Seven RAMS was born from the meeting of engineers with more
than 15 years of experience in RAMS, Risk Management and
Safety processes. These engineers have developed their
competences in the Transport Systems, for example, working in
projects as the Validation of Italian High Speed Railway, in
international projects as Metro Dubai and Metro Riyadh.
Seven RAMS developed a strong know-how for V&V of the systems
and products, following CENELEC and IEC norms, from the editing
and management of the documentation, to the execution of the
tests.
Their know-how is still growing in other fields, where the Risk
Management is required, as mechanical, chemical and industrial
fields.
Company’s history
RAM & Safety
for the Life Cycle of the Systems and Products
Company’s Mission
Seven RAMS provides high quality services for engineering,
RAMS, Verification and Validation both for Manufactures and
for Transport and Industrial Operators.
Seven RAMS is able to support the companies in the
development of complex projects and critical activities.
Validation
System
Validation
System
Requirements
Requirements
Allocation
System
Acceptance
HW + SW VerificationHW + SW
Requirements
Seven RAMS supports the companies during the life cycle of their
products, for the V&V activities requested by CENELEC norms EN
50126, EN 50128 and EN 50129.
Verification and Validation
Functional and Safety Analysis
STANDARDS AND NORMS i.e.
CENELEC
FMEA is a methodology widely used to identify which failure modes could be critical for the
system. Fault Tree Analysis is used to find the casual connection between human factor,
environmental influences, HW faults and SW errors.
Seven RAMS experts have used these techniques in different industrial projects.
BOTTOM-UP ANALYSIS i.e. FMEA
TOP-DOWN ANALYSIS i.e. FTA
Safety Analysis
Hazard Analysis
Risk Management
Support for Assessment
Seven RAMS supplies these services, using Common Safety Method, for Risk
Evaluation and Assessment:
• Preparation of the technical documentation as requested by UE 402/2013
• Support for the application of Regulation UE 402/2013, CENELEC, IEC norms
• Safety Evaluation and Risk Management (Safety Report, Hazard Log, etc.)
• Training courses about Regulation UE 402/2013
CSM-RA Regulation UE 402/2013
IEC 61508
The IEC 61508 defines mainly the following aspects:
• the contents of the Quality Management System with respect to the Functional
Safety of products
• the methods for the determination of PFD (Probability of Failure on Demand) or
PFH (Probability of Failure per Hour), or of the SIL (Safety Integrity Level), or the
definition of the reliability of components, systems and equipment used in Safety
applications
Brainstorming
Training
Audit
Inspection
Services for companies
Document and Analysis
Development
• Safety Analysis, Hazard Analysis and Risk Management (HAZOP,
PHA, Hazard Log, etc.)
• Application of the CSM-RA
• Support for Assessment, Certification and approval of Systems,
Products and Applications following the CENELEC and IEC norms
• RAM Analysis and Study (RBD, Markov Chains, FRACAS, etc.)
• Functional and Safety Analysis (FMECA, FTA, ETA, etc.)
• Statistical analysis, modeling and system simulations
• Verification and Validation of Systems, Hardware and Software
• Planning and support to the execution of System, HW / SW Tests
• Planning and support to the execution of Fault Tests (Fault Injection,
etc.)
• Support for Tenders
• System and Products Specification
• Requirements Management
• Documentation and Process Management for the Quality assurance
• Training courses
Seven RAMS supplies these services:
Areas of Interest:
Transport
Industrial
Contacts
SEVEN RAMS S.r.l.
VAT: IT02360080994
Headquarter: Via C.R. Ceccardi 4/10 - 16121 Genova
Email: info@sevenrams.com
PEC: seven.rams@pec.it
http:// www.sevenrams.com
RAMS Manager: Marco Oliveri
Phone: +39 392 8796249
Email: marco.oliveri@sevenrams.com
RAMS Engineer: Marco Addino
Phone: +39 328 5716931
Email: marco.addino@sevenrams.com
Seven_RAMS_Presentation_EN_04

More Related Content

DOC
ORAIB CV (7-May-2016)
DOCX
Miranda.Osvaldo_Resume
PDF
Shahzad Khan
ODP
Radar CDU Testing- A Case Study from Oak Systems Pvt Ltd
DOC
Sathyakaman instrmnt cv
PPTX
Autonomous Industry Feedback
PDF
RBI for Power Generation
DOC
RandyOldsResume2
ORAIB CV (7-May-2016)
Miranda.Osvaldo_Resume
Shahzad Khan
Radar CDU Testing- A Case Study from Oak Systems Pvt Ltd
Sathyakaman instrmnt cv
Autonomous Industry Feedback
RBI for Power Generation
RandyOldsResume2

Similar to Seven_RAMS_Presentation_EN_04 (14)

PDF
Reliability Instrumented System | Arrelic Insights
PPT
Introduction to Functional Safety and SIL Certification
PDF
PDF
NIER_ESS
PPTX
NIER for ESS
PPT
Functional-Safety-Overview-UL.ppt
PDF
V&V Considerations In Implementing IEC61508-3
PPTX
Introduction to reliability theories
PDF
Functional Safety Of Machinery How To Apply Iso 138491 And Iec 62061 Marco Ta...
PDF
Mynd company presentation
PPT
Andrew parsons toyota
PDF
System Assurance & RAMS
PPTX
Railway gamification 02
PDF
WSFS13E02_TUEV_SUED_Shaker Haj Hussein
Reliability Instrumented System | Arrelic Insights
Introduction to Functional Safety and SIL Certification
NIER_ESS
NIER for ESS
Functional-Safety-Overview-UL.ppt
V&V Considerations In Implementing IEC61508-3
Introduction to reliability theories
Functional Safety Of Machinery How To Apply Iso 138491 And Iec 62061 Marco Ta...
Mynd company presentation
Andrew parsons toyota
System Assurance & RAMS
Railway gamification 02
WSFS13E02_TUEV_SUED_Shaker Haj Hussein
Ad

Recently uploaded (20)

PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
Strings in CPP - Strings in C++ are sequences of characters used to store and...
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
Sustainable Sites - Green Building Construction
PPTX
UNIT 4 Total Quality Management .pptx
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PDF
Well-logging-methods_new................
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PPTX
web development for engineering and engineering
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PPTX
OOP with Java - Java Introduction (Basics)
PPT
Project quality management in manufacturing
CYBER-CRIMES AND SECURITY A guide to understanding
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Strings in CPP - Strings in C++ are sequences of characters used to store and...
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
Model Code of Practice - Construction Work - 21102022 .pdf
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
Sustainable Sites - Green Building Construction
UNIT 4 Total Quality Management .pptx
Operating System & Kernel Study Guide-1 - converted.pdf
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
Well-logging-methods_new................
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
web development for engineering and engineering
UNIT-1 - COAL BASED THERMAL POWER PLANTS
OOP with Java - Java Introduction (Basics)
Project quality management in manufacturing
Ad

Seven_RAMS_Presentation_EN_04

  • 2. Seven RAMS was born from the meeting of engineers with more than 15 years of experience in RAMS, Risk Management and Safety processes. These engineers have developed their competences in the Transport Systems, for example, working in projects as the Validation of Italian High Speed Railway, in international projects as Metro Dubai and Metro Riyadh. Seven RAMS developed a strong know-how for V&V of the systems and products, following CENELEC and IEC norms, from the editing and management of the documentation, to the execution of the tests. Their know-how is still growing in other fields, where the Risk Management is required, as mechanical, chemical and industrial fields. Company’s history
  • 3. RAM & Safety for the Life Cycle of the Systems and Products Company’s Mission Seven RAMS provides high quality services for engineering, RAMS, Verification and Validation both for Manufactures and for Transport and Industrial Operators. Seven RAMS is able to support the companies in the development of complex projects and critical activities.
  • 4. Validation System Validation System Requirements Requirements Allocation System Acceptance HW + SW VerificationHW + SW Requirements Seven RAMS supports the companies during the life cycle of their products, for the V&V activities requested by CENELEC norms EN 50126, EN 50128 and EN 50129. Verification and Validation
  • 5. Functional and Safety Analysis STANDARDS AND NORMS i.e. CENELEC FMEA is a methodology widely used to identify which failure modes could be critical for the system. Fault Tree Analysis is used to find the casual connection between human factor, environmental influences, HW faults and SW errors. Seven RAMS experts have used these techniques in different industrial projects. BOTTOM-UP ANALYSIS i.e. FMEA TOP-DOWN ANALYSIS i.e. FTA
  • 6. Safety Analysis Hazard Analysis Risk Management Support for Assessment
  • 7. Seven RAMS supplies these services, using Common Safety Method, for Risk Evaluation and Assessment: • Preparation of the technical documentation as requested by UE 402/2013 • Support for the application of Regulation UE 402/2013, CENELEC, IEC norms • Safety Evaluation and Risk Management (Safety Report, Hazard Log, etc.) • Training courses about Regulation UE 402/2013 CSM-RA Regulation UE 402/2013 IEC 61508 The IEC 61508 defines mainly the following aspects: • the contents of the Quality Management System with respect to the Functional Safety of products • the methods for the determination of PFD (Probability of Failure on Demand) or PFH (Probability of Failure per Hour), or of the SIL (Safety Integrity Level), or the definition of the reliability of components, systems and equipment used in Safety applications
  • 9. • Safety Analysis, Hazard Analysis and Risk Management (HAZOP, PHA, Hazard Log, etc.) • Application of the CSM-RA • Support for Assessment, Certification and approval of Systems, Products and Applications following the CENELEC and IEC norms • RAM Analysis and Study (RBD, Markov Chains, FRACAS, etc.) • Functional and Safety Analysis (FMECA, FTA, ETA, etc.) • Statistical analysis, modeling and system simulations • Verification and Validation of Systems, Hardware and Software • Planning and support to the execution of System, HW / SW Tests • Planning and support to the execution of Fault Tests (Fault Injection, etc.) • Support for Tenders • System and Products Specification • Requirements Management • Documentation and Process Management for the Quality assurance • Training courses Seven RAMS supplies these services:
  • 11. Contacts SEVEN RAMS S.r.l. VAT: IT02360080994 Headquarter: Via C.R. Ceccardi 4/10 - 16121 Genova Email: info@sevenrams.com PEC: seven.rams@pec.it http:// www.sevenrams.com RAMS Manager: Marco Oliveri Phone: +39 392 8796249 Email: marco.oliveri@sevenrams.com RAMS Engineer: Marco Addino Phone: +39 328 5716931 Email: marco.addino@sevenrams.com