MAY 09, 2008 POWER SHORTAGE IN PAKISTAN AND SHORT TERMS SOLUTION TO AVOID LOADSHEDDING.
EXISTING GENERATING CAPACITY   *   Hydro  availability based on last 5 years average **  Excludes 10% Forced Outages for GENCOs & 6.0% for IPPs & Rental Type of Generation Nameplate/Installed Capacity (MW) Derated/ Dependable Capacity (MW) Availability (MW) Summer Winter WAPDA Hydro 6444 6444 6250 2300* GENCOs 4840 3580 2780 3222** IPPs (incl Nuclear) 6115 5541 4950 5208** Rental 285 188 168 177** Total 17684 15753 14148 10907
Historical Demand (2002 – 2007) *  WAPDA computed demand; without export to KESC ** Assuming 1% diversity between WAPDA & KESC Power Demands YEAR WAPDA * KESC COUNTRY ** MW G.R. MW G.R. MW G.R. 2001-02 10109 4.0% 1885 1.3% 11875 3.6% 2002-03 10481 3.7% 1973 4.7% 12244 3.1% 2003-04 11078 5.7% 2073 10.0% 13021 6.4% 2004-05 12035 8.6% 2197 6.0% 14091 8.2% 2005-06 13212 9.8% 2223 1.2% 15282 8.5% 2006-07 15138 14.6% 2349 5.7% 17314 13.3%
Historical Surplus/Deficit (2002 – 2007) YEAR WAPDA SYSTEM Installed Capacity Firm Capability Computed Peak Demand Surplus/ Shortfall 2001-02 15819  10894  10459  435  2002-03 15819  10958  11044  -86   2003-04 17299  11834  11598  236  2004-05 17350  12792  12595  197  2005-06 17400  12600  13847  -1247  2006-07 17366  13292  15838  -2546
Month-wise surplus/deficit (MW) -3837 9845 13682 Mar-08 -3151 9104 12255 Jan-08 -2475 9679 12154 Dec-07 -811 11590 12401 Nov-07 355 14092 13737 Oct-07 Month Peak Demand Corresponding Capability Surplus/deficit Jan-07 12093 11039 -1054 Feb-07 11590 12552 962 Mar-07 12311 11171 -1140 Apr-07 13843 13002 -841 May-07 14650 13567 -1083 Jun-07 15838 13292 -2546 Jul-07 15941 13706 -2235 Aug-07 15862 13666 -2196 Sep-7 16056 13644 -2412 Feb-08 12123 10122 -2001 Apr-08 15124 11568 -3556
Demand & Hydro Capability in May (MW) 2007 vs 2008 -1646 -2118 -1746 -1674 -2195 -1742 -1959 -2093 Diff 5418 5588 5571 5473 5521 5358 5526 5502 2007 Hydro Capability 1596 1788 2168 1211 2325 2896 2010 1448 Diff 15305 15386 15838 14892 15042 15739 15857 15008 2008 Date Peak Demand 2007 2008 1 13560 3409 2 13847 3567 3 12843 3616 4 12717 3326 5 13681 3799 6 13670 3825 7 13598 3470 8 13709 3772
LOAD FORECAST Based on Regression Analysis (Revised April, 2008) *  Base year figure without export to KESC Year MW G.R (%) 2006-07* 15138   2007-08 16484 8.9 2008-09 17868 8.4 2009-10 19352 8.3 A.C.G.R. (2006-2010) 8.5 2010-11 20874 7.9 2011-12 22460 7.6 2012-13 24126 7.4 2013-14 25919 7.4 2014-15 28029 8.1 A.C.G.R. (2010-2015)   7.7
FUTURE GENERATION PROJECTS* (2008-2011) *Based on WPPO information dated 25  April 2008 Fiscal Year Name of Project Type Installed Capacity (MW) Expected COD Capacity Added in each Year (MW) Total Installed Capacity (MW) Existing Capacity 17684 2007-08 Malakand-III HPP Public 81 May.  2008 141 17825 Rehab. of GENCO Plants Public 60 Jun.  2008 2008-09 Orient Thermal (Balloki) IPP 150 Jul.  2008 2029 19854 Attock Power Project IPP 165 Oct.  2008 Rental Plant at F/Abad IPP 150 Nov.  2008 Rental Plant at Guddu IPP 110 Nov.  2008 Rental Plant at Multan IPP 192 Dec.  2008 Rental Plant at Sahiwal IPP 150 Dec.  2008 Rehab. of GENCO Plants IPP 240 Dec.  2008 Rental Plant at Satiana Road IPP 200 Jan.  2009 Orient Thermal(Balloki) IPP 75 Jan.  2009
FUTURE GENERATION PROJECTS* (2008-2011) *Based on WPPO information dated 25  April 2008   IPP Public IPP Public Public IPP IPP Public Public IPP IPP IPP Type Jul.  2009 225 Muridke Power Project 22109 2255 Jul.  2009 130 Duber Khwar HPP 2009-10 Fiscal Year Name of Project Installed Capacity (MW) Expected COD Capacity Added in each Year (MW) Total Installed Capacity (MW) Rental Plant at Ludewala 200 Feb.  2009 Rental Plant at Nooriabad 100 Mar.  2009 Atlas Shirazi Project 225 Mar.  2009 Khan Khwar HPP 72 Apr.  2009 Fauji Mari Power Proj 202 Sep.  2009 F/Abad ICB Project 375 Nov.  2009 Dadu ICB Project 375 Nov.  2009 Nishat Power project 200 Dec.  2009 Jinnah Low Head Hydel 96 Feb.  2010 Sahiwal Power Project 225 Feb.  2010
FUTURE GENERATION PROJECTS* (2008-2011) *Based on WPPO information dated 25  April 2008   Jun.  2010 227 IPP Engro Power Project Fiscal Year Name of Project Type Installed Capacity (MW) Expected COD Capacity Added in each Year (MW) Total Installed Capacity (MW) Nishat Chunian Project IPP 200 Jun.  2010 2010-11 Allai Khwar HPP Public 121 Jul.  2010 4856 26965 C.C. at F/Abad Public 125 Nov.  2010 C.C. at Dadu Public 125 Nov.  2010 Nandipur Power project Public 425 Dec.  2010 Bhikki Power Project IPP 225 Dec.  2010 Western ElectricProject IPP 150 Dec.  2010 Green Power Project IPP 205 Dec.  2010 KAPCO Extension IPP 400 Dec.  2010 HUBCO Narowal IPP 225 Dec.  2010 Liberty Power IPP 200 Dec.  2010
FUTURE GENERATION PROJECTS* (2008-2011) *Based on WPPO information dated 25  April 2008   Dec.  2010 390 IPP PIE AmPower Project Fiscal Year Name of Project Type Installed Capacity (MW) Expected COD Capacity Added in each Year (MW) Total Installed Capacity (MW) Star Thermal Project IPP 134 Jan.  2011 CC at Chichoki Mallian Public 526 Mar.  2011 Bestway IPP 205 Mar.  2011 Guddu Steam Public 750 Apr.  2011 UCH-2 ICB Power Project IPP 450 Jun.  2011 Gulistan Project IPP 200 Jun.  2011
SUMMAY OF POWER SUPPLY & DEMAND POSITION (MW) *Actual figures up to April, 2008 **Based on average hydrology conditions & includes export to KESC   Year Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 2007-08 -2235 -2196 -2412 355 -811 -2475 -3151 -2001 -3837 -3556 -3676 -3198 2008-09 -2884 -2714 -2749 -2780 -2945 -2779 -3028 -2791 -2819 -2824 -2777 -2780 2009-10 -2548 -2276 -2388 -2291 -2270 -2409 -2412 -2282 -2274 -2295 -2264 -2283 2010-11 -2207 -1919 -1598 -1329 -868 -859 -674 -885 -877 -871 -901 -888
Load Management Programme (LMP) By Reduction in Peak Load    1000 MW Reduction in industrial load (during peak hours)  (400MW) Switching off alternate street light points   (30 MW) Switching off Bill Boards  (20 MW) Closure of Shopping Plazas by 8.00 P.M (300 MW) Staggering of Holidays (100 MW) TOD Meters for Tubewells (150 MW) By Additional Capacity & System Augmentation/Improvement    200 MW Addition of SPPs at 11 K.V or 132 KV (100 MW) Massive maintenance–Transmission & Distt. System (50 MW) System augmentation & up-gradation of distribution T/Fs (30 MW) Installation of 11KV Capacitors on 11KV Lines (20 MW) Energy Loss Reduction     300 MW Technical measures (150 MW) Theft reduction (150 MW) Total Target Saving   1500 MW
Presentation N14

More Related Content

PDF
Presentazione di Gruppo Veronagest
PDF
Cambridge lecture areva robert davies
PDF
Energy generation 10_11
PPTX
presentation
PPT
Renewable energy course#00
PDF
Energy savings antwerp april 2014
PDF
Cost of Electricity Generation and the National Economy
PDF
Nl energy aug 29 - sept 4, 2015
Presentazione di Gruppo Veronagest
Cambridge lecture areva robert davies
Energy generation 10_11
presentation
Renewable energy course#00
Energy savings antwerp april 2014
Cost of Electricity Generation and the National Economy
Nl energy aug 29 - sept 4, 2015

What's hot (18)

PDF
Modelling of offshore wind
PDF
Res evolution italy_gse
PDF
Ceew cef market_handbook_q1_2020
PPT
IZVOARELE 38 MW PV PLANT
PDF
Session3 RE_ situation_in_egypt
PDF
Opportunities & Challenges in Developing Wind Energy in India
DOCX
Steinbeis 1MW Grid Connected System design report
DOC
2009 deep research report on china wind farm operation
PPTX
UKRAINE:RENEWABLE ENERGY DEVELOPMENT
PPTX
Lecture 1 piyush 21
PDF
World's Largest Solar Project
PDF
Top ten biggest onshore wind farms in Europe
PDF
Olav Johan Botnen - Long Term Analysis for the German Power Market
PDF
RWF PR90
PDF
How Idaho Power Company uses AURORAxmp
PPT
Energy saving ideas
PPTX
Go Solar
PPTX
Project Proposal on 10 MW Solar PV Power Plant
Modelling of offshore wind
Res evolution italy_gse
Ceew cef market_handbook_q1_2020
IZVOARELE 38 MW PV PLANT
Session3 RE_ situation_in_egypt
Opportunities & Challenges in Developing Wind Energy in India
Steinbeis 1MW Grid Connected System design report
2009 deep research report on china wind farm operation
UKRAINE:RENEWABLE ENERGY DEVELOPMENT
Lecture 1 piyush 21
World's Largest Solar Project
Top ten biggest onshore wind farms in Europe
Olav Johan Botnen - Long Term Analysis for the German Power Market
RWF PR90
How Idaho Power Company uses AURORAxmp
Energy saving ideas
Go Solar
Project Proposal on 10 MW Solar PV Power Plant
Ad

Viewers also liked (18)

PPT
Rental Power By Ssa Jafri
PPT
New product development by ehsan bukhari
PDF
Pakathon Webinar: EcoEnergyFinance and Energy in Pakistan
PPT
Electic crisis in pakistan
PPTX
Energy crisis in pakistan (1)
PPT
Awaz Foundation Centre for Development Services, Pakistan - Post 2015 Scotlan...
PPTX
Electricity crisis in Pakistan
PPTX
Liberation movement in Gilgit-Baltistan
PPTX
PPT
Energy Crisis Of Pakistan
PPT
ENERGY CRISIS
PPTX
Energy crisis ppt
PPT
Energy Crisis of Pakistan
PPS
Electricity CIRSES IN PAKISTAN
PPTX
Energy Crises of Pakistan
PPTX
Energy Crisis In Pakistan
PPTX
Steam turbine Working
PPT
Electricity crisis in Pakistan and its possible solutions
Rental Power By Ssa Jafri
New product development by ehsan bukhari
Pakathon Webinar: EcoEnergyFinance and Energy in Pakistan
Electic crisis in pakistan
Energy crisis in pakistan (1)
Awaz Foundation Centre for Development Services, Pakistan - Post 2015 Scotlan...
Electricity crisis in Pakistan
Liberation movement in Gilgit-Baltistan
Energy Crisis Of Pakistan
ENERGY CRISIS
Energy crisis ppt
Energy Crisis of Pakistan
Electricity CIRSES IN PAKISTAN
Energy Crises of Pakistan
Energy Crisis In Pakistan
Steam turbine Working
Electricity crisis in Pakistan and its possible solutions
Ad

Similar to Presentation N14 (20)

PPT
E N E R G Y M A N A G E M E N T
PPTX
Energy crisis in pakistan by ali raza under graduate of sukkur iba.
PPT
Electricity & Water Demand Forecast 2009 - 2030
PPTX
NTDC Power System of including generation, transmission and generation
PPTX
Electricity Year 2023_updated_22022024.pptx
PDF
RETOOLING NIGERIAS ELECTRICITY GENERATION SUB – SYSTEM FOR SUSTAINABLE GRID O...
PDF
CEA's Monthly Review of Indian Power Sector
PPTX
15. Future Power System for the year 2030.pptx
PPTX
Pakistan electricity scenario
PDF
GPA Energy Analysis Report 06-12-12
PPTX
Gencos Rehabilitation 27.03.2013
PPTX
Gencos rehabilitation 27.03.2013
PPTX
Power industries and solar pv power plant in pakistan
PPTX
Equipment Arrival Status.pptx
PPTX
PPTX
Power genaration in bangladesh
PDF
Transmission Summit West 2013
PPT
National Transmission And Dispatch Company (NTDC)
PPTX
PDF
1_Geothermal_Development_in_Indonesia (2)
E N E R G Y M A N A G E M E N T
Energy crisis in pakistan by ali raza under graduate of sukkur iba.
Electricity & Water Demand Forecast 2009 - 2030
NTDC Power System of including generation, transmission and generation
Electricity Year 2023_updated_22022024.pptx
RETOOLING NIGERIAS ELECTRICITY GENERATION SUB – SYSTEM FOR SUSTAINABLE GRID O...
CEA's Monthly Review of Indian Power Sector
15. Future Power System for the year 2030.pptx
Pakistan electricity scenario
GPA Energy Analysis Report 06-12-12
Gencos Rehabilitation 27.03.2013
Gencos rehabilitation 27.03.2013
Power industries and solar pv power plant in pakistan
Equipment Arrival Status.pptx
Power genaration in bangladesh
Transmission Summit West 2013
National Transmission And Dispatch Company (NTDC)
1_Geothermal_Development_in_Indonesia (2)

More from sajid ghafoor (20)

PPTX
New microsoft office power point presentation
PPTX
Al qur'an
PPTX
Al qur'an
PPT
Store Accounting
PPTX
Global warming
PPTX
Al qurqn 1
PPTX
Al qurqn 1
PPTX
Al quran
PPTX
PPT
Accounting reports & accountabilit
PPT
Hajj presentation
PPT
Training
PPT
Project
PPT
Project
PPT
Financial Forecasting
PPT
Npv Irr
PPT
Risk And Returns
PPT
Break Even
PPT
Risk And Returns
New microsoft office power point presentation
Al qur'an
Al qur'an
Store Accounting
Global warming
Al qurqn 1
Al qurqn 1
Al quran
Accounting reports & accountabilit
Hajj presentation
Training
Project
Project
Financial Forecasting
Npv Irr
Risk And Returns
Break Even
Risk And Returns

Presentation N14

  • 1. MAY 09, 2008 POWER SHORTAGE IN PAKISTAN AND SHORT TERMS SOLUTION TO AVOID LOADSHEDDING.
  • 2. EXISTING GENERATING CAPACITY * Hydro availability based on last 5 years average ** Excludes 10% Forced Outages for GENCOs & 6.0% for IPPs & Rental Type of Generation Nameplate/Installed Capacity (MW) Derated/ Dependable Capacity (MW) Availability (MW) Summer Winter WAPDA Hydro 6444 6444 6250 2300* GENCOs 4840 3580 2780 3222** IPPs (incl Nuclear) 6115 5541 4950 5208** Rental 285 188 168 177** Total 17684 15753 14148 10907
  • 3. Historical Demand (2002 – 2007) * WAPDA computed demand; without export to KESC ** Assuming 1% diversity between WAPDA & KESC Power Demands YEAR WAPDA * KESC COUNTRY ** MW G.R. MW G.R. MW G.R. 2001-02 10109 4.0% 1885 1.3% 11875 3.6% 2002-03 10481 3.7% 1973 4.7% 12244 3.1% 2003-04 11078 5.7% 2073 10.0% 13021 6.4% 2004-05 12035 8.6% 2197 6.0% 14091 8.2% 2005-06 13212 9.8% 2223 1.2% 15282 8.5% 2006-07 15138 14.6% 2349 5.7% 17314 13.3%
  • 4. Historical Surplus/Deficit (2002 – 2007) YEAR WAPDA SYSTEM Installed Capacity Firm Capability Computed Peak Demand Surplus/ Shortfall 2001-02 15819 10894 10459 435 2002-03 15819 10958 11044 -86 2003-04 17299 11834 11598 236 2004-05 17350 12792 12595 197 2005-06 17400 12600 13847 -1247 2006-07 17366 13292 15838 -2546
  • 5. Month-wise surplus/deficit (MW) -3837 9845 13682 Mar-08 -3151 9104 12255 Jan-08 -2475 9679 12154 Dec-07 -811 11590 12401 Nov-07 355 14092 13737 Oct-07 Month Peak Demand Corresponding Capability Surplus/deficit Jan-07 12093 11039 -1054 Feb-07 11590 12552 962 Mar-07 12311 11171 -1140 Apr-07 13843 13002 -841 May-07 14650 13567 -1083 Jun-07 15838 13292 -2546 Jul-07 15941 13706 -2235 Aug-07 15862 13666 -2196 Sep-7 16056 13644 -2412 Feb-08 12123 10122 -2001 Apr-08 15124 11568 -3556
  • 6. Demand & Hydro Capability in May (MW) 2007 vs 2008 -1646 -2118 -1746 -1674 -2195 -1742 -1959 -2093 Diff 5418 5588 5571 5473 5521 5358 5526 5502 2007 Hydro Capability 1596 1788 2168 1211 2325 2896 2010 1448 Diff 15305 15386 15838 14892 15042 15739 15857 15008 2008 Date Peak Demand 2007 2008 1 13560 3409 2 13847 3567 3 12843 3616 4 12717 3326 5 13681 3799 6 13670 3825 7 13598 3470 8 13709 3772
  • 7. LOAD FORECAST Based on Regression Analysis (Revised April, 2008) * Base year figure without export to KESC Year MW G.R (%) 2006-07* 15138   2007-08 16484 8.9 2008-09 17868 8.4 2009-10 19352 8.3 A.C.G.R. (2006-2010) 8.5 2010-11 20874 7.9 2011-12 22460 7.6 2012-13 24126 7.4 2013-14 25919 7.4 2014-15 28029 8.1 A.C.G.R. (2010-2015)   7.7
  • 8. FUTURE GENERATION PROJECTS* (2008-2011) *Based on WPPO information dated 25 April 2008 Fiscal Year Name of Project Type Installed Capacity (MW) Expected COD Capacity Added in each Year (MW) Total Installed Capacity (MW) Existing Capacity 17684 2007-08 Malakand-III HPP Public 81 May. 2008 141 17825 Rehab. of GENCO Plants Public 60 Jun. 2008 2008-09 Orient Thermal (Balloki) IPP 150 Jul. 2008 2029 19854 Attock Power Project IPP 165 Oct. 2008 Rental Plant at F/Abad IPP 150 Nov. 2008 Rental Plant at Guddu IPP 110 Nov. 2008 Rental Plant at Multan IPP 192 Dec. 2008 Rental Plant at Sahiwal IPP 150 Dec. 2008 Rehab. of GENCO Plants IPP 240 Dec. 2008 Rental Plant at Satiana Road IPP 200 Jan. 2009 Orient Thermal(Balloki) IPP 75 Jan. 2009
  • 9. FUTURE GENERATION PROJECTS* (2008-2011) *Based on WPPO information dated 25 April 2008 IPP Public IPP Public Public IPP IPP Public Public IPP IPP IPP Type Jul. 2009 225 Muridke Power Project 22109 2255 Jul. 2009 130 Duber Khwar HPP 2009-10 Fiscal Year Name of Project Installed Capacity (MW) Expected COD Capacity Added in each Year (MW) Total Installed Capacity (MW) Rental Plant at Ludewala 200 Feb. 2009 Rental Plant at Nooriabad 100 Mar. 2009 Atlas Shirazi Project 225 Mar. 2009 Khan Khwar HPP 72 Apr. 2009 Fauji Mari Power Proj 202 Sep. 2009 F/Abad ICB Project 375 Nov. 2009 Dadu ICB Project 375 Nov. 2009 Nishat Power project 200 Dec. 2009 Jinnah Low Head Hydel 96 Feb. 2010 Sahiwal Power Project 225 Feb. 2010
  • 10. FUTURE GENERATION PROJECTS* (2008-2011) *Based on WPPO information dated 25 April 2008 Jun. 2010 227 IPP Engro Power Project Fiscal Year Name of Project Type Installed Capacity (MW) Expected COD Capacity Added in each Year (MW) Total Installed Capacity (MW) Nishat Chunian Project IPP 200 Jun. 2010 2010-11 Allai Khwar HPP Public 121 Jul. 2010 4856 26965 C.C. at F/Abad Public 125 Nov. 2010 C.C. at Dadu Public 125 Nov. 2010 Nandipur Power project Public 425 Dec. 2010 Bhikki Power Project IPP 225 Dec. 2010 Western ElectricProject IPP 150 Dec. 2010 Green Power Project IPP 205 Dec. 2010 KAPCO Extension IPP 400 Dec. 2010 HUBCO Narowal IPP 225 Dec. 2010 Liberty Power IPP 200 Dec. 2010
  • 11. FUTURE GENERATION PROJECTS* (2008-2011) *Based on WPPO information dated 25 April 2008 Dec. 2010 390 IPP PIE AmPower Project Fiscal Year Name of Project Type Installed Capacity (MW) Expected COD Capacity Added in each Year (MW) Total Installed Capacity (MW) Star Thermal Project IPP 134 Jan. 2011 CC at Chichoki Mallian Public 526 Mar. 2011 Bestway IPP 205 Mar. 2011 Guddu Steam Public 750 Apr. 2011 UCH-2 ICB Power Project IPP 450 Jun. 2011 Gulistan Project IPP 200 Jun. 2011
  • 12. SUMMAY OF POWER SUPPLY & DEMAND POSITION (MW) *Actual figures up to April, 2008 **Based on average hydrology conditions & includes export to KESC Year Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 2007-08 -2235 -2196 -2412 355 -811 -2475 -3151 -2001 -3837 -3556 -3676 -3198 2008-09 -2884 -2714 -2749 -2780 -2945 -2779 -3028 -2791 -2819 -2824 -2777 -2780 2009-10 -2548 -2276 -2388 -2291 -2270 -2409 -2412 -2282 -2274 -2295 -2264 -2283 2010-11 -2207 -1919 -1598 -1329 -868 -859 -674 -885 -877 -871 -901 -888
  • 13. Load Management Programme (LMP) By Reduction in Peak Load 1000 MW Reduction in industrial load (during peak hours) (400MW) Switching off alternate street light points (30 MW) Switching off Bill Boards (20 MW) Closure of Shopping Plazas by 8.00 P.M (300 MW) Staggering of Holidays (100 MW) TOD Meters for Tubewells (150 MW) By Additional Capacity & System Augmentation/Improvement 200 MW Addition of SPPs at 11 K.V or 132 KV (100 MW) Massive maintenance–Transmission & Distt. System (50 MW) System augmentation & up-gradation of distribution T/Fs (30 MW) Installation of 11KV Capacitors on 11KV Lines (20 MW) Energy Loss Reduction 300 MW Technical measures (150 MW) Theft reduction (150 MW) Total Target Saving 1500 MW