Pure Energy Consultants, LLC


Field Development Plan of Texas
   Creek Oriskany Sandstone
       Client: Shell (Fm. East Resources)
               Date: 7 April 2011

     Mike Cronin             Matt Minemier
    716-479-2722             814-222-1854
  mbc5043@psu.edu          mtm5097@psu.edu

     Zach Fidurko              Naser Saleh
    716-378-5970              814-441-1599
  zmf5005@psu.edu           nbs5043@psu.edu
Introduction
• Deliverables:
  1) Reservoir Characterization
  2) Reservoir Development Options w/ Economics

• Findings:
  1) OGIP = 5.8 Bscf
  2) Economics - Gas Price ($4/Mscf)
     • Gas Storage Infeasible
     • Infill Drilling Sub-Economic
  3) Recommend Depleting Field to 500psi with Existing
  Wells.
Reservoir Characterization


                                       -OGIP = 5.8 Bscf
                                       -Swcon = 25%
                                       -Thickness = 30ft
                                       -Net Pay = 15ft
                                       -Porosity = 5%
                                       -GWC at 6200ft



Structure Map with Water Saturation:
Looking NW
History Match
History Match
                                                                1600000                                     Graham 2
                                                                1400000
• Cumulative Gas




                                                     Cumulative Production (MMscf)
                                                                1200000
  Produced vs. Time                                             1000000

                                                                               800000
                                                                                                                                           Graham 2
                                                                               600000
                                                                                                                                           Modeled
                                                                               400000

                                                                               200000

                                                                                            0
                                                                           1/22/2010             5/2/2010      8/10/2010    11/18/2010   2/26/2011
                                                                      -200000                                 Time (Days)



 • Daily Gas Produced                                              16000                                    Graham 2
                                                                   14000
   vs. Time
                                                                   12000
                           Daily Production (mscf)




                                                                   10000

                                                                                     8000
                                                                                                                                             Historical
                                                                                     6000
                                                                                                                                             Modeled
                                                                                     4000

                                                                                     2000

                                                                                        0
                                                                            1/22/2010
                                                                         -2000                  5/2/2010       8/10/2010    11/18/2010    2/26/2011
                                                                                                              Time (Days)
Development Options
1) Production to Abandonment
  -Add Wells
  -No Additional Wells


2) Gas Storage
Abandonment Strategy
For P abandonment of 500psi:

1) Addition of One Well (Two Test Locations)
                  VS
2) Produce Existing Wells Until Depleted
TW-1
Incremental Economics TW-1
                           TW- 1
                  • Gas produced 4.31
                    BCF
                  • Recovery Factor 74 %
                  • At $4 Mscf additional
                    revenue will equal
                    $1.8 million
                  • Cost to Drill Well
                    (from East AFE) $ 1.3
                    million
                  • NPV @ 10 % give
                    $-325,946
                  • ROR equals 3.3 %
                    NPV=Net Present Value
                    ROR=Rate of Return
TW-2
Incremental Economics TW-2
                           TW- 2
                 • Gas produced 4.28
                   BCF
                 • Recovery Factor 73%
                 • At $4 Mscf additional
                   revenue will equal
                   $1.68 million
                 • Cost to Drill Well
                   (from East AFE) $ 1.3
                   million
                 • NPV @ 10 % give
                   $-355,968
                 • ROR equals 3.2 %
                   NPV=Net Present Value
                   ROR=Rate of Return
Economics of Abandonment
• Plan Produce Original Three Wells to Abandonment
  Pressure (500 psi)
• Abandonment Date
• Total Gas Produced        BCF
• At $4 Mscf
   - Producing to Abandonment

   - Stopping Production @ 1000 psi for injection
Gas Storage Strategy
Np, Pressures at inject
-Burst pressure (FG work)

Working Gas: OGIP-Np = 5.8-3.9 = 1.9 Bscf

No new wells, convert existing wells to injectors

-6month injection/production cycling
Gas Storage Results
• Losing X % per cycle

• -(Storage Cost + Summer Buy Price)*Vinj
• + (Winter Sell Price)*Vprod
• -12.5% *Value of Unproduced Accessible Gas
Economics
                                             at t=0 Gas Produced vs. Injected Produced
                           6.00E+09


                           5.00E+09


                           4.00E+09
Cumulative Gas SC (ft^3)




                           3.00E+09
                                                                                                                  Production
                           2.00E+09                                                                               Injection


                           1.00E+09


                           0.00E+00
                                12/27/2014    5/10/2016    9/22/2017          2/4/2019   6/18/2020   10/31/2021
                           -1.00E+09
                                                                       Date
Economics




 Summer Price   $3.75
 Winter Price   $4.75
Economics


Cycle       Money loss               Cycle       Gas loss (ft3)          Cycle       % Gas Loss (ft3)
        1                -7.67E+06           1                1.90E+09           1            14.98537127
        2                -8.90E+06           2                2.27E+09           2            28.18611201
        3                -9.20E+06           3                2.44E+09           3            39.47369726
        4                -9.07E+06           4                2.52E+09           4            48.29953467
Conclusions
-OGIP:
-Reserves:

-Abandonment Economics

-Gas Storage Economics
Questions
Support Slides
Delciotto 2 History Match
                       1600000                                            Delciotto 2
                       1400000




               Cumulative Production (MMscf)
                       1200000

                       1000000

                                      800000
                                                                                                          Historical
                                      600000
                                                                                                          CMG
                                      400000

                                      200000

                                                   0
                                  1/22/2010                   5/2/2010      8/10/2010     11/18/2010    2/26/2011
                             -200000
                                                                           Time (Days)


                                          14000                          Delciotto 2
                                          12000

                                          10000
  Daily Production (mscf)




                                               8000
                                                                                                            Del 2 Hist
                                               6000
                                                                                                            CMG
                                               4000

                                               2000

                                                   0
                                                  1/22/2010   5/2/2010       8/10/2010     11/18/2010    2/26/2011
                                               -2000                        Time (Days)
Delciotto 1 History Match
                                             250000                    Delciotto 1
                                             200000




             Cumulative Production (MMscf)
                                             150000


                                             100000                                                      CMG
                                                                                                         Historical
                                              50000


                                                    0
                                                1/22/2010    5/2/2010       8/10/2010    11/18/2010   2/26/2011
                                             -50000                        Time (Days)

                                             3000                       Delciotto 1
                                             2500
 Daily Production (mscf)




                                             2000

                                             1500
                                                                                                             Del 1
                                             1000
                                                                                                             CMG
                                              500

                                                0
                                               1/22/2010    5/2/2010       8/10/2010     11/18/2010   2/26/2011
                                             -500                         Time (Days)
Graham 2 History Match
1600000                          Graham 2
1400000
1200000
1000000
 800000
                                                                           Graham 2
 600000
                                                                           Modeled
 400000
 200000
        0
     1/22/2010
-200000      3/13/20105/2/20106/21/2010
                                      8/10/2010
                                              9/29/2010
                                                      11/18/2010
                                                               1/7/20112/26/2011


16000                             Graham 2
14000

12000

10000

 8000
                                                                                Historical
 6000
                                                                                Modeled
 4000

 2000

    0
   1/22/20103/13/2010 5/2/2010 6/21/20108/10/20109/29/2010
                                                         11/18/20101/7/2011 2/26/2011
-2000
Pure Energy Consultants, LLC

                    • Gas Produced
                       3.86 BCF
                    • Recovery Factor
                       67%
                    • With no
                      additional Wells
Pure Energy Consultants, LLC

More Related Content

PDF
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...
PPTX
Climate Finance for Sustainable Infrastructure Development
PDF
Pe Insights Presentation (Syd) Aug09
PDF
Indonesiacoal indutry outlook_english
PDF
CBH Resources - Resources & Energy Symposium 2012
PDF
Inmet Presentation
PDF
Cobre Panama Basic Engineering Summary Report
PDF
Introduction to CO2GEO software
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...
Climate Finance for Sustainable Infrastructure Development
Pe Insights Presentation (Syd) Aug09
Indonesiacoal indutry outlook_english
CBH Resources - Resources & Energy Symposium 2012
Inmet Presentation
Cobre Panama Basic Engineering Summary Report
Introduction to CO2GEO software

What's hot (18)

PDF
2012 Inmet Presentation
PDF
Graphite in Turkey
PDF
Forest in Scotland’s climate change targets | Wendy Aubrey
PDF
KA6564 Assignment 2
PPT
Leds 1st worshop_jelavic
PPT
Carbon Footprint of Nations 090622
PDF
Hard Creek Nickel Investor Presentation
PPTX
Livestock production in a changing climate - Beverley Henry
PDF
Graphite Presentation
PDF
Sv interim report presentation compress
PPTX
Cincinnati's approach for a city of the future
PDF
John Norquist on the Mayor as Head City Designer for the Israeli Mayors Insti...
PPTX
Whole farm systems analysis of the greenhouse gas emissions of Australian dai...
PPT
Clad oct09 acoupar_dnayak (nx_power_lite)
PDF
MGI Securities Initiates Coverage on Northern Gaphite
PDF
1450 peter vander
PDF
Graham Brennan Sei
PDF
Janet Gellici - October 6, 2011
2012 Inmet Presentation
Graphite in Turkey
Forest in Scotland’s climate change targets | Wendy Aubrey
KA6564 Assignment 2
Leds 1st worshop_jelavic
Carbon Footprint of Nations 090622
Hard Creek Nickel Investor Presentation
Livestock production in a changing climate - Beverley Henry
Graphite Presentation
Sv interim report presentation compress
Cincinnati's approach for a city of the future
John Norquist on the Mayor as Head City Designer for the Israeli Mayors Insti...
Whole farm systems analysis of the greenhouse gas emissions of Australian dai...
Clad oct09 acoupar_dnayak (nx_power_lite)
MGI Securities Initiates Coverage on Northern Gaphite
1450 peter vander
Graham Brennan Sei
Janet Gellici - October 6, 2011
Ad

Similar to Png 492 pec final-presentation (20)

PDF
Calpine2Q08_Earnings_Presentation_vFINAL
PDF
Calpine2Q08_Earnings_Presentation_vFINAL
PDF
Carbon Intensity of Electricity: Towards More Realistic Numbers | Professor G...
PDF
Keith duncan delivering a successful gb feed-in tariff
PPTX
Drilling & Acquisition Fund, LLC
PDF
Ms Ryndam Homogenizer Data.Docx
PDF
Update on US Rail Transportation
PDF
Solutions for the Texas Energy Shortage
PDF
Fish in the Mekong from a BFP point of view
PPTX
Toward a Net Zero World
PPTX
Access to open data through open access articles in the life sciences
PPT
1308- The Sustainable Sugarcane Initiative (SSI) in India and Beyond
PDF
Graham Brennan - SEI - Renewable Energy and Transport Developments in Ireland
PPT
Energy Forum 031809
PDF
Jeremy Leggett, Hillary Laureate, at the Hillary Symposium
PPTX
Barrack
PDF
PLG 2nd proppants summit
PDF
Workshop david aron (formatted)
PDF
Sterlite Industries Ltd, Silvassa
PDF
UBS Australian Utilities Conference
Calpine2Q08_Earnings_Presentation_vFINAL
Calpine2Q08_Earnings_Presentation_vFINAL
Carbon Intensity of Electricity: Towards More Realistic Numbers | Professor G...
Keith duncan delivering a successful gb feed-in tariff
Drilling & Acquisition Fund, LLC
Ms Ryndam Homogenizer Data.Docx
Update on US Rail Transportation
Solutions for the Texas Energy Shortage
Fish in the Mekong from a BFP point of view
Toward a Net Zero World
Access to open data through open access articles in the life sciences
1308- The Sustainable Sugarcane Initiative (SSI) in India and Beyond
Graham Brennan - SEI - Renewable Energy and Transport Developments in Ireland
Energy Forum 031809
Jeremy Leggett, Hillary Laureate, at the Hillary Symposium
Barrack
PLG 2nd proppants summit
Workshop david aron (formatted)
Sterlite Industries Ltd, Silvassa
UBS Australian Utilities Conference
Ad

Recently uploaded (20)

PDF
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
DOCX
80 DE ÔN VÀO 10 NĂM 2023vhkkkjjhhhhjjjj
PDF
1911 Gold Corporate Presentation Aug 2025.pdf
PPTX
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
PDF
PMB 401-Identification-of-Potential-Biotechnological-Products.pdf
DOCX
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PDF
Booking.com The Global AI Sentiment Report 2025
PPTX
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
PDF
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PPT
Lecture notes on Business Research Methods
PDF
Daniels 2024 Inclusive, Sustainable Development
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PDF
Technical Architecture - Chainsys dataZap
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
PDF
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
PPTX
Principles of Marketing, Industrial, Consumers,
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PPTX
CTG - Business Update 2Q2025 & 6M2025.pptx
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
80 DE ÔN VÀO 10 NĂM 2023vhkkkjjhhhhjjjj
1911 Gold Corporate Presentation Aug 2025.pdf
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
PMB 401-Identification-of-Potential-Biotechnological-Products.pdf
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
Lecture 3344;;,,(,(((((((((((((((((((((((
Booking.com The Global AI Sentiment Report 2025
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
Lecture notes on Business Research Methods
Daniels 2024 Inclusive, Sustainable Development
2025 Product Deck V1.0.pptxCATALOGTCLCIA
Technical Architecture - Chainsys dataZap
Solaris Resources Presentation - Corporate August 2025.pdf
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
Principles of Marketing, Industrial, Consumers,
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
CTG - Business Update 2Q2025 & 6M2025.pptx

Png 492 pec final-presentation

  • 1. Pure Energy Consultants, LLC Field Development Plan of Texas Creek Oriskany Sandstone Client: Shell (Fm. East Resources) Date: 7 April 2011 Mike Cronin Matt Minemier 716-479-2722 814-222-1854 mbc5043@psu.edu mtm5097@psu.edu Zach Fidurko Naser Saleh 716-378-5970 814-441-1599 zmf5005@psu.edu nbs5043@psu.edu
  • 2. Introduction • Deliverables: 1) Reservoir Characterization 2) Reservoir Development Options w/ Economics • Findings: 1) OGIP = 5.8 Bscf 2) Economics - Gas Price ($4/Mscf) • Gas Storage Infeasible • Infill Drilling Sub-Economic 3) Recommend Depleting Field to 500psi with Existing Wells.
  • 3. Reservoir Characterization -OGIP = 5.8 Bscf -Swcon = 25% -Thickness = 30ft -Net Pay = 15ft -Porosity = 5% -GWC at 6200ft Structure Map with Water Saturation: Looking NW
  • 5. History Match 1600000 Graham 2 1400000 • Cumulative Gas Cumulative Production (MMscf) 1200000 Produced vs. Time 1000000 800000 Graham 2 600000 Modeled 400000 200000 0 1/22/2010 5/2/2010 8/10/2010 11/18/2010 2/26/2011 -200000 Time (Days) • Daily Gas Produced 16000 Graham 2 14000 vs. Time 12000 Daily Production (mscf) 10000 8000 Historical 6000 Modeled 4000 2000 0 1/22/2010 -2000 5/2/2010 8/10/2010 11/18/2010 2/26/2011 Time (Days)
  • 6. Development Options 1) Production to Abandonment -Add Wells -No Additional Wells 2) Gas Storage
  • 7. Abandonment Strategy For P abandonment of 500psi: 1) Addition of One Well (Two Test Locations) VS 2) Produce Existing Wells Until Depleted
  • 9. Incremental Economics TW-1 TW- 1 • Gas produced 4.31 BCF • Recovery Factor 74 % • At $4 Mscf additional revenue will equal $1.8 million • Cost to Drill Well (from East AFE) $ 1.3 million • NPV @ 10 % give $-325,946 • ROR equals 3.3 % NPV=Net Present Value ROR=Rate of Return
  • 10. TW-2
  • 11. Incremental Economics TW-2 TW- 2 • Gas produced 4.28 BCF • Recovery Factor 73% • At $4 Mscf additional revenue will equal $1.68 million • Cost to Drill Well (from East AFE) $ 1.3 million • NPV @ 10 % give $-355,968 • ROR equals 3.2 % NPV=Net Present Value ROR=Rate of Return
  • 12. Economics of Abandonment • Plan Produce Original Three Wells to Abandonment Pressure (500 psi) • Abandonment Date • Total Gas Produced BCF • At $4 Mscf - Producing to Abandonment - Stopping Production @ 1000 psi for injection
  • 13. Gas Storage Strategy Np, Pressures at inject -Burst pressure (FG work) Working Gas: OGIP-Np = 5.8-3.9 = 1.9 Bscf No new wells, convert existing wells to injectors -6month injection/production cycling
  • 14. Gas Storage Results • Losing X % per cycle • -(Storage Cost + Summer Buy Price)*Vinj • + (Winter Sell Price)*Vprod • -12.5% *Value of Unproduced Accessible Gas
  • 15. Economics at t=0 Gas Produced vs. Injected Produced 6.00E+09 5.00E+09 4.00E+09 Cumulative Gas SC (ft^3) 3.00E+09 Production 2.00E+09 Injection 1.00E+09 0.00E+00 12/27/2014 5/10/2016 9/22/2017 2/4/2019 6/18/2020 10/31/2021 -1.00E+09 Date
  • 16. Economics Summer Price $3.75 Winter Price $4.75
  • 17. Economics Cycle Money loss Cycle Gas loss (ft3) Cycle % Gas Loss (ft3) 1 -7.67E+06 1 1.90E+09 1 14.98537127 2 -8.90E+06 2 2.27E+09 2 28.18611201 3 -9.20E+06 3 2.44E+09 3 39.47369726 4 -9.07E+06 4 2.52E+09 4 48.29953467
  • 21. Delciotto 2 History Match 1600000 Delciotto 2 1400000 Cumulative Production (MMscf) 1200000 1000000 800000 Historical 600000 CMG 400000 200000 0 1/22/2010 5/2/2010 8/10/2010 11/18/2010 2/26/2011 -200000 Time (Days) 14000 Delciotto 2 12000 10000 Daily Production (mscf) 8000 Del 2 Hist 6000 CMG 4000 2000 0 1/22/2010 5/2/2010 8/10/2010 11/18/2010 2/26/2011 -2000 Time (Days)
  • 22. Delciotto 1 History Match 250000 Delciotto 1 200000 Cumulative Production (MMscf) 150000 100000 CMG Historical 50000 0 1/22/2010 5/2/2010 8/10/2010 11/18/2010 2/26/2011 -50000 Time (Days) 3000 Delciotto 1 2500 Daily Production (mscf) 2000 1500 Del 1 1000 CMG 500 0 1/22/2010 5/2/2010 8/10/2010 11/18/2010 2/26/2011 -500 Time (Days)
  • 23. Graham 2 History Match 1600000 Graham 2 1400000 1200000 1000000 800000 Graham 2 600000 Modeled 400000 200000 0 1/22/2010 -200000 3/13/20105/2/20106/21/2010 8/10/2010 9/29/2010 11/18/2010 1/7/20112/26/2011 16000 Graham 2 14000 12000 10000 8000 Historical 6000 Modeled 4000 2000 0 1/22/20103/13/2010 5/2/2010 6/21/20108/10/20109/29/2010 11/18/20101/7/2011 2/26/2011 -2000
  • 24. Pure Energy Consultants, LLC • Gas Produced 3.86 BCF • Recovery Factor 67% • With no additional Wells