10. Name : Mobile Cepu Ltd, Bojonegoro, East Java
Owner : Mobil Cepu Ltd
Contractor : Tripatra – Samsung
Total Volume : 110.000 m3
Year : 2011-2012
EPC PROJECTS
Name : Tangguh Expansion Project
Owner : British Petroleum
Contractor : Chiyoda – Saipem – Tripatra – SAE
Total Volume : 225.000 m3
Year : 2017-2024
11. Name : Salak Brine Recovery Heat Recovery Binary Power
Owner : Star Energy
Contractor : Tripatra Engineers & Constructors
Total Volume : 9.000 m3
Years : Apr 2022-2023
Name : SP ABG Stage 1 Akasia Bagus
Owner : PT Pertamina EP
Contractor : PT Tripatra Engineers and Constructors
Total Volume : 7.000 m3
Years : Jun 2024 – now
EPC PROJECTS
12. Name : Integrate Gas Terminal Facilities, Tanjung
Uban
Owner : PT Pertamina (Persero)
Contractor : Wijaya Karya
Total Volume : 25.870 m3
Year : Apr 2014-2017
Name : Road Development & Facilities in Mining Unit
Contractor : Adhi Karya – Waskita Karya
Total Volume : 78.000 m3
Year : Sept 2023 – now
EPC PROJECTS
13. Name : Jatigede Dam, Sumedang
Owner : The Ministry of Public Works and
Housing Main
Contractor : SINOHYDRO JO CIC – Waskita Karya
Total Volume : 268.000 m3
Years : 2008-2016
INFRASTRUCTURE PROJECTS
Name : Waduk Pidekso, Wonogiri
Owner : The Ministry of Public Works and Housing
Main Contractor : PT PP
Total Volume : 48.000 m3
Years : 2018-2021
14. INFRASTRUCTURE PROJECTS
Name : Leuwikeris Dam, Ciamis
Owner : The Ministry of Public Works and Housing
Contractor : Adhi Karya – Hutama Karya – Waskita Karya
Total Volume : 121.300 m3
Years : Apr 2020-2022
Name : Sadawarna Dam, Sumedang
Owner : The Ministry of Public Works and Housing
Contractor : Nindya Karya – Adhi Karya KSO
Total Volume : 99.500 m3
Years : Apr 2019-2022
15. INFRASTRUCTURE PROJECTS
Name : Rentang Irrigation Modernization
Owner : The Ministry of Public Works and Housing
Contractor : Adhi Karya – Waskita Karya – Nindya Karya –
Hutama Karya
Total Volume : 72.650 m3
Year : Jun 2021 – now
Name : Patimban Port, Subang, West Java
Owner : The Ministry of Transportation
Contractor : Toyo-Adhi-Wakachiku, WIKA-PP, Penta-Rinkai
Total Volume : 45.000 m3
Years : 2019-2022
17. OWNED EQUIPMENT
DUMP TRUCK : 80 Unit
Brand : Hino, Mercedes Benz
Year : Various
BATCHING PLANT : 25 Unit
Capacity : 15, 25, 60, 80, 110 m3/hr
Year : Various
WHEEL LOADER : 20 Unit
Brand : Cat, Luigong, etc
Year : Various
Concrete Pump : 9 Unit
Capacity : 22, 33, above 33 meter
Year : Various
Truck Mixer : 120 Unit
Capacity : 7 m3
Year : Various
19. TANJUNG ENIM BATCHING PLANT
INFRASTRUCTURE
• Kami telah mendirikan Batching Plant yang sudah beroperasi dengan kapasitas produksi sampai dengan 60 M3/Hour
• Kami teleh memobilisasi (*Eksisting) Tiga (3) Truck Mixer yang sudah dapat digunakan di dalam Area PTBA
• Batching Plant Kami telah dilengkapi dengan fasilitas-fasilitas penunjangnya seperti Kantor, Gudang, Workshop, Laboratory,
Laydown area,dll yang sudah terbukti dan dapat megeksekusi proyek di dalam area PTBA
20. TANJUNG ENIM BATCHING PLANT
LOCATION
• OUR BATCHING PLANT LOCATED INSIDE PT. BUKIT ASAM AREA
• https://maps.app.goo.gl/6ZWg6erfUykSAtw6A
21. MANPOWER & EQUIPMENT LOADING
HSE OFFICERS
PROJECT
CONTROL
SECURITY
FIELD
TECHNICIAN
PROJECT
MANAGER
ANTO YULIANTO
HELPER
HELPER
PROJECT
ADMIN
PT. UNGGUL SEJATI INDONESIA
BATCHING PLANT SITE ORGANISATION CHART
OPERATOR
BATCHING PLANT
LOGISTIC STAFF
LOADER
OPERATORS
TM OPERATOR
DRIVER
KEPALA
PRODUKSI
QUALITY
CONTROL
MECHANICS &
TECHNICIAN
23. MANPOWER & EQUIPMENT LOADING
EKSISTING EQUIPMENT
COD Maret 2024 COD Desember 2024
24. MATERIAL SOURCES
No Material Source Remark
1 Cement Indocement and or SIG
2 Coarse Aggregate Own Stone Crusher & Supplier
Lahat, Martapura,
Lampung
3 Fine Aggregate Supplier Muara Enim, Martapura,
Lampung
4 Additive Flowric BAS From Java
5 Water From Near Point Sources
1. Coarse Aggregate tested on Agreed Independent Laboratory
2. Fine Aggregate tested on Agreed Independent Laboratory
3. Water tested on Agreed Independent Laboratory
25. PRODUCTION AND TRIAL MIX
1. USI telah mengajukan JMF/D kepada Contractor dan telah disetujui untuk diajukan sebagai Trial Mix
2. USI telah mengadakan Trial Produksi dan Trial mix yang dihadiri oleh Consultant dan Contractor
Trial Production
Material Check
Trial mix
26. LABORATORY
• Kami menyediakan Laboratorium dalam skope pekerjaan kami dan berlokasi di dalam area Batching Plant kami
• Laboratorium kami dilengkapi peralatan lab seperti Alat Uji Kuat tekan beton, molding, Bak Rendam, dll
• Kami juga menempatkan personel Quality yang sudah berpengalaman dan Memenuhi Kualifikasi
27. STRATEGY EKSEKUSI PROYEK
Mempertimbangkan Lokasi plant yang berada di dalam area
Eksisting Tambang Bukit asam dan juga sumber material yang
disetujui berada dalam jarak yang lumayan jauh yakni ± 200 km
menuju plant kami, sehingga penentuan moda logistik, jarak
bongkar material ke Batching plant dan Jumlah Armada
menentukan keberhasilan eksekusi
Sehingga USI akan menyediakan armada yang lengkap dan juga
partner Logistik yang kredible dan atau sudah teruji bekerja sama
sebelumnya
Semen dan Batu merupakan pareto terbesar terhadap Satuan
Harga penyusun Beton dan ketersediaan material disupport dari
luar area. Sehingga kemampuan Finansial untuk menjamin
pembelian material diawal menentukan keberlangsungan proyek
Keuntungan USI adalah lean organization sehingga pengambilan
keputusan untuk melakukan downpayment atau pembayaran
material lebih cepat dari competitor sehingga dapat menjamin
bahwa vedor material akan tetap mensupport supplai material
tanpa putus
Sebelumnya kami telah menyelesaikan proyek di dalam lokasi
PT. Bukit Asam untuk scope Suplai Beton Readymix, sehingga
kami sudah menerapkan Persyaratan-Persyaratan yang
dibutuhkan untuk bekerja dalam lingkup Area PTBA, dengan
bahasa lain Learning Curve kami sudah terselesaikan dalam
eksekusi Proyek sebelumnya. Sehingga dalam proyek kali ini
kami sudah dapat langsung beroperasi, dikarenakan juga karena
eksisting batching plant dan tim kami masih berada di lokasi.
Menjamin
Ketersediaan
Material di Lapangan
menjadi strategi utama
kami dalam mengeksekusi
proyek Rail loop TLS 6 & 7