SlideShare a Scribd company logo
SCADA DASH BOARD
Introduction
According to Wikipedia, SCADA (Supervisory Control And Data Acquisition) is a system
that operates with coded signals over communication channels so as to provide control
of remote equipment (using typically one communication channel per remote station).
Architecture
SCADA dash board comprises of the Business and Operators end.
Business End
The business end is a web application accessible through a web browser.
Each end functions independently and integrates as a whole.
SCADA Setup and Usage
SCADA dashboard is accessible through the URL: scada.abujaelectricity.com/SCADA-
2/XII.php
NB: This will be changed subsequently to: “scada.abujaelectricity.com/SCADA/” once it
has been approved to have met the end user needs.
The dashboard comprises of 3 menu tabs –Power, Energy and System.
It provides information as regards power, energy and disparity in time between systems
respectively.
To use this system, a date range needs to be provided. This is done by clicking on the
input tag, which drops down a calendar menu. A date is selected and also time.
NB: If no time is selected, the dashboard uses the device’s current time (Hour).
A substation is selected from the list of dynamically updated substations available on the
database.
A meter address is also selected in the same manner as the substation.
Once all records have been provided the “Enter” button is clicked. This queries the
database using the user’s input.
When the server is done with the query, it returns to the user (web browser –front end)
representation of records using data analytical tools such as line graphs, pie and bar
charts.
Below are snap shots of the Dashboard:
Data representation
Displayed Data set using Multiple Bar chart
Displayed Data set using Line Diagram
Data set being compared using Line Diagram
Operator’s End
Background
AEDC SCADA system is SATEC’s Power Monitoring and future Energy
Management Solution. It was designed to work seamlessly with SATEC
devices as well as many other device like raspberry pi, RTU, and PLC. The
SCADA system will reads data on a continuous basis from over 2,000
meters.
AEDC SCADA System Benefits
 Early detection of problems prevents costly damage to equipment.
 Power Quality Analysis enables efficientand professionalsolutions for
problems throughout the grid
 Detect Sources of Energy inefficiency
 Turn customers into partners by applying a transparent policy
 Real-time date virtualizations.
 Graphical representation of real-time data.
What AEDC SCADA System is for?
 Collects data from meters
 Analyzes the data
 Presents the information using:
 Tables
 Line Diagrams
 Standard Data Displays
 Graphical Presentations
 Interactive Graphs
 Archiving and Display
Application Highlights
 Navigation & Data Display through line diagram. This is a customize
navigation screens, such that when operators mouse over line
diagram, they get real-time data from MySQL database server.
 Substation Monitoring providing one glance view of all devices on all
substations.
 Events and Alarms
Still under development.
Steps to access and use SCADA Frontend for Operators Audiences
1. Logon to your SCADA desktop system configure by IT department.
2. Open Internet Explorer or any browser of your choice.
3. On the address bar,type http://scada.abujaelectricity.com/scada3/ and
press enter key on your keyboard.
4.
5. You will now be presented with a web application interface as shown
below:
6. Operators can navigate the SCADA Graphical User Interface with the
left navigation panel by mouse over on AEDC SUBSTATION link.
7. AEDC SUBSTATIONpage provide a landing page to view all Injection
Substations from one location. In this view, SCADA Operators are
made to select substation from drop down menu as shown below:
8. Mouse over AEDC SUBSTATION link will display a submenu for
injection substation areas:
i. Garki Area
ii. Wuse Area
9. Garki Area and Wuse Area links when click will display summary of all
substations in those areas.
10. Further mouse over Garki Area and Wuse Area will display
substations within those areas as illustrated below:
11. So with a particular substation selected from the left navigation
panel, a line diagram will be display in the main content sectionof the
application. Example, in the line diagram above, the pilot substation
Wuse II-2 was selected and corresponding line diagram is display with
area maps within the diagrams.
12. Area maps in each line diagram representSATEC meters.When
mouse over, display real time readings from the meters at a particular
substation. In addition, when a particular substation is being view, you
can use the top navigation bar to view real time data across all SATEC
meters of a station. For example, Active Power is view across all
meters in the pilot substation Wuse II-2 as shown below:
13. On the same view of a substation selected from the left
navigation submenu, a onetime view of all SATEC meters from 11 and
33 KV can be view by clicking on the DATA POOL link from the top
navigation menu on a substation line diagram page.
14. When on the DATA POOL view page, it is developed to refresh
at interval of 5 seconds.

More Related Content

PDF
Điều khiển thiết bị điện công nghiệp - Trần Quang Thọ, Nguyễn Vinh Quan.pdf
PDF
Ứng dụng phần mềm etap cho bài toán tính toán ngắn mạch áp dụng cho hệ thống ...
DOC
Bài giảng hệ thống bms
PDF
he-thong-bai-tap-plc-co-ban
PDF
Đề tài: Nghiên cứu STATCOM, ứng dụng trong truyền tải điện năng
DOCX
Đề tài: Thiết kế và chế tạo máy pha café dạng phin, HAY
PDF
Đề tài: Hệ thống phân loại cà chua theo màu sắc, HAY, 9đ
PDF
33-11-kv-substation-training-report (1) (1).pdf
Điều khiển thiết bị điện công nghiệp - Trần Quang Thọ, Nguyễn Vinh Quan.pdf
Ứng dụng phần mềm etap cho bài toán tính toán ngắn mạch áp dụng cho hệ thống ...
Bài giảng hệ thống bms
he-thong-bai-tap-plc-co-ban
Đề tài: Nghiên cứu STATCOM, ứng dụng trong truyền tải điện năng
Đề tài: Thiết kế và chế tạo máy pha café dạng phin, HAY
Đề tài: Hệ thống phân loại cà chua theo màu sắc, HAY, 9đ
33-11-kv-substation-training-report (1) (1).pdf

What's hot (20)

PDF
Đề tài: Tìm hiểu về hệ thống BMS trong các tòa nhà cao tầng
PDF
Xây dựng hệ thống biến đổi DC-AC đốt đèn trong trường hợp mất điện lưới.pdf
PDF
đồ áN cung cấp điện thiết kế cung cấp điện cho tòa nhà 7 tầng
PDF
Summer Internship Report For PLC Programming of Traffic light through Ladder ...
PDF
Ứng dụng phần mềm ETAP trong công nghệ lưới điện thông minh.pdf
PDF
Đề tài: Nghịch lưu hòa lưới điện mặt trời công suất nhỏ hơn 500W
PDF
Bài giảng về máy điện
PPTX
Chuong 2 152
PDF
Luận văn: Phân tích an toàn vận hành cho hệ thống điện, HAY
PPT
Chuong 3 9082
PPT
Chuong 2
PPT
Quy hoach mang w cdma
DOC
Tổng quan tài liệu Hướng dẫn hệ thống BMS
PDF
Đề tài: Quy trình vận hành an toàn cho một số thiết bị điện, HAY
PDF
Calculo de Corriente de cortocircuito
DOCX
Bài tập ngắn mạch
PDF
Phương pháp nâng cao hiệu quả khai thác nguồn pin mặt trời, HAY
PPTX
Power system transients (IV-EEE)
PPT
Per unit (pu) quantities|vivasolve.blogspot.com
Đề tài: Tìm hiểu về hệ thống BMS trong các tòa nhà cao tầng
Xây dựng hệ thống biến đổi DC-AC đốt đèn trong trường hợp mất điện lưới.pdf
đồ áN cung cấp điện thiết kế cung cấp điện cho tòa nhà 7 tầng
Summer Internship Report For PLC Programming of Traffic light through Ladder ...
Ứng dụng phần mềm ETAP trong công nghệ lưới điện thông minh.pdf
Đề tài: Nghịch lưu hòa lưới điện mặt trời công suất nhỏ hơn 500W
Bài giảng về máy điện
Chuong 2 152
Luận văn: Phân tích an toàn vận hành cho hệ thống điện, HAY
Chuong 3 9082
Chuong 2
Quy hoach mang w cdma
Tổng quan tài liệu Hướng dẫn hệ thống BMS
Đề tài: Quy trình vận hành an toàn cho một số thiết bị điện, HAY
Calculo de Corriente de cortocircuito
Bài tập ngắn mạch
Phương pháp nâng cao hiệu quả khai thác nguồn pin mặt trời, HAY
Power system transients (IV-EEE)
Per unit (pu) quantities|vivasolve.blogspot.com
Ad

Similar to SCADA Documentation (20)

PPT
Scada
PPTX
4-DCSBBVVB BMNBMNBNMV BMNBMNBMNVBMNVBVMN .pptx
PPT
Supervisory control and data acquisition
PPTX
Scada-PPT POWER SYSTEM OPERATION AND CONTROL
PPTX
Scada slide
PDF
Scada & hmi
PDF
An In-Depth Introduction to SCADA Systems
PPTX
SCADA of the Future
PDF
Lecture+9+-+SCADA+Systems.pdf
PDF
Priti-Bhagat-EEE-ICEEEM
PDF
Lecture note for undergraduate 13 SCADA.pdf
PPT
Scada System
PPTX
Scada ppt
PPTX
A Smart Landfill Gas Control System Design to Optimize ROI & Performance
PPT
LIBRARY RESEARCH PROJECT cyber security control inSCAD.ppt
PPT
LIBRARY RESEARCH PROJECT SECURITY CONTROL IN SCADA
PPTX
Lecture+9+-+SCADA+Systems.pptx
PPTX
Scada (supervisory control and data acquisition)
PPT
WHAT IS SCADA AND BASIC KNOWLEDGE ABOUT IT.
Scada
4-DCSBBVVB BMNBMNBNMV BMNBMNBMNVBMNVBVMN .pptx
Supervisory control and data acquisition
Scada-PPT POWER SYSTEM OPERATION AND CONTROL
Scada slide
Scada & hmi
An In-Depth Introduction to SCADA Systems
SCADA of the Future
Lecture+9+-+SCADA+Systems.pdf
Priti-Bhagat-EEE-ICEEEM
Lecture note for undergraduate 13 SCADA.pdf
Scada System
Scada ppt
A Smart Landfill Gas Control System Design to Optimize ROI & Performance
LIBRARY RESEARCH PROJECT cyber security control inSCAD.ppt
LIBRARY RESEARCH PROJECT SECURITY CONTROL IN SCADA
Lecture+9+-+SCADA+Systems.pptx
Scada (supervisory control and data acquisition)
WHAT IS SCADA AND BASIC KNOWLEDGE ABOUT IT.
Ad

SCADA Documentation

  • 1. SCADA DASH BOARD Introduction According to Wikipedia, SCADA (Supervisory Control And Data Acquisition) is a system that operates with coded signals over communication channels so as to provide control of remote equipment (using typically one communication channel per remote station). Architecture SCADA dash board comprises of the Business and Operators end. Business End The business end is a web application accessible through a web browser. Each end functions independently and integrates as a whole. SCADA Setup and Usage SCADA dashboard is accessible through the URL: scada.abujaelectricity.com/SCADA- 2/XII.php NB: This will be changed subsequently to: “scada.abujaelectricity.com/SCADA/” once it has been approved to have met the end user needs. The dashboard comprises of 3 menu tabs –Power, Energy and System. It provides information as regards power, energy and disparity in time between systems respectively. To use this system, a date range needs to be provided. This is done by clicking on the input tag, which drops down a calendar menu. A date is selected and also time. NB: If no time is selected, the dashboard uses the device’s current time (Hour).
  • 2. A substation is selected from the list of dynamically updated substations available on the database. A meter address is also selected in the same manner as the substation. Once all records have been provided the “Enter” button is clicked. This queries the database using the user’s input. When the server is done with the query, it returns to the user (web browser –front end) representation of records using data analytical tools such as line graphs, pie and bar charts. Below are snap shots of the Dashboard:
  • 4. Displayed Data set using Multiple Bar chart Displayed Data set using Line Diagram
  • 5. Data set being compared using Line Diagram Operator’s End Background AEDC SCADA system is SATEC’s Power Monitoring and future Energy Management Solution. It was designed to work seamlessly with SATEC devices as well as many other device like raspberry pi, RTU, and PLC. The SCADA system will reads data on a continuous basis from over 2,000 meters. AEDC SCADA System Benefits  Early detection of problems prevents costly damage to equipment.  Power Quality Analysis enables efficientand professionalsolutions for problems throughout the grid  Detect Sources of Energy inefficiency  Turn customers into partners by applying a transparent policy  Real-time date virtualizations.  Graphical representation of real-time data. What AEDC SCADA System is for?  Collects data from meters  Analyzes the data  Presents the information using:  Tables
  • 6.  Line Diagrams  Standard Data Displays  Graphical Presentations  Interactive Graphs  Archiving and Display Application Highlights  Navigation & Data Display through line diagram. This is a customize navigation screens, such that when operators mouse over line diagram, they get real-time data from MySQL database server.
  • 7.  Substation Monitoring providing one glance view of all devices on all substations.
  • 8.  Events and Alarms Still under development. Steps to access and use SCADA Frontend for Operators Audiences 1. Logon to your SCADA desktop system configure by IT department. 2. Open Internet Explorer or any browser of your choice. 3. On the address bar,type http://scada.abujaelectricity.com/scada3/ and press enter key on your keyboard. 4. 5. You will now be presented with a web application interface as shown below:
  • 9. 6. Operators can navigate the SCADA Graphical User Interface with the left navigation panel by mouse over on AEDC SUBSTATION link. 7. AEDC SUBSTATIONpage provide a landing page to view all Injection Substations from one location. In this view, SCADA Operators are made to select substation from drop down menu as shown below: 8. Mouse over AEDC SUBSTATION link will display a submenu for injection substation areas: i. Garki Area ii. Wuse Area 9. Garki Area and Wuse Area links when click will display summary of all substations in those areas. 10. Further mouse over Garki Area and Wuse Area will display substations within those areas as illustrated below:
  • 10. 11. So with a particular substation selected from the left navigation panel, a line diagram will be display in the main content sectionof the application. Example, in the line diagram above, the pilot substation Wuse II-2 was selected and corresponding line diagram is display with area maps within the diagrams. 12. Area maps in each line diagram representSATEC meters.When mouse over, display real time readings from the meters at a particular substation. In addition, when a particular substation is being view, you can use the top navigation bar to view real time data across all SATEC meters of a station. For example, Active Power is view across all meters in the pilot substation Wuse II-2 as shown below: 13. On the same view of a substation selected from the left navigation submenu, a onetime view of all SATEC meters from 11 and 33 KV can be view by clicking on the DATA POOL link from the top navigation menu on a substation line diagram page.
  • 11. 14. When on the DATA POOL view page, it is developed to refresh at interval of 5 seconds.