This document discusses several types of setting out works including:
1. Setting out a foundation plan using a center line plan and batter boards. Batter boards are used to accurately transfer the center line onto the work site.
2. Setting out a sewer line by fixing stakes along the proposed center line and excavating the trench to the desired width and depth. Cross heads and sight rails are also used to maintain proper gradient and alignment.
3. Setting out a culvert involves marking points along the center lines X1 and Y1 based on given distances from the origin point O. Pegs are placed at the intersection of the points using two tapes held at equal distances between assistants. The culvert is then set