SlideShare a Scribd company logo
MANPREET SINGH
E-Mail: SPRUCE33.KALSI@GMAIL.COM & MSKALSI@LNTECC.COM
Mobile No: (+91) 8054083026
OBJECTIVE:
I am seeking a responsible position in company where I can Utilizing my skills and experience to advance my Knowledge
so that I keep on working for growth of self & company.
EDUCATION:
• Mehr Chand Polytechnic Collage, Jalandhar (PUNJAB)
Diploma in Mechanical Engineering with 74.5% -With Honour (from 2004-2007).
• Educational Institute Of Management And Engineering Studies (Approved By Govt. of Delhi)
B.E. in Mechanical Engineering (Trough distance learning) with ‘B’ Grade (from 2009-2011).
RELEVENT CERTICATIONS:
• Larsen & Toubro Ltd. (LNT- CONSTRUCTION)
Certificate in Internal Auditor (ISO9001:2008)
Certificate in SDP (Supervisory Development Programme)
PRESENT EMPLOYER:
• Presently working on OFFICER GRADE of CONSTRUCTION PROJECT PLANNING ENGINEER in LARSEN & TOUBRO
LIMITED since 02nd
July’ 2007.
KEY SKILLS SUMMARY:
• Primvera V6, SCHEDULING & CONTROLLING USING MSPROJECT2010AutoCAD2013, L2 L3 LEVEL PROJECT
PLANNING, GANTT CHART/ BAR, SCHEDULING, PROJECT ESTIMATION-BOQ CALCULATION, RATE ANALYSIS FOR
EXTRA ITEMS, CEMENT PLANT PROJECT ENGINEERING, QUANTITY SURVEY, BBS (BAR BENDING SCHEDULING),
FABRICATION & ERECTION OF STEEL STRUCTURES & STEEL VESSELS USING GA/ DETAIL DRAWINGS,
DETAILING/DEVELOPMENT OF SHOP DRAWINGS USING AUTOCAD2013, EQUIPMENT INSTALLATION, SUB-
CONTRACTOR BILLING USING ERP SYSTEM, PROGRESSIVE CLIENT BILLING USING MS OFFICE2010, FACADE JOB-
SHEETING & CLADDING OF BUILDINGS, UTILITY PIPING ENGINEERING
JOB RESPONSIBILITY:
In Larsen & Toubro Ltd. (CONSTRUCTION) My Job responsibilities being PROJECT PLANNING ENGINEER are:-
Expediting Fabrication-Erection and Equipment Installation Work for Cement Plant Projects/PEB
Projects/Wagon Industry Projects i.e. Fabrication & Erection of Cyclones, Stacks, Ducts, Chutes, Risers, Feed Pipes,
Hoppers, Built-up sections and Steel Structures incl. Metal Roof sheeting and Cladding fixing.
Equipment Erection for Crusher, Wobbler feeder, Apron feeder, Bag Filters, EOT Cranes, Stacker, Reclaimer, Belt
Conveyors, VRM, Ball Mill, Roller Press, Bag house, Bucket Elevators, DPC, KILN, Cooler, ESP (Electrostatic Precipitator),
Packers, Air slides, Screw Conveyors and Dedusting Pipe Lines.
• Following Activities carried out by me being Project Planning Engineer to expedite same:-
 Working out for HIRA (Hazard Identification and Risk Assessment) for Activities involved in Fabrication
and Erection, Setting up working environment in line with EHS.
 Preparing WORK METHOD STATEMENTS, explaining to sub-contractors after getting it approved form
authorized personnel.
 Preparing ERECTION SCHEMATIC DRAWINGS for erection of Mills, Kiln, Silos Roof Structures etc. using
AutoCAD2013 and Load charts of concerned Cranes.
 Preparing L3 - GANTT CHART Schedule using MSP2010 and monitoring accomplishment of construction
CV- CONSTRUCTION PROJECT ENGINEER PAGE 1
activities.
 Preparing MANPOWER DEPLOYEMENT SCHEDULE and then Sub-Contractors delegation to work
according to need to project.
 Preparing EQUIPMENT DEPLOYEMENT SCHEDULE.
 Calculation of Steel and other material being required f4or Project and Raising PROCUREMENT ORDERS on
time to sustain hassle free fabrication activities.
 DEVELOPMENT OF PLATE WORK DRAWINGS & DETAILING OF STEEL STRUCTURE DRAWINGS using
AUTOCAD2013 (2D) to minimize expenditure of LMP in time taking layouts.
 Timely SUB-CONTRACTOR BILLING after Analysis of item rates to generate suitable Item Codes with
competitive rate to issue Work Orders to SC. Processing of sub-contractor bills on EIP CeMa SC billing software.
 Implementation of QMS through daily checklists formats to improve Supervision of construction activities for
enhancing their quality and minimizing idle movements of LMP (labour, material and Plant machinery) to give out
work at scheduled date.
 Monitoring DPR from Site and compiling same with resources to check productivity of TNP and MAN HOURS.
 Synchronization with Client’s requirement for Project and hitching L3 Schedule with Front Availability.
• Preparing ACE (Actual Cost Estimated) of project in beginning of commencement of Project.
• Preparing JCR (Job Cost Report) after gathering details of S3 (Cost of Plant machinery), S4 (Cost of staff), S5
(Cost of labour/SC), Admin & Store expenditure, RSV (Revised Sales Value), ETC (Estimated to complete) and S2
(Specialized Agency Cost) incl. liabilities ‘on monthly basis.
• Preparing MRM (Monthly Reconciliation of Material) to control Steel and Sheeting Wastage.
• PROGRESSIVE CLIENT BILLING – Preparing BOQ for Fabrication work, Piping work, Sheeting Work, Painting
Work, Equipment Erection Work getting it certify from client.
• Working out to Maintain Client Sales Cost v/s Sub-Contractor Cost positive.
SKILLS:
• Five years of experience in Planning Engineering.
• Steel Quantity Survey for Steel structure and Steel Vessels.
• Progressive Client Billing.
• Worked for Quality Inspection for
• Proficient in AUTO CAD2014 (2D).
• Proficient in Structure Detailing and Cyclone/Vessels Detailing.
• Proficient in MS PROJECT2010.
• Proficient in MS Office (Window 2010) (Includes MS Word, Excel, Power Point, Picture Manager, Microsoft Outlook
etc.), Adobe Photo shop.
• Experienced in Equipment installation in Cement Projects and Fabrication Erection work of Cement Projects.
• Adequate Knowledge of processes in Cement Plants from Blasting Area to Wagon Loading.
• Gathered Experience in Three Category of Projects i.e. Cement Plant Projects, Wagon Industry Project & PEB
Projects.
WORK EXPERIENCE:
8. FROM MARCH’2016 TO TILL DATE- Presently, I am working at ‘PROPOSED INTEGRATED CONSUMER GOODS
CV- CONSTRUCTION PROJECT ENGINEER PAGE 2
MANUFACTURING AND LOGISTICS FACILITY FOR ITC, Kapurthala, (PUNJAB, India).
7. FROM APRIL’2014 TO FEBRUARY’2016- I had worked at ‘WONDER CEMENT PROJECT LINE-II’ a Project of RK
Group, Nimbahera (Rajasthan, India).
6. FROM JANUARY’2014 TO APRIL’2014- I had worked at ‘ADITIYA LINE-III’ a Project of UTCL CEMENTS,
Shambupurra, Chittorgarh (Rajasthan, India).
5. FROM JULY’2012 TO JANUARY’2014- I had worked at ‘WONDER CEMENT PROJECT LINE-I’ a Project of RK
Group, Nimbahera (Rajasthan, India).
4. FROM AUGUST’2011 TO JULY’2012- I had worked at ‘CIP-5 LAUNDRY TOWER PROJECT’ a project of Procter &
Gamble (P&G), Mandideep (Madhya Pradesh, India).
3. FROM NOVEMBER’2008 TO AUGUST’2011- I had worked at ‘MAHI CEMENT PLANT PROJECT’ a project of
India Cement Ltd, Banswara (Rajasthan).
2. FROM JANUARY’2008 TO NOVEMBER’2008- I had worked at ‘KB & CASTING PROJECT’ a project of Maruti
Suzuki India Ltd, Gurgaon (Haryana).
1. FROM JULY’2007 TO JANUARY’2008- I had worked at ‘EXPANSION PROJECT’ a project of Honda Seil Cars India
Limited, Greater Noida (U.P.)
HONORS AND AWARDS:
• For year of 2015 awarded as Top Performer
• For year of 2014 awarded as Top Performer
• For year of 2013 awarded as Out Standing Performer
• For year of 2012 awarded as Out Standing Performer
• For year of 2011 awarded as Out Standing Performer
• For year of 2010 awarded as Top Performer
• Stood 7th
Position in State Topper List of Mechanical Engineers For Batch (2004-2007)
PERSONAL PROFILE AND ADDRESS:
FATHER’S NAME : S. Tarlochon Singh
MOTHER’S NAME : Smt. Ravinder Kaur
DATE OF BIRTH : 4TH
December, 1987
MARTIAL STATUS : Married
PASSPORT : H1198876
LANGUAGES KNOWN : Punjabi, English and Hindi
NATIONALITY : Indian
RELIGION : Sikh
PRESENT LOCATION : R.K. Colony, Nimbahera, Rajasthan (India)
PERMANENT LOCATION : H.No:- 13792, ST. No: 2ª, Pharbat Nagar, Dholewal, Ludhiana-141003 (Punjab, India)
CTC : 12.9Lakh/ Annum + Medical + House Hold Furniture Provided
EXPECTED CTC :
I hereby declare that the information given above is true to the best of my knowledge.
DATE : 30- MARCH -2016 MANPREET SINGH
CV- CONSTRUCTION PROJECT ENGINEER PAGE 3

More Related Content

PDF
Civil Engineer & Inspector
PDF
MUHAMMAD JAVED
DOC
MUHAMMAD BILAL CV For Surveyor
PDF
CIVIL SUPERVISOR-CV-abdul shukoor
DOCX
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
DOC
C v surveyor( Mumtaz )
PDF
HVAC DRAFTSMAN CV
DOC
Land Surveyor Updated CV
Civil Engineer & Inspector
MUHAMMAD JAVED
MUHAMMAD BILAL CV For Surveyor
CIVIL SUPERVISOR-CV-abdul shukoor
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
C v surveyor( Mumtaz )
HVAC DRAFTSMAN CV
Land Surveyor Updated CV

What's hot (19)

DOC
Nawab civil supervisor cv
DOC
(Highway Engineer) Raj singh
DOC
Civil engineer
PDF
Mechanical engineer cv
DOCX
PABITRA HVAC DRAFTSMAN
PDF
CV-Civil engineer (Highway Engineer)
DOCX
MOHAMED CV - Civil Engineer
PDF
NIAZ ALI KHAN CV UPDATE
DOC
civil engineer Cv
PDF
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
DOC
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
DOC
CV Shahzad Ahmed
DOCX
CV Site Engineer Civil
PDF
Curriculum vitae contractor civil engineer -
DOCX
Cv of civil structural design engineer
PDF
CV - Mechanical Engineer
DOCX
BhavyaRaj CV
DOC
Sohail Afzaal CV for Site Engineer
Nawab civil supervisor cv
(Highway Engineer) Raj singh
Civil engineer
Mechanical engineer cv
PABITRA HVAC DRAFTSMAN
CV-Civil engineer (Highway Engineer)
MOHAMED CV - Civil Engineer
NIAZ ALI KHAN CV UPDATE
civil engineer Cv
CV ENGGALAYDH FAARAX AXMED CIVIL ENGINEERING
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV Shahzad Ahmed
CV Site Engineer Civil
Curriculum vitae contractor civil engineer -
Cv of civil structural design engineer
CV - Mechanical Engineer
BhavyaRaj CV
Sohail Afzaal CV for Site Engineer
Ad

Viewers also liked (20)

PDF
Arquitectura de las computadoras
PDF
Tratamento acústico para estúdios
PDF
Runwal My City Brochure
PDF
CV-UTP rev 08-8-2016
PDF
10 Tipps für erfolgreiche PR-Videos
PDF
Πλατάρος Γιάννης.Εκπαιδευτικές-εργασίες-και-αρθρογραφία. Τόμπς Γ΄ (208 σελίδες)
PDF
AIXÍ ÉS LA MEVA ESCOLA!
PDF
2015 05 heimdall-joint-brochure-v03
PPT
Christmas Crackers
PPT
The help kathryn stockett
PPTX
blanca lo hizo este trabajo ta wuenoooo ahaaaa
PPTX
New Media Driver's License Final Presentation
PDF
被災時に役立つIt活用セミナー
PPTX
Expanded bed chromatography
DOCX
Reportaje
PDF
Caixas acusticas
PPT
Impact of pandemic influenza
PPT
Sant Just-Roser
PDF
01 history of anaesthesia
PPTX
History of Anaesthesia - Dr Tanjim Reza
Arquitectura de las computadoras
Tratamento acústico para estúdios
Runwal My City Brochure
CV-UTP rev 08-8-2016
10 Tipps für erfolgreiche PR-Videos
Πλατάρος Γιάννης.Εκπαιδευτικές-εργασίες-και-αρθρογραφία. Τόμπς Γ΄ (208 σελίδες)
AIXÍ ÉS LA MEVA ESCOLA!
2015 05 heimdall-joint-brochure-v03
Christmas Crackers
The help kathryn stockett
blanca lo hizo este trabajo ta wuenoooo ahaaaa
New Media Driver's License Final Presentation
被災時に役立つIt活用セミナー
Expanded bed chromatography
Reportaje
Caixas acusticas
Impact of pandemic influenza
Sant Just-Roser
01 history of anaesthesia
History of Anaesthesia - Dr Tanjim Reza
Ad

Similar to PROJECT ENGINEER - MANPREET SINGH (20)

PDF
CV-SHAJEER(23-02-2015).PDF
PDF
Amol Sawant (Piping Engineer with 10 years experience) docx
PDF
Arun_Resume
DOC
Krishna Updated Resume
DOC
Rahul ghosh(1)
PDF
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
DOC
Anas Khalifa's CV_JAN.-2017
DOC
Anas Khalifa's CV_JAN.-2017
DOC
Cv amit
DOC
Cv amit
DOC
Rana Pal_Resume
DOC
MonaliCV
DOC
Rahul Ghosh-Mechanical Designer
DOC
Rahul_Ghosh
DOCX
MHS Engineer CV
DOC
K. Srinivas Rao- CV - QS
DOC
csk2016
DOCX
Mudasar Resume-
DOCX
cv@sanjaychaubey REV
CV-SHAJEER(23-02-2015).PDF
Amol Sawant (Piping Engineer with 10 years experience) docx
Arun_Resume
Krishna Updated Resume
Rahul ghosh(1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
Cv amit
Cv amit
Rana Pal_Resume
MonaliCV
Rahul Ghosh-Mechanical Designer
Rahul_Ghosh
MHS Engineer CV
K. Srinivas Rao- CV - QS
csk2016
Mudasar Resume-
cv@sanjaychaubey REV

PROJECT ENGINEER - MANPREET SINGH

  • 1. MANPREET SINGH E-Mail: SPRUCE33.KALSI@GMAIL.COM & MSKALSI@LNTECC.COM Mobile No: (+91) 8054083026 OBJECTIVE: I am seeking a responsible position in company where I can Utilizing my skills and experience to advance my Knowledge so that I keep on working for growth of self & company. EDUCATION: • Mehr Chand Polytechnic Collage, Jalandhar (PUNJAB) Diploma in Mechanical Engineering with 74.5% -With Honour (from 2004-2007). • Educational Institute Of Management And Engineering Studies (Approved By Govt. of Delhi) B.E. in Mechanical Engineering (Trough distance learning) with ‘B’ Grade (from 2009-2011). RELEVENT CERTICATIONS: • Larsen & Toubro Ltd. (LNT- CONSTRUCTION) Certificate in Internal Auditor (ISO9001:2008) Certificate in SDP (Supervisory Development Programme) PRESENT EMPLOYER: • Presently working on OFFICER GRADE of CONSTRUCTION PROJECT PLANNING ENGINEER in LARSEN & TOUBRO LIMITED since 02nd July’ 2007. KEY SKILLS SUMMARY: • Primvera V6, SCHEDULING & CONTROLLING USING MSPROJECT2010AutoCAD2013, L2 L3 LEVEL PROJECT PLANNING, GANTT CHART/ BAR, SCHEDULING, PROJECT ESTIMATION-BOQ CALCULATION, RATE ANALYSIS FOR EXTRA ITEMS, CEMENT PLANT PROJECT ENGINEERING, QUANTITY SURVEY, BBS (BAR BENDING SCHEDULING), FABRICATION & ERECTION OF STEEL STRUCTURES & STEEL VESSELS USING GA/ DETAIL DRAWINGS, DETAILING/DEVELOPMENT OF SHOP DRAWINGS USING AUTOCAD2013, EQUIPMENT INSTALLATION, SUB- CONTRACTOR BILLING USING ERP SYSTEM, PROGRESSIVE CLIENT BILLING USING MS OFFICE2010, FACADE JOB- SHEETING & CLADDING OF BUILDINGS, UTILITY PIPING ENGINEERING JOB RESPONSIBILITY: In Larsen & Toubro Ltd. (CONSTRUCTION) My Job responsibilities being PROJECT PLANNING ENGINEER are:- Expediting Fabrication-Erection and Equipment Installation Work for Cement Plant Projects/PEB Projects/Wagon Industry Projects i.e. Fabrication & Erection of Cyclones, Stacks, Ducts, Chutes, Risers, Feed Pipes, Hoppers, Built-up sections and Steel Structures incl. Metal Roof sheeting and Cladding fixing. Equipment Erection for Crusher, Wobbler feeder, Apron feeder, Bag Filters, EOT Cranes, Stacker, Reclaimer, Belt Conveyors, VRM, Ball Mill, Roller Press, Bag house, Bucket Elevators, DPC, KILN, Cooler, ESP (Electrostatic Precipitator), Packers, Air slides, Screw Conveyors and Dedusting Pipe Lines. • Following Activities carried out by me being Project Planning Engineer to expedite same:-  Working out for HIRA (Hazard Identification and Risk Assessment) for Activities involved in Fabrication and Erection, Setting up working environment in line with EHS.  Preparing WORK METHOD STATEMENTS, explaining to sub-contractors after getting it approved form authorized personnel.  Preparing ERECTION SCHEMATIC DRAWINGS for erection of Mills, Kiln, Silos Roof Structures etc. using AutoCAD2013 and Load charts of concerned Cranes.  Preparing L3 - GANTT CHART Schedule using MSP2010 and monitoring accomplishment of construction CV- CONSTRUCTION PROJECT ENGINEER PAGE 1
  • 2. activities.  Preparing MANPOWER DEPLOYEMENT SCHEDULE and then Sub-Contractors delegation to work according to need to project.  Preparing EQUIPMENT DEPLOYEMENT SCHEDULE.  Calculation of Steel and other material being required f4or Project and Raising PROCUREMENT ORDERS on time to sustain hassle free fabrication activities.  DEVELOPMENT OF PLATE WORK DRAWINGS & DETAILING OF STEEL STRUCTURE DRAWINGS using AUTOCAD2013 (2D) to minimize expenditure of LMP in time taking layouts.  Timely SUB-CONTRACTOR BILLING after Analysis of item rates to generate suitable Item Codes with competitive rate to issue Work Orders to SC. Processing of sub-contractor bills on EIP CeMa SC billing software.  Implementation of QMS through daily checklists formats to improve Supervision of construction activities for enhancing their quality and minimizing idle movements of LMP (labour, material and Plant machinery) to give out work at scheduled date.  Monitoring DPR from Site and compiling same with resources to check productivity of TNP and MAN HOURS.  Synchronization with Client’s requirement for Project and hitching L3 Schedule with Front Availability. • Preparing ACE (Actual Cost Estimated) of project in beginning of commencement of Project. • Preparing JCR (Job Cost Report) after gathering details of S3 (Cost of Plant machinery), S4 (Cost of staff), S5 (Cost of labour/SC), Admin & Store expenditure, RSV (Revised Sales Value), ETC (Estimated to complete) and S2 (Specialized Agency Cost) incl. liabilities ‘on monthly basis. • Preparing MRM (Monthly Reconciliation of Material) to control Steel and Sheeting Wastage. • PROGRESSIVE CLIENT BILLING – Preparing BOQ for Fabrication work, Piping work, Sheeting Work, Painting Work, Equipment Erection Work getting it certify from client. • Working out to Maintain Client Sales Cost v/s Sub-Contractor Cost positive. SKILLS: • Five years of experience in Planning Engineering. • Steel Quantity Survey for Steel structure and Steel Vessels. • Progressive Client Billing. • Worked for Quality Inspection for • Proficient in AUTO CAD2014 (2D). • Proficient in Structure Detailing and Cyclone/Vessels Detailing. • Proficient in MS PROJECT2010. • Proficient in MS Office (Window 2010) (Includes MS Word, Excel, Power Point, Picture Manager, Microsoft Outlook etc.), Adobe Photo shop. • Experienced in Equipment installation in Cement Projects and Fabrication Erection work of Cement Projects. • Adequate Knowledge of processes in Cement Plants from Blasting Area to Wagon Loading. • Gathered Experience in Three Category of Projects i.e. Cement Plant Projects, Wagon Industry Project & PEB Projects. WORK EXPERIENCE: 8. FROM MARCH’2016 TO TILL DATE- Presently, I am working at ‘PROPOSED INTEGRATED CONSUMER GOODS CV- CONSTRUCTION PROJECT ENGINEER PAGE 2
  • 3. MANUFACTURING AND LOGISTICS FACILITY FOR ITC, Kapurthala, (PUNJAB, India). 7. FROM APRIL’2014 TO FEBRUARY’2016- I had worked at ‘WONDER CEMENT PROJECT LINE-II’ a Project of RK Group, Nimbahera (Rajasthan, India). 6. FROM JANUARY’2014 TO APRIL’2014- I had worked at ‘ADITIYA LINE-III’ a Project of UTCL CEMENTS, Shambupurra, Chittorgarh (Rajasthan, India). 5. FROM JULY’2012 TO JANUARY’2014- I had worked at ‘WONDER CEMENT PROJECT LINE-I’ a Project of RK Group, Nimbahera (Rajasthan, India). 4. FROM AUGUST’2011 TO JULY’2012- I had worked at ‘CIP-5 LAUNDRY TOWER PROJECT’ a project of Procter & Gamble (P&G), Mandideep (Madhya Pradesh, India). 3. FROM NOVEMBER’2008 TO AUGUST’2011- I had worked at ‘MAHI CEMENT PLANT PROJECT’ a project of India Cement Ltd, Banswara (Rajasthan). 2. FROM JANUARY’2008 TO NOVEMBER’2008- I had worked at ‘KB & CASTING PROJECT’ a project of Maruti Suzuki India Ltd, Gurgaon (Haryana). 1. FROM JULY’2007 TO JANUARY’2008- I had worked at ‘EXPANSION PROJECT’ a project of Honda Seil Cars India Limited, Greater Noida (U.P.) HONORS AND AWARDS: • For year of 2015 awarded as Top Performer • For year of 2014 awarded as Top Performer • For year of 2013 awarded as Out Standing Performer • For year of 2012 awarded as Out Standing Performer • For year of 2011 awarded as Out Standing Performer • For year of 2010 awarded as Top Performer • Stood 7th Position in State Topper List of Mechanical Engineers For Batch (2004-2007) PERSONAL PROFILE AND ADDRESS: FATHER’S NAME : S. Tarlochon Singh MOTHER’S NAME : Smt. Ravinder Kaur DATE OF BIRTH : 4TH December, 1987 MARTIAL STATUS : Married PASSPORT : H1198876 LANGUAGES KNOWN : Punjabi, English and Hindi NATIONALITY : Indian RELIGION : Sikh PRESENT LOCATION : R.K. Colony, Nimbahera, Rajasthan (India) PERMANENT LOCATION : H.No:- 13792, ST. No: 2ª, Pharbat Nagar, Dholewal, Ludhiana-141003 (Punjab, India) CTC : 12.9Lakh/ Annum + Medical + House Hold Furniture Provided EXPECTED CTC : I hereby declare that the information given above is true to the best of my knowledge. DATE : 30- MARCH -2016 MANPREET SINGH CV- CONSTRUCTION PROJECT ENGINEER PAGE 3