Personal Data
Mr. Paramatt Prom-on
Birth Date: Aug 10, 1978
Address : 235/53 Lopburiramasuan Road M2 Phawong Muang Songkhla 90100
Email: paramatt.promon@gmaill.com
Tel: +66814124573,+66816902260
Education
Bachelor's Degree in Electrical Engineering , Major Control and Automatic
May. 2002, King Mongkut’s Institute of Technology North Bangkok, Bangkok GPA 2.61
High School/College
High School (Mathematics and science ),Mahavajiravudh School Songkhla GPA 2.16
Working Experience
Total working experience: 13 years
1. ISHIDA(THAILAND) Co.,Ltd , Bangkok , Thailand
Industry: Marketing and Service
Company business: the world's leading manufacturer of precision weighing and packaging equipment.
Position: Service engineer
July 2002 – Sep 2004
Responsibilities: Installation & maintenance for food packaging , inspection ,distribution system including
preventive and corrective maintenance. Customer adviser to improve productivity and production line design.
Inventory control for spare parts.
2002 Install weighing packing and inspect line in GFPT factory including commissioning and test run
2003 Install automatic product distribution system and packing line in siam ruammite factory including
commissioning and test run
2004 Install weighing and inspect machine in EFFEM FOOD factory (Project Explanation) including commissioning
and test run, Install High speed packing machine in Frito-Lays factory including commissioning and test run
2. CONOCO(THAILAND) Co.,Ltd,Bangkok,Thailand
Industry: Fuel Marketing
Company business: the world's leading Thailand leading Gas station operation
Position: Facility Coordinator
Oct 2004 – May 2005
Responsibilities:. Control Repair & Maintenances work to highest quality, minimized down time and best safety for
21 Jet gas station.
Position: Project Engineer
Jun 2004 – Mar 2007
Responsibilities:. Full scope project management for oil storage terminal and retail station construction.
New site construction
• Responsible for project work scope, project schedules, cost estimates, and development of engineering
designs and specifications Provide on-site supervision during construction on safety and Risk management.
Reviews construction schedule with teams for maximizing quality. Insures contractor equipment, QA/QC
and project costs are being tracked during construction.
Product Terminal storage tank construction with gasohol blending system (Equipment& Instrument)
• A part of design team to determine area classification and instrument selection according to NEC and IEC
standard
• Instrument and Equipment selection. Monitor and control project progress safety Quality schedule and
expenditure for responsible work. Assists in preparation and participation of HAZOP reviews
Underground Storage Tank replacement 8 station for HSE reason
• Responsible for project work scope, project schedules, cost estimates and budget
control
3. Baker Hughes Inc.
Position: Maintenance Engineer (Wireline Services)
Apr 2007 – Apr 2011
Responsibilities:. Down Hole and surface wireline logging Equipment maintenance for Opened and Cased hole
special assign for Reservoir Fluid testing instruments maintenance
Position: Field Engineer (Wireline Services)
May 2011 – Nov 2015
Responsibilities:
Job preparation Planning at customer office together will client representative to meet operation objective select
suitable equipment and instrument according to customer needed. Review operation procedure to complied
customer and company safety requirement
Operation at Job site As Team leader and overall field responsible on Cased hole wireline operation as
international operation assignment ensure all equipment are meet customer requirement and valid inspection
certificate
Plan and Execute wireline well intervention and complexly rig up and wireline deployment risk management, (logging
and perforation )
Work together with client and other service company to design well program ,operation procedure, rig up schematic
in order to meet international well control standard, maximize safe work and reasonable time spending
Design downhole tool string and rig up equipment to meet client requirement
conduct safe operation for hazard material usage and transportation (Explosive and Radioactive material)
Work as Engineer In Charge(Acting Mamager) at Kemaman wireline form June – July 2015
working country : Vietnam, Malaysia, Thailand and Middle East country
Experience
Well understand about oil & gas well drilling ,evaluation ,completion and production , well control in order to perform
well intervention
coil tubing convey wireline logging and perforation,
Wireine operation in Hydraulic fracturing with complexly rig up
10 K wireline Pressure control equipment operation on drilling rig and production platform
Help customer to analysis reservoir performance before and post production for future oil and gas production plan
Passed IWCF for well intervention level 2
Strengths
1. Ambitious / Achievement oriented
I am very ambitious to achieve my life's goals. I never think of being just an employee. I set goals and devise
approaches to reach those goals. I am willing to sacrifice myself
2. Able to be committed/Responsible
I am committed to my jobs. I willingly take on projects assigned to me and see them through to completion.
Additional Information
Based on my professional background and experiences, I believe that I will make significant contributions to your
company. I am seeking a challenging position which provides the opportunity to further my career.

More Related Content

DOCX
resume paramatt1
PDF
Pramesak Poonthong
PDF
Sumpun Paungplub Resume
DOCX
swapnil cv
PDF
Resume
DOCX
Jacob Samuel CV
DOCX
Jacob samuel cv
resume paramatt1
Pramesak Poonthong
Sumpun Paungplub Resume
swapnil cv
Resume
Jacob Samuel CV
Jacob samuel cv

What's hot (18)

DOC
DOC
DOC
Naveen Resume.doc
PDF
NISHANT SAXENA QUALITY ENGINEER RESUME
DOCX
CV of Mohammed Uzair
DOC
Chak-krit S_Resume
DOC
mechanical_engineer-raman-cv.
DOC
Mitchell Lee resume
DOC
Arun Siby - RESUME
DOCX
rushikesh cv revision 1 8-12-2016
DOCX
CV ...
DOCX
Hany Salah last update C.V
DOCX
Hany Salah last update C.V
DOC
CV-Mechanical Engineer
DOC
Cv melwin samuel w lt
DOC
Cv melwin samuel w lt 2
PDF
Samaa CV
DOC
Cv melwin samuel w lt
Naveen Resume.doc
NISHANT SAXENA QUALITY ENGINEER RESUME
CV of Mohammed Uzair
Chak-krit S_Resume
mechanical_engineer-raman-cv.
Mitchell Lee resume
Arun Siby - RESUME
rushikesh cv revision 1 8-12-2016
CV ...
Hany Salah last update C.V
Hany Salah last update C.V
CV-Mechanical Engineer
Cv melwin samuel w lt
Cv melwin samuel w lt 2
Samaa CV
Cv melwin samuel w lt
Ad

Viewers also liked (14)

PDF
Curriculum Vitae Jan 2016 Consultant Main
DOCX
PDF
Mart_Resume 2015_Update
PDF
Yonlaya_resume Jul 2016
PDF
RESUME - Danny Ng(Aug 2016)
PDF
RESUME_Chitchaya Chongchuwong
DOC
Resume 2016
PDF
Resume - SAPITCHA PROMMIN
PDF
Phat Resume
PDF
Nabeel+Azmat
DOC
update resume (1)
PDF
Tras_Obsuwan Resume 29-7-2016
DOC
aldrin palad resume 2016
Curriculum Vitae Jan 2016 Consultant Main
Mart_Resume 2015_Update
Yonlaya_resume Jul 2016
RESUME - Danny Ng(Aug 2016)
RESUME_Chitchaya Chongchuwong
Resume 2016
Resume - SAPITCHA PROMMIN
Phat Resume
Nabeel+Azmat
update resume (1)
Tras_Obsuwan Resume 29-7-2016
aldrin palad resume 2016
Ad

Similar to resume paramatt (20)

DOCX
SushantCV
DOC
Najeeullah CV
DOC
Amrendra Singh's Resume
PDF
CV-Ali Alhasani 2016
DOCX
resumeanbu
DOCX
Resume for Mechanical Engineer (1)
PDF
Yuthasil cv-june-2016-pp-1
PDF
Yuthasil-CV-June-2016-pp-1
DOC
SRIMANIVANNAN UPDATED RESUME - 12.04.2015
PDF
Wichai B_CV_2016
DOC
Velpandi CV
DOC
Preetam_Goswami_Resume
PDF
CV John Mathew
DOC
shibu resume
PDF
upated c.v sa S.E.C (1)
DOC
CV_PhamDinhRinh
PDF
Mechanical engg-- 8+Yrs. Exp.
DOC
CV john philbert supan
DOC
D duronslet resume (r8)
DOCX
CV_Chatchawal_Yodpol_16-03-2016
SushantCV
Najeeullah CV
Amrendra Singh's Resume
CV-Ali Alhasani 2016
resumeanbu
Resume for Mechanical Engineer (1)
Yuthasil cv-june-2016-pp-1
Yuthasil-CV-June-2016-pp-1
SRIMANIVANNAN UPDATED RESUME - 12.04.2015
Wichai B_CV_2016
Velpandi CV
Preetam_Goswami_Resume
CV John Mathew
shibu resume
upated c.v sa S.E.C (1)
CV_PhamDinhRinh
Mechanical engg-- 8+Yrs. Exp.
CV john philbert supan
D duronslet resume (r8)
CV_Chatchawal_Yodpol_16-03-2016

resume paramatt

  • 1. Personal Data Mr. Paramatt Prom-on Birth Date: Aug 10, 1978 Address : 235/53 Lopburiramasuan Road M2 Phawong Muang Songkhla 90100 Email: paramatt.promon@gmaill.com Tel: +66814124573,+66816902260 Education Bachelor's Degree in Electrical Engineering , Major Control and Automatic May. 2002, King Mongkut’s Institute of Technology North Bangkok, Bangkok GPA 2.61 High School/College High School (Mathematics and science ),Mahavajiravudh School Songkhla GPA 2.16 Working Experience Total working experience: 13 years 1. ISHIDA(THAILAND) Co.,Ltd , Bangkok , Thailand Industry: Marketing and Service Company business: the world's leading manufacturer of precision weighing and packaging equipment. Position: Service engineer July 2002 – Sep 2004 Responsibilities: Installation & maintenance for food packaging , inspection ,distribution system including preventive and corrective maintenance. Customer adviser to improve productivity and production line design. Inventory control for spare parts. 2002 Install weighing packing and inspect line in GFPT factory including commissioning and test run 2003 Install automatic product distribution system and packing line in siam ruammite factory including commissioning and test run 2004 Install weighing and inspect machine in EFFEM FOOD factory (Project Explanation) including commissioning and test run, Install High speed packing machine in Frito-Lays factory including commissioning and test run 2. CONOCO(THAILAND) Co.,Ltd,Bangkok,Thailand Industry: Fuel Marketing Company business: the world's leading Thailand leading Gas station operation Position: Facility Coordinator Oct 2004 – May 2005 Responsibilities:. Control Repair & Maintenances work to highest quality, minimized down time and best safety for 21 Jet gas station. Position: Project Engineer Jun 2004 – Mar 2007 Responsibilities:. Full scope project management for oil storage terminal and retail station construction. New site construction • Responsible for project work scope, project schedules, cost estimates, and development of engineering designs and specifications Provide on-site supervision during construction on safety and Risk management. Reviews construction schedule with teams for maximizing quality. Insures contractor equipment, QA/QC and project costs are being tracked during construction.
  • 2. Product Terminal storage tank construction with gasohol blending system (Equipment& Instrument) • A part of design team to determine area classification and instrument selection according to NEC and IEC standard • Instrument and Equipment selection. Monitor and control project progress safety Quality schedule and expenditure for responsible work. Assists in preparation and participation of HAZOP reviews Underground Storage Tank replacement 8 station for HSE reason • Responsible for project work scope, project schedules, cost estimates and budget control 3. Baker Hughes Inc. Position: Maintenance Engineer (Wireline Services) Apr 2007 – Apr 2011 Responsibilities:. Down Hole and surface wireline logging Equipment maintenance for Opened and Cased hole special assign for Reservoir Fluid testing instruments maintenance Position: Field Engineer (Wireline Services) May 2011 – Nov 2015 Responsibilities: Job preparation Planning at customer office together will client representative to meet operation objective select suitable equipment and instrument according to customer needed. Review operation procedure to complied customer and company safety requirement Operation at Job site As Team leader and overall field responsible on Cased hole wireline operation as international operation assignment ensure all equipment are meet customer requirement and valid inspection certificate Plan and Execute wireline well intervention and complexly rig up and wireline deployment risk management, (logging and perforation ) Work together with client and other service company to design well program ,operation procedure, rig up schematic in order to meet international well control standard, maximize safe work and reasonable time spending Design downhole tool string and rig up equipment to meet client requirement conduct safe operation for hazard material usage and transportation (Explosive and Radioactive material) Work as Engineer In Charge(Acting Mamager) at Kemaman wireline form June – July 2015 working country : Vietnam, Malaysia, Thailand and Middle East country Experience Well understand about oil & gas well drilling ,evaluation ,completion and production , well control in order to perform well intervention coil tubing convey wireline logging and perforation, Wireine operation in Hydraulic fracturing with complexly rig up 10 K wireline Pressure control equipment operation on drilling rig and production platform Help customer to analysis reservoir performance before and post production for future oil and gas production plan Passed IWCF for well intervention level 2 Strengths 1. Ambitious / Achievement oriented I am very ambitious to achieve my life's goals. I never think of being just an employee. I set goals and devise approaches to reach those goals. I am willing to sacrifice myself 2. Able to be committed/Responsible I am committed to my jobs. I willingly take on projects assigned to me and see them through to completion. Additional Information Based on my professional background and experiences, I believe that I will make significant contributions to your
  • 3. company. I am seeking a challenging position which provides the opportunity to further my career.