Project Controls on a 900 Project Substation 
Network Upgrade
Patrick O’Connell
Project Control Coordinator
patrick.oconnell@gatrans.com
• This presentation
• Objective 1: How a utility prepares to manage 
hundreds of projects within the enterprise 
using Primavera
• Objective 2: How to manage cost from within 
Primavera
• Objective 3: Why lessons learned will be 
visited throughout the project life cycle
• Georgia Transmission Corporation
• GTC ‐ owned by 39 Electric Membership 
Cooperatives (EMCs) in Georgia
• Build, operate and maintain Transmission 
Lines and Substations 
– not only for the EMC’s but also for the ITS
– ITS – shared transmission system in Georgia with 4 
members: GTC, GPC, MEAG and Dalton
Transmission
Build and Maintain
What is a Substation?
• Purpose is to transform voltage from low to 
high (from generation) or high to low in 
transmission
• It’s a connection point and is part of a greater 
grid
• Substations are not like plants, they are 
unattended because they can be monitored 
and controlled remotely ‐ SCADA 
Substation Communication
• Substations communicate status, metering 
and can be controlled by a central location
• SCADA – Supervisory Control and Data 
Acquisition
• Reliance on the phone system or wireless 
backup
ATT, Frame Relay and MPLS
• Communication circuit
• ATT provides the circuit but is discontinuing 
and replacing with MPLS
• Multi‐Protocol Label Switching
• Frame is old and tired, MPLS is new and fresh
NERC and CIP
• North American Electic Reliability Corporation
– Under FERC
– Reliability Standards
• CIP – Critical Infrastucture Protection
– Physical and Cyber Security
– 2015 is a milestone for our project
The Scope of Work
• Migrate from existing Frame Relay to MPLS on all 
GTC, GPC, MEAG stations where an EMC takes 
service, each EMC headquarters, coordinating sites 
with GPC and on campus ECS and off campus backup 
site. 
• Field ‐ 852 Stations, 39 EMCs, 3 communication 
centers 
• Approximately 900 facilities means 900 project 
numbers for each ‐ accounting driven as each is an 
asset
• So we have 894 projects to complete in two years
Projects in Primavera
• All capital projects and some others for timesheet users
• Schedules created from standard templates
– Provide standard lead times for common projects
– Proper coding for time, contracting and invoices
• Resource loaded
– Timesheet users may be assigned in template or
• Assigned by their matrix assignment or
• Assigned by department
– Expense codes for payments
• Consistent across all projects
• Project schedule has all cost – BAC, AC, ETC, EAC
• One Stop Shop (almost)
Primavera
• Scoping  and 12 Pilot Projects
– Estimating ‐ ~$30M project 
• That is a LOT for the EMCs to swallow
– Scoping of equipment and installation of different 
combinations
– Configurations, testing, data gathering
– Vendor
– Workforce planning
Size and Scope
• Primavera will have dedicated EPS nodes 
based on project status
– This is for ease of maintaining projects that need 
to be open vs closed
• Why not in speadsheets?
– Primavera is linked to our accounting system and 
creates all the charge codes
– Budgeting and Capital projections
How to
• Templates
– Likely only a few templates will be used to create 
all of the projects
– Activities will include 
• Scoping
• Materials procurement
• Construction and Testing
• Closeout
Resources
• All activities have resources assigned
– Expense codes for OFM and contractors
– Assignments for work force planning
– Primary resources for status updates
Primavera and Status Reporting
• Cost – all capital project cost that is scheduled 
is budgeted in Primavera
• Status reporting will be higher level than 
captured in P6 and likely reported via 
spreadsheet to PDF.
Consistency of Data
• Here is the lesson learned from our CTIP 
program – use a database. Have it linked to 
other databases.
• Maintenance uses Maximo for a good bit of 
their work
– Largely accurate information with few meaningful 
gaps
– Reporting of status to Maximo – lacking…
Demos
• P6 configuration
• Status Reports
Questions?

More Related Content

PDF
Network upgrade
PPTX
Network Infrastructure Upgrade - Nextrio
PDF
A University Network Design Exercise
PDF
WWTC_implementation_plan_Group5_FINAL
PPT
Network Developement Capstone Project 2009 Sping Quarter
PPTX
Design of network
PDF
Visualizing Your Network Health - Driving Visibility in Increasingly Complex...
PPTX
Riverbed Software Defined IT Survey
Network upgrade
Network Infrastructure Upgrade - Nextrio
A University Network Design Exercise
WWTC_implementation_plan_Group5_FINAL
Network Developement Capstone Project 2009 Sping Quarter
Design of network
Visualizing Your Network Health - Driving Visibility in Increasingly Complex...
Riverbed Software Defined IT Survey

What's hot (20)

PDF
Detect and Fix Performance Problems Faster
PPT
Completed+Presentation+Capstone
PPT
Capstone Powerpoint
PPTX
ITT CNS Capstone Project
PDF
Evolve automation v1.01 - White Paper
PDF
vCOSolutionOfferingWhitePaper_KunalK
PDF
PDF Transforming Your Infrastructure into a Utility-Grade Network
PPTX
NSA Capstone Presentation
PPSX
Ibc Firewall Utm High Availability Solution .
DOC
Resume_Karthikeyan SR
PDF
Basic Campus Network Design - Network Cabling System
DOC
Eric Cory Resume
PDF
SteelCentral NetSensor 3.0
PPTX
ITT - Tech CNS Captstone Project
PPT
Proactive Services Customer V8
PDF
nokia_performance_manager_brochure_2015
PPTX
PDF
Cascade 10.5: Visibility & Control
PPTX
NetScout Systems corporate overview
Detect and Fix Performance Problems Faster
Completed+Presentation+Capstone
Capstone Powerpoint
ITT CNS Capstone Project
Evolve automation v1.01 - White Paper
vCOSolutionOfferingWhitePaper_KunalK
PDF Transforming Your Infrastructure into a Utility-Grade Network
NSA Capstone Presentation
Ibc Firewall Utm High Availability Solution .
Resume_Karthikeyan SR
Basic Campus Network Design - Network Cabling System
Eric Cory Resume
SteelCentral NetSensor 3.0
ITT - Tech CNS Captstone Project
Proactive Services Customer V8
nokia_performance_manager_brochure_2015
Cascade 10.5: Visibility & Control
NetScout Systems corporate overview
Ad

Viewers also liked (6)

PPT
CCNA Discovery 4 - Chapter 9
DOC
Mini-Fiber Node Technology
PDF
Upgrade IOS Cisco Aironet 1130AG Series Access Point
PPT
Case Study on BPL Colour TV
PDF
2010 11 18 Substation Automation Systems By Gin Quesada
PPTX
Network proposal ppt
CCNA Discovery 4 - Chapter 9
Mini-Fiber Node Technology
Upgrade IOS Cisco Aironet 1130AG Series Access Point
Case Study on BPL Colour TV
2010 11 18 Substation Automation Systems By Gin Quesada
Network proposal ppt
Ad

Similar to Projects controls on a 900 project substation network upgrade ppt (20)

PDF
Gridcomm overview
DOC
Resume_Bala
PDF
[Webinar Presentation] Best Practices for IT/OT Convergence
PDF
System Level Data and Technology Requirements of REV
PPTX
Distribution System Automation
PDF
Tollgrade LightHouse Asset Management Techniques Using Smart Grid Sensors
PPTX
Smart Grid Implementation Experiences - TPDDL.pptx
PPTX
Smart grid distribution system
DOC
Phani_Resume
PDF
INOC - Art Meierdirk Presentation from UTC April 15, 2014
PPTX
UNMESH 2015 modified Presentation
PDF
Topic 2 -network_computing
PDF
Lithium: Event-Driven Network Control
DOC
Karlo n. mallorca updated
PPTX
Load Despatch and Communication System.pptx
DOC
Archana Mishra Resume
PPTX
Smart Microgrid
PPTX
Fiber Optic Network Topologies Ring Star and Mesh.pptx
Gridcomm overview
Resume_Bala
[Webinar Presentation] Best Practices for IT/OT Convergence
System Level Data and Technology Requirements of REV
Distribution System Automation
Tollgrade LightHouse Asset Management Techniques Using Smart Grid Sensors
Smart Grid Implementation Experiences - TPDDL.pptx
Smart grid distribution system
Phani_Resume
INOC - Art Meierdirk Presentation from UTC April 15, 2014
UNMESH 2015 modified Presentation
Topic 2 -network_computing
Lithium: Event-Driven Network Control
Karlo n. mallorca updated
Load Despatch and Communication System.pptx
Archana Mishra Resume
Smart Microgrid
Fiber Optic Network Topologies Ring Star and Mesh.pptx

More from p6academy (20)

PDF
Oracle OpenWorld 2015
PDF
Plan and Execute the Right Projects— Easily and Affordably
PDF
What's New In Primavera P6 EPPM 17.1
PDF
Oracle Primavera Unifier What's New in Release 16.2
PDF
Oracle What's New In Primavera P6 16.2
PDF
What's New in Primavera Prime 16.1
PDF
What's New in Primavera Gateway 16.1
PDF
What's New In Primavera Analytics 16.1
PDF
What's New in Unifier 16.1
PDF
20160405 How to Install Primavera P6 16.1 Professional desktop
PDF
Oracle Primavera P6 16.1 Announced
PDF
Oracle Primavera Unifier 16.1
PDF
P6 Release 8 Application Considerations Overview
PDF
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
PDF
P6 Release 8 Installation Orientation
PDF
Oracle Primavera P6 R8 Release Value Proposition
PDF
Oracle Primavera P6 v7 Release Value Proposition
PDF
Oracle Primavera P6 Release Content Document (RCD)
PDF
Oracle Support Accreditation – Level 1 Study Guide
PDF
Oracle Primavera Support Accreditation Study Guide
Oracle OpenWorld 2015
Plan and Execute the Right Projects— Easily and Affordably
What's New In Primavera P6 EPPM 17.1
Oracle Primavera Unifier What's New in Release 16.2
Oracle What's New In Primavera P6 16.2
What's New in Primavera Prime 16.1
What's New in Primavera Gateway 16.1
What's New In Primavera Analytics 16.1
What's New in Unifier 16.1
20160405 How to Install Primavera P6 16.1 Professional desktop
Oracle Primavera P6 16.1 Announced
Oracle Primavera Unifier 16.1
P6 Release 8 Application Considerations Overview
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
P6 Release 8 Installation Orientation
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 Release Content Document (RCD)
Oracle Support Accreditation – Level 1 Study Guide
Oracle Primavera Support Accreditation Study Guide

Projects controls on a 900 project substation network upgrade ppt