Risk Assessment
Likelihood of occurrence: High, Medium, Unlikely
Site Name Risk Number 1
Project A2 Media News Package Name Arman, Rye & Samit
Location Trafalgar Square Assistants
Date Assessed 1st
November
What hazards
have been
identified?
What are the
potential injuries
or damage?
Severity (1, 2 or 3)
What measures have
been taken to prevent
injury or damage?
Number of
people at
risk
What additional
measures or
actions are
required?
Who is responsible for
action?
R
A
G
Knocking
equipment over
2 Film in a less populated
section of the area
3 Some should
guard the
equipment
Arman, Rye & Samit
Risk of getting
robbed
3 Guard the equipment 3 If not in use, keep
the equipment
packed away at
all time
Arman, Rye & Samit
Likelihood of occurrence: High, Medium, Unlikely
What hazards
have been
identified?
What are the
potential injuries
or damage?
Severity (1, 2 or 3)
What measures have
been taken to prevent
injury or damage?
Number of
people at
risk
What additional
measures or
actions are
required?
Who is responsible for
action?
R
A
G
Risk of getting
robbed
3 Stay with equipment at
all times
1 Use as little
equipment as
possible and
carry a bag easy
to lock and hold
easily
Seyi & Arman
Knocking over
equipment
1 Keep as much room
between the equipment
and the public
Everyone
in the
building
Use handheld
items
Megan & Seyi
Site Name Concerts and Meet & Greets Risk Number 2
Project A2 Media News Package Name Seyi & Arman
Location JD Oxford Street, HMV Oxford Street,
Alexandra Palace
Assistants
Date Assessed 25th
January 2017, 15th
November, 17th
November
Likelihood of occurrence: High, Medium, Unlikely
Site Name Chagford Road Risk-A number 3
Project A2 Media News Package Name Seyi, Rye & Samit
Location Marylebone Assistants -
Date Assessed 30th
November
Likelihood of occurrence: High, Medium, Unlikely
What hazards
have been
identified?
What are the
potential injuries
or damage?
Severity (1, 2 or 3)
What measures have
been taken to prevent
injury or damage?
Number of
people at
risk
What additional
measures or
actions are
required?
Who is responsible for
action?
R
A
G
Tripping over
cables
2 Keep all cables out of
the way.
5 To unplug what is
not necessary and
tape down loose
wires
Megan & Seyi
Knocking over
equipment
1 Make room between
each piece of
equipment if it is
necessary to walk past
it.
5 Megan & Seyi
Site Name Classroom Risk Number 4
Project A2 Media News Package Name Rye & Samit
Location Mill Hill County High School Assistant
Date Assessed 25th
, 31st
January
What hazards have
been identified?
What are the
potential injuries
or damage?
What measures have
been taken to prevent
injury or damage?
Number of
people at
risk
What additional
measure or
action are
required?
Who is responsible for
action?
Knocking over
equipment
1 Make room between
each piece of
equipment if it is
necessary to walk past
it.
6 Use as little large
equipment as
possible and
keep out of
harms way
Rye & Samit
Iron catching fire 3 Turn the iron off when
not in use
2 Pack the iron
away when done
Rye & Samit
Site Name Classroom Risk Number 5
Project A2 Media News Package Name Rye
Location Mill Hill County High School Assistant Seyi & Arman
Date Assessed 28th
February
Likelihood of occurrence: High, Medium, Unlikely
Site Name Risk-A Number 6
Project A2 Media News Package Name Samit & Arman
Location Mill Hill County High School Assistant
Date Assessed 22nd
& 27th
March
Likelihood of occurrence: High, Medium, Unlikely
Site Name Risk-A Number 6
Project A2 Media News Package Name Samit & Arman
Location Mill Hill County High School Assistant
Date Assessed 22nd
& 27th
March
Likelihood of occurrence: High, Medium, Unlikely

More Related Content

DOC
Risk assessment Media
PDF
DOC
Shooting schedule - IMNL
DOCX
Risk assessment gabriel.kelly.28.04.21
DOC
Risk assessment
DOCX
Barbering risk assessment
DOCX
Risk assessment
DOCX
Risk assessments
Risk assessment Media
Shooting schedule - IMNL
Risk assessment gabriel.kelly.28.04.21
Risk assessment
Barbering risk assessment
Risk assessment
Risk assessments

Similar to Risk Assessment - IMNL (20)

DOCX
Risk Assessment Template.docx
DOCX
Risk assessment template
DOC
Risk Assessment
DOC
Risk assessment template media
DOCX
risk assessment
DOCX
Risk Assessment
DOCX
Risk Assessment Template (Exemplar).docx
DOCX
Risk Assessment.docx
DOCX
Risk Assessment Template (Exemplar).docx
DOCX
Risk assessment
DOCX
"Indelible" Risk Assessment
DOCX
Risk assessment for pitch
DOCX
Riskassessmenttemplate 200124132817
DOCX
Risk assessment template. copy
DOCX
Risk assessment template media
DOCX
Risk assessment
DOCX
Risk assessment 1
DOC
Risk assessment template media
DOCX
Risk assessment template (1)
ODT
Risk Assessment
Risk Assessment Template.docx
Risk assessment template
Risk Assessment
Risk assessment template media
risk assessment
Risk Assessment
Risk Assessment Template (Exemplar).docx
Risk Assessment.docx
Risk Assessment Template (Exemplar).docx
Risk assessment
"Indelible" Risk Assessment
Risk assessment for pitch
Riskassessmenttemplate 200124132817
Risk assessment template. copy
Risk assessment template media
Risk assessment
Risk assessment 1
Risk assessment template media
Risk assessment template (1)
Risk Assessment
Ad

More from SeyiiO (17)

DOCX
Final script
DOC
News Package: Shooting Schedule
PPTX
Evaluation Question 6 Extract: MSP software
DOCX
My Music Video Idea/Concept/Message
DOCX
Hip Hop music video Focus Group Questions
DOCX
Song Lyric Visuals
PPTX
Target Audience: Secondary Data
DOCX
New Script - The Ruin's Mist
PPTX
Evaluation Question Six
PPTX
Filming & Editing Updates
DOCX
Evaluation question 4
PPTX
Evaluation question 2
DOC
BBFC Post
DOC
Shooting schedule - The Ruin's Mist
PPTX
Storyboarding
PPTX
Pitches
DOCX
Target Audience Analysis
Final script
News Package: Shooting Schedule
Evaluation Question 6 Extract: MSP software
My Music Video Idea/Concept/Message
Hip Hop music video Focus Group Questions
Song Lyric Visuals
Target Audience: Secondary Data
New Script - The Ruin's Mist
Evaluation Question Six
Filming & Editing Updates
Evaluation question 4
Evaluation question 2
BBFC Post
Shooting schedule - The Ruin's Mist
Storyboarding
Pitches
Target Audience Analysis
Ad

Recently uploaded (20)

PDF
Climate and Adaptation MCQs class 7 from chatgpt
PDF
LIFE & LIVING TRILOGY- PART (1) WHO ARE WE.pdf
PPTX
Computer Architecture Input Output Memory.pptx
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PDF
HVAC Specification 2024 according to central public works department
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
My India Quiz Book_20210205121199924.pdf
PPTX
Climate Change and Its Global Impact.pptx
PDF
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 2).pdf
PDF
Journal of Dental Science - UDMY (2020).pdf
PDF
LIFE & LIVING TRILOGY - PART (3) REALITY & MYSTERY.pdf
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
Hazard Identification & Risk Assessment .pdf
PPTX
Education and Perspectives of Education.pptx
PDF
Skin Care and Cosmetic Ingredients Dictionary ( PDFDrive ).pdf
PDF
Race Reva University – Shaping Future Leaders in Artificial Intelligence
Climate and Adaptation MCQs class 7 from chatgpt
LIFE & LIVING TRILOGY- PART (1) WHO ARE WE.pdf
Computer Architecture Input Output Memory.pptx
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
HVAC Specification 2024 according to central public works department
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
My India Quiz Book_20210205121199924.pdf
Climate Change and Its Global Impact.pptx
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 2).pdf
Journal of Dental Science - UDMY (2020).pdf
LIFE & LIVING TRILOGY - PART (3) REALITY & MYSTERY.pdf
FORM 1 BIOLOGY MIND MAPS and their schemes
AI-driven educational solutions for real-life interventions in the Philippine...
B.Sc. DS Unit 2 Software Engineering.pptx
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
Hazard Identification & Risk Assessment .pdf
Education and Perspectives of Education.pptx
Skin Care and Cosmetic Ingredients Dictionary ( PDFDrive ).pdf
Race Reva University – Shaping Future Leaders in Artificial Intelligence

Risk Assessment - IMNL

  • 1. Risk Assessment Likelihood of occurrence: High, Medium, Unlikely Site Name Risk Number 1 Project A2 Media News Package Name Arman, Rye & Samit Location Trafalgar Square Assistants Date Assessed 1st November What hazards have been identified? What are the potential injuries or damage? Severity (1, 2 or 3) What measures have been taken to prevent injury or damage? Number of people at risk What additional measures or actions are required? Who is responsible for action? R A G Knocking equipment over 2 Film in a less populated section of the area 3 Some should guard the equipment Arman, Rye & Samit Risk of getting robbed 3 Guard the equipment 3 If not in use, keep the equipment packed away at all time Arman, Rye & Samit
  • 2. Likelihood of occurrence: High, Medium, Unlikely What hazards have been identified? What are the potential injuries or damage? Severity (1, 2 or 3) What measures have been taken to prevent injury or damage? Number of people at risk What additional measures or actions are required? Who is responsible for action? R A G Risk of getting robbed 3 Stay with equipment at all times 1 Use as little equipment as possible and carry a bag easy to lock and hold easily Seyi & Arman Knocking over equipment 1 Keep as much room between the equipment and the public Everyone in the building Use handheld items Megan & Seyi
  • 3. Site Name Concerts and Meet & Greets Risk Number 2 Project A2 Media News Package Name Seyi & Arman Location JD Oxford Street, HMV Oxford Street, Alexandra Palace Assistants Date Assessed 25th January 2017, 15th November, 17th November Likelihood of occurrence: High, Medium, Unlikely Site Name Chagford Road Risk-A number 3 Project A2 Media News Package Name Seyi, Rye & Samit Location Marylebone Assistants - Date Assessed 30th November
  • 4. Likelihood of occurrence: High, Medium, Unlikely What hazards have been identified? What are the potential injuries or damage? Severity (1, 2 or 3) What measures have been taken to prevent injury or damage? Number of people at risk What additional measures or actions are required? Who is responsible for action? R A G Tripping over cables 2 Keep all cables out of the way. 5 To unplug what is not necessary and tape down loose wires Megan & Seyi Knocking over equipment 1 Make room between each piece of equipment if it is necessary to walk past it. 5 Megan & Seyi
  • 5. Site Name Classroom Risk Number 4 Project A2 Media News Package Name Rye & Samit Location Mill Hill County High School Assistant Date Assessed 25th , 31st January What hazards have been identified? What are the potential injuries or damage? What measures have been taken to prevent injury or damage? Number of people at risk What additional measure or action are required? Who is responsible for action? Knocking over equipment 1 Make room between each piece of equipment if it is necessary to walk past it. 6 Use as little large equipment as possible and keep out of harms way Rye & Samit Iron catching fire 3 Turn the iron off when not in use 2 Pack the iron away when done Rye & Samit Site Name Classroom Risk Number 5 Project A2 Media News Package Name Rye Location Mill Hill County High School Assistant Seyi & Arman Date Assessed 28th February Likelihood of occurrence: High, Medium, Unlikely
  • 6. Site Name Risk-A Number 6 Project A2 Media News Package Name Samit & Arman Location Mill Hill County High School Assistant Date Assessed 22nd & 27th March Likelihood of occurrence: High, Medium, Unlikely
  • 7. Site Name Risk-A Number 6 Project A2 Media News Package Name Samit & Arman Location Mill Hill County High School Assistant Date Assessed 22nd & 27th March Likelihood of occurrence: High, Medium, Unlikely