SAFE LIFTING
RESPONSIBILITIES OF RIGGER
• To Qualify as a slinger / Bansk man, the person should
be medically and physically fit (have a good eye sight, hearing)
• Have been trained in the safe use of lifting equipment.
Ability to select and use the lifting tackles as per load configuration.
• To be able to provide necessary signals for crane operators.
• To locate load in away, to ensure safety of load and working personnel.
• To understand his companies, rules and regulation, color coding and
certification of lifting tackle.
• To be able to communicate with radio where the crane operator
Is out of range.
Definition of Rigging
• Rigging is part of the lifting operation which forms
the link between the crane and the load.
• Safe working load (SWL) is the load that can safely
be lifted provided your lifting equipment is in good
condition and has three(3) items marked on it i.e.
• S.W.L. or WLL
• Identification No.
• Color code
If does not have these (3) items marked on it,
Change it for items that do have
these (3) items marked on it.
SWL
Identification No.
SLING MARKING
current Color code
Hardware Application
When the included angle is greater than 90 degree use a shackle to
attach the sling legs to the hook.
Hook Inspection
Hook must be removed from service when any of the following
conditions exist.
•Cracks, nicks or gouges
• Twist exceeding 10% from plane of unbent hook.
• Latch engagement, damage or malfunction.
• Throat opening exceeding 15%.
• Wear exceeding 10% of original dimension.
• Damage from heat.
•Unauthorized repairs.
Hitches
1 1ˣ1 2ˣ
1 0.75ˣ
Safety Precautions
 Check the sling before use, if any damage don't
use.
 Higher elevation rigger should wear safety harness.
 Objects lifting time use tagline to avoid rotate the
objects.
 Use proper type of slings, size of slings for the
objects.
Shackle Application
Shackle Application
Never replace a shackle pin with a bolt. the
strength of an ordinary bolt is much less than that of
a shackle pin.
Hardware Shackles Inspection
 Absence of capacity or identifying marks.
 Bent or distorted pin and/ or body.
 Nicks, gouges or cracks.
 Heat or chemical damage.
 Body spread.
 Reduction in diameter of pin and/ or body greater than 10% .
Sling Inspection
Rigging equipment shall not be loaded in
excess of its indicated recommended safe
load, and shall be inspected prior to each
lifting operation. In case of wire slings, the
working load shall be based on the size
and load chart, as marking is not practical.
Inspections shall be carried out for every lifting device or
accessory before use. In addition, yearly inspection and
load test shall be carried out by a competent inspection
agency.
Wire ropes used for slinging will not be used with sling eye
formed by knotting the wire rope or the use of wire rope
bolted clips.
CRANE APPLICATION
Wind speed for mobile crane,
Maximum from 32 / 35 km/h
Thank you

More Related Content

PPT
Majid Rigger sahara Persentation
PPT
Presentation of Rigger
PPT
Crane safety by abidnadeemkhan
PPT
Cranes C
PDF
Crane Safety
PPT
Cranes and Rigging
PDF
12 lifting rigging operations
Majid Rigger sahara Persentation
Presentation of Rigger
Crane safety by abidnadeemkhan
Cranes C
Crane Safety
Cranes and Rigging
12 lifting rigging operations

What's hot (13)

PPT
Lifting Sling Safety
PDF
Rigger signalman handbook
PDF
CRANE SAFETY HANDBOOK
PDF
11 stepladders
PPT
Crane Safety & Rigging
PPT
Materials Handling Ppt
PPTX
Cranes safety
PDF
Safe Rigging Practices
PDF
Ladder safety
PDF
OSHA AWP Lift Fact Sheet
PPT
Industrial safetY of height works
PDF
Ladder handout
Lifting Sling Safety
Rigger signalman handbook
CRANE SAFETY HANDBOOK
11 stepladders
Crane Safety & Rigging
Materials Handling Ppt
Cranes safety
Safe Rigging Practices
Ladder safety
OSHA AWP Lift Fact Sheet
Industrial safetY of height works
Ladder handout
Ad

Similar to Presentation Majid (20)

PPTX
Converted_Rigging_Slinging_Training_Northstar (1).pptx
PPTX
07- Lifting and Rigging Training it's contain More topics discussion..pptx
PDF
Safe Rigging and Lifting Training Material
PDF
Riggers Training Program (Ateeq - Copy.pdf
PPTX
Lifting & Rigging Safety.pptx
PDF
Lifting and Rigging Training Slides.pdf
PDF
Good for knowledge amazing skills for everyone enjoy it love it
PDF
Lifting equipment, also known as lifting gear, is a general term for any equi...
PDF
Lifting practices for engineers
PPTX
Hoisting and Rigging Safety
PPTX
SIGNALMAN IS THE BACKBONE OF THE WORKING
PPTX
Training on Lifting & Rigging Safety.pptx
DOCX
Safe rigging training presentation transcript
PDF
Safe_Rigging.pdf
PPTX
Quality Control Operator Training &.pptx
PDF
Crane Safety HAZARDS AND PRECAUTIONS TRAINING
PPT
Safe Rigging Practices-Saudi Arabia.Com.SA.ppt
PPT
MATERIAL.ppt
PPT
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industry
PPTX
Rrigging Safety 2020
Converted_Rigging_Slinging_Training_Northstar (1).pptx
07- Lifting and Rigging Training it's contain More topics discussion..pptx
Safe Rigging and Lifting Training Material
Riggers Training Program (Ateeq - Copy.pdf
Lifting & Rigging Safety.pptx
Lifting and Rigging Training Slides.pdf
Good for knowledge amazing skills for everyone enjoy it love it
Lifting equipment, also known as lifting gear, is a general term for any equi...
Lifting practices for engineers
Hoisting and Rigging Safety
SIGNALMAN IS THE BACKBONE OF THE WORKING
Training on Lifting & Rigging Safety.pptx
Safe rigging training presentation transcript
Safe_Rigging.pdf
Quality Control Operator Training &.pptx
Crane Safety HAZARDS AND PRECAUTIONS TRAINING
Safe Rigging Practices-Saudi Arabia.Com.SA.ppt
MATERIAL.ppt
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Rrigging Safety 2020
Ad

Presentation Majid

  • 2. RESPONSIBILITIES OF RIGGER • To Qualify as a slinger / Bansk man, the person should be medically and physically fit (have a good eye sight, hearing) • Have been trained in the safe use of lifting equipment. Ability to select and use the lifting tackles as per load configuration. • To be able to provide necessary signals for crane operators. • To locate load in away, to ensure safety of load and working personnel. • To understand his companies, rules and regulation, color coding and certification of lifting tackle. • To be able to communicate with radio where the crane operator Is out of range.
  • 3. Definition of Rigging • Rigging is part of the lifting operation which forms the link between the crane and the load. • Safe working load (SWL) is the load that can safely be lifted provided your lifting equipment is in good condition and has three(3) items marked on it i.e. • S.W.L. or WLL • Identification No. • Color code If does not have these (3) items marked on it, Change it for items that do have these (3) items marked on it.
  • 5. Hardware Application When the included angle is greater than 90 degree use a shackle to attach the sling legs to the hook. Hook Inspection Hook must be removed from service when any of the following conditions exist. •Cracks, nicks or gouges • Twist exceeding 10% from plane of unbent hook. • Latch engagement, damage or malfunction. • Throat opening exceeding 15%. • Wear exceeding 10% of original dimension. • Damage from heat. •Unauthorized repairs.
  • 7. Safety Precautions  Check the sling before use, if any damage don't use.  Higher elevation rigger should wear safety harness.  Objects lifting time use tagline to avoid rotate the objects.  Use proper type of slings, size of slings for the objects.
  • 8. Shackle Application Shackle Application Never replace a shackle pin with a bolt. the strength of an ordinary bolt is much less than that of a shackle pin. Hardware Shackles Inspection  Absence of capacity or identifying marks.  Bent or distorted pin and/ or body.  Nicks, gouges or cracks.  Heat or chemical damage.  Body spread.  Reduction in diameter of pin and/ or body greater than 10% .
  • 9. Sling Inspection Rigging equipment shall not be loaded in excess of its indicated recommended safe load, and shall be inspected prior to each lifting operation. In case of wire slings, the working load shall be based on the size and load chart, as marking is not practical.
  • 10. Inspections shall be carried out for every lifting device or accessory before use. In addition, yearly inspection and load test shall be carried out by a competent inspection agency. Wire ropes used for slinging will not be used with sling eye formed by knotting the wire rope or the use of wire rope bolted clips.
  • 11. CRANE APPLICATION Wind speed for mobile crane, Maximum from 32 / 35 km/h