Outline
  The job

  R4D environment

  Project planning
    - Overview
    - Specify problem                           Planning aims to coordinate decisions
    - Agreeing objectives                       in an attempt to influence, direct and
    - Analyze options                           control the future in order to achieve
    - Plan of operations                           certain predetermined objectives

  If IITA were a donor…
     - Bank of CNs
     - Control management
     - MIS

  Conclusions
                     International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
1. The job
        7 key responsibility areas                                      26yrs post-PhD experience
Lead responses to funding opportunities                   Managed 10 projects of US9m, 38% of which
                                                          I led in proposal development
Facilitate project proposals development                  25 projects: 11 successful, 9 pending, 6
                                                          unfunded or refused
Strengthen use of appropriate design for                  UNDP-ESCaPP; IFAD/CGM; CG-NGOIPM; SDC
proposal development                                      cowpea & vegs; FAO cassava & Striga; ADA
                                                          vegs; NRC vegs; BI-WAFRINET; SPIPM
Develop/conduct training programs to                      Project planning/management, UK; IPM tools,
strengthen project management at IITA                     Australia; Corporate governance, FARA
Facilitate development of strategic                       IITA-Benin; HVP; PRSP-SL; initiatives with
initiatives/internal proposals                            CFC, UEMOA, UNIDO;3 partnership wshps pa;
Facilitate partnerships for smooth                        Inclusive partnerships through projects
implementation of projects                                development and coordination
Collaborate with CGO & DDG-RS: recruit                    MoU with host-countries, CIRAD, NRC-Norway
staff; establish sites; monitor progress
                              International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
2. R4D environment: MTP projects
MTP legacies on SC priorities                 CLS          HVP            AH           RTS          BPS           AB          OT

Gene conservation & use                                                                                            

Increased knowledge/tech                                                                                                  

Improved/stabilized profitability                                                                   

High food & nutritional quality                                                                     

Efficient labour-use                                                       

Self reliant NARS/capacity dev                  

Markets/informed enterprises                                                            

Policy advice/ext environment                                 

Suggestion
- Consider placing some the 3 thematic projects within commodity MTP projects
                          International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
R4D environment: many special projects, one mission




Suggestions
- Coordinate results generation into common impact to achieve IITA mission




                        International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
3. Project planning: Overview

                                                 SPECIFY
   Formulate strategy                            PROBLEM                                       Implement strategy
  - Leadership                                                                                                 - Long-term
  - Decision-making                                                                              - Anticipate changes
  - Communications                                                                         - Proactive/ideas/vision
               MONITOR                                                                    ANALYSE
              PROGRESS                  PLANNING CYCLE
                                                                                          OPTIONS
  - Work culture                                                                                                 Short-term
  - Resources                                                                                        - Reactive/tactical
  - Authority levels                                                                                    - Reverse losses
                                              CONTROL
           Strategy:                         STANDARDS                                         Implementation:
    Establish key targets in                                                          Forecast & correct changes
        social, political,                                                            in target environment and
    technology & economic                                                              justify ones position and
     environment & show                                                                 proposals to deliver the
      means to fulfil them                                                                  desired change
                           International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
Specify problem/a good problem statement
 Situation
- What situation needs change?                                                           Allocate $ to BC or
                                                                                    experiential learning or both?
- Who/what/region is affected?
- Magnitude of the problem?
 Causes (not symptoms)
- Why does problem exists?
- Single or multiple causes?                        Functional                  Leaf loss in S. macrocarpon:
                                                    group                      Mite population density per leaf
- Are causes interdependent?
                                                                                  On-station                      On-farm
 Consequences
                                                                                    8.6       5.5            159.8           52.9
- Population size affected?                               Pest mite
                                                          Predators                8.3        1.5                1.6        0.6
- Political, cultural, economic?

Suggestions
- Intensive problem analyses is pivotal to resource mobilization/allocation
- Learn PSW tools: Surveys; historical profiles; consultations, pinboarding
                           International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
Agreeing objectives/the desired future
  SMART Objectives
 - State what will/should happen                                    DD-Projects: Authority environment

 - Specify project expectations
 - Clarify how to influence future                                                   Negotiated

  Agree, not set, objectives
 - More motivated implementers
                                                                  Existing
 - Maximise chances of achievement
 - Inputs of diverse expertise
 - Realistic plans/complement capacity                                                       Imposed
 - Confident decision-making: managers

 Suggestions
 - Invest in professionally facilitated project planning workshops
 - Greater involvement of potential partners in a timely manner
                          International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
Agreeing objectives: MTP project strategy




    Diverse expertise: IITA, AVRDC, ARC, ICIPE, NARS Benin, Ghana, Nigeria, Togo

Suggestion
-   Harmonize strategic planning approaches across MTP projects
-   Specify research/thrusts (= central pillars/strategic objectives. HVP now has 4
    research thrusts: a) Productivity growth; b) Market efficiency & enterprise; c)
    Nutritional quality & product diversity; d) Policies & institutional arrangements
-   Position component projects within strategic objectives per MTP projects
                             International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
Agreeing objectives: Template to position projects
                                                                   Equivalent objectives to propose
Hierarchy of          Description
                                                            Strategic plan                          Component projects
expectations
Goal           - Greater why                                      Mission                         Problem statement in
               - Summarise rationale                                                               executive summary
Purpose        - Change/impact needed               Vision/research thrusts                      Basis of goal statement
               - Motivation for outputs
Output         - Specific deliverables               Strategic objective/RT                            Basis of purpose
               - ToR for projects
Activities     - How/action                                 Responses/RT                               Basis of outputs

Output         - What? Qty/quality                                   N/A                                Output targets
target         - Location, time
Activities     - How/action                                          N/A                          Activities & resources

Suggestions
- Hands on training/common understanding of hierarchy of objectives
- Incorporate AU projected 6% annual productivity gain into planning process

                              International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
Analyse options: Feasibility of tasks
 Decision Tree Analysis
- Conceptual map of potential decisions/outcomes on activities to produce OTs

                    Start task: step 1              Step 1 succeeds                    Step 2 succeeds                       Continue


                                                                    Step 1 fails                  Step 2 fails

   1
       = Decide
      = Continue or exit/hand over
       = Abandon task




Suggestions
- Test consequences of tasks prior to implementation
- Review/merge or develop alternative tasks based on possible consequences
- Visualize contingences, exit/handover of tasks (link to stakeholder analysis)

                                      International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
Analyse options: Relative feasibility of output targets
                                Force Field Analysis, e.g. IITA biopesticides
10
                                                 Learning
      Specificity                Durability

                       Demand                                                                        Average
 5                                                               Production

                                                                                    Expertise
                                                                                                                      +ve forces
 0
                                                                                                                       -ve forces
                                                       Application

-5

                                                                                                             Average
           2nd/other                  Toxicology
-10          pests         Markets                                     Registration      Recruitment



Suggestions
- Assess/compare practicality of solutions (fertilisers, GMOs, biopesticides etc)
- Identify clear action points/inventory driving & restraining factors on OTs
- Minimize risks, amend/improve chances of success
                                         International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
Analyse options: Skills profiling

 Confident HR decision making
- Identify skills required to deliver OT
- Analyse internal skills/within the group
- Negotiate synergies/linkages & cross functions
- Inventory of external skills
- Identify potential consultancy areas

Suggestions
- Stakeholder analysis helps place objectives within IITA control
- MTP projects may require pillar champions/coordinators

                     International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
Plan of operations/writing
By this stage information is available to prepare a winning project proposal
- A strategy framework approved by RDC
- CNs approved by RDC to operationize the strategy
- Proposal writing includes PoP to indicate time, staff & $ resource allocation


Output 1: Collective action on MTP projects documented and lessons shared
Output target   Activity                                   2007 timeframe                         Performance            Responsible            $
                                                                                                    indicator
                                              J   F   M   A   M   J   J   A    S   O   N    D

MTP action       Identify & prioritize                                                             RDC report            DD-R &               000
initiatives     emerging new themes                                                               on decisions          Coordinator
published on
web              Organize internal                                                                 M&E/CCER              DDG-R &              000
                review                                                                            report                Coordinator

                 Facilitate strategic                                                              MTP strategy          Consultant &         000
                planning workshop                                                                 document              DD-R, DD-Proj
                 Recruit project                                                                   Strategy              DDG-R, CGO,          000
                leadership                                                                        operational           HR
                 Convene symposium.                                                                15 papers             DD-R;                000
                                                                                                                        Coordinator


                                         International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
4. If IITA were a donor: Bank of CNs

            By end year 1                                                              Benefits

 Problem specification                                  Coalition of interests in CNs

- Criteria to prioritize problem areas                  - Transparent decision making on CNs

- Justify technical, social, economic &                 - Ensure objectives are under IITA
environmental viability of CNs                          control


 Which projects?                                        Advocacy on donor policies

- SWOT CNs for robustness                               - Proactive donor intelligence

- Intranet-publicize database of CNs                    - Info support for investment

- Specify CNs which IITA would invest                   - Timely response to funding calls
in if it were a donor agency
                                                        - Basis of R4D $ mobilization/allocation


                           International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
Control management: a control system

 A good plan is achieved only if it is subjected to good system of control




- Output targets = control standards

- Monitor progress towards standards

- Compare results with standards

- Adjust objectives/flexibility




Suggestions
- Agree financial resource management tools with CGO, CFO and DD-R

                            International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
Design a management information systems

  Category       Type of info required                  Source of the info                              Use of the info

Deliverables   - What has been done?                 - Activity records                       - Plan future/year’s work
               - Not done but planned?               - Supervision reports                    - Identify successes
               - Problems encountered?               - Periodic reports                       - Identify strengths
               - How problems solved?                - Staff reviews                          - Identify weaknesses
               - Change in ext situation?            - Clients                                - Plan to overcome them
               - How staff work as team?             - Surveys                                - Review and evaluation

Suggestions
- Agree on categories of info and other MIS elements
- Agree on type of MIS required: formal, informal, extensive or limited
- Keep MIS simple, efficient and useful (advisory; not a spy in the cab!)
- Train/supervise project team in use of MIS


                             International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
5. Conclusion: I am suitable
 IITA research results are the only tools we have to impact on national
(e.g., PRSP), regional (e.g. with SROs) and continental (e.g. CAADP)
agricultural development plans

 I have summarized project planning & management tools & processes as
I know and apply in my work, and suggest each of us IRS learns such tools
for planning to improve effectiveness and usefulness of our research results

 I have also suggested action areas to guide R4D decisions on projects &
increase IRS understanding & collective ownership of those decisions

 I have drawn on 26yrs post-PhD experiences in education, partnership
building, project development, implementation/management & informal
discussions with colleagues to arrive at the summary I have provided

 I believe I have clearly demonstrated that I am suitable for the
advertised position of DD-Project planning and management at IITA

                         International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
Thank you



 I look forward to
 working with you,
 various authority
 levels, SROs/NARS so
 that together we help
 improve IITA’s R4D
 impact in the fight
 against declining
 livelihoods in SSA



                   International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org

More Related Content

PPT
Nrmc profile
PDF
Grieman
PDF
Inter bounds
PDF
Hoyt diana
PPTX
Leading change
PDF
Rackley mike
PDF
Ray hines stegeman
PDF
Adapting agile to the entreprise
Nrmc profile
Grieman
Inter bounds
Hoyt diana
Leading change
Rackley mike
Ray hines stegeman
Adapting agile to the entreprise

Similar to Project design and management contributions to improve IITA’s Research for Development program (20)

PPTX
The Africa RISING project in Ethiopia
PPT
The Nile Basin Development Challenge: A component of the CGIAR Challenge Pro...
PDF
13 Ousmane Coulibaly Objective1cowpea
PPTX
Caadp cgiar alignment-24_july_ver_01
PDF
Decision Support that is useful to national and regional users
PDF
A guide to Permaculture Designing
PPT
Embrapa’s platform for impact assessment of agricultural technologies and Ind...
PDF
Robert Zougmoré Overview CCAFS, incl. West Africa
PDF
14 Ousmane Coulibaly Objective1 Soybean
PDF
Darren Williams and Danna Campbell Canada's Approach to Marine Spatial Planni...
PDF
BOP business in Indochina Peninsula (AIHE project)_english
PDF
Sustainable Agriculture Framework
PDF
Beyond the usual suspects? The role of expert knowledge in sustainability ind...
PPT
Cross CRP gender sites
PPTX
Integral sustainability to business
PPTX
Workshop Trade-off Analysis - CGIAR_20 Feb 2013_Keynote Monika Zurek
PPT
Including NRM and environmental impacts within ACIAR impact assessments - Met...
PPTX
Reflections on knowledge management practice case study
PPTX
P1.1. Partnerships to Achieve Food and Nutrition Security
The Africa RISING project in Ethiopia
The Nile Basin Development Challenge: A component of the CGIAR Challenge Pro...
13 Ousmane Coulibaly Objective1cowpea
Caadp cgiar alignment-24_july_ver_01
Decision Support that is useful to national and regional users
A guide to Permaculture Designing
Embrapa’s platform for impact assessment of agricultural technologies and Ind...
Robert Zougmoré Overview CCAFS, incl. West Africa
14 Ousmane Coulibaly Objective1 Soybean
Darren Williams and Danna Campbell Canada's Approach to Marine Spatial Planni...
BOP business in Indochina Peninsula (AIHE project)_english
Sustainable Agriculture Framework
Beyond the usual suspects? The role of expert knowledge in sustainability ind...
Cross CRP gender sites
Integral sustainability to business
Workshop Trade-off Analysis - CGIAR_20 Feb 2013_Keynote Monika Zurek
Including NRM and environmental impacts within ACIAR impact assessments - Met...
Reflections on knowledge management practice case study
P1.1. Partnerships to Achieve Food and Nutrition Security
Ad

More from International Institute of Tropical Agriculture (20)

PPTX
Plantain (Musa, Abb) Pests And Disease Management
PPTX
Plantain/Banana Seed Production Technologies
PDF
Make your research visible and create more impact using DataCite DOIs
PDF
Induction of early flowering in cassava through light supplementation and CM...
PDF
Producing yam mother plants to collect vines for propagation
PDF
Effects of moult and breeding on the body condition of some forest birds in s...
PDF
Conserving Nigeria’s rarest endemic bird: Ibadan Malimbe, Malimbusibadanensis
PDF
Cassava brown streak epidemiology in Eastern Democratic Republic of the Congo
PDF
Assessment of genetic diversity among Rwandan cassava (Manihot esculenta) ger...
PDF
9 osunbade identification of end users preferences of a cassava product
PDF
7 helen ufondu perception of yam landraces quality among value chain actors i...
PDF
8 kazeem quality attributes and consumer acceptability of cookies flavoured
PDF
6 anajekwu ekpereka chemical, functional and pasting properties of flours pro...
PDF
5 seun olowote effect of drying method on caroteniod content of yellow maize
PDF
4 ayodele adenitan survey of dried plantain (musa paradisiaca) chips processo...
PDF
2 akin olagunju does crop diversification influenc e food and nutrition secur...
PDF
3 akinsola carotenoid apparent retention in ogi flour made from different pro...
PDF
1 pearl amadi assessing the level of consumption of pro vitamin a cassava pr...
PDF
Plantain (Musa, Abb) Pests And Disease Management
Plantain/Banana Seed Production Technologies
Make your research visible and create more impact using DataCite DOIs
Induction of early flowering in cassava through light supplementation and CM...
Producing yam mother plants to collect vines for propagation
Effects of moult and breeding on the body condition of some forest birds in s...
Conserving Nigeria’s rarest endemic bird: Ibadan Malimbe, Malimbusibadanensis
Cassava brown streak epidemiology in Eastern Democratic Republic of the Congo
Assessment of genetic diversity among Rwandan cassava (Manihot esculenta) ger...
9 osunbade identification of end users preferences of a cassava product
7 helen ufondu perception of yam landraces quality among value chain actors i...
8 kazeem quality attributes and consumer acceptability of cookies flavoured
6 anajekwu ekpereka chemical, functional and pasting properties of flours pro...
5 seun olowote effect of drying method on caroteniod content of yellow maize
4 ayodele adenitan survey of dried plantain (musa paradisiaca) chips processo...
2 akin olagunju does crop diversification influenc e food and nutrition secur...
3 akinsola carotenoid apparent retention in ogi flour made from different pro...
1 pearl amadi assessing the level of consumption of pro vitamin a cassava pr...
Ad

Recently uploaded (20)

PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
Charisse Litchman: A Maverick Making Neurological Care More Accessible
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PPTX
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
PPTX
Business Ethics - An introduction and its overview.pptx
PPTX
Sales & Distribution Management , LOGISTICS, Distribution, Sales Managers
PPTX
Probability Distribution, binomial distribution, poisson distribution
PDF
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
PDF
SBI Securities Weekly Wrap 08-08-2025_250808_205045.pdf
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PDF
How to Get Funding for Your Trucking Business
PDF
NEW - FEES STRUCTURES (01-july-2024).pdf
PPT
Chapter four Project-Preparation material
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
Charisse Litchman: A Maverick Making Neurological Care More Accessible
ICG2025_ICG 6th steering committee 30-8-24.pptx
2025 Product Deck V1.0.pptxCATALOGTCLCIA
Digital Marketing & E-commerce Certificate Glossary.pdf.................
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
Business Ethics - An introduction and its overview.pptx
Sales & Distribution Management , LOGISTICS, Distribution, Sales Managers
Probability Distribution, binomial distribution, poisson distribution
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
SBI Securities Weekly Wrap 08-08-2025_250808_205045.pdf
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
340036916-American-Literature-Literary-Period-Overview.ppt
Power and position in leadershipDOC-20250808-WA0011..pdf
How to Get Funding for Your Trucking Business
NEW - FEES STRUCTURES (01-july-2024).pdf
Chapter four Project-Preparation material

Project design and management contributions to improve IITA’s Research for Development program

  • 1. Project design and management contributions to improve IITA’s Research for Development program Braima James Candidate Deputy Director Project development and management IITA International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 2. Outline  The job  R4D environment  Project planning - Overview - Specify problem Planning aims to coordinate decisions - Agreeing objectives in an attempt to influence, direct and - Analyze options control the future in order to achieve - Plan of operations certain predetermined objectives  If IITA were a donor… - Bank of CNs - Control management - MIS  Conclusions International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 3. 1. The job 7 key responsibility areas 26yrs post-PhD experience Lead responses to funding opportunities Managed 10 projects of US9m, 38% of which I led in proposal development Facilitate project proposals development 25 projects: 11 successful, 9 pending, 6 unfunded or refused Strengthen use of appropriate design for UNDP-ESCaPP; IFAD/CGM; CG-NGOIPM; SDC proposal development cowpea & vegs; FAO cassava & Striga; ADA vegs; NRC vegs; BI-WAFRINET; SPIPM Develop/conduct training programs to Project planning/management, UK; IPM tools, strengthen project management at IITA Australia; Corporate governance, FARA Facilitate development of strategic IITA-Benin; HVP; PRSP-SL; initiatives with initiatives/internal proposals CFC, UEMOA, UNIDO;3 partnership wshps pa; Facilitate partnerships for smooth Inclusive partnerships through projects implementation of projects development and coordination Collaborate with CGO & DDG-RS: recruit MoU with host-countries, CIRAD, NRC-Norway staff; establish sites; monitor progress International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 4. 2. R4D environment: MTP projects MTP legacies on SC priorities CLS HVP AH RTS BPS AB OT Gene conservation & use  Increased knowledge/tech       Improved/stabilized profitability     High food & nutritional quality     Efficient labour-use   Self reliant NARS/capacity dev  Markets/informed enterprises   Policy advice/ext environment  Suggestion - Consider placing some the 3 thematic projects within commodity MTP projects International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 5. R4D environment: many special projects, one mission Suggestions - Coordinate results generation into common impact to achieve IITA mission International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 6. 3. Project planning: Overview SPECIFY Formulate strategy PROBLEM Implement strategy - Leadership - Long-term - Decision-making - Anticipate changes - Communications - Proactive/ideas/vision MONITOR ANALYSE PROGRESS PLANNING CYCLE OPTIONS - Work culture Short-term - Resources - Reactive/tactical - Authority levels - Reverse losses CONTROL Strategy: STANDARDS Implementation: Establish key targets in Forecast & correct changes social, political, in target environment and technology & economic justify ones position and environment & show proposals to deliver the means to fulfil them desired change International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 7. Specify problem/a good problem statement  Situation - What situation needs change? Allocate $ to BC or experiential learning or both? - Who/what/region is affected? - Magnitude of the problem?  Causes (not symptoms) - Why does problem exists? - Single or multiple causes? Functional Leaf loss in S. macrocarpon: group Mite population density per leaf - Are causes interdependent? On-station On-farm  Consequences 8.6 5.5 159.8 52.9 - Population size affected? Pest mite Predators 8.3 1.5 1.6 0.6 - Political, cultural, economic? Suggestions - Intensive problem analyses is pivotal to resource mobilization/allocation - Learn PSW tools: Surveys; historical profiles; consultations, pinboarding International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 8. Agreeing objectives/the desired future  SMART Objectives - State what will/should happen DD-Projects: Authority environment - Specify project expectations - Clarify how to influence future Negotiated  Agree, not set, objectives - More motivated implementers Existing - Maximise chances of achievement - Inputs of diverse expertise - Realistic plans/complement capacity Imposed - Confident decision-making: managers Suggestions - Invest in professionally facilitated project planning workshops - Greater involvement of potential partners in a timely manner International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 9. Agreeing objectives: MTP project strategy Diverse expertise: IITA, AVRDC, ARC, ICIPE, NARS Benin, Ghana, Nigeria, Togo Suggestion - Harmonize strategic planning approaches across MTP projects - Specify research/thrusts (= central pillars/strategic objectives. HVP now has 4 research thrusts: a) Productivity growth; b) Market efficiency & enterprise; c) Nutritional quality & product diversity; d) Policies & institutional arrangements - Position component projects within strategic objectives per MTP projects International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 10. Agreeing objectives: Template to position projects Equivalent objectives to propose Hierarchy of Description Strategic plan Component projects expectations Goal - Greater why Mission Problem statement in - Summarise rationale executive summary Purpose - Change/impact needed Vision/research thrusts Basis of goal statement - Motivation for outputs Output - Specific deliverables Strategic objective/RT Basis of purpose - ToR for projects Activities - How/action Responses/RT Basis of outputs Output - What? Qty/quality N/A Output targets target - Location, time Activities - How/action N/A Activities & resources Suggestions - Hands on training/common understanding of hierarchy of objectives - Incorporate AU projected 6% annual productivity gain into planning process International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 11. Analyse options: Feasibility of tasks  Decision Tree Analysis - Conceptual map of potential decisions/outcomes on activities to produce OTs Start task: step 1 Step 1 succeeds Step 2 succeeds Continue Step 1 fails Step 2 fails 1 = Decide  = Continue or exit/hand over = Abandon task Suggestions - Test consequences of tasks prior to implementation - Review/merge or develop alternative tasks based on possible consequences - Visualize contingences, exit/handover of tasks (link to stakeholder analysis) International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 12. Analyse options: Relative feasibility of output targets Force Field Analysis, e.g. IITA biopesticides 10 Learning Specificity Durability Demand Average 5 Production Expertise +ve forces 0 -ve forces Application -5 Average 2nd/other Toxicology -10 pests Markets Registration Recruitment Suggestions - Assess/compare practicality of solutions (fertilisers, GMOs, biopesticides etc) - Identify clear action points/inventory driving & restraining factors on OTs - Minimize risks, amend/improve chances of success International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 13. Analyse options: Skills profiling  Confident HR decision making - Identify skills required to deliver OT - Analyse internal skills/within the group - Negotiate synergies/linkages & cross functions - Inventory of external skills - Identify potential consultancy areas Suggestions - Stakeholder analysis helps place objectives within IITA control - MTP projects may require pillar champions/coordinators International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 14. Plan of operations/writing By this stage information is available to prepare a winning project proposal - A strategy framework approved by RDC - CNs approved by RDC to operationize the strategy - Proposal writing includes PoP to indicate time, staff & $ resource allocation Output 1: Collective action on MTP projects documented and lessons shared Output target Activity 2007 timeframe Performance Responsible $ indicator J F M A M J J A S O N D MTP action Identify & prioritize RDC report DD-R & 000 initiatives emerging new themes on decisions Coordinator published on web Organize internal M&E/CCER DDG-R & 000 review report Coordinator Facilitate strategic MTP strategy Consultant & 000 planning workshop document DD-R, DD-Proj Recruit project Strategy DDG-R, CGO, 000 leadership operational HR Convene symposium. 15 papers DD-R; 000 Coordinator International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 15. 4. If IITA were a donor: Bank of CNs By end year 1 Benefits  Problem specification  Coalition of interests in CNs - Criteria to prioritize problem areas - Transparent decision making on CNs - Justify technical, social, economic & - Ensure objectives are under IITA environmental viability of CNs control  Which projects?  Advocacy on donor policies - SWOT CNs for robustness - Proactive donor intelligence - Intranet-publicize database of CNs - Info support for investment - Specify CNs which IITA would invest - Timely response to funding calls in if it were a donor agency - Basis of R4D $ mobilization/allocation International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 16. Control management: a control system  A good plan is achieved only if it is subjected to good system of control - Output targets = control standards - Monitor progress towards standards - Compare results with standards - Adjust objectives/flexibility Suggestions - Agree financial resource management tools with CGO, CFO and DD-R International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 17. Design a management information systems Category Type of info required Source of the info Use of the info Deliverables - What has been done? - Activity records - Plan future/year’s work - Not done but planned? - Supervision reports - Identify successes - Problems encountered? - Periodic reports - Identify strengths - How problems solved? - Staff reviews - Identify weaknesses - Change in ext situation? - Clients - Plan to overcome them - How staff work as team? - Surveys - Review and evaluation Suggestions - Agree on categories of info and other MIS elements - Agree on type of MIS required: formal, informal, extensive or limited - Keep MIS simple, efficient and useful (advisory; not a spy in the cab!) - Train/supervise project team in use of MIS International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 18. 5. Conclusion: I am suitable  IITA research results are the only tools we have to impact on national (e.g., PRSP), regional (e.g. with SROs) and continental (e.g. CAADP) agricultural development plans  I have summarized project planning & management tools & processes as I know and apply in my work, and suggest each of us IRS learns such tools for planning to improve effectiveness and usefulness of our research results  I have also suggested action areas to guide R4D decisions on projects & increase IRS understanding & collective ownership of those decisions  I have drawn on 26yrs post-PhD experiences in education, partnership building, project development, implementation/management & informal discussions with colleagues to arrive at the summary I have provided  I believe I have clearly demonstrated that I am suitable for the advertised position of DD-Project planning and management at IITA International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org
  • 19. Thank you I look forward to working with you, various authority levels, SROs/NARS so that together we help improve IITA’s R4D impact in the fight against declining livelihoods in SSA International Institute of Tropical Agriculture – Institut international d’agriculture tropicale – www.iita.org