PROJECT
MANAGEMENT
LECTURE 01 : INTRODUCTION TO PROJECT MANAGEMENT
Mihiransie Elvitigala
BSc. (Hons) in Quantity Surveying
MSc. in Management (Reading)
Lecturer – Dept. of QS
FBESS - KDU
What is Project Management?
 Project management is the application of methods, processes, skills,
experience, and knowledge to complete projects in accordance with the
project acceptance criteria and within the agreed parameters.
 It involves the application of knowledge, skills, experience, tools, methods
and resources in the project.
Differentiating Project Management
from Management
Project Management
Contains deliverables that are
constrained to a defined budget
and time scale.
 Final Deliverable
 Finite Timespan
 Defined Budget
Management
An ongoing/continuous processes
or functions of the organization.
Strategic planning
Establishment of objectives
Arrangement and optimum
allocation of resources
Controlling the activities
Measurement of the results
PROJECT MANAGEMENT intro - Lecture 01.pptx
PROJECT MANAGEMENT intro - Lecture 01.pptx
Definition of a Project
 A project is a series of related tasks which when they are carried out in the
correct order will lead to the completion of the project.
 It is a temporary endeavor undertaken with an aim of creating a distinctive
output which can be a product, service or outcome.
 It has a specified beginning and finish time.
 A project has an acceptance criteria, plus agreed specifications.
Nature of a Project
1. A clear start and an end date –
There are projects that last several years but a project cannot
go on forever. It needs to have a clear beginning, a definite end,
and an overview of what happens in between.
2. A project creates something new –
Every project is unique, producing something that did not
previously exist. A project is a one-time, once-off activity, never
to be repeated exactly the same way again.
Characteristics of a Project
3. A project is not Business as usual –
Projects are often confused with processes. A Process is a
series of routine, predefined steps to perform a particular
function, eg: expense reimbursement approvals.
4. A project has boundaries –
A project operates within certain constraints of time, budget,
quality, and functionality.
Attributes of a Project
Project Goal – Achieving Client’s requirements
Project Process and Deliverable – It is a process aimed at achieving
specified objectives
Finite – A project is a temporary process with a finite duration.
Complex – Interlinked tasks, resources, disciplines, organizations.
Project Lifecycle – Has a distinctive and unique life cycle that passes through
several distinct phases
Resources – Material, Human (Labor), Equipment etc.
Risk – For a unique outcome which never existed has some uncertainty.
Project Constraints
Cost: The financial constraints of
a project, also known as the
project budget
Scope: The tasks required to
fulfill the project’s goals
Time: The schedule for the
project to reach completion
 Time and Scope: You can reduce your project scope to also reduce your project duration
if you’re running behind schedule. In the opposite case, you can increase the length of
your project timeline in case the project stakeholders come up with extra project
activities.
 Cost and Scope: By reducing the project scope, you’ll need to execute fewer tasks, which
means lower costs. In the opposite case, a larger project scope means higher costs.
 Cost and Time: In some projects, time and cost can be directly related. For example, the
costs of renting equipment or labor are directly proportional to the time you need them
for.
Time Constraint
 For the project to achieve its purpose, to reach its objective, and to deliver its value, the
project team should declare it done on a set date.
 Time constraints determine when activities or tasks of a project should start and when
they should end.
 The constraints include the defined deadlines for each important phase of the project
and the rollout of the final deliverable.
Start no earlier than
 Specifies the earliest date the team can start working on a task within a project.
 It may not specify a deadline but it can affect the progress of the project or the start of
dependent tasks.
 For example, the activity of laying the building foundation cannot start earlier than the arrival
of trucks to pour the cement.
Finish no later than
 Specifies when the latest date the team can finish a task within the project.
 This is a hard deadline that will impact the overall schedule of the project when missed.
As soon as possible
 An ASAP constraint is a type of time constraint with direct implications to
cost.
 Any delay incurs cost that affects the project budget limits. Conversely,
early start and completion can result in savings.
Scope Constraint
 Project scope refers to a project’s magnitude in terms of quality, detail, and deliverables.
 Provides a common understanding between the Project manager and the Project
stakeholders.
 Time and money are dependencies of project scope, because as the project scope grows,
the project will require more time and money to complete.
 Scope creep should be prevented by creating detailed project plans and getting project
stakeholders to sign off on everything before production begins.
Cost Constraint
 Cost constraints involve the financial limitations of the resources allocated
to the project budget and the overall limit on the total amount that can be
spent.
 It is important to estimate what the project will cost and set controls to
reduce the chances of the project going over budget.
 Cost overruns lead to Project Delays and even project failure.
Project Manager
The person who ensures the team meets the project goal within the set
timeline, budget and quality.
Largely responsible for the success or failure of the project.
Role of a Project Manager
→ Leading teams
→ Communicating with stakeholders
→ Defining goals
→ Seeing the project through its closure
Project Team
 Project team requires professionals with specific skills which are required
for the completion of the project, especially the technical skills along with
the managerial skills.
Project Management System
 A model for overseeing the execution of a project.
 Provides a framework for managing expectations, delegating
responsibilities and creating procedures.
 Helps the Project Manager to be more efficient with their time
and resource allocation.
 A project management system may use specialized project
management software – MS Project
Why use a Project Management
System
 Project Planning
 Budget Estimation
 Document Organization
 Time Management
 Task Delegation
 Resource Allocation
 Performance Tracking
 Communication and coordination
 Improved onboarding
 Risk Mitigation
Project Stakeholders
Individuals and organizations who are actively involved in the project, or
whose interests may be positively or negatively affected as a result of project
execution or successful project completion.
Project vs. Operations
Projects vs. Operations
OPERATIONS
 Process is repetitive
 Permanent process
 Equilibrium
 Less chances for risk
 Traditional hierarchy of
responsibilities
 Undergo several stages
 Doesn’t have uniqueness
 Stable
PROJECTS
• Always a new process
• Temporary process
• Disequilibrium
• High risk
• Informal responsibilities shared
• It has final end goal
• Has a uniqueness
• Unstable
Project Life Cycle
 There are many distinctive phases a project undergo to achieve the
objective under the given pre defined budget and duration.
 There are four main phases identified in a project.
 Initiation
 Planning
 Execution
 Closure
Initiation
 Concept Stage
 Identify a business need, problem, or opportunity and brainstorm ways
that your team can meet this need, solve this problem, or seize this
opportunity.
 Stage of determining whether the project is feasible, and identifying the
major deliverables for the project.
Steps in Project Initiation Stage
1. Undertaking a feasibility study:
Technical Feasibility – Site analysis, Site Justification, Detailing, User Analysis
Economical Feasibility – Cost Benefit Analysis, How economically viable it is for the
end user/client/public
Financial Feasibility – Investment vs. Return gained
Social Feasibility – Analyze involved social group; project has to be socially acceptable by
the community
Environmental Feasibility – Analyze the impact on existing nature by implementation of
the project
2. Identifying scope: Define the depth and breadth of the project
3. Identifying deliverables: Define the product or service to provide
4. Identifying project stakeholders: Figure out whom the project affects and what their
needs may be
5. Developing a business case: Use the above criteria to compare the potential costs and
benefits for the project to determine if it moves forward
6. Developing a statement of work: Document the project’s objectives, scope, and
deliverables that you have identified previously as a working agreement between the
project owner and those working on the project
Planning
 Development Stage – Process of sorting out
 Breaking the larger project to smaller tasks, building teams, preparing
schedules for completion of assignments.
 Create smaller goals within the larger projects, which are achievable within
the timeframe.
Steps in Project Planning Stage
1. Creating a project plan:
Identify the project timeline, including the phases of the
project, the tasks to be performed, and possible
constraints
2. Creating workflow diagrams:
Visualize the processes to make the team members clearly
understand their role in a project
3. Estimating budget and creating a financial plan:
Use cost estimates to determine how much to spend on the
project to get the maximum return on investment
4. Gathering resources:
Build the functional team from internal and external talent pools while
making sure everyone has the necessary tools (software, hardware, etc.)
to complete their tasks
5. Anticipating risks and potential quality roadblocks:
Identify issues that may cause the project to stall while planning to
mitigate those risks and maintain the project’s quality and timeline
6. Holding a project kickoff meeting:
Bring the team on board and outline the project in order to implement
the planned work.
Execution
 Turns the Plan into Action
 Keep work on track
 Organize team members
 Manage timelines
 Stick to the original plan
Steps for Project Execution Stage
1. Creating tasks and organizing workflows:
Assign granular aspects of the projects to the appropriate
team members, making sure team members are not
overworked
2. Briefing team members on tasks:
Explain tasks to team members, providing necessary
guidance on how they should be completed, and organizing
process-related training if necessary
3. Communicating with team members, clients, and upper
management:
Provide updates to project stakeholders at all levels
4. Monitoring quality of work: Ensure that team members
are meeting their time and quality goals for tasks
5. Managing budget: Monitor spending and keeping the
project on track in terms of assets and resources
Closure
 Provide final deliverables
 Release project resources
 Determine the success of the project
 Evaluating what did and did not work with the project
Steps for Project Closure Phase
 Analyzing project performance: Determine whether the project's goals
were met (tasks completed, on time and on budget) and the initial
problem solved using a prepared checklist.
 Analyzing team performance: Evaluate how team members performed,
including whether they met their goals along with timeliness and quality of
work.
 Documenting project closure: Make sure that all aspects of the project
are completed with no loose ends remaining and providing reports to key
stakeholders
 Conducting post-implementation reviews: Conduct a final analysis of the
project, taking into account lessons learned for similar projects in the
future
 Accounting for used and unused budget: Allocate remaining resources for
future projects
The End

More Related Content

PPTX
Lecture 1- Introduction.pptx
PPTX
Project Management online sample (1) (1).pptx
PPTX
Project management
PPTX
Project planning and control
PPTX
2. PAE AcFn621 Ch-2 Principle ppt.pptx
PPT
Project Analysis & Management (CH 1 to 4).ppt
PDF
IT project management is a best slides for students
PPTX
Project ManagementforstudentsCH 1 -.pptx
Lecture 1- Introduction.pptx
Project Management online sample (1) (1).pptx
Project management
Project planning and control
2. PAE AcFn621 Ch-2 Principle ppt.pptx
Project Analysis & Management (CH 1 to 4).ppt
IT project management is a best slides for students
Project ManagementforstudentsCH 1 -.pptx

Similar to PROJECT MANAGEMENT intro - Lecture 01.pptx (20)

PPTX
1. into. to project and project management (1)
PPTX
INTRODUCTION TO PROJECT MANAGMENT
PPTX
Project Management
DOC
Project 27663255255255781771777166162666
PPTX
CW3007-IT PROJECT MANAGEMENT NOTES FOR AUTONOMOUS STUDENT
PPTX
Unit-1.pptxgeyeuueueu7r7r7r77r7r7r7uriruru
PPTX
project mgmt chapter 1.pptx
PPT
01-Introduction to Project Management.ppt
PPT
Project management
PPT
Project management ALL ABOUT PROJECTS AND HIS
PPTX
PME UNIT-3.pptx
PPTX
Introduction to Project Management 9 May 2023-1.pptx
PPTX
UNIT-1.pptx
PPTX
Project Management and Control Techniques
PPT
Project Mana Session 1 (with practice).ppt
PPT
1. introduction
PDF
Software Project Management by Dr. B. J. Mohite
PPT
0. Foundations of project management (2).ppt
PPTX
Project Management_ SMART Projects Class.pptx
PPT
6396901
1. into. to project and project management (1)
INTRODUCTION TO PROJECT MANAGMENT
Project Management
Project 27663255255255781771777166162666
CW3007-IT PROJECT MANAGEMENT NOTES FOR AUTONOMOUS STUDENT
Unit-1.pptxgeyeuueueu7r7r7r77r7r7r7uriruru
project mgmt chapter 1.pptx
01-Introduction to Project Management.ppt
Project management
Project management ALL ABOUT PROJECTS AND HIS
PME UNIT-3.pptx
Introduction to Project Management 9 May 2023-1.pptx
UNIT-1.pptx
Project Management and Control Techniques
Project Mana Session 1 (with practice).ppt
1. introduction
Software Project Management by Dr. B. J. Mohite
0. Foundations of project management (2).ppt
Project Management_ SMART Projects Class.pptx
6396901
Ad

Recently uploaded (20)

PDF
MLpara ingenieira CIVIL, meca Y AMBIENTAL
PDF
Prof. Dr. KAYIHURA A. SILAS MUNYANEZA, PhD..pdf
PPTX
mechattonicsand iotwith sensor and actuator
PDF
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
PPTX
Management Information system : MIS-e-Business Systems.pptx
PDF
Computer System Architecture 3rd Edition-M Morris Mano.pdf
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PPTX
Principal presentation for NAAC (1).pptx
PPTX
wireless networks, mobile computing.pptx
PDF
LOW POWER CLASS AB SI POWER AMPLIFIER FOR WIRELESS MEDICAL SENSOR NETWORK
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PDF
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
PDF
Soil Improvement Techniques Note - Rabbi
PDF
Introduction to Power System StabilityPS
PDF
Design of Material Handling Equipment Lecture Note
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
PPTX
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
PPTX
CONTRACTS IN CONSTRUCTION PROJECTS: TYPES
MLpara ingenieira CIVIL, meca Y AMBIENTAL
Prof. Dr. KAYIHURA A. SILAS MUNYANEZA, PhD..pdf
mechattonicsand iotwith sensor and actuator
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
Management Information system : MIS-e-Business Systems.pptx
Computer System Architecture 3rd Edition-M Morris Mano.pdf
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
Principal presentation for NAAC (1).pptx
wireless networks, mobile computing.pptx
LOW POWER CLASS AB SI POWER AMPLIFIER FOR WIRELESS MEDICAL SENSOR NETWORK
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
Soil Improvement Techniques Note - Rabbi
Introduction to Power System StabilityPS
Design of Material Handling Equipment Lecture Note
distributed database system" (DDBS) is often used to refer to both the distri...
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
CONTRACTS IN CONSTRUCTION PROJECTS: TYPES
Ad

PROJECT MANAGEMENT intro - Lecture 01.pptx

  • 1. PROJECT MANAGEMENT LECTURE 01 : INTRODUCTION TO PROJECT MANAGEMENT Mihiransie Elvitigala BSc. (Hons) in Quantity Surveying MSc. in Management (Reading) Lecturer – Dept. of QS FBESS - KDU
  • 2. What is Project Management?  Project management is the application of methods, processes, skills, experience, and knowledge to complete projects in accordance with the project acceptance criteria and within the agreed parameters.  It involves the application of knowledge, skills, experience, tools, methods and resources in the project.
  • 3. Differentiating Project Management from Management Project Management Contains deliverables that are constrained to a defined budget and time scale.  Final Deliverable  Finite Timespan  Defined Budget Management An ongoing/continuous processes or functions of the organization. Strategic planning Establishment of objectives Arrangement and optimum allocation of resources Controlling the activities Measurement of the results
  • 6. Definition of a Project  A project is a series of related tasks which when they are carried out in the correct order will lead to the completion of the project.  It is a temporary endeavor undertaken with an aim of creating a distinctive output which can be a product, service or outcome.  It has a specified beginning and finish time.  A project has an acceptance criteria, plus agreed specifications.
  • 7. Nature of a Project 1. A clear start and an end date – There are projects that last several years but a project cannot go on forever. It needs to have a clear beginning, a definite end, and an overview of what happens in between. 2. A project creates something new – Every project is unique, producing something that did not previously exist. A project is a one-time, once-off activity, never to be repeated exactly the same way again.
  • 8. Characteristics of a Project 3. A project is not Business as usual – Projects are often confused with processes. A Process is a series of routine, predefined steps to perform a particular function, eg: expense reimbursement approvals. 4. A project has boundaries – A project operates within certain constraints of time, budget, quality, and functionality.
  • 9. Attributes of a Project Project Goal – Achieving Client’s requirements Project Process and Deliverable – It is a process aimed at achieving specified objectives Finite – A project is a temporary process with a finite duration. Complex – Interlinked tasks, resources, disciplines, organizations. Project Lifecycle – Has a distinctive and unique life cycle that passes through several distinct phases Resources – Material, Human (Labor), Equipment etc. Risk – For a unique outcome which never existed has some uncertainty.
  • 10. Project Constraints Cost: The financial constraints of a project, also known as the project budget Scope: The tasks required to fulfill the project’s goals Time: The schedule for the project to reach completion
  • 11.  Time and Scope: You can reduce your project scope to also reduce your project duration if you’re running behind schedule. In the opposite case, you can increase the length of your project timeline in case the project stakeholders come up with extra project activities.  Cost and Scope: By reducing the project scope, you’ll need to execute fewer tasks, which means lower costs. In the opposite case, a larger project scope means higher costs.  Cost and Time: In some projects, time and cost can be directly related. For example, the costs of renting equipment or labor are directly proportional to the time you need them for.
  • 12. Time Constraint  For the project to achieve its purpose, to reach its objective, and to deliver its value, the project team should declare it done on a set date.  Time constraints determine when activities or tasks of a project should start and when they should end.  The constraints include the defined deadlines for each important phase of the project and the rollout of the final deliverable.
  • 13. Start no earlier than  Specifies the earliest date the team can start working on a task within a project.  It may not specify a deadline but it can affect the progress of the project or the start of dependent tasks.  For example, the activity of laying the building foundation cannot start earlier than the arrival of trucks to pour the cement. Finish no later than  Specifies when the latest date the team can finish a task within the project.  This is a hard deadline that will impact the overall schedule of the project when missed.
  • 14. As soon as possible  An ASAP constraint is a type of time constraint with direct implications to cost.  Any delay incurs cost that affects the project budget limits. Conversely, early start and completion can result in savings.
  • 15. Scope Constraint  Project scope refers to a project’s magnitude in terms of quality, detail, and deliverables.  Provides a common understanding between the Project manager and the Project stakeholders.  Time and money are dependencies of project scope, because as the project scope grows, the project will require more time and money to complete.  Scope creep should be prevented by creating detailed project plans and getting project stakeholders to sign off on everything before production begins.
  • 16. Cost Constraint  Cost constraints involve the financial limitations of the resources allocated to the project budget and the overall limit on the total amount that can be spent.  It is important to estimate what the project will cost and set controls to reduce the chances of the project going over budget.  Cost overruns lead to Project Delays and even project failure.
  • 17. Project Manager The person who ensures the team meets the project goal within the set timeline, budget and quality. Largely responsible for the success or failure of the project. Role of a Project Manager → Leading teams → Communicating with stakeholders → Defining goals → Seeing the project through its closure
  • 18. Project Team  Project team requires professionals with specific skills which are required for the completion of the project, especially the technical skills along with the managerial skills.
  • 19. Project Management System  A model for overseeing the execution of a project.  Provides a framework for managing expectations, delegating responsibilities and creating procedures.  Helps the Project Manager to be more efficient with their time and resource allocation.  A project management system may use specialized project management software – MS Project
  • 20. Why use a Project Management System  Project Planning  Budget Estimation  Document Organization  Time Management  Task Delegation  Resource Allocation  Performance Tracking  Communication and coordination  Improved onboarding  Risk Mitigation
  • 21. Project Stakeholders Individuals and organizations who are actively involved in the project, or whose interests may be positively or negatively affected as a result of project execution or successful project completion.
  • 23. Projects vs. Operations OPERATIONS  Process is repetitive  Permanent process  Equilibrium  Less chances for risk  Traditional hierarchy of responsibilities  Undergo several stages  Doesn’t have uniqueness  Stable PROJECTS • Always a new process • Temporary process • Disequilibrium • High risk • Informal responsibilities shared • It has final end goal • Has a uniqueness • Unstable
  • 24. Project Life Cycle  There are many distinctive phases a project undergo to achieve the objective under the given pre defined budget and duration.  There are four main phases identified in a project.  Initiation  Planning  Execution  Closure
  • 25. Initiation  Concept Stage  Identify a business need, problem, or opportunity and brainstorm ways that your team can meet this need, solve this problem, or seize this opportunity.  Stage of determining whether the project is feasible, and identifying the major deliverables for the project.
  • 26. Steps in Project Initiation Stage 1. Undertaking a feasibility study: Technical Feasibility – Site analysis, Site Justification, Detailing, User Analysis Economical Feasibility – Cost Benefit Analysis, How economically viable it is for the end user/client/public Financial Feasibility – Investment vs. Return gained Social Feasibility – Analyze involved social group; project has to be socially acceptable by the community Environmental Feasibility – Analyze the impact on existing nature by implementation of the project
  • 27. 2. Identifying scope: Define the depth and breadth of the project 3. Identifying deliverables: Define the product or service to provide 4. Identifying project stakeholders: Figure out whom the project affects and what their needs may be 5. Developing a business case: Use the above criteria to compare the potential costs and benefits for the project to determine if it moves forward 6. Developing a statement of work: Document the project’s objectives, scope, and deliverables that you have identified previously as a working agreement between the project owner and those working on the project
  • 28. Planning  Development Stage – Process of sorting out  Breaking the larger project to smaller tasks, building teams, preparing schedules for completion of assignments.  Create smaller goals within the larger projects, which are achievable within the timeframe.
  • 29. Steps in Project Planning Stage 1. Creating a project plan: Identify the project timeline, including the phases of the project, the tasks to be performed, and possible constraints 2. Creating workflow diagrams: Visualize the processes to make the team members clearly understand their role in a project 3. Estimating budget and creating a financial plan: Use cost estimates to determine how much to spend on the project to get the maximum return on investment
  • 30. 4. Gathering resources: Build the functional team from internal and external talent pools while making sure everyone has the necessary tools (software, hardware, etc.) to complete their tasks 5. Anticipating risks and potential quality roadblocks: Identify issues that may cause the project to stall while planning to mitigate those risks and maintain the project’s quality and timeline 6. Holding a project kickoff meeting: Bring the team on board and outline the project in order to implement the planned work.
  • 31. Execution  Turns the Plan into Action  Keep work on track  Organize team members  Manage timelines  Stick to the original plan
  • 32. Steps for Project Execution Stage 1. Creating tasks and organizing workflows: Assign granular aspects of the projects to the appropriate team members, making sure team members are not overworked 2. Briefing team members on tasks: Explain tasks to team members, providing necessary guidance on how they should be completed, and organizing process-related training if necessary 3. Communicating with team members, clients, and upper management: Provide updates to project stakeholders at all levels
  • 33. 4. Monitoring quality of work: Ensure that team members are meeting their time and quality goals for tasks 5. Managing budget: Monitor spending and keeping the project on track in terms of assets and resources
  • 34. Closure  Provide final deliverables  Release project resources  Determine the success of the project  Evaluating what did and did not work with the project
  • 35. Steps for Project Closure Phase  Analyzing project performance: Determine whether the project's goals were met (tasks completed, on time and on budget) and the initial problem solved using a prepared checklist.  Analyzing team performance: Evaluate how team members performed, including whether they met their goals along with timeliness and quality of work.  Documenting project closure: Make sure that all aspects of the project are completed with no loose ends remaining and providing reports to key stakeholders
  • 36.  Conducting post-implementation reviews: Conduct a final analysis of the project, taking into account lessons learned for similar projects in the future  Accounting for used and unused budget: Allocate remaining resources for future projects

Editor's Notes

  • #6: Electric Mask Festivel
  • #7: Project Acceptance criteria are criteria that include performance requirements and essential conditions, which must be met before project deliverables are accepted
  • #11: Time constraint: The time constraint refers to the project’s schedule for completion, including the deadlines for each phase of the project, as well as the date for rollout of the final deliverable. Scope constraint: The scope of a project defines its specific goals, deliverables, features, and functions, in addition to the tasks required to complete the project. Cost constraint: The cost of the project, often dubbed the project’s budget, comprises all of the financial resources needed to complete the project on time, in its predetermined scope. Keep in mind that cost does not just mean money for materials — it encompasses costs for labor, vendors, quality control, and other factors, as well.
  • #16: Scope creep is what happens when the asks and deliverables exceed the pre-set project scope.
  • #22: a stakeholder is anyone with an interest or investment in your project. In other words, your project’s stakeholders are the people or groups who have something to gain (or lose) from your project’s outcome.
  • #29: Once the project is approved to move forward based on your business case, statement of work, or project initiation document, you move into the planning phase. Re- read the feasibility reports and this stage may involve in additions and omissions to the initial concept design
  • #32: You’ve received business approval, developed a plan, and built your team. Now it’s time to get to work.