SlideShare a Scribd company logo
RL/PT/VJ
Date
Presenter Name
COGS and SBNB Considerations with Third party
Sales orders - VPRS and Billing supplement
postings
15.03.2017
Background
• RE: COGS and SBNB issues with Third part sales order 12218175 in 2560 - GL SBNB
1031130
• This ticket was raised as the COGS is not being posted or being incorrectly or double
posted for this sales order .
• Amount involved was +/- 200K USD , sales order had > 500 line items
• Scenario appears under these conditions:
- Third Party Material (Drop Ship) Scenario
- ZDP Down Payment orders with the a Billing plan (i.e. not delivery or order related billing !)
- Supplier Invoice received after Customer Invoice
• This relates to the SAP Functionality on Down Payment drop ship orders, Post-Billing
Subsequent cost:
• Posts subsequent cost to SBNB account
• updates VPRS condition on the order, so triggers a Subsequent Billing Doc – that reverses
out original SBNB/COGS posting and replaces it with the new full value(SBNB should clear)
1
Reasons for the Processing issues – No COGS posting (ZB)
2
1. Third Party Materials have no Standard
Price
• Example 1 – 3rd Party Materials No
Standard price
Third party Materials require A standard Price at a minimum of 10 /1000
Reasons for the Processing issues – "Double" COGS Posting
3
2. VC Materials have both a Standard price
as well as a SO Costing price
Costing
• Example 2 – VC with both Standard price
and Costing
Pricing Procedure
Material master
VC materials must NOT have any Standard Costs
Reasons for the Processing issues – Incorrect COGS Posting
4
3. The system cannot recognize whether a
third-party business transaction is
completed and no further incoming
invoices are to follow in SD. Problems
occur, for example, if the quantities in
MM and in SD do not correspond. The
special correction program was created
for this but was “missed” on the end-to-
end process.
• Example 3 – Correction Programs
Authorization Role assigned
YE_FI_CENTL_CL_ACCTG_SBU_TMPL
Correction Program to be run on request – Ticket to OM/FI
Transaction Program Title
S_ALR_87014367 SDMFSTRP Quantity Flow Monitoring
VF_VPRS SDINVUPDR Update Costs
Reasons for the Processing issues – SBNB Imbalance
5
4. FX setups for the SBNB account (this
was not applicable in this ticket but was
included for completeness)
Scenario appears under these conditions:
- Third Party Material (Drop Ship) Scenario
- Exchange Difference on Foreign Currency
Supplier Invoice
- Supplier Invoice received after Customer
Invoice
- Customer Order/Billing in Foreign Currency
(Key Difference)
Note this behavior is as per FX design
decided at a Company Code level (OMRW)
• Example 4 – Details attached
INC000010316152 ANALYSIS VPRS SBNB
OMRW - Treatment of Exch. Rate Differences
Note this behavior is as per FX design decided at a Company Code level
Additional Detail documents
6
INC000011107246 - RE- COGS and SBNB
issues with Third part sales order 12218175
in 2560
OSS Notes
Technical and Investigation details
• Business Finance / Logistics to initiate a clean up
of their material masters –Business FILS
• Material master Team to follow GDM Rules for VC
and 3rd Party Materials –Standard Cost on 3rd
Party Material minimum 10 / 1000
- No Standard Costs to be loaded on VC materials
Actions
• Documentation update on team room
• OM/FI COE to inform Support and Cota
7
Accounting Example – Scenario - 3rd Party product Sale with
Down Payment Order (Header Billing Plan)
8
ZDP – Down Payment
Accounting Example – Scenario - 3rd Party product Sale with
Standard ZOR Order (F2 Invoice)
9
ZOR Standard Order
Accounting Example – FX SBNB (OMRW)
10
FX setup requires manual JV clearing(OMRW)

More Related Content

PDF
Inventory scrapping and write-off process in Decentral-EWM _ SAP Blogs.pdf
PPT
EWM SAP Overview Presentation for Business.ppt
PDF
Accounts Payable Solution Overview and detail
PPTX
508037705-PostProcessingFramework-1.pptx
PPT
EWM_BASIC_SIMPLE_INBOUND_PROCESS_STEP.ppt
PPTX
PTP SO01 Sewing Order Creation and Confirmation.pptx
PPTX
Proposal CAPM BTP Training - 3 H.pptx
PPT
123717102-Sap-MM-overview.ppt
Inventory scrapping and write-off process in Decentral-EWM _ SAP Blogs.pdf
EWM SAP Overview Presentation for Business.ppt
Accounts Payable Solution Overview and detail
508037705-PostProcessingFramework-1.pptx
EWM_BASIC_SIMPLE_INBOUND_PROCESS_STEP.ppt
PTP SO01 Sewing Order Creation and Confirmation.pptx
Proposal CAPM BTP Training - 3 H.pptx
123717102-Sap-MM-overview.ppt

Recently uploaded (20)

PPTX
The-Importance-of-School-Sanitation.pptx
PDF
si manuel quezon at mga nagawa sa bansang pilipinas
PDF
📍 LABUAN4D EXCLUSIVE SERVER STAR GAMING ASIA NO.1 TERPOPULER DI INDONESIA ! 🌟
PDF
The Evolution of Traditional to New Media .pdf
PPTX
Power Point - Lesson 3_2.pptx grad school presentation
PPT
415456121-Jiwratrwecdtwfdsfwgdwedvwe dbwsdjsadca-EVN.ppt
PDF
Slides PDF: The World Game (s) Eco Economic Epochs.pdf
PDF
simpleintnettestmetiaerl for the simple testint
PDF
📍 LABUAN4D EXCLUSIVE SERVER STAR GAMING ASIA NO.1 TERPOPULER DI INDONESIA ! 🌟
PPTX
Slides PPTX: World Game (s): Eco Economic Epochs.pptx
PPT
12 Things That Make People Trust a Website Instantly
PPTX
artificialintelligenceai1-copy-210604123353.pptx
PDF
Exploring The Internet Of Things(IOT).ppt
PDF
Containerization lab dddddddddddddddmanual.pdf
PPT
isotopes_sddsadsaadasdasdasdasdsa1213.ppt
PDF
Session 1 (Week 1)fghjmgfdsfgthyjkhfdsadfghjkhgfdsa
PPTX
Mathew Digital SEO Checklist Guidlines 2025
PPTX
Introduction to cybersecurity and digital nettiquette
PPT
FIRE PREVENTION AND CONTROL PLAN- LUS.FM.MQ.OM.UTM.PLN.00014.ppt
PPTX
E -tech empowerment technologies PowerPoint
The-Importance-of-School-Sanitation.pptx
si manuel quezon at mga nagawa sa bansang pilipinas
📍 LABUAN4D EXCLUSIVE SERVER STAR GAMING ASIA NO.1 TERPOPULER DI INDONESIA ! 🌟
The Evolution of Traditional to New Media .pdf
Power Point - Lesson 3_2.pptx grad school presentation
415456121-Jiwratrwecdtwfdsfwgdwedvwe dbwsdjsadca-EVN.ppt
Slides PDF: The World Game (s) Eco Economic Epochs.pdf
simpleintnettestmetiaerl for the simple testint
📍 LABUAN4D EXCLUSIVE SERVER STAR GAMING ASIA NO.1 TERPOPULER DI INDONESIA ! 🌟
Slides PPTX: World Game (s): Eco Economic Epochs.pptx
12 Things That Make People Trust a Website Instantly
artificialintelligenceai1-copy-210604123353.pptx
Exploring The Internet Of Things(IOT).ppt
Containerization lab dddddddddddddddmanual.pdf
isotopes_sddsadsaadasdasdasdasdsa1213.ppt
Session 1 (Week 1)fghjmgfdsfgthyjkhfdsadfghjkhgfdsa
Mathew Digital SEO Checklist Guidlines 2025
Introduction to cybersecurity and digital nettiquette
FIRE PREVENTION AND CONTROL PLAN- LUS.FM.MQ.OM.UTM.PLN.00014.ppt
E -tech empowerment technologies PowerPoint
Ad
Ad

SAP_VPRS_Third_Party_Billing_document_su.pdf

  • 1. RL/PT/VJ Date Presenter Name COGS and SBNB Considerations with Third party Sales orders - VPRS and Billing supplement postings 15.03.2017
  • 2. Background • RE: COGS and SBNB issues with Third part sales order 12218175 in 2560 - GL SBNB 1031130 • This ticket was raised as the COGS is not being posted or being incorrectly or double posted for this sales order . • Amount involved was +/- 200K USD , sales order had > 500 line items • Scenario appears under these conditions: - Third Party Material (Drop Ship) Scenario - ZDP Down Payment orders with the a Billing plan (i.e. not delivery or order related billing !) - Supplier Invoice received after Customer Invoice • This relates to the SAP Functionality on Down Payment drop ship orders, Post-Billing Subsequent cost: • Posts subsequent cost to SBNB account • updates VPRS condition on the order, so triggers a Subsequent Billing Doc – that reverses out original SBNB/COGS posting and replaces it with the new full value(SBNB should clear) 1
  • 3. Reasons for the Processing issues – No COGS posting (ZB) 2 1. Third Party Materials have no Standard Price • Example 1 – 3rd Party Materials No Standard price Third party Materials require A standard Price at a minimum of 10 /1000
  • 4. Reasons for the Processing issues – "Double" COGS Posting 3 2. VC Materials have both a Standard price as well as a SO Costing price Costing • Example 2 – VC with both Standard price and Costing Pricing Procedure Material master VC materials must NOT have any Standard Costs
  • 5. Reasons for the Processing issues – Incorrect COGS Posting 4 3. The system cannot recognize whether a third-party business transaction is completed and no further incoming invoices are to follow in SD. Problems occur, for example, if the quantities in MM and in SD do not correspond. The special correction program was created for this but was “missed” on the end-to- end process. • Example 3 – Correction Programs Authorization Role assigned YE_FI_CENTL_CL_ACCTG_SBU_TMPL Correction Program to be run on request – Ticket to OM/FI Transaction Program Title S_ALR_87014367 SDMFSTRP Quantity Flow Monitoring VF_VPRS SDINVUPDR Update Costs
  • 6. Reasons for the Processing issues – SBNB Imbalance 5 4. FX setups for the SBNB account (this was not applicable in this ticket but was included for completeness) Scenario appears under these conditions: - Third Party Material (Drop Ship) Scenario - Exchange Difference on Foreign Currency Supplier Invoice - Supplier Invoice received after Customer Invoice - Customer Order/Billing in Foreign Currency (Key Difference) Note this behavior is as per FX design decided at a Company Code level (OMRW) • Example 4 – Details attached INC000010316152 ANALYSIS VPRS SBNB OMRW - Treatment of Exch. Rate Differences Note this behavior is as per FX design decided at a Company Code level
  • 7. Additional Detail documents 6 INC000011107246 - RE- COGS and SBNB issues with Third part sales order 12218175 in 2560 OSS Notes Technical and Investigation details
  • 8. • Business Finance / Logistics to initiate a clean up of their material masters –Business FILS • Material master Team to follow GDM Rules for VC and 3rd Party Materials –Standard Cost on 3rd Party Material minimum 10 / 1000 - No Standard Costs to be loaded on VC materials Actions • Documentation update on team room • OM/FI COE to inform Support and Cota 7
  • 9. Accounting Example – Scenario - 3rd Party product Sale with Down Payment Order (Header Billing Plan) 8 ZDP – Down Payment
  • 10. Accounting Example – Scenario - 3rd Party product Sale with Standard ZOR Order (F2 Invoice) 9 ZOR Standard Order
  • 11. Accounting Example – FX SBNB (OMRW) 10 FX setup requires manual JV clearing(OMRW)