepreneurship 4 Chapters.docx
PDF
Daniels 2024 Inclusive, Sustainable Development
PDF
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
PPTX
Astra-Investor- business Presentation (1).pptx
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
PDF
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
PPTX
CTG - Business Update 2Q2025 & 6M2025.pptx
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
PDF
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
PPTX
Slide gioi thieu VietinBank Quy 2 - 2025
PDF
Booking.com The Global AI Sentiment Report 2025
PPTX
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
PDF
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PDF
Tata consultancy services case study shri Sharda college, basrur
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PPT
Lecture notes on Business Research Methods
PDF
Keppel_Proposed Divestment of M1 Limited
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
Hand book of Entrepreneurship 4 Chapters.docx
Daniels 2024 Inclusive, Sustainable Development
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
Astra-Investor- business Presentation (1).pptx
Digital Marketing & E-commerce Certificate Glossary.pdf.................
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
CTG - Business Update 2Q2025 & 6M2025.pptx
Solaris Resources Presentation - Corporate August 2025.pdf
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
Slide gioi thieu VietinBank Quy 2 - 2025
Booking.com The Global AI Sentiment Report 2025
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
2025 Product Deck V1.0.pptxCATALOGTCLCIA
Tata consultancy services case study shri Sharda college, basrur
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Lecture notes on Business Research Methods
Keppel_Proposed Divestment of M1 Limited
Lecture 3344;;,,(,(((((((((((((((((((((((
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax

PDCA.pdf

  • 1. PDCA Cycle | Plan Do Check Act | Implementation
  • 3. What is the PDCA cycle in TQM? 3  The full name is the Plan-Do-Check-Act Cycle and it is one of the popular Problem Solving Method and Continuous Improvement Methodology.  It is often referred to as the Deming wheel or Deming cycle.  Shewhart and Deming are recognized as pioneers in the Quality Management movement.  Shewhart introduced the PDSA cycle, (Plan-Do-Study-Act).  He believed that data analysis is an essential part of any improvement effort and checking does not necessarily imply an in-depth study.
  • 4. What is the PDCA model of continuous improvement? 4  PDCA is widely recognized as the basis of continually improving the Quality of Products processes, and services and also it is a simple structured approach for solving quality-related problems. It may be necessary to solve the problem permanently and reach the ultimate goal state.  Used to verify the feasibility of a proposed idea whether it is an incremental or a breakthrough improvement.  Plan-Do-Check-Act approach is the base for TQM, ISO 9001:2015 Quality Management System Standard, A3 thinking methodology, and IATF 16949:2016 Automotive QMS Standard.  This methodology relies on trial and error, however, it keeps on improving until it achieves excellence.  It is one of the most popular Lean Manufacturing Tool across the manufacturing industries.
  • 6. What are the four steps in the PDCA cycle? 6 1. Plan – A change aimed at improvement 2. Do – Carry out the change 3. Check – Study the results 4. Act – Adopt, Adapt, or Abandon
  • 7. Four Phases of PDCA Cycle 7
  • 8. How to Implement the PDCA Cycle? Example: Implementation of Plan Phase: 8 There are four sub-phases are available in the planning phase which is explained below in sequence: 1. Select Improvement Opportunity 2. Analyze Current Situation 3. Identify Root Causes 4. Generate and Choose Solution
  • 9. [1] Select Improvement Opportunity: 9  Generate a list and select  Redefine team  Write problem / opportunity / aim statement  Describe the problem  Management review  The team selects the problem to be solved (to be improved)  The problem and objectives are clearly identified  The current situation is analyzed.  Solution alternatives are identified, selected and scheduled
  • 10. [2] Analyze Current Situation: 10  Define the process/problem to be solved  Identify the customer(s).  Prepare Baseline data  Check any Performance gaps are available?  Look at benchmarks, standards, regulatory requirements  Validate problem and statement  Management review
  • 11. [3] Identify Root Causes: 11  This is a very very important step  Utilize the Cause and Effect Diagram (Fishbone Diagram or Ishikawa Diagram, or Why- Why analysis to identify the most likely cause(s).  Use Genchi Gembutsu Method  Select root cause  Management review
  • 12. [4] Generate and Choose Solutions: 12  Generate a list and select solutions  Directly linked to root cause & supported by data  Team brainstorming and shared decision making  Be honest about barriers  Choose the best solution based on criteria  Define and map out a solution  Develop solution(s) to remove the root cause(s)  Select the best solution(s) to remove the root cause(s)  Verify that effectiveness of the selected solutions  Verify that selected solutions do not cause any undesirable effects  Set a Target that you want to achieve
  • 13. Implementation of Do Phase: [5] Map Out and Implement a Trial Run: 13  Map out a trial run  Communication and education/training are key factors  Be specific  Implement a trial run  Ensure all the countermeasures are completed  It involves collecting data for later analysis  It ensures the solution is appropriately tested Implementation of Check Phase:  The check phase has two sub-phases which are mentioned below. 6. Analyze the Results 7. Draw Conclusions
  • 14. [6] Analyze the Results: 14  Evaluate results based on collected data  Team-based analysis  Objective and subjective data  Revisit the process as it was mapped out  Be honest!  Evaluate both Results and Process  Involves analyzing the collected data and comparing the actual results against the planned objectives.  Allows discussing whether further improvements are possible  You may have to repeat the Do and Check a number of times until you get the optimum results
  • 15. [7] Draw Conclusions: 15  Team-based discussion  Was the root cause eliminated?  What worked?  Did the desired change occur?  What didn’t work?  What could be improved/changed?  Implement the best solution(s) to remove the root cause(s)  What did we learn?  Implement the best solution(s) to address the escape point(s)  Validate the effectiveness of the implemented solutions by Customer's perspective  Monitor the effectiveness of the implemented solutions and assure that they do not cause any undesirable effects  Remove Interim Containment Actions Implementation of Act Phase: The last phase is the act phase and it has two sub-phases as mentioned below. 8. Adopt, Adapt, or Abandon the Intervention 9. Monitor; Hold the gains
  • 16. [8] Adopt, Adapt, or Abandon the Intervention: 16  Team-based discussion and beyond  Test again on a larger scale?  Communication, education, and training  Revise plan and repeat trial  Communication, education, and training  Revisit root cause analysis and/or list of solutions  Need additional/new members on the team?  Involves acting on the feedback and lessons learned and implementing the solution  It is also concerned with: Standardizing, Documenting, Sustaining the improved process  Integrating it into the organization’s system.
  • 17. [9] Monitor; Hold the gains: 17  Standardize the change  Change to department policy?  Continue to monitor improvement  Same data collection tools and process  Continue reporting to staff and management  Move to new improvement opportunity  Standardize Success and Learn from Failures
  • 18. Useful Tools for PDCA Cycle: 18  There are several useful tools of the PDCA Cycle is mentioned in the below picture.
  • 19. What are the benefits of the PDCA cycle? 19 • PDCA approach encourages the way of problem-solving and implementing solutions • PDCA (Plan-Do-Check-Act) approach ensures that you plan, test, and include feedback before you start full-scale implementation • Repeating the PDCA_Cycle frequently will help to implement Kaizen and other continuous improvement initiatives. • PDCA_approach brings you closer to your goals as knowledge is increased: from solving problems, from failures, from the feedback received. • This approach Improves the critical thinking skills of your team
  • 20. THANKS! Any questions? You can find me at: ⦿ @username ⦿ user@mail.me 20