During the lifecycle phases of a Project, starting from the Project Concept,
followed by a feasibility study preliminary Design and then the detail of
the asset design, there are a lot of opportunities for influencing the quality
of the asset in terms of construction, functionality, reliability, availability,
maintainability, inspectability and cost.
Maintenance Engineering and Asset Integrity Management are sure two
approaches useful to evaluate the lifecycle of the asset, during the different
phases of a Project, and finalized to optimize the Asset Life.
RAMCUBE Asset Management
Services are addressed to
provide and to assure the best
Asset Life Cycle
Management
ASSET MANAGEMENT SERVICES 2 • 6
MAINTENANCEENGINEERING
ASSETINTEGRITYMANAGEMENT
ASSET
MANAGEMENT
DATA& DOCUMENT
MANAGEMENT
CIMS
MASTER EQUIPMENT
LIST - MEL
OPERABILITY &
MAINTAINABILITY
ANALYSIS
RELIABILITY CENTRED
MAINTENANCE - RCM
SPARE PARTS &
WAREHOUSE
MANAGEMENT
CMMS
INSPECTION
PLAN
FITNESS FOR
SERVICE “FFS”
RISK BASED
INSPECTION
“RBI”
DEGRADATION
MECHANISMS
CORROSION
LOOP
INSPECTION
ASSET REGISTER
DATA & DOCUMENT MANAGEMENT
•	 Managing data & document relevant to components, materials and
documents
•	 Cost reduction
•	 Rationalization and optimization of company processes integration of
engineering, maintenance and production
MASTER EQUIPMENT LIST - MEL
•	 Definition of the item to be included in the maintenance analysis
•	 Development of an appropriate “maintenance manual” for the collection
of all the vendor operation and maintenance manuals
MAINTENANCE ENGINEERING 3 • 6
OPERABILITY & MAINTAINABILITY ANALYSIS
•	 Checking and assuring operability and maintainability aspects
•	 Ensuring that engineering and procurement of project facilities meet
safety, accessibility, operability, maintainability and HFE objectives
RELIABILITY CENTRED MAINTENANCE - RCM
•	 Determination of “what activity” is required for each item in terms of
maintenance
•	 Failure mode and effect analysis (FMEA) development
•	 Criticality analysis development
•	 Selection of the right maintenance policy to apply for each item
•	 Customized maintenance plan
2
3
4
1
•	 Evaluation of the reliability, availability, maintainability and safety of
complex systems
•	 Determination of the production availability
•	 Suggestion of potential solutions in order to improve the reliability
and the availability of the plant
WAREHOUSE MANAGEMENT
•	 Managing and optimization of all spare parts necessary for the
operations
•	 Material coding
•	 Optimization of the warehouse stock levels with the anticipated
behaviour of the equipment
•	 Availability and storing into the site warehouses
•	 Interchangeability report
MAINTENANCE ENGINEERING 4 • 6
CMMS
•	 Document management
•	 Maintenance activities management and scheduling
•	 Approving work flow
•	 Resources and material optimization
•	 Key performance evaluation
RAM ANALYSIS
5
6
7
INSPECTION ASSET REGISTER
•	 Clearly definition of the item to be inspected
•	 Appropriate, adequate and customized inspection plan
•	 Rationalization and optimization of company processes integration of
engineering, maintenance and production
CORROSION LOOP
•	 Definition of homogeneous groups of items in terms of design,
operating parameters, material, and inspection topics
•	 Determination of potential damage mechanisms, corrosion types and
corrosion rates for each corrosion loop and item
•	 Risk ranking
ASSET INTEGRITY MANAGEMENT 5 • 6
DEGRADATION MECHANISMS
•	 Identification of the appropriate degradation mechanism
•	 Determination of the susceptibilities for all item
•	 Quality, appropriate and effectiveness of the inspection techniques to
be selected
RISK BASED INSPECTION - RBI
•	 Optimization of the inspection activities performed
•	 Risk ranking
•	 Improving the management of the assets integrity and reducing the
overall costs for inspection and monitoring
•	 Identification of the areas and items with higher risk categories and
development a prioritized list for more in-depth inspection or analysis
2
3
4
1
•	 Procedures assessment
•	 Taking in consideration of the plant history
•	 Calculation of the remaining life of an item
•	 Defects characterization
INSPECTION PLAN
•	 Development of the appropriate and customized inspection plan
•	 Development of written scheme of examination linked for each item in
order to manage what, when and where inspection will be performed
and the most appropriate inspection techniques
ASSET INTEGRITY MANAGEMENT 6 • 6
CIMS
•	 Inspection activities management and scheduling
•	 Approving work flow
•	 Inspection report management
•	 Non destructive testing - resources and material optimization
•	 Remaining life and corrosion rate calculation
FITNESS FOR SERVICE - FFS
5
6
7
RAMCUBE s.r.l. via Parmigianino, 16
20148 Milano
VAT-ID IT12265050158
www.ramcube.it
ramcube@ramcube.it
ramcube@pec.ramcube.it
T +39 02 87 23 77 00
F +39 02 87 23 77 34
REL.1.1
Share Capital € 50,000 fully paid-up.Tax code and Milan Register of Companies No.: 12265050158 - Certified quality system according to UNI EN ISO 9001:2008

More Related Content

PDF
RAMCUBE AG - Asset management services
DOC
Omar's CV
DOC
MDK Maintenance Manager 1 7+Year Experience
PDF
Experienced Sourcing professional with 10years Exp- Material/vendor Management
DOC
vijins new-11-2016
DOC
Perdue Farms Experience
DOC
CV_Alana Miles-2015-
PPTX
CPI_MOM_KBR_20110909_v1
RAMCUBE AG - Asset management services
Omar's CV
MDK Maintenance Manager 1 7+Year Experience
Experienced Sourcing professional with 10years Exp- Material/vendor Management
vijins new-11-2016
Perdue Farms Experience
CV_Alana Miles-2015-
CPI_MOM_KBR_20110909_v1

What's hot (19)

DOC
SHASHANK CV
DOC
CormanV5dates
PDF
Saiphali gmp-guidelines
DOC
Vladimir Nikitin - Completed CV
DOCX
ASIF CV - HVAC O & M
PPT
PPTX
Production planning and control
PPT
Seminar on cim 02
PPTX
Process planning and cost estimation
PPTX
Preparing for new project inbound material logistics operation
DOC
resumegfp_2016
DOC
Raghu CV 30_12_15
PPT
Prerequisites of ppc
PDF
Respa For Life Science
PDF
ARLIE LLUNAR-Projects Presentations
PPTX
Lance Bemis - Operations Capstone
PPTX
Control Process Design parameter
PPTX
IA and Assurance Path
SHASHANK CV
CormanV5dates
Saiphali gmp-guidelines
Vladimir Nikitin - Completed CV
ASIF CV - HVAC O & M
Production planning and control
Seminar on cim 02
Process planning and cost estimation
Preparing for new project inbound material logistics operation
resumegfp_2016
Raghu CV 30_12_15
Prerequisites of ppc
Respa For Life Science
ARLIE LLUNAR-Projects Presentations
Lance Bemis - Operations Capstone
Control Process Design parameter
IA and Assurance Path
Ad

Viewers also liked (18)

PPTX
Simplifying algebraic expressions
PDF
TAM new report
PPTX
Slope
PPTX
Social Media Case (ZHAW)
PPTX
Solving algebraic expressions
PDF
RAMCUBE - Company profile
PPTX
17 juli 1203 beleg van constantinopel
PPT
PDF
Hacking
PPT
How to Make a Resume
PPTX
"12 Core Values for Thais" ค่านิยม 12 ประการ
PDF
Ramcube - Cmms³ maintenance management system sw Ver. 2016
PPTX
The 12 Thai values ค่านิยม 12 ประการ
PPTX
Production in relation to economies and diseconomies of scale
PDF
Production Strategy (ZHAW Case HS12)
PPT
Biomolekul ppt
PPTX
Traffic jam in dhaka
PPTX
Copal's story
Simplifying algebraic expressions
TAM new report
Slope
Social Media Case (ZHAW)
Solving algebraic expressions
RAMCUBE - Company profile
17 juli 1203 beleg van constantinopel
Hacking
How to Make a Resume
"12 Core Values for Thais" ค่านิยม 12 ประการ
Ramcube - Cmms³ maintenance management system sw Ver. 2016
The 12 Thai values ค่านิยม 12 ประการ
Production in relation to economies and diseconomies of scale
Production Strategy (ZHAW Case HS12)
Biomolekul ppt
Traffic jam in dhaka
Copal's story
Ad

Similar to RAMCUBE - Asset management services (20)

PDF
678177833-KPIs-and-Performance-Helmut-Salsland-BRCE2016.pdf
PPTX
Asset Integrity _ Asset Managment ISO 55001 Certification
PDF
Reliability Of Computer Systems And Networks Fault Tolerance Analysis And Des...
PDF
SUOKAS Kuwait s-2015 slides_FINAL
PDF
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)
PPTX
ASSET INTEGRITY MANAGEMENT SYSTEM-BOOK.pptx
PDF
Infrastructure Management PowerPoint Presentation Slides
PDF
Master Data, From Inspection to Analytics to Business Decision
PDF
2011 Summit Fixed Equipment Inspection Programs_r6.pdf
PDF
Lcc book chapter_6_parra_asset_management
PDF
A life cycle approach to corrosion management and asset integrity
PPTX
Inspecta OTD presentation
PDF
reliability plan.pdf
DOC
Reliability Engineer
DOC
Preventive Maintenance Process and Program
PDF
2025-04 Quality Webinar Topic - Mechanical Integrity Overview.pdf
PDF
Rules_of_Thumb_for_Maintenance_and_Relia.pdf
PPTX
BIM For Free_28May2013_EdBartlett_BIM and lifecycle management
PDF
Zablocki, Shawn, Olsson Associates, Mechanical Integrity Programs for MRP and...
PPTX
How to Instill a Culture of Reliability - "The Big Bang"
678177833-KPIs-and-Performance-Helmut-Salsland-BRCE2016.pdf
Asset Integrity _ Asset Managment ISO 55001 Certification
Reliability Of Computer Systems And Networks Fault Tolerance Analysis And Des...
SUOKAS Kuwait s-2015 slides_FINAL
RAE BROCHURE - SERVICES OVERVIEW (FEB 2015 00.099.075)
ASSET INTEGRITY MANAGEMENT SYSTEM-BOOK.pptx
Infrastructure Management PowerPoint Presentation Slides
Master Data, From Inspection to Analytics to Business Decision
2011 Summit Fixed Equipment Inspection Programs_r6.pdf
Lcc book chapter_6_parra_asset_management
A life cycle approach to corrosion management and asset integrity
Inspecta OTD presentation
reliability plan.pdf
Reliability Engineer
Preventive Maintenance Process and Program
2025-04 Quality Webinar Topic - Mechanical Integrity Overview.pdf
Rules_of_Thumb_for_Maintenance_and_Relia.pdf
BIM For Free_28May2013_EdBartlett_BIM and lifecycle management
Zablocki, Shawn, Olsson Associates, Mechanical Integrity Programs for MRP and...
How to Instill a Culture of Reliability - "The Big Bang"

More from lt1968 (6)

PDF
RAMCUBE - DOC3 software
PDF
RAMCUBE - engineering services
PDF
RAMCUBE - CODE3 software
PDF
RAMCUBE - CMMS software (data sheet)
PDF
RAMCUBE - scheda Animp
PDF
Cmms3 presentation (Rev Apr2015)
RAMCUBE - DOC3 software
RAMCUBE - engineering services
RAMCUBE - CODE3 software
RAMCUBE - CMMS software (data sheet)
RAMCUBE - scheda Animp
Cmms3 presentation (Rev Apr2015)

Recently uploaded (20)

PPTX
Internet of Things (IOT) - A guide to understanding
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PPTX
bas. eng. economics group 4 presentation 1.pptx
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPT
Mechanical Engineering MATERIALS Selection
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
web development for engineering and engineering
DOCX
573137875-Attendance-Management-System-original
PDF
PPT on Performance Review to get promotions
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PPTX
Construction Project Organization Group 2.pptx
PPTX
Sustainable Sites - Green Building Construction
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
Internet of Things (IOT) - A guide to understanding
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
bas. eng. economics group 4 presentation 1.pptx
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
Automation-in-Manufacturing-Chapter-Introduction.pdf
Mechanical Engineering MATERIALS Selection
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
web development for engineering and engineering
573137875-Attendance-Management-System-original
PPT on Performance Review to get promotions
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
CYBER-CRIMES AND SECURITY A guide to understanding
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
Model Code of Practice - Construction Work - 21102022 .pdf
R24 SURVEYING LAB MANUAL for civil enggi
Construction Project Organization Group 2.pptx
Sustainable Sites - Green Building Construction
Operating System & Kernel Study Guide-1 - converted.pdf

RAMCUBE - Asset management services

  • 2. ASSET MANAGEMENT SERVICES 1 • 6 During the lifecycle phases of a Project, starting from the Project Concept, followed by a feasibility study preliminary Design and then the detail of the asset design, there are a lot of opportunities for influencing the quality of the asset in terms of construction, functionality, reliability, availability, maintainability, inspectability and cost. Maintenance Engineering and Asset Integrity Management are sure two approaches useful to evaluate the lifecycle of the asset, during the different phases of a Project, and finalized to optimize the Asset Life.
  • 3. RAMCUBE Asset Management Services are addressed to provide and to assure the best Asset Life Cycle Management ASSET MANAGEMENT SERVICES 2 • 6 MAINTENANCEENGINEERING ASSETINTEGRITYMANAGEMENT ASSET MANAGEMENT DATA& DOCUMENT MANAGEMENT CIMS MASTER EQUIPMENT LIST - MEL OPERABILITY & MAINTAINABILITY ANALYSIS RELIABILITY CENTRED MAINTENANCE - RCM SPARE PARTS & WAREHOUSE MANAGEMENT CMMS INSPECTION PLAN FITNESS FOR SERVICE “FFS” RISK BASED INSPECTION “RBI” DEGRADATION MECHANISMS CORROSION LOOP INSPECTION ASSET REGISTER
  • 4. DATA & DOCUMENT MANAGEMENT • Managing data & document relevant to components, materials and documents • Cost reduction • Rationalization and optimization of company processes integration of engineering, maintenance and production MASTER EQUIPMENT LIST - MEL • Definition of the item to be included in the maintenance analysis • Development of an appropriate “maintenance manual” for the collection of all the vendor operation and maintenance manuals MAINTENANCE ENGINEERING 3 • 6 OPERABILITY & MAINTAINABILITY ANALYSIS • Checking and assuring operability and maintainability aspects • Ensuring that engineering and procurement of project facilities meet safety, accessibility, operability, maintainability and HFE objectives RELIABILITY CENTRED MAINTENANCE - RCM • Determination of “what activity” is required for each item in terms of maintenance • Failure mode and effect analysis (FMEA) development • Criticality analysis development • Selection of the right maintenance policy to apply for each item • Customized maintenance plan 2 3 4 1
  • 5. • Evaluation of the reliability, availability, maintainability and safety of complex systems • Determination of the production availability • Suggestion of potential solutions in order to improve the reliability and the availability of the plant WAREHOUSE MANAGEMENT • Managing and optimization of all spare parts necessary for the operations • Material coding • Optimization of the warehouse stock levels with the anticipated behaviour of the equipment • Availability and storing into the site warehouses • Interchangeability report MAINTENANCE ENGINEERING 4 • 6 CMMS • Document management • Maintenance activities management and scheduling • Approving work flow • Resources and material optimization • Key performance evaluation RAM ANALYSIS 5 6 7
  • 6. INSPECTION ASSET REGISTER • Clearly definition of the item to be inspected • Appropriate, adequate and customized inspection plan • Rationalization and optimization of company processes integration of engineering, maintenance and production CORROSION LOOP • Definition of homogeneous groups of items in terms of design, operating parameters, material, and inspection topics • Determination of potential damage mechanisms, corrosion types and corrosion rates for each corrosion loop and item • Risk ranking ASSET INTEGRITY MANAGEMENT 5 • 6 DEGRADATION MECHANISMS • Identification of the appropriate degradation mechanism • Determination of the susceptibilities for all item • Quality, appropriate and effectiveness of the inspection techniques to be selected RISK BASED INSPECTION - RBI • Optimization of the inspection activities performed • Risk ranking • Improving the management of the assets integrity and reducing the overall costs for inspection and monitoring • Identification of the areas and items with higher risk categories and development a prioritized list for more in-depth inspection or analysis 2 3 4 1
  • 7. • Procedures assessment • Taking in consideration of the plant history • Calculation of the remaining life of an item • Defects characterization INSPECTION PLAN • Development of the appropriate and customized inspection plan • Development of written scheme of examination linked for each item in order to manage what, when and where inspection will be performed and the most appropriate inspection techniques ASSET INTEGRITY MANAGEMENT 6 • 6 CIMS • Inspection activities management and scheduling • Approving work flow • Inspection report management • Non destructive testing - resources and material optimization • Remaining life and corrosion rate calculation FITNESS FOR SERVICE - FFS 5 6 7
  • 8. RAMCUBE s.r.l. via Parmigianino, 16 20148 Milano VAT-ID IT12265050158 www.ramcube.it ramcube@ramcube.it ramcube@pec.ramcube.it T +39 02 87 23 77 00 F +39 02 87 23 77 34 REL.1.1 Share Capital € 50,000 fully paid-up.Tax code and Milan Register of Companies No.: 12265050158 - Certified quality system according to UNI EN ISO 9001:2008