• Disclaimer: Except for the statutes and regulations
cited, the contents of this document do not have the
force and effect of law and are not meant to bind the
public in any way. The document is intended only to
provide clarity to the public regarding existing
requirements under the law or agency
policies. General considerations are not necessarily
required by the statute or regulations; however,
FHWA encourages these for all PEL approaches.
Agenda
PEL Overview
• What is PEL?
• PEL Benefits
• Flexibility in PEL Approaches
• PEL Best Practices
• FHWA PEL Resources
4/5/2022
3
What is PEL?
• PEL is a collaborative transportation decision-
making approach
o considers environmental, community, and economic
goals early in the transportation planning process
o uses the information, analysis, and products
developed during planning to inform the
environmental review process
• Ultimately, the goal of PEL is early collaboration
to facilitate better planning to inform National
Environmental Policy Act (NEPA) reviews to
accelerate project delivery
4/5/2022
4
PEL Benefits
4/5/2022
5
Accelerate project
delivery
Align with future
requirements
Stimulates development
of new tools
Helps build relationships
for agencies & the public
Early engagement in
decision-making
Helps identify
stakeholders early on
Creates better outcomes
for the community
Improves planning
products
PELToday
Funding PEL
4/5/2022
7
• PL and SPR funding
• Transportation planning activities undertaken as part of planning
process prior to the initiation of NEPA are eligible for PL and SPR
funding.
• Once the NEPA process has been initiated, activities undertaken for a
project are not eligible for PL or SPR funds.
Additional information: Metropolitan Planning Funding Eligibility Reminder
https://www.fhwa.dot.gov/planning/metroplanfund.cfm
PEL General Considerations
8 4/5/2022
Follow the transportation planning process
Solicit participation by Federal and State resource
agencies and Indian tribes
Provide an opportunity for public review and comments
Use reliable and reasonably current data and reasonable,
scientifically acceptable methodologies
Involve the FHWA Division and FTA RegionalOffice, as
appropriate
Prepare appropriate documentation
Flexibility in PEL Approaches
4/5/2022
Add a footer
9
Integration of planning and environmental
review statute
23 U.S.C. 168
Efficient environmental reviews statute
23 U.S.C. 139(f)(4)(E)(ii)
Planning Regulations
23 CFR 450.212(a)-(c) & 23 CFR 450.318 (a)-(d)
CEQ NEPA Regulations
40 CFR 1500.4(l) and 40 CFR 1501.12
Programmatic Mitigation Planning statute
23 U.S.C. 169
Planning Regulations
23 CFR 450.214 and 23 CFR 450.320
How Planning Products Can
Benefit the NEPA Process
Planning Products Support NEPA
Travel Demand
Forecasting /Traffic
Modeling /Transit
Ridership / Safety Data
• Inform purpose and need
• Screen alternatives, including modal
alternatives
• Scope certain studies (e.g., air, noise)
Land Use and Growth
Management
• Define transportation problems
• Evaluate alternatives, including modal
alternatives
• Ensure consistency with local goals
Population and
Employment
• Identify stakeholders
• Assess community impacts
• Achieve full participation by all affected
populations
10
Planning Products:
Purpose and Need
• Develop a statement of purpose and need for a future project
during planning that can be used in the environmental review
process
• Consult with FHWA/FTA to ensure purpose & need can be used
in subsequent environmental review processes
4/5/2022
11
Purpose &
Need
Planning
Purpose
& Need
NEPA
Planning Products:
Preliminary Screening and
Elimination of Alternatives
• Best Practices
• Be objective/fact based
• Focus on corridor vision, fatal
flaw analysis, mode selection
• Reflects project purpose & need,
community and public input,
environmental impacts
• May require several levels of
screening or analysis
• The alternative to be eliminated from
consideration is not necessary for
compliance with the NEPA
(23 U.S.C. 139(f)(4)(E)(ii)
4/5/2022
12
Credit: Getty Images
PEL Best Practices
4/5/2022
13
Plan before initiating
project
Plan schedule &
budget
Planning informs future
environmental study.
Leverage tools such as
GIS and other mapping
tools to help inform
planning.
Agencies sharing
resources to provide
data.
Comprehensive record of
data, analysis and decision-
making is important
PEL Hypothetical Case Studies
• https://www.environment.fhwa.dot.gov/env_initiativ
es/pel/publications.aspx
4/5/2022
Add a footer
14
NHI Planning and Environment
Linkages (PEL) Course
COURSE NUMBER: FHWA-NHI-142078, 142078 A
and 142078V
4/5/2022
https://www.nhi.fhwa.dot.gov/course-
search?tab=0&key=PEL&sf=0&course_no=142078V
15
Other PEL Resources
4/5/2022
Virtual Public Involvement & PELWebinar Recording:
https://usdot.zoomgov.com/rec/play/Wy5WiNgW5-
1naI2Az1HKBm3csR6hDvE4Oz72QzdMiNgr2dHYRkWTJFoG4jtxZZLHy0y71
T5Q6oqN4qli.odfrUQnrHSWHAHh1?startTime=1637252868000
Federal-Aid Essentials PELVideo: https://www.fhwa.dot.gov/federal-
aidessentials/catmod.cfm?id=122
PlanWorks PELApplication & DecisionGuide:
https://fhwaapps.fhwa.dot.gov/planworks/Applications/Show/planning-and-
environment-linkages
16
Conclusion
• PEL is flexible.
• Consider the future use of the planning analysis and planning
products in the environmental review process.
• Consider environmental, social and economic early into the
planning process to:
• reduce duplication;
• encourage relationship building and public engagement;
• create better products, decisions, and outcomes; and
• accelerate project delivery.
4/5/2022
17
Mack.Frost@dot.gov Marisel.Lopez-Cruz@dot.gov
Marisel Lopez-Cruz
Mack Frost

More Related Content

PDF
Planning and Environment Linkages in Pennsylvania
PDF
Humboldt County Assn of Goverments: Public Involvement Methods and Documentation
PDF
Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bria...
PPTX
State and Regional Transportation Planning Partnerships in Tennessee
PPTX
Monitoring Committee Meeting, Q1, 2017
PDF
Adderly rpo2012
PPTX
Rural Planning Organizations: Rural Transportation Planning in Pennsylvania
PPTX
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Planning and Environment Linkages in Pennsylvania
Humboldt County Assn of Goverments: Public Involvement Methods and Documentation
Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bria...
State and Regional Transportation Planning Partnerships in Tennessee
Monitoring Committee Meeting, Q1, 2017
Adderly rpo2012
Rural Planning Organizations: Rural Transportation Planning in Pennsylvania
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...

What's hot (20)

PPTX
Regional Bicycle and Pedestrian Planning Framework
PPTX
Regional Transportation Planning in Colorado
PDF
Improving Sewerage Services for Baghdad
PDF
Community energy planning roadmap
PPTX
Dpw ocfc ad-coo_highlights
PDF
Artba Map 21 Re-authorization VS Grow Act
PDF
Establishment of the Asian Regional Soil Partnership by Ronald Vargas Rojas
 
PDF
World Bank IAG1_Aug1997
PPT
Funding programs
PPTX
SGB Survey Capacity Development Program
PPTX
WV Broadband Mapping (3Nov11)
PDF
Data and information management for M&E of national adaptation
PPTX
Update of Fairfax County's Transportation Priorities Plan (TPP)
PPT
Regional Review of UNDP-UNEP Partnership on SAP Implementation in the South C...
PPT
The Arun Approach
PDF
CGIAR Site Integration: Site Integration Plans – next steps
PPTX
NVBIA NAIOP GOAL 3 Update
PPTX
Atal Bhujal Yojana: Capacity building
PPT
Councillor Briefing: Local Plans and Plan making
PPTX
Dan Stone, Centre for Sustainable Energy - Renewable Energy
Regional Bicycle and Pedestrian Planning Framework
Regional Transportation Planning in Colorado
Improving Sewerage Services for Baghdad
Community energy planning roadmap
Dpw ocfc ad-coo_highlights
Artba Map 21 Re-authorization VS Grow Act
Establishment of the Asian Regional Soil Partnership by Ronald Vargas Rojas
 
World Bank IAG1_Aug1997
Funding programs
SGB Survey Capacity Development Program
WV Broadband Mapping (3Nov11)
Data and information management for M&E of national adaptation
Update of Fairfax County's Transportation Priorities Plan (TPP)
Regional Review of UNDP-UNEP Partnership on SAP Implementation in the South C...
The Arun Approach
CGIAR Site Integration: Site Integration Plans – next steps
NVBIA NAIOP GOAL 3 Update
Atal Bhujal Yojana: Capacity building
Councillor Briefing: Local Plans and Plan making
Dan Stone, Centre for Sustainable Energy - Renewable Energy
Ad

Similar to Planning and Environment Linkage: An Overview (20)

PPTX
Cheng Yan, FHWA PEL Overview
PPT
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...
PDF
Introducing the National Adaptation Plans technical guidelines from the UNFCC...
PPTX
Day 2: Plan to Project Process
PDF
PublicParticipation
PDF
4c.1 Overview of the NAP process and the Open NAP case studies
PDF
Volume 1 - June Final
PPTX
Dhaka revpres160814
PDF
3-OECD-Green-Budgeting-Survey-2021.pdf
PDF
Monitoring the process using the PEG M&E Tool
PDF
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PDF
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
PPT
New TxDOT ENV Processes To Reduce Time to Deliver Projects by 50%
PDF
TOR for EBA MTR 2014.pdf
PDF
'National PID Recommendations & Roadmap' by DR Michelle Doran at the Research...
PDF
The sample NAP process based on the UNFCCC NAP technical guidelines
PDF
The sample NAP process based on the UNFCCC NAP technical guidelines
PDF
The sample NAP process based on the UNFCCC NAP technical guidelines
PDF
The sample NAP process based on the UNFCCC NAP technical guidelines
PPTX
3. Pre-feasibility Study.pptx of project
Cheng Yan, FHWA PEL Overview
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...
Introducing the National Adaptation Plans technical guidelines from the UNFCC...
Day 2: Plan to Project Process
PublicParticipation
4c.1 Overview of the NAP process and the Open NAP case studies
Volume 1 - June Final
Dhaka revpres160814
3-OECD-Green-Budgeting-Survey-2021.pdf
Monitoring the process using the PEG M&E Tool
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
New TxDOT ENV Processes To Reduce Time to Deliver Projects by 50%
TOR for EBA MTR 2014.pdf
'National PID Recommendations & Roadmap' by DR Michelle Doran at the Research...
The sample NAP process based on the UNFCCC NAP technical guidelines
The sample NAP process based on the UNFCCC NAP technical guidelines
The sample NAP process based on the UNFCCC NAP technical guidelines
The sample NAP process based on the UNFCCC NAP technical guidelines
3. Pre-feasibility Study.pptx of project
Ad

More from RPO America (20)

PPTX
Matthew BikePed Infrastructure in Rural Areas Peer Exchange
PDF
Kelly from AARP presentation on bike ped infrastructure in rural areas
PPTX
Mandla from AARP Bike-Ped Infrastructure in Rural areas
PPTX
Transit and Mobility in Rural Transportation Safety
PPTX
RPO America and RPO Council Orientation: Rural and Regional Transportation Roles
PPTX
RPO America Peer Exchange: Rural Transportation Planning Programs
PPTX
Electric vehicle infrastructure in rural areas
PPTX
Tennessee DOT- TEVI Plan coordination & EV
PPTX
Electric Vehicle infrastructure planning in Rural Planning Organizations
PPTX
PEL implementation tools.pptx
PPTX
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
PPTX
CARTS Microtransit—Innovation in Rural Mobility
PPTX
BCGo: Microtransit System Operating throughout Calhoun County, MI
PDF
Shared. Connected. Sustainable.
PDF
Microtransit and Digital Infrastructure
PDF
Microtransit Planning & Implementation Lessons from the North Carolina Experi...
PPTX
Microtransit Overview: A Research Perspective
PPTX
Lowcountry Go Vanpool
PPTX
Employment & Transportation in the Southern Georgia Region
PDF
EDDs and States: Collaborating for Success
Matthew BikePed Infrastructure in Rural Areas Peer Exchange
Kelly from AARP presentation on bike ped infrastructure in rural areas
Mandla from AARP Bike-Ped Infrastructure in Rural areas
Transit and Mobility in Rural Transportation Safety
RPO America and RPO Council Orientation: Rural and Regional Transportation Roles
RPO America Peer Exchange: Rural Transportation Planning Programs
Electric vehicle infrastructure in rural areas
Tennessee DOT- TEVI Plan coordination & EV
Electric Vehicle infrastructure planning in Rural Planning Organizations
PEL implementation tools.pptx
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
CARTS Microtransit—Innovation in Rural Mobility
BCGo: Microtransit System Operating throughout Calhoun County, MI
Shared. Connected. Sustainable.
Microtransit and Digital Infrastructure
Microtransit Planning & Implementation Lessons from the North Carolina Experi...
Microtransit Overview: A Research Perspective
Lowcountry Go Vanpool
Employment & Transportation in the Southern Georgia Region
EDDs and States: Collaborating for Success

Recently uploaded (20)

PDF
PPT Item # 10 -- Proposed 2025 Tax Rate
PPTX
Reactivity of metals with oxygen, rusting.pptx
PDF
The GDP double bind- Anders Wijkman Honorary President Club of Rome
PDF
4_Key Concepts Structure and Governance plus UN.pdf okay
PPT
The Central Civil Services (Leave Travel Concession) Rules, 1988, govern the ...
PDF
AAAAAAAAAAAAAAAAAaaaaaaaAAAAAAAt - ĐV.pdf
PPTX
Developing_An_Advocacy_Agenda_by_Kevin_Karuga.pptx
PPTX
Workshop introduction and objectives. SK.pptx
PDF
Building Bridges (of Hope) over Our Troubled Waters_PART 1
PDF
Concept_Note_-_GoAP_Primary_Sector_-_The_Great_Rural_Reset_-_Updated_18_June_...
PPTX
The DFARS - Part 251 - Use of Government Sources By Contractors
PDF
Abhay Bhutada Foundation’s ESG Compliant Initiatives
PPT
Republic Act 9729 Climate Change Adaptation
PPTX
CHS rollout Presentation by Abraham Lebeza.pptx
PPTX
International Tracking Project Unloading Guidance Manual V1 (1) 1.pptx
PDF
Item # 8 - 218 Primrose Place variance req.
PPTX
Robotics_Presentation.pptxdhdrhdrrhdrhdrhdrrh
PPTX
BHARATIYA NAGARIKA SURAKSHA SAHMITA^J2023 (1).pptx
PPTX
ANALYSIS OF THE PROCLAMATION OF THE PHILIPPHINE INDEPENDENCE.pptx
PDF
2024-Need-Assessment-Report-March-2025.pdf
PPT Item # 10 -- Proposed 2025 Tax Rate
Reactivity of metals with oxygen, rusting.pptx
The GDP double bind- Anders Wijkman Honorary President Club of Rome
4_Key Concepts Structure and Governance plus UN.pdf okay
The Central Civil Services (Leave Travel Concession) Rules, 1988, govern the ...
AAAAAAAAAAAAAAAAAaaaaaaaAAAAAAAt - ĐV.pdf
Developing_An_Advocacy_Agenda_by_Kevin_Karuga.pptx
Workshop introduction and objectives. SK.pptx
Building Bridges (of Hope) over Our Troubled Waters_PART 1
Concept_Note_-_GoAP_Primary_Sector_-_The_Great_Rural_Reset_-_Updated_18_June_...
The DFARS - Part 251 - Use of Government Sources By Contractors
Abhay Bhutada Foundation’s ESG Compliant Initiatives
Republic Act 9729 Climate Change Adaptation
CHS rollout Presentation by Abraham Lebeza.pptx
International Tracking Project Unloading Guidance Manual V1 (1) 1.pptx
Item # 8 - 218 Primrose Place variance req.
Robotics_Presentation.pptxdhdrhdrrhdrhdrhdrrh
BHARATIYA NAGARIKA SURAKSHA SAHMITA^J2023 (1).pptx
ANALYSIS OF THE PROCLAMATION OF THE PHILIPPHINE INDEPENDENCE.pptx
2024-Need-Assessment-Report-March-2025.pdf

Planning and Environment Linkage: An Overview

  • 1. Planning and Environment Linkages: An Overview www.environment.fhwa.dot.gov April 4, 2022 Lana Lau
  • 2. 4/5/2022 Add a footer 2 • Disclaimer: Except for the statutes and regulations cited, the contents of this document do not have the force and effect of law and are not meant to bind the public in any way. The document is intended only to provide clarity to the public regarding existing requirements under the law or agency policies. General considerations are not necessarily required by the statute or regulations; however, FHWA encourages these for all PEL approaches.
  • 3. Agenda PEL Overview • What is PEL? • PEL Benefits • Flexibility in PEL Approaches • PEL Best Practices • FHWA PEL Resources 4/5/2022 3
  • 4. What is PEL? • PEL is a collaborative transportation decision- making approach o considers environmental, community, and economic goals early in the transportation planning process o uses the information, analysis, and products developed during planning to inform the environmental review process • Ultimately, the goal of PEL is early collaboration to facilitate better planning to inform National Environmental Policy Act (NEPA) reviews to accelerate project delivery 4/5/2022 4
  • 5. PEL Benefits 4/5/2022 5 Accelerate project delivery Align with future requirements Stimulates development of new tools Helps build relationships for agencies & the public Early engagement in decision-making Helps identify stakeholders early on Creates better outcomes for the community Improves planning products
  • 7. Funding PEL 4/5/2022 7 • PL and SPR funding • Transportation planning activities undertaken as part of planning process prior to the initiation of NEPA are eligible for PL and SPR funding. • Once the NEPA process has been initiated, activities undertaken for a project are not eligible for PL or SPR funds. Additional information: Metropolitan Planning Funding Eligibility Reminder https://www.fhwa.dot.gov/planning/metroplanfund.cfm
  • 8. PEL General Considerations 8 4/5/2022 Follow the transportation planning process Solicit participation by Federal and State resource agencies and Indian tribes Provide an opportunity for public review and comments Use reliable and reasonably current data and reasonable, scientifically acceptable methodologies Involve the FHWA Division and FTA RegionalOffice, as appropriate Prepare appropriate documentation
  • 9. Flexibility in PEL Approaches 4/5/2022 Add a footer 9 Integration of planning and environmental review statute 23 U.S.C. 168 Efficient environmental reviews statute 23 U.S.C. 139(f)(4)(E)(ii) Planning Regulations 23 CFR 450.212(a)-(c) & 23 CFR 450.318 (a)-(d) CEQ NEPA Regulations 40 CFR 1500.4(l) and 40 CFR 1501.12 Programmatic Mitigation Planning statute 23 U.S.C. 169 Planning Regulations 23 CFR 450.214 and 23 CFR 450.320
  • 10. How Planning Products Can Benefit the NEPA Process Planning Products Support NEPA Travel Demand Forecasting /Traffic Modeling /Transit Ridership / Safety Data • Inform purpose and need • Screen alternatives, including modal alternatives • Scope certain studies (e.g., air, noise) Land Use and Growth Management • Define transportation problems • Evaluate alternatives, including modal alternatives • Ensure consistency with local goals Population and Employment • Identify stakeholders • Assess community impacts • Achieve full participation by all affected populations 10
  • 11. Planning Products: Purpose and Need • Develop a statement of purpose and need for a future project during planning that can be used in the environmental review process • Consult with FHWA/FTA to ensure purpose & need can be used in subsequent environmental review processes 4/5/2022 11 Purpose & Need Planning Purpose & Need NEPA
  • 12. Planning Products: Preliminary Screening and Elimination of Alternatives • Best Practices • Be objective/fact based • Focus on corridor vision, fatal flaw analysis, mode selection • Reflects project purpose & need, community and public input, environmental impacts • May require several levels of screening or analysis • The alternative to be eliminated from consideration is not necessary for compliance with the NEPA (23 U.S.C. 139(f)(4)(E)(ii) 4/5/2022 12 Credit: Getty Images
  • 13. PEL Best Practices 4/5/2022 13 Plan before initiating project Plan schedule & budget Planning informs future environmental study. Leverage tools such as GIS and other mapping tools to help inform planning. Agencies sharing resources to provide data. Comprehensive record of data, analysis and decision- making is important
  • 14. PEL Hypothetical Case Studies • https://www.environment.fhwa.dot.gov/env_initiativ es/pel/publications.aspx 4/5/2022 Add a footer 14
  • 15. NHI Planning and Environment Linkages (PEL) Course COURSE NUMBER: FHWA-NHI-142078, 142078 A and 142078V 4/5/2022 https://www.nhi.fhwa.dot.gov/course- search?tab=0&key=PEL&sf=0&course_no=142078V 15
  • 16. Other PEL Resources 4/5/2022 Virtual Public Involvement & PELWebinar Recording: https://usdot.zoomgov.com/rec/play/Wy5WiNgW5- 1naI2Az1HKBm3csR6hDvE4Oz72QzdMiNgr2dHYRkWTJFoG4jtxZZLHy0y71 T5Q6oqN4qli.odfrUQnrHSWHAHh1?startTime=1637252868000 Federal-Aid Essentials PELVideo: https://www.fhwa.dot.gov/federal- aidessentials/catmod.cfm?id=122 PlanWorks PELApplication & DecisionGuide: https://fhwaapps.fhwa.dot.gov/planworks/Applications/Show/planning-and- environment-linkages 16
  • 17. Conclusion • PEL is flexible. • Consider the future use of the planning analysis and planning products in the environmental review process. • Consider environmental, social and economic early into the planning process to: • reduce duplication; • encourage relationship building and public engagement; • create better products, decisions, and outcomes; and • accelerate project delivery. 4/5/2022 17