The Role of Engineers and Relevant Authority
Engr. Mohd. Golam Mostafa
C.I.P, Govt. Of Bangladesh
Gold Medal recipient from His Highness Sheikh Zayed, Ruler of U.A.E.
and Lead Structural Engineer of all Structural Developments,
Abu Dhabi Municipality
Ex-Lecturer of BUET
 A Closer Look at What caused the Savar Tragedy
◦ Key Reasons for Building Collapse
◦ Risk Mitigation Steps
 Building Permit Offering
◦ Checkpoints for BP Issuance
 APPLICATION
 LEGAL SECTION
 ARCHITECTURAL SECTION
 STRUCTURAL SECTION
 SERVICES DEPT
 BP ISSUANCE
 RAJUK LCO
 Photo Reference Slides
◦ Failure Signs and Post-Seismic Scenarios
 Comprehensive Disaster
Management Programme
(CDMP) predicted in 2010
◦ 78,323 buildings will be
destroyed completely if a 6-
magnitude earthquake hits
Dhaka causing US $ 650 M
economic loss
RANA PLAZA
before after
 Courtesy of The Daily Star publication, 25 April 2013
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Concrete of column bulged out
due to vertical loads
Structural failures occur in connection areas such as
• beam column connection,
• roof trusses-beam connection
• column-foundation connection
Common weaknesses found in buildings are in
• Inadequate structural layout (unsymmetrical)
• Insufficient load-bearing capacity of the walls
• Inadequate connection between the walls.
• Poor quality materials or work methods in the construction.
1. The working load on the building was more than the design load
2. Three extra floors had been built without approval from the local
authority on the top of the approved 6 storied building
3. Total working load on the columns in the lower floors could be more
than double :
4. The debris are more powdery than the integrated broken concrete
chips
5. The quality of the construction materials used were poor
6. The sizes of the column were inadequate
7. The site Soil conditions are unknown
8. Design documents and the construction drawing are not available
1. Structural design shall be based on the functional loadings of all floors of the building as per the
architect’s requirements
2. Design live loads of the floors and the design strengths of construction materials must be mentioned
in the structural drawings
3. Foundation shall be based on the result soil investigation report by one professional agency
4. The strength of the construction materials to be used should be easily achievable.
5. All construction materials should be carefully selected, tested and to be stored in a clean place
6. Clear cover to reinforcing steel, washing the formwork/shutters by clean water and removal of rust &
dust of the reinforcing steel as well as curing the concrete after casting are very important to achieve
the strength of the concrete elements
7. All test results and other information shall be documented and stored for future ref
8. All alterations and modifications must be done as per modified drawings approved from RajUK
9. The building controlling agency of the Govt. ` RAJUK in Dhaka’ must be very careful to issue Building
Permit.
The process of issuance of BP requires the professional
services of the following sections
 Legal Section
 Architectural section
 Structural Section
 Building Permit issuance & Drawing Storage Section
 Local construction controlling office of RAJUK (LCO)
 APPLICATION
 LEGAL SECTION
 ARCHITECTURAL SECTION
 STRUCTURAL SECTION
 SERVICES DEPT
 BP ISSUANCE
 RAJUK LCO
 APPLICATION
◦ The landowner/or his consultant will submit an
application for Building Permit to RAJUK’s building
permit department(BPD) with relevant documents of
his land as required by the legal section of BPD and
the architectural drawings of the proposed project.
After receiving the application, the administration
shall make one file and send it to legal section
 LEGAL SECTION
◦ The legal section shall check the legal documents of
the land and confirm the ownership and his plot
size and shape and send it to the architectural
section informing the admin.
 ARCHITECTURAL SECTION
◦ When the file reaches to the section, it will be
assigned to an architect of the section and the
architect shall check the proposal with the land-use
regulation of Rajuk, the size, the shape and the
passage of the project as well as the functions and
ventilations of each space assigned, in case, he
needs modifications, ha can call the project
architect and discuss the required modification.
Five copies of the final architectural drawings
signed by the project architect shall have to be
submitted for approval. After signing and stamping
each architectural drawing, the file will be send to
the structural section informing the admin
 STRUCTURAL SECTION
◦ After approval from architectural section, the file will be
sent to the structural section where the consultant/land
owner of the project shall submit the structural drawings
signed by the structural designer. These drawings need
to be thoroughly checked for safety & economy of the
project before counter signing these drawing by the
structural section for issuance of the Building Permit.
This is very time consuming job for the Structural
Engineers of the section and most probably they may not
have enough qualified manpower even to handle this
issue. It is suggested that RAJUK should enlist structural
consultants/structural engineers in Bangladesh as per
the suggestions and classifications of IEB’s Civil
Engineering Department and RAJUK may outsource the
technical checking jobs to structural consultants and
may handle structural drawing approval in the following
way,
 When a project is designed & the Structural drawings are signed by an
IEB graded structural engineer and if the project’s technical size is
within the limit of his grade, Rajuk may accept these drawing
technically
 When a structure is designed and the structural drawings are signed by
an engineer not yet graded in the IEB’s Grade list or his grade does not
permit the structural design of this technical size, Rajuk may outsource
the drawings for checking to an IEB Graded structural Consultant or
Structural Engineer of concerned grade or higher and get these
drawings signed and accept these drawings technically.
 For small projects like boundary walls or small sheds, single or two
storied single unit houses, the structural section may approve without
IEB Graded structural consultant
 In all cases, the structural section shall match the structural drawings
with the approved architecture and check the specifications of the
materials to be used in the project and counter sign these drawing for
approval and forward the file to BP issuance section.
 SERVICE DEPT
◦ After approval from the architectural section, the
client (landowner or the consultant) may take two
copies of the approved architectural drawings one
for the Water supply and Sanitary Dept and the
other for the Electricity Dept. The client will submit
5 copies of the service drawings to the concerned
service Dept and after approval from them, the
client will take delivery 4 copies of the approved
service drawings from each dept and submit to the
building permit section of Rajuk
 BUILDING PERMIT ISSUANCE
◦ Building permit may be issued to the land owner or to the
builder after approval from all the concerned sections and
service depts.
◦ Approval from service depts. may be done later also but in this
case the client shall submit a commitment letter to the BP
Section to deliver one copy of the approved service drawings
from each service depts. to store in the client’s file within three
months from the date of delivery of the Building Permit.
◦ BPS shall ask the client to submit one copy of the soil
investigation report (if the building is more than two storied)
for storage within the file.
◦ The Building Permit Section shall store each building permit file
in its archives for future reference.
◦ It preferable that the BPS should ask the consultant for a soft
copy of the approved drawings by e-mail to store in the soft
copy archives of BPS.
 LOCAL CONTROLLING (CONSTRUCTION) OFFICE (LCO) OF RAJUK
◦ Rajuk should have one construction quality controlling office (LCO-1) in
each sub area with one quality controlling civil engineer and some trained
diploma engineers. Once the BP is issued, one copy of the approved
drawings would be sent to the concerned LCO.
◦ The land owner shall inform the local LCO in writing the names details of
the project builder, the supervising consultant and its project engineer.
◦ No major structural work or concrete work should be done without
informing the LCO and taking their written permission. When some major
jobs are ready for execution, the builder should get it first checked by the
project consultant and then by LCO in writing and then should execute the
job
◦ When the construction is complete, the builder should submit a letter to
LCO in the format of RAJUK for completion certificate with one copy of the
as built drawings stamped and signed by the consultant and requesting
the LCO to check. The LCO visit the site & check the building site in co-
ordination with the consultant and issue completion certificate
◦ The builder then applies to the local depts. with this completion certificate
to get local service connections.
Let’s pray we never have to revisit
another Savar-Like Tragedy
Thank You
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
All new constructions have to have a seismic separation of 1.5%
of the height between adjacent buildings to prevent pounding.
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
Consulting Structural Engineers and Architects
www.mgma-bd.com

More Related Content

PDF
Ehsan Asghar - Hydromechanical Engineer
PDF
Project Management Assignment 1
DOC
Mohamed sanoussi cv
PDF
amrocvEN1-updated 15
DOCX
Raman K Gupta ,QC Engr
DOC
Updated Resume.DOC
DOCX
CV Abdul Gaffer.docx revised (3)
Ehsan Asghar - Hydromechanical Engineer
Project Management Assignment 1
Mohamed sanoussi cv
amrocvEN1-updated 15
Raman K Gupta ,QC Engr
Updated Resume.DOC
CV Abdul Gaffer.docx revised (3)

What's hot (19)

DOC
Richard Kildea. CV October 2016
DOC
CV-PM Ponraj
DOC
Najim updated CV
PDF
Curriculum Vitae end to start 19-7-2016
DOC
resume-ehlibongco_2015e
DOCX
CV of KP Tomy
DOC
Imaran CV
DOC
DOC
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
PDF
Resume 2014 without cover letter short
DOC
Huzoor-_feb_20091 CV (2)
DOC
Ramanuja CV-
PDF
Monthly Progress Report - September 2014
DOC
Huzoor-_feb_20091 CV (2)
PDF
Elamathi Panneerselvam CV
PDF
Causes of Delay in Construction of Bridge Girders
Richard Kildea. CV October 2016
CV-PM Ponraj
Najim updated CV
Curriculum Vitae end to start 19-7-2016
resume-ehlibongco_2015e
CV of KP Tomy
Imaran CV
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Resume 2014 without cover letter short
Huzoor-_feb_20091 CV (2)
Ramanuja CV-
Monthly Progress Report - September 2014
Huzoor-_feb_20091 CV (2)
Elamathi Panneerselvam CV
Causes of Delay in Construction of Bridge Girders
Ad

Recently uploaded (20)

PDF
Pride World City: Redefining Township Living in Charholi
PDF
Robin Pahuja – The Driving Force Among Gurgaon’s Top Real Estate Partners
PDF
Indra Developer in dholera smart city, real Esate
PDF
Buyer's Agency in Queensland- Wise Nest Realty.pdf
DOCX
Immobilien – Understanding the Real Estate Market
DOC
价格咨询WAU毕业证学历认证,达特茅斯学院毕业证学士学历
PDF
Whiteland Westin Residences Elite Edge Legacy @9999977783.pdf
PDF
SkyHills Astra at Dubai Science Park.pdf
PDF
Wellness Villas in Hyderabad – Forest Nation
PPTX
The Driving Principles of Anthony Lester Fresno: Integrity and Impact
PDF
Rustomjee Pune - Luxury Lifestyle for Families and Investors
PDF
Golden Grande Commercial Project in Greater Noida
PDF
Move In Checklist Using eAuditor Audits & Inspections
PPT
industrial theory for the urban economics
PDF
Century Sankhya Plots Bangalore - Brochure
PDF
Plots in Dholera Call:-8588-926-927 for Best Deal
PDF
The Element at Sobha One (Sobha Hartland) Dubai.pdf
PDF
Plots in Jattari Near Noida International Airport Yamuna Expressway Call:-858...
PPT
SBP StarHills DeraBassi | 2 & 3 BHK Flats
PDF
Make Yourself at Home - Raymond Mahim Mumbai
Pride World City: Redefining Township Living in Charholi
Robin Pahuja – The Driving Force Among Gurgaon’s Top Real Estate Partners
Indra Developer in dholera smart city, real Esate
Buyer's Agency in Queensland- Wise Nest Realty.pdf
Immobilien – Understanding the Real Estate Market
价格咨询WAU毕业证学历认证,达特茅斯学院毕业证学士学历
Whiteland Westin Residences Elite Edge Legacy @9999977783.pdf
SkyHills Astra at Dubai Science Park.pdf
Wellness Villas in Hyderabad – Forest Nation
The Driving Principles of Anthony Lester Fresno: Integrity and Impact
Rustomjee Pune - Luxury Lifestyle for Families and Investors
Golden Grande Commercial Project in Greater Noida
Move In Checklist Using eAuditor Audits & Inspections
industrial theory for the urban economics
Century Sankhya Plots Bangalore - Brochure
Plots in Dholera Call:-8588-926-927 for Best Deal
The Element at Sobha One (Sobha Hartland) Dubai.pdf
Plots in Jattari Near Noida International Airport Yamuna Expressway Call:-858...
SBP StarHills DeraBassi | 2 & 3 BHK Flats
Make Yourself at Home - Raymond Mahim Mumbai
Ad

Preventing savar like tragedy by engr. golam mostafa

  • 1. The Role of Engineers and Relevant Authority Engr. Mohd. Golam Mostafa C.I.P, Govt. Of Bangladesh Gold Medal recipient from His Highness Sheikh Zayed, Ruler of U.A.E. and Lead Structural Engineer of all Structural Developments, Abu Dhabi Municipality Ex-Lecturer of BUET
  • 2.  A Closer Look at What caused the Savar Tragedy ◦ Key Reasons for Building Collapse ◦ Risk Mitigation Steps  Building Permit Offering ◦ Checkpoints for BP Issuance  APPLICATION  LEGAL SECTION  ARCHITECTURAL SECTION  STRUCTURAL SECTION  SERVICES DEPT  BP ISSUANCE  RAJUK LCO  Photo Reference Slides ◦ Failure Signs and Post-Seismic Scenarios
  • 3.  Comprehensive Disaster Management Programme (CDMP) predicted in 2010 ◦ 78,323 buildings will be destroyed completely if a 6- magnitude earthquake hits Dhaka causing US $ 650 M economic loss RANA PLAZA before after
  • 4.  Courtesy of The Daily Star publication, 25 April 2013
  • 8. Concrete of column bulged out due to vertical loads
  • 9. Structural failures occur in connection areas such as • beam column connection, • roof trusses-beam connection • column-foundation connection Common weaknesses found in buildings are in • Inadequate structural layout (unsymmetrical) • Insufficient load-bearing capacity of the walls • Inadequate connection between the walls. • Poor quality materials or work methods in the construction.
  • 10. 1. The working load on the building was more than the design load 2. Three extra floors had been built without approval from the local authority on the top of the approved 6 storied building 3. Total working load on the columns in the lower floors could be more than double : 4. The debris are more powdery than the integrated broken concrete chips 5. The quality of the construction materials used were poor 6. The sizes of the column were inadequate 7. The site Soil conditions are unknown 8. Design documents and the construction drawing are not available
  • 11. 1. Structural design shall be based on the functional loadings of all floors of the building as per the architect’s requirements 2. Design live loads of the floors and the design strengths of construction materials must be mentioned in the structural drawings 3. Foundation shall be based on the result soil investigation report by one professional agency 4. The strength of the construction materials to be used should be easily achievable. 5. All construction materials should be carefully selected, tested and to be stored in a clean place 6. Clear cover to reinforcing steel, washing the formwork/shutters by clean water and removal of rust & dust of the reinforcing steel as well as curing the concrete after casting are very important to achieve the strength of the concrete elements 7. All test results and other information shall be documented and stored for future ref 8. All alterations and modifications must be done as per modified drawings approved from RajUK 9. The building controlling agency of the Govt. ` RAJUK in Dhaka’ must be very careful to issue Building Permit.
  • 12. The process of issuance of BP requires the professional services of the following sections  Legal Section  Architectural section  Structural Section  Building Permit issuance & Drawing Storage Section  Local construction controlling office of RAJUK (LCO)
  • 13.  APPLICATION  LEGAL SECTION  ARCHITECTURAL SECTION  STRUCTURAL SECTION  SERVICES DEPT  BP ISSUANCE  RAJUK LCO
  • 14.  APPLICATION ◦ The landowner/or his consultant will submit an application for Building Permit to RAJUK’s building permit department(BPD) with relevant documents of his land as required by the legal section of BPD and the architectural drawings of the proposed project. After receiving the application, the administration shall make one file and send it to legal section  LEGAL SECTION ◦ The legal section shall check the legal documents of the land and confirm the ownership and his plot size and shape and send it to the architectural section informing the admin.
  • 15.  ARCHITECTURAL SECTION ◦ When the file reaches to the section, it will be assigned to an architect of the section and the architect shall check the proposal with the land-use regulation of Rajuk, the size, the shape and the passage of the project as well as the functions and ventilations of each space assigned, in case, he needs modifications, ha can call the project architect and discuss the required modification. Five copies of the final architectural drawings signed by the project architect shall have to be submitted for approval. After signing and stamping each architectural drawing, the file will be send to the structural section informing the admin
  • 16.  STRUCTURAL SECTION ◦ After approval from architectural section, the file will be sent to the structural section where the consultant/land owner of the project shall submit the structural drawings signed by the structural designer. These drawings need to be thoroughly checked for safety & economy of the project before counter signing these drawing by the structural section for issuance of the Building Permit. This is very time consuming job for the Structural Engineers of the section and most probably they may not have enough qualified manpower even to handle this issue. It is suggested that RAJUK should enlist structural consultants/structural engineers in Bangladesh as per the suggestions and classifications of IEB’s Civil Engineering Department and RAJUK may outsource the technical checking jobs to structural consultants and may handle structural drawing approval in the following way,
  • 17.  When a project is designed & the Structural drawings are signed by an IEB graded structural engineer and if the project’s technical size is within the limit of his grade, Rajuk may accept these drawing technically  When a structure is designed and the structural drawings are signed by an engineer not yet graded in the IEB’s Grade list or his grade does not permit the structural design of this technical size, Rajuk may outsource the drawings for checking to an IEB Graded structural Consultant or Structural Engineer of concerned grade or higher and get these drawings signed and accept these drawings technically.  For small projects like boundary walls or small sheds, single or two storied single unit houses, the structural section may approve without IEB Graded structural consultant  In all cases, the structural section shall match the structural drawings with the approved architecture and check the specifications of the materials to be used in the project and counter sign these drawing for approval and forward the file to BP issuance section.
  • 18.  SERVICE DEPT ◦ After approval from the architectural section, the client (landowner or the consultant) may take two copies of the approved architectural drawings one for the Water supply and Sanitary Dept and the other for the Electricity Dept. The client will submit 5 copies of the service drawings to the concerned service Dept and after approval from them, the client will take delivery 4 copies of the approved service drawings from each dept and submit to the building permit section of Rajuk
  • 19.  BUILDING PERMIT ISSUANCE ◦ Building permit may be issued to the land owner or to the builder after approval from all the concerned sections and service depts. ◦ Approval from service depts. may be done later also but in this case the client shall submit a commitment letter to the BP Section to deliver one copy of the approved service drawings from each service depts. to store in the client’s file within three months from the date of delivery of the Building Permit. ◦ BPS shall ask the client to submit one copy of the soil investigation report (if the building is more than two storied) for storage within the file. ◦ The Building Permit Section shall store each building permit file in its archives for future reference. ◦ It preferable that the BPS should ask the consultant for a soft copy of the approved drawings by e-mail to store in the soft copy archives of BPS.
  • 20.  LOCAL CONTROLLING (CONSTRUCTION) OFFICE (LCO) OF RAJUK ◦ Rajuk should have one construction quality controlling office (LCO-1) in each sub area with one quality controlling civil engineer and some trained diploma engineers. Once the BP is issued, one copy of the approved drawings would be sent to the concerned LCO. ◦ The land owner shall inform the local LCO in writing the names details of the project builder, the supervising consultant and its project engineer. ◦ No major structural work or concrete work should be done without informing the LCO and taking their written permission. When some major jobs are ready for execution, the builder should get it first checked by the project consultant and then by LCO in writing and then should execute the job ◦ When the construction is complete, the builder should submit a letter to LCO in the format of RAJUK for completion certificate with one copy of the as built drawings stamped and signed by the consultant and requesting the LCO to check. The LCO visit the site & check the building site in co- ordination with the consultant and issue completion certificate ◦ The builder then applies to the local depts. with this completion certificate to get local service connections.
  • 21. Let’s pray we never have to revisit another Savar-Like Tragedy Thank You
  • 26. All new constructions have to have a seismic separation of 1.5% of the height between adjacent buildings to prevent pounding.
  • 55. Consulting Structural Engineers and Architects www.mgma-bd.com