Geotechnical Instruments are :-
•Site Investigation Work
•Design Verification
•Performance
•Safety
•Construction Control
•Quality Control
•Legal Protection
When safety is the highest
priority, it must have a reliable
and fast method to deliver on-
site results to decision
makers:-
•Safety
•Construction Control
•Quality Control
•Legal Protection
Lessons
learned from
a Major Past
incident
Inclinometers are used for monitoring
the soil movements over time
Daily
Automatic
Data
Processing of
Inclinometer
Readings
Current Industry
practice
Geokon Slope Indicator Encardio-rite
RST Instruments (PDA)
Inclinometers from various manufacturers
Soil Instruments (PDA)
There readout
boxes require a
PC to download
their data
Timing for measuring 10 bore holes in a site
10 mins
In Main office, switch on
PC to download,
process, verify and
email to Stake Holders
Drive back
for 60 mins
Case Study:
Total Throughput time
for Bore Hole#1 data to
reach end user is
60x10 + 10x9 + 60 + 30
mins = 780 mins (13 hrs)
30 mins for
processing data
60 minsBore
Hole#1
10 mins
60 minsBore
Hole#2
10 mins
60 minsBore
Hole#3
60 minsBore
Hole#10
Many challenges to ensure
consistency as construction sites
are far from ideal conditions with
practical constraints of :-
•Human Errors
•Measurement bore holes with
blockages
•Worker inexperience
•Inefficiencies due to manual work
•Weather (Rain, Lightning and Heat)
A new method to
reduce the time taken
from the
measurement until it
reaches the Stake
Holder using Wire-
less Technologies
Simple steps for Data retrieval from sites using
existing inclinometer, user’s mobile phone
Short Range
Device consists
of a battery
powered
embedded
computer with
Wire-less
Bluetooth
module
3 m
Central
Server
System
Transferring data from Mobile Phone to
Stake holder using Central Server
GPRS
Open
Public
Network
Email with
raw data &
Inclinometer
plot
Worker walks
to another
bore hole
Timing taken in the New Work Flow Process
2 mins
Case Study:
Total Throughput time
for Bore Hole#1 data to
reach end user is
60 + 2 + 8 mins = 70 mins
60 minsBore
Hole#1
8 mins
GPRS
Transmission
Automatic
Processing
and Emailing
10 mins
Comparison of the time taken to
obtain on site measurements
Current Practice : 780 minutes
Improve Method : 70 minutes
Throughput improvements :
= 780 / 70 = 11 !
+
Advantages of the Semi-Real Time
Inclinometer solution
• PC-less system to retrieve the data
• Preventing loss of PC on site
• Maximum use of inclinometer system
• Low Error possibility with less human
intervention of data processing
• Worker uses this own Mobile Phone with only
additional GPRS charges
• Consultant gets measured data immediately
• Any measurement re-confirmation can be done
immediately via a phone call rather than doing it
the next day
Site Workers Office staff gets
information and
discuss resultsMeasures and Transmit data
+
SDR
The feedback comments from
the users:-
• When the readings showed
unexpected movements, it
provides opportunity to
immediately phone the site staff
to re-measure and verify that
particular bore-hole.
• When there are Critical Lateral
Displacements to be monitored,
this is the best approach to
control the Site Work Activities
to enhance the Safety as well as
to allow Critical Activity to be
carried out
• Without this technology, the
technician needs to monitor all
the inclinometers of the project
before he comes back to office
at the end of the day to down
load the raw data readings
logged in the readout box to the
PC. It will take a few hours for
the readings of the inclinometer
to reach the user after it is taken
An added advantage for
the data security to
prevent unaware data
alteration in the system
to help Professional
Engineers minimize
their risks & liabilities
Current Data Flow Practice
Readout
Box and
Computer
for down
loading
Monitoring
Engineer
Process
Report with
justifiable
adjustment
Mistakes ?
Care-less ?
Forget ?
Authority
Consultant
Proposed Data Flow Security
Central
Server
Monitoring
Engineer
Process
Reports with
justifiable
adjustments
Raw data
kept intact
using Parallel
Information
Flow for
verification
Processed
Inclinometer
Information
Authority
Consultant
Benefits of the Proposed System
• The measured data is automatically plotted
and email simultaneously to all stake holders
• This processed information will be over-
ride, if the monitoring engineer has
correction with justifications
• Unique User ID tagged to Readout Box to
avoid mixed up information from various
Readout Boxes and Files
• Date & Time when the readings are carried
out are Logged at the Server, & NOT using
the clock of the Readout Box, which could
be altered at Box level

More Related Content

PPT
Safety Inspection Software
PDF
Endurance Consultancy
PPT
THUM'S UP! : Wireless Troubleshooting of Intermittent Upsets
PDF
REMOWZ - Realtime Water Quality Monitoring using ZigBee based WSN (Part I)
PDF
IRJET-Complete Industrial Solution for Automation in Temperature and Humidity...
PPTX
Save Time, Money and Hair with ManageCO2
PPTX
Wastewater Collection System & Results-Oriented Management Using Autonomous R...
PPTX
Weather Station Using IoT
Safety Inspection Software
Endurance Consultancy
THUM'S UP! : Wireless Troubleshooting of Intermittent Upsets
REMOWZ - Realtime Water Quality Monitoring using ZigBee based WSN (Part I)
IRJET-Complete Industrial Solution for Automation in Temperature and Humidity...
Save Time, Money and Hair with ManageCO2
Wastewater Collection System & Results-Oriented Management Using Autonomous R...
Weather Station Using IoT

What's hot (20)

PDF
MDC plus. Zyfra
PPTX
FMS intro
PPTX
Further improvements
PDF
Direct Digital Control
PDF
K05137073
PPTX
datalogger
PDF
Remote HVAC service presentation
PDF
Design Of Cooling Tower With Iot
PPT
JP Morgan North American Remote to Core Justification
PDF
2016_Brochure_Book
PDF
Top 9 issues in construction industry and how Ayoga can solve it
PDF
Industrial Automation
PDF
PointSense Portable Logger Data Sheet
PPT
GE Oil & Gas Threatscan
PPTX
Data logger
DOC
Digital contrs
PDF
Take 5 Feedback Safety Monitoring Solutions
PPTX
HGCM System2
PPTX
PDF
Customer case: Health & Safety
 
MDC plus. Zyfra
FMS intro
Further improvements
Direct Digital Control
K05137073
datalogger
Remote HVAC service presentation
Design Of Cooling Tower With Iot
JP Morgan North American Remote to Core Justification
2016_Brochure_Book
Top 9 issues in construction industry and how Ayoga can solve it
Industrial Automation
PointSense Portable Logger Data Sheet
GE Oil & Gas Threatscan
Data logger
Digital contrs
Take 5 Feedback Safety Monitoring Solutions
HGCM System2
Customer case: Health & Safety
 
Ad

Viewers also liked (9)

PPTX
P10 e2 diego_aranda_2bcd
PDF
AWS RoadShow Dublin - Intro to AWS
PPT
TEL (TRASTORNO ESPECIFICO DEL LENGUAJE)
PPTX
Fundamentos técnicos de internet
PPTX
P10 e2 rodrigo_rivilla_2ºa
PDF
Neurocoaching de equipos de Alto Rendimiento 2017
PPT
Retention in complete denture/ dental crown & bridge courses
PDF
Philosophies-in-full-mouth-rehabilitation-a-systematic-review
PDF
Vocabulário relacionado com o meio envolvente
P10 e2 diego_aranda_2bcd
AWS RoadShow Dublin - Intro to AWS
TEL (TRASTORNO ESPECIFICO DEL LENGUAJE)
Fundamentos técnicos de internet
P10 e2 rodrigo_rivilla_2ºa
Neurocoaching de equipos de Alto Rendimiento 2017
Retention in complete denture/ dental crown & bridge courses
Philosophies-in-full-mouth-rehabilitation-a-systematic-review
Vocabulário relacionado com o meio envolvente
Ad

Similar to Semi-Real Time Inclinometer readings using Wireless Technologies (20)

PDF
Automatic Real Time Monitoring using Machine to Machine (M2M) Technology
PDF
Machine Intelligence in Manufacturing Industry - Igor Mihajlovic
PDF
NAMICON - SimpleOilfield - Efficiency of EMAT Ultrasonic Thickness Measuremen...
PDF
Geotechnical & Structural Automated Real Time Monitoring and Alert Systems
PPT
IT Transformation Proposal
PDF
Remote HVAC Service Value and benefits
PDF
Real Time Monitoring and Electro Magnetic Interference causing Data corruption
PDF
Digital workflow.pdf
PPTX
Group6 presentation
PPTX
Digital twin ISF Production Engineering 1
PPTX
isf with IoT Mechanical Engineering 12345
PPTX
PlantConnect insights
PPTX
Iot based industrial boiler temperature control
PDF
3.42211- CIS Audit.pdf
PDF
Plant Maintenance & Condition Monitoring
PPTX
Mobile Apps or Else
PDF
Ischia ATEX Inspection - Paperless Efficiency Company Brochure
PDF
Automated Tunnel Monitoring System (ATMS)
PPTX
How to reduce more than 10% cost of printing supplies in your operation
PDF
weatherstationusingiotfyp-190505230304 (1).pdf
Automatic Real Time Monitoring using Machine to Machine (M2M) Technology
Machine Intelligence in Manufacturing Industry - Igor Mihajlovic
NAMICON - SimpleOilfield - Efficiency of EMAT Ultrasonic Thickness Measuremen...
Geotechnical & Structural Automated Real Time Monitoring and Alert Systems
IT Transformation Proposal
Remote HVAC Service Value and benefits
Real Time Monitoring and Electro Magnetic Interference causing Data corruption
Digital workflow.pdf
Group6 presentation
Digital twin ISF Production Engineering 1
isf with IoT Mechanical Engineering 12345
PlantConnect insights
Iot based industrial boiler temperature control
3.42211- CIS Audit.pdf
Plant Maintenance & Condition Monitoring
Mobile Apps or Else
Ischia ATEX Inspection - Paperless Efficiency Company Brochure
Automated Tunnel Monitoring System (ATMS)
How to reduce more than 10% cost of printing supplies in your operation
weatherstationusingiotfyp-190505230304 (1).pdf

More from RekaNext Capital (20)

PPTX
Data Classification for CyberSecurity System Design
PDF
Root cause of Magnetic Humming due to Transformer
PDF
Design for Product Assembly#4
PDF
Design for Product Assembly#3
PDF
Design for Product Assembly#2
PDF
Henderson Bridge Report.pdf
PDF
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
DOC
MBFC Test Report Dec2008.doc
PDF
Z Vibration Monitoring for pre-cast slab
PPT
Pre-load results.ppt
PDF
IDA Mission Critical M2M of SysEng.pdf
PDF
Dr Tan Guan Hong PhD Thesis 1980.pdf
PPT
ZigBee Personnel Tracking System
PPTX
AV Latency Measurement
PPTX
Computer Vision for Measurement & FR
PPTX
Business Transformation V6
PPTX
Business Transformation V5
PDF
Building and Construction Authority GeoSS Seminar 2010
PPTX
SysEng Water India 2011 conference presentation
PPT
SysEng Environmental Projects
Data Classification for CyberSecurity System Design
Root cause of Magnetic Humming due to Transformer
Design for Product Assembly#4
Design for Product Assembly#3
Design for Product Assembly#2
Henderson Bridge Report.pdf
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
MBFC Test Report Dec2008.doc
Z Vibration Monitoring for pre-cast slab
Pre-load results.ppt
IDA Mission Critical M2M of SysEng.pdf
Dr Tan Guan Hong PhD Thesis 1980.pdf
ZigBee Personnel Tracking System
AV Latency Measurement
Computer Vision for Measurement & FR
Business Transformation V6
Business Transformation V5
Building and Construction Authority GeoSS Seminar 2010
SysEng Water India 2011 conference presentation
SysEng Environmental Projects

Recently uploaded (20)

PPTX
additive manufacturing of ss316l using mig welding
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PDF
737-MAX_SRG.pdf student reference guides
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PDF
R24 SURVEYING LAB MANUAL for civil enggi
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPT
introduction to datamining and warehousing
PDF
PPT on Performance Review to get promotions
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PPTX
Sustainable Sites - Green Building Construction
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PPTX
Artificial Intelligence
additive manufacturing of ss316l using mig welding
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
Foundation to blockchain - A guide to Blockchain Tech
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Automation-in-Manufacturing-Chapter-Introduction.pdf
737-MAX_SRG.pdf student reference guides
Categorization of Factors Affecting Classification Algorithms Selection
R24 SURVEYING LAB MANUAL for civil enggi
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
introduction to datamining and warehousing
PPT on Performance Review to get promotions
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
Sustainable Sites - Green Building Construction
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
Fundamentals of safety and accident prevention -final (1).pptx
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
III.4.1.2_The_Space_Environment.p pdffdf
Artificial Intelligence

Semi-Real Time Inclinometer readings using Wireless Technologies

  • 1. Semi-Real Time Inclinometer readings using Wire-less Technologies G.H. Tan, Y.K. Poh SysEng (S) Pte Ltd N. Osborne, C.C. Ng Land Transport Authority, Singapore
  • 2. Geotechnical Instruments are :- •Site Investigation Work •Design Verification •Performance •Safety •Construction Control •Quality Control •Legal Protection
  • 3. When safety is the highest priority, it must have a reliable and fast method to deliver on- site results to decision makers:- •Safety •Construction Control •Quality Control •Legal Protection
  • 5. Inclinometers are used for monitoring the soil movements over time Daily Automatic Data Processing of Inclinometer Readings
  • 7. Geokon Slope Indicator Encardio-rite RST Instruments (PDA) Inclinometers from various manufacturers Soil Instruments (PDA) There readout boxes require a PC to download their data
  • 8. Timing for measuring 10 bore holes in a site 10 mins In Main office, switch on PC to download, process, verify and email to Stake Holders Drive back for 60 mins Case Study: Total Throughput time for Bore Hole#1 data to reach end user is 60x10 + 10x9 + 60 + 30 mins = 780 mins (13 hrs) 30 mins for processing data 60 minsBore Hole#1 10 mins 60 minsBore Hole#2 10 mins 60 minsBore Hole#3 60 minsBore Hole#10
  • 9. Many challenges to ensure consistency as construction sites are far from ideal conditions with practical constraints of :- •Human Errors •Measurement bore holes with blockages •Worker inexperience •Inefficiencies due to manual work •Weather (Rain, Lightning and Heat)
  • 10. A new method to reduce the time taken from the measurement until it reaches the Stake Holder using Wire- less Technologies
  • 11. Simple steps for Data retrieval from sites using existing inclinometer, user’s mobile phone Short Range Device consists of a battery powered embedded computer with Wire-less Bluetooth module 3 m
  • 12. Central Server System Transferring data from Mobile Phone to Stake holder using Central Server GPRS Open Public Network Email with raw data & Inclinometer plot
  • 13. Worker walks to another bore hole Timing taken in the New Work Flow Process 2 mins Case Study: Total Throughput time for Bore Hole#1 data to reach end user is 60 + 2 + 8 mins = 70 mins 60 minsBore Hole#1 8 mins GPRS Transmission Automatic Processing and Emailing 10 mins
  • 14. Comparison of the time taken to obtain on site measurements Current Practice : 780 minutes Improve Method : 70 minutes Throughput improvements : = 780 / 70 = 11 ! +
  • 15. Advantages of the Semi-Real Time Inclinometer solution • PC-less system to retrieve the data • Preventing loss of PC on site • Maximum use of inclinometer system • Low Error possibility with less human intervention of data processing • Worker uses this own Mobile Phone with only additional GPRS charges • Consultant gets measured data immediately • Any measurement re-confirmation can be done immediately via a phone call rather than doing it the next day
  • 16. Site Workers Office staff gets information and discuss resultsMeasures and Transmit data + SDR
  • 17. The feedback comments from the users:- • When the readings showed unexpected movements, it provides opportunity to immediately phone the site staff to re-measure and verify that particular bore-hole.
  • 18. • When there are Critical Lateral Displacements to be monitored, this is the best approach to control the Site Work Activities to enhance the Safety as well as to allow Critical Activity to be carried out
  • 19. • Without this technology, the technician needs to monitor all the inclinometers of the project before he comes back to office at the end of the day to down load the raw data readings logged in the readout box to the PC. It will take a few hours for the readings of the inclinometer to reach the user after it is taken
  • 20. An added advantage for the data security to prevent unaware data alteration in the system to help Professional Engineers minimize their risks & liabilities
  • 21. Current Data Flow Practice Readout Box and Computer for down loading Monitoring Engineer Process Report with justifiable adjustment Mistakes ? Care-less ? Forget ? Authority Consultant
  • 22. Proposed Data Flow Security Central Server Monitoring Engineer Process Reports with justifiable adjustments Raw data kept intact using Parallel Information Flow for verification Processed Inclinometer Information Authority Consultant
  • 23. Benefits of the Proposed System • The measured data is automatically plotted and email simultaneously to all stake holders • This processed information will be over- ride, if the monitoring engineer has correction with justifications • Unique User ID tagged to Readout Box to avoid mixed up information from various Readout Boxes and Files • Date & Time when the readings are carried out are Logged at the Server, & NOT using the clock of the Readout Box, which could be altered at Box level