SlideShare a Scribd company logo
12
Most read
13
Most read
© akaidpl 2010. All Rights Reserved.
PREFABRICATED
STRUCTURE
PANKAJ KUMAR
PANKAJ KUMAR SAGAR
VISHVENDU PANDEY
© akaidpl 2010. All Rights Reserved.
21st century design technologies
present us with endless possibilities
to ‘rethink’ how we design and
manufacture and:
• create a shift from mass-
production to mass-customisation;
• embrace parametric modelling for
site specific, value driven responses;
• maximize the interface of these
technologies with manufacturing.
Social, economic and environmental factors suggest an
urgent need to consider new ways to build. These
factors include:
• shortages of skilled trade labour in many
communities;
• need for increased construction quality and lower
costs;
• need to improve construction productivity;
• need for more sustainable, cradle to cradle solutions;
• increased acceptance of quality prefabrication.
© akaidpl 2010. All Rights Reserved.
Why prefabricated structure?
•Speed
•Quality
•Safety
•Skills
•Sustainability
•Cost
•Impermanent site
© akaidpl 2010. All Rights Reserved.
Relocatables>
Common problems
•Heat gain and loss: difficult to manage in current ‘generic’ products;
•Indoor environment quality: acoustics and light levels are often less than ideal;
•Floors: generally low thermal mass, sometimes undesirable floor movement;
•Floor level: typically circa 600mm above ground for connection crawl space;
•Connections and views: generally limited, both visually and physically;
•Placement: often disconnected from other school buildings, hidden from view;
•Toilets: usually not provided due to distance from soil waste connections;
•Extras: no standard range of ‘extras’ that are also ‘relocatable’;
•Temporary: often look and feel temporary, yet can become permanent;
•Details: joins between modules and other details add to ‘temporary feel’;
•Appearance: utilitarian in appearance, generally designed by manufacturers;
•Transport: design is largely defined by transport logistics rather than end use.
© akaidpl 2010. All Rights Reserved.
Future needs
Relocatables of the future will need to respond to:
• a range of climate zones;
• a range of architectural vernacular;
• a wide variety of physical contexts;
• a range of pedagogies and student ages;
• and address the common problems.
How do you:
• develop a design idea that responds to a range of parameters and contexts?
• develop a design idea that is both customisable and economical?
• make it easy to add elements that allow buildings to evolve as needs change? •
deal with the relocation of buildings to new contexts at some point in the future?
Other issues to consider are:
• procurement models
• the role of architects
• the role of manufacturers
• the interface with end users.
© akaidpl 2010. All Rights Reserved.
© akaidpl 2010. All Rights Reserved.
“Prefabricated structure cannot
transform poor design, but prefabricated
structure can be transformed by good
design and considered details.”
Key Lessons
• Importance of a strong, innovative industry body with a research and
development wing;
• Investment in cutting edge manufacturing equipment is a significant
investment that requires a certainty of volume;
• The housing market plays a vital role in creating demand for prefabrication
innovation;
• Lean manufacturing principles and systems thinking are critical to innovation
and development in prefabrication;
• Prefabrication Structure has a vital role to play in the future of a more
sustainable, efficient construction industry;
• Architects have an important role to play in the design and development of
future prefabrication systems;
• Architecture Schools in Europe will increasingly include more teaching of
industrial design thinking to help bridge the gap between architecture and
manufacture.
© akaidpl 2010. All Rights Reserved.
“Prefabricated structure
“The Bauzentrum
near Munich is a
display village with
something for every
taste and budget...
wonderful! It
demonstrates a
range of
prefabricated
structure
approaches and
style choices from
different
manufacturers...
excellent quality,
energy performance
and value for
money are common
to all the products.”
DaVinci Haus
Elk
Gruber
Baufritz Rubner
Huf Haus The Energy Centre
Rubner
© akaidpl 2010. All Rights Reserved.
Gymnasium-Amsterdam
“This is a temporarily sited school building that is moveable and most importantly of a
permament design and construction quality.”
© akaidpl 2010. All Rights Reserved.
Gymnasium -Amsterdam
Key Lessons
• Permanent quality yet moveable;
• Prefabrication fundamental to the design strategy, and vice versa;
• 3D off-site modular approach;
• Cladding and rainscreen as a ‘skin’ that can be changed over time;
• Clever details;
• Life Cycle costing supported argument for increased build quality;
• The role of good design in urban regeneration, even when buildings are temporary.
© akaidpl 2010. All Rights Reserved.
Crissy Field -
Key Lessons
• Prefabrication fundamental to the design strategy, and vice versa;
• 2D off-site kit of parts approach;
• The ’configurator’ software allows for a level of controlled customisation;
• Parametric modelling is core to the mass customisation of the product;
• Product can be fabricated local to the site to avert long distance haulage;
• Straightforward assembly, so no specialist assembly contractors.
© akaidpl 2010. All Rights Reserved.
McDonalds use prefabricated
structures for their buildings, and set
a record of constructing a building
and opening for business within 13
hours.
CONCLUSION
Because of the design simplifications modern
architecture provides many in the manufactured
housing sector generally feel that modern
architecture designs are better suited for prefab home
construction.
© akaidpl 2010. All Rights Reserved.
REFERENCES
Because of the design simplification
www.slideshare.com
(Prefabrication | Future Proofing Schools)
www.Wikipedia.com
www.google.com

More Related Content

PPTX
Prefabricated Structure and its installation process
PDF
Prefabrication
PPTX
Prefabricated structures
PPTX
Prefabrication in construction
PDF
Basement construction report
PPTX
Speedy construction presentation
PDF
Steel Roof Truss
Prefabricated Structure and its installation process
Prefabrication
Prefabricated structures
Prefabrication in construction
Basement construction report
Speedy construction presentation
Steel Roof Truss

What's hot (20)

PPTX
Prefabricated components
PDF
Pre Engineered buildings
PPTX
Prefabricated structures
PPTX
Space frame
PDF
Precast-concrete Details
PPTX
Advance Formwork System (PERI FORMWORK SYSTEM)
PPTX
Prefabricated wall panel
PPTX
PRECAST BUILDING SYSTEM
PPTX
Mudarchitecture,
PPTX
ALL ABOUT PRECAST
PPT
Modular construction
PPTX
Prefabrication​ structure ppt
DOCX
PREFABRICATION AND MODULAR COORDINATION
PPTX
Low cost building components
PPTX
Shells ppt
PDF
Steel trusses
PPTX
Bricks bats and closers
PPTX
Grid/ Waffle Slabs
PPTX
EVOLUTION OF HOUSING.pptx
Prefabricated components
Pre Engineered buildings
Prefabricated structures
Space frame
Precast-concrete Details
Advance Formwork System (PERI FORMWORK SYSTEM)
Prefabricated wall panel
PRECAST BUILDING SYSTEM
Mudarchitecture,
ALL ABOUT PRECAST
Modular construction
Prefabrication​ structure ppt
PREFABRICATION AND MODULAR COORDINATION
Low cost building components
Shells ppt
Steel trusses
Bricks bats and closers
Grid/ Waffle Slabs
EVOLUTION OF HOUSING.pptx
Ad

Similar to Prefabricated structure (20)

PDF
Prefabrication
PDF
Prefabrication structures in construction
PPTX
PREFABRICATED structures power point presentation.pptx
PDF
PPTX
Prefabrication for improving Sustainability and Economics of Civil Engineerin...
PPTX
Prefab Building CR ppt.pptx
PPTX
presentattion Role and Importance of Pre-Fabrication (3).pptx
PDF
архитектура Prefab city
PDF
архитектура Prefab city
DOCX
prefabrication structure report
PPTX
Prefabrication - building construction
PDF
Prefabricated Systems Principles Of Construction Ulrich Knaack Sharon Chungkl...
PPT
11. pre febricated construction system
PDF
Analysis of Prefabricational Construction And Conventional Construction
PPTX
The-Future-of-Construction-Prefabrication.pptx
PPTX
Prefabricated structures in UK
PPTX
5 Ways Prefabrication Benefits your Construction Project.pptx
PPT
PREFABRICATED structure
PPTX
CONSTRUCTION ENABLED BY INTERNET OF THINGS
PDF
pre fab buildings with different methods used
Prefabrication
Prefabrication structures in construction
PREFABRICATED structures power point presentation.pptx
Prefabrication for improving Sustainability and Economics of Civil Engineerin...
Prefab Building CR ppt.pptx
presentattion Role and Importance of Pre-Fabrication (3).pptx
архитектура Prefab city
архитектура Prefab city
prefabrication structure report
Prefabrication - building construction
Prefabricated Systems Principles Of Construction Ulrich Knaack Sharon Chungkl...
11. pre febricated construction system
Analysis of Prefabricational Construction And Conventional Construction
The-Future-of-Construction-Prefabrication.pptx
Prefabricated structures in UK
5 Ways Prefabrication Benefits your Construction Project.pptx
PREFABRICATED structure
CONSTRUCTION ENABLED BY INTERNET OF THINGS
pre fab buildings with different methods used
Ad

More from Vishvendu pandey (20)

PDF
Power of gratitude
PDF
Infusing your brain with mastery
PDF
Finding your-true-passion
PDF
50 simple-stress-relief-strategies
PDF
17 ways to attract abundance
PDF
Urban design hand book
PDF
I s 2526_-_1963 (acoustical design)
PDF
9296 2001 inspection and maintenance
PDF
Ar803 Architectural Structure Question Paper
PDF
Ar803 Architectural Structure Question Paper-2013
PPT
portfolio
PDF
portfolio
PDF
Basu resume 12
PDF
Basu Resume-12
DOCX
The origin of all sources of water is rainfall when precipitation occurs
PDF
From planning-to-execution-wp-352123
PDF
Municipal business bye laws
PDF
Le corbusier in furniture design
PDF
75 tips and_tricks_excel_reduced
PPTX
Matrimandir final
Power of gratitude
Infusing your brain with mastery
Finding your-true-passion
50 simple-stress-relief-strategies
17 ways to attract abundance
Urban design hand book
I s 2526_-_1963 (acoustical design)
9296 2001 inspection and maintenance
Ar803 Architectural Structure Question Paper
Ar803 Architectural Structure Question Paper-2013
portfolio
portfolio
Basu resume 12
Basu Resume-12
The origin of all sources of water is rainfall when precipitation occurs
From planning-to-execution-wp-352123
Municipal business bye laws
Le corbusier in furniture design
75 tips and_tricks_excel_reduced
Matrimandir final

Recently uploaded (20)

PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PDF
Hazard Identification & Risk Assessment .pdf
PPTX
Introduction to pro and eukaryotes and differences.pptx
PDF
IGGE1 Understanding the Self1234567891011
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PDF
What if we spent less time fighting change, and more time building what’s rig...
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
advance database management system book.pdf
PDF
Trump Administration's workforce development strategy
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
Indian roads congress 037 - 2012 Flexible pavement
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PPTX
20th Century Theater, Methods, History.pptx
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
Hazard Identification & Risk Assessment .pdf
Introduction to pro and eukaryotes and differences.pptx
IGGE1 Understanding the Self1234567891011
FORM 1 BIOLOGY MIND MAPS and their schemes
Share_Module_2_Power_conflict_and_negotiation.pptx
What if we spent less time fighting change, and more time building what’s rig...
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
advance database management system book.pdf
Trump Administration's workforce development strategy
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
A powerpoint presentation on the Revised K-10 Science Shaping Paper
Indian roads congress 037 - 2012 Flexible pavement
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
Weekly quiz Compilation Jan -July 25.pdf
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
20th Century Theater, Methods, History.pptx

Prefabricated structure

  • 1. © akaidpl 2010. All Rights Reserved. PREFABRICATED STRUCTURE PANKAJ KUMAR PANKAJ KUMAR SAGAR VISHVENDU PANDEY
  • 2. © akaidpl 2010. All Rights Reserved. 21st century design technologies present us with endless possibilities to ‘rethink’ how we design and manufacture and: • create a shift from mass- production to mass-customisation; • embrace parametric modelling for site specific, value driven responses; • maximize the interface of these technologies with manufacturing. Social, economic and environmental factors suggest an urgent need to consider new ways to build. These factors include: • shortages of skilled trade labour in many communities; • need for increased construction quality and lower costs; • need to improve construction productivity; • need for more sustainable, cradle to cradle solutions; • increased acceptance of quality prefabrication.
  • 3. © akaidpl 2010. All Rights Reserved. Why prefabricated structure? •Speed •Quality •Safety •Skills •Sustainability •Cost •Impermanent site
  • 4. © akaidpl 2010. All Rights Reserved. Relocatables> Common problems •Heat gain and loss: difficult to manage in current ‘generic’ products; •Indoor environment quality: acoustics and light levels are often less than ideal; •Floors: generally low thermal mass, sometimes undesirable floor movement; •Floor level: typically circa 600mm above ground for connection crawl space; •Connections and views: generally limited, both visually and physically; •Placement: often disconnected from other school buildings, hidden from view; •Toilets: usually not provided due to distance from soil waste connections; •Extras: no standard range of ‘extras’ that are also ‘relocatable’; •Temporary: often look and feel temporary, yet can become permanent; •Details: joins between modules and other details add to ‘temporary feel’; •Appearance: utilitarian in appearance, generally designed by manufacturers; •Transport: design is largely defined by transport logistics rather than end use.
  • 5. © akaidpl 2010. All Rights Reserved. Future needs Relocatables of the future will need to respond to: • a range of climate zones; • a range of architectural vernacular; • a wide variety of physical contexts; • a range of pedagogies and student ages; • and address the common problems. How do you: • develop a design idea that responds to a range of parameters and contexts? • develop a design idea that is both customisable and economical? • make it easy to add elements that allow buildings to evolve as needs change? • deal with the relocation of buildings to new contexts at some point in the future? Other issues to consider are: • procurement models • the role of architects • the role of manufacturers • the interface with end users.
  • 6. © akaidpl 2010. All Rights Reserved.
  • 7. © akaidpl 2010. All Rights Reserved. “Prefabricated structure cannot transform poor design, but prefabricated structure can be transformed by good design and considered details.” Key Lessons • Importance of a strong, innovative industry body with a research and development wing; • Investment in cutting edge manufacturing equipment is a significant investment that requires a certainty of volume; • The housing market plays a vital role in creating demand for prefabrication innovation; • Lean manufacturing principles and systems thinking are critical to innovation and development in prefabrication; • Prefabrication Structure has a vital role to play in the future of a more sustainable, efficient construction industry; • Architects have an important role to play in the design and development of future prefabrication systems; • Architecture Schools in Europe will increasingly include more teaching of industrial design thinking to help bridge the gap between architecture and manufacture.
  • 8. © akaidpl 2010. All Rights Reserved. “Prefabricated structure “The Bauzentrum near Munich is a display village with something for every taste and budget... wonderful! It demonstrates a range of prefabricated structure approaches and style choices from different manufacturers... excellent quality, energy performance and value for money are common to all the products.” DaVinci Haus Elk Gruber Baufritz Rubner Huf Haus The Energy Centre Rubner
  • 9. © akaidpl 2010. All Rights Reserved. Gymnasium-Amsterdam “This is a temporarily sited school building that is moveable and most importantly of a permament design and construction quality.”
  • 10. © akaidpl 2010. All Rights Reserved. Gymnasium -Amsterdam Key Lessons • Permanent quality yet moveable; • Prefabrication fundamental to the design strategy, and vice versa; • 3D off-site modular approach; • Cladding and rainscreen as a ‘skin’ that can be changed over time; • Clever details; • Life Cycle costing supported argument for increased build quality; • The role of good design in urban regeneration, even when buildings are temporary.
  • 11. © akaidpl 2010. All Rights Reserved. Crissy Field - Key Lessons • Prefabrication fundamental to the design strategy, and vice versa; • 2D off-site kit of parts approach; • The ’configurator’ software allows for a level of controlled customisation; • Parametric modelling is core to the mass customisation of the product; • Product can be fabricated local to the site to avert long distance haulage; • Straightforward assembly, so no specialist assembly contractors.
  • 12. © akaidpl 2010. All Rights Reserved. McDonalds use prefabricated structures for their buildings, and set a record of constructing a building and opening for business within 13 hours. CONCLUSION Because of the design simplifications modern architecture provides many in the manufactured housing sector generally feel that modern architecture designs are better suited for prefab home construction.
  • 13. © akaidpl 2010. All Rights Reserved. REFERENCES Because of the design simplification www.slideshare.com (Prefabrication | Future Proofing Schools) www.Wikipedia.com www.google.com