SlideShare a Scribd company logo
Project Report
On
Ore Body Modeling & Comparison Between Different
Reserve Estimation Techniques with Datamine
Submitted By
Abhilash Chandrawat
Sushant Kumar
(B.Tech. Final Year)
Guided By
Dr. S.C Jain
Asstt. Professor
Dept. of Mining Engineering
Reduction in cost and time of reserve estimation
process.
To predict suitable mineral estimation tech. for
achieving efficient, tending towards more
precise and accurate computation .
Many of the mines are abandoned due to lack of
knowledge about structural geology and its
various techniques related to ore reserve
estimation.
To facilitate economic mining activity by
predicting appropriate estimation method.
Objectives of the project:
Mineral reserve is a economically mineable part of a measured or
indicated mineral resource demonstrated by at least a preliminary
feasible study.
Reserve Estimation Methods
Nearest Neighbour method
Inverse distance method
Ordinary krigging method
Nearest Neighbour Method(Proximal Interpolation) :
Interpolation is the method of approximation of the value
of a function for a given point in some space. The nearest
neighbor method selects the value of the nearest point in
the predefined space and does not consider the value of
other neighboring points.
Inverse Distance Method:
The inverse-distance weighted procedure is versatile, easy
to program and understand, and is fairly accurate under a
wide range of conditions. Using this method, the property
at each unknown location for which a solution is sought.
The basic equation used in inverse distance method is:
Ordinary Krigging Method :
Krigging is an estimating method that gives the minimum
variance unbiased linear estimates of point values or of
block averages. The accuracy of the estimates depends
on the several factors which are as follows:
The main venture in ordinary krigging is to build a
variogram from the dissipate point set to be interpolated.
A variogram comprises of two parts: an experimental
variogram and a model variogram.
The basic equation used in ordinary kriging is:
World’s Leading integrated software for the natural industries.
Used for data capture & analysis, exploration, geology,
geochemistry, surveying, ore body modelling, UG & Open Pit
Mine Design and Production Planning and also in related
areas such as environmental studies.
Key Advantages:
1. Data entry & Validation
2. Geological Modelling
3. Mine Planning & Production Scheduling (NPV Scheduler)
4. Ramps and Haul Road Design
Brief Introduction Of CAE’s DATAMINE Software
METHODOLOGY
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Reserve Estimation Using DATAMINE software
Conclusion
- The error in estimation in case of Ordinary Krigging was
computed and the efficiency of reserve estimation using
Nearest Neighbor and Inverse Distance (with power 2 & 3)
method was compared with Ordinary Krigging method
assuming it to be the best linear unbiased method.
- From the obtained estimation results it was concluded that
Nearest Neighbor method overestimates the Copper
percentage and underestimates the volume of the reserve
while Inverse distance (with power 2 & 3) method
overestimates both attributes in comparison to Ordinary
Krigging.
THANK YOU!

More Related Content

PDF
Resource estimation using Surpac software in mining
PPTX
Mine planning feasibility report
PPTX
Block modeling using surpac
PPTX
Basalts
PDF
Geomodelling, resource & reserve estimation using mining software
PPTX
Underground mining methods
PDF
Studio 3 Geology Training Manual.pdf
PDF
Mineral Reserve Estimation In The Real World
Resource estimation using Surpac software in mining
Mine planning feasibility report
Block modeling using surpac
Basalts
Geomodelling, resource & reserve estimation using mining software
Underground mining methods
Studio 3 Geology Training Manual.pdf
Mineral Reserve Estimation In The Real World

What's hot (20)

PPTX
Metalogénesis e hidrotermalismo.pptx
PPT
Economic geology - Introduction
PPTX
Southern granulite
PPT
Fe-deposits
PPT
Ore texture and paragenesis krishanu
PDF
Source rock
PDF
Surpac geological modelling 3
PPT
Carbonate rocks
PPT
Economic geology - Supergene ore deposits
PDF
Topic 3 ore forming processes and magmatic mineral deposits
PPT
Economic geology - Magmatic ore deposits 2
PPT
Geological criteria for ore prospecting
PDF
LA NORMATIVA CANADIENSE NI 43-101
PPT
Geological mapping
PPTX
Cut & fill mining method
PPTX
Mineral exploration
PPTX
ORE TEXTURES.pptx
PDF
Topic 7 sedimentary mineral deposits
Metalogénesis e hidrotermalismo.pptx
Economic geology - Introduction
Southern granulite
Fe-deposits
Ore texture and paragenesis krishanu
Source rock
Surpac geological modelling 3
Carbonate rocks
Economic geology - Supergene ore deposits
Topic 3 ore forming processes and magmatic mineral deposits
Economic geology - Magmatic ore deposits 2
Geological criteria for ore prospecting
LA NORMATIVA CANADIENSE NI 43-101
Geological mapping
Cut & fill mining method
Mineral exploration
ORE TEXTURES.pptx
Topic 7 sedimentary mineral deposits
Ad

Viewers also liked (12)

PDF
Topic 3- mineral resource and reserve
PPTX
Sample and sampling techniques
PPT
Sampling for Mineral Resource definition – A pragmatic approach.SAIMM present...
PPTX
sushant_ppt _Final Year
PPTX
Recent Advancements in Automation and Remote Control Technology
PPTX
Western Coalfield Limited- Industrial Training Report
PPTX
Environmental Factors Affecting Dimensional Stone Quarrying
PPTX
Introduction to Surpac
PDF
Topic 7-mining methods-part iii -surface mining- placer mining
PPTX
sampling ppt
PPT
Chapter 8-SAMPLE & SAMPLING TECHNIQUES
PPTX
Sampling and Sample Types
Topic 3- mineral resource and reserve
Sample and sampling techniques
Sampling for Mineral Resource definition – A pragmatic approach.SAIMM present...
sushant_ppt _Final Year
Recent Advancements in Automation and Remote Control Technology
Western Coalfield Limited- Industrial Training Report
Environmental Factors Affecting Dimensional Stone Quarrying
Introduction to Surpac
Topic 7-mining methods-part iii -surface mining- placer mining
sampling ppt
Chapter 8-SAMPLE & SAMPLING TECHNIQUES
Sampling and Sample Types
Ad

Recently uploaded (20)

PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
bas. eng. economics group 4 presentation 1.pptx
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPT
Project quality management in manufacturing
PPTX
Geodesy 1.pptx...............................................
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPTX
web development for engineering and engineering
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PDF
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
PDF
Well-logging-methods_new................
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
Foundation to blockchain - A guide to Blockchain Tech
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
bas. eng. economics group 4 presentation 1.pptx
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Operating System & Kernel Study Guide-1 - converted.pdf
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
Project quality management in manufacturing
Geodesy 1.pptx...............................................
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
web development for engineering and engineering
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
Well-logging-methods_new................
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
Embodied AI: Ushering in the Next Era of Intelligent Systems

Reserve Estimation Using DATAMINE software

  • 1. Project Report On Ore Body Modeling & Comparison Between Different Reserve Estimation Techniques with Datamine Submitted By Abhilash Chandrawat Sushant Kumar (B.Tech. Final Year) Guided By Dr. S.C Jain Asstt. Professor Dept. of Mining Engineering
  • 2. Reduction in cost and time of reserve estimation process. To predict suitable mineral estimation tech. for achieving efficient, tending towards more precise and accurate computation . Many of the mines are abandoned due to lack of knowledge about structural geology and its various techniques related to ore reserve estimation. To facilitate economic mining activity by predicting appropriate estimation method. Objectives of the project:
  • 3. Mineral reserve is a economically mineable part of a measured or indicated mineral resource demonstrated by at least a preliminary feasible study.
  • 4. Reserve Estimation Methods Nearest Neighbour method Inverse distance method Ordinary krigging method Nearest Neighbour Method(Proximal Interpolation) : Interpolation is the method of approximation of the value of a function for a given point in some space. The nearest neighbor method selects the value of the nearest point in the predefined space and does not consider the value of other neighboring points.
  • 5. Inverse Distance Method: The inverse-distance weighted procedure is versatile, easy to program and understand, and is fairly accurate under a wide range of conditions. Using this method, the property at each unknown location for which a solution is sought. The basic equation used in inverse distance method is:
  • 6. Ordinary Krigging Method : Krigging is an estimating method that gives the minimum variance unbiased linear estimates of point values or of block averages. The accuracy of the estimates depends on the several factors which are as follows: The main venture in ordinary krigging is to build a variogram from the dissipate point set to be interpolated. A variogram comprises of two parts: an experimental variogram and a model variogram. The basic equation used in ordinary kriging is:
  • 7. World’s Leading integrated software for the natural industries. Used for data capture & analysis, exploration, geology, geochemistry, surveying, ore body modelling, UG & Open Pit Mine Design and Production Planning and also in related areas such as environmental studies. Key Advantages: 1. Data entry & Validation 2. Geological Modelling 3. Mine Planning & Production Scheduling (NPV Scheduler) 4. Ramps and Haul Road Design Brief Introduction Of CAE’s DATAMINE Software
  • 43. Conclusion - The error in estimation in case of Ordinary Krigging was computed and the efficiency of reserve estimation using Nearest Neighbor and Inverse Distance (with power 2 & 3) method was compared with Ordinary Krigging method assuming it to be the best linear unbiased method. - From the obtained estimation results it was concluded that Nearest Neighbor method overestimates the Copper percentage and underestimates the volume of the reserve while Inverse distance (with power 2 & 3) method overestimates both attributes in comparison to Ordinary Krigging.