Nilex provides multiple solutions
for the new four-lane highway
along Vancouver’s Fraser River.
South Fraser Perimeter Road in Metro Vancouver,
also called Highway 17, is a new four-lane highway
along the Fraser River, connecting southwest
Delta to North Surrey. Nilex assisted in the design
and onsite installation of sections of this 40
km-long road and supplied multiple products
for its construction. This included geogrids and
geotextiles for a few sections of road, along with
systems for Mechanically Stabilized Earth (MSE)
walls and slopes, erosion and sediment control
and water management.
Challenges
As a new roadway system, this multi-year project
had many grade separation challenges. Roads and
walls were required in and over areas of poor soils
with a high likelihood of settlement caused by
proximity to the Fraser River and Burns Bog.
In one location, a drainage pipe from the above-
grade roadway required an outlet to the river,
several meters away. The chosen conveyance
structure had to respect the sensitive terrain in
this area as it moved water from the pipe to the
outlet without extensive excavation.
LOCATION:
Delta and Surrey, British Columbia
PRODUCTS:
SierraScape, Sierra Slope & ARES MSE Systems
TriAx® Geogrid & Nonwoven Geotextile
SmartDitch
Turf Reinforcement Mats
PROJECT PARTNERS:
Owner
BC Ministry of Transportation
Consultant
Stantec, Buckland & Taylor, exp and Associated
Engineering
Contractor
FTG Constructors Group, Kan Retain-it,
Sea-Jae Builders Ltd, B&B Contracting, M2K
Construction, Tyam Group, Stanco Landscaping
Completion Date
January 2014
THE NILEX ADVANTAGE:
Cost Savings CO2
Saved
Nearly $810,000 605 tonnes
South Fraser
Perimeter Road
(SFPR)
PROJECT PROFILE
MSE WALLS
& SLOPES
Additional challenges:
• Pile-supported MSE walls were originally
specified with steel reinforcement, rather than
High Density Polyethylene (HDPE).
• Two-stage bridge abutments were required,
but the panels had to be installed after the
structure over top had been opened to traffic.
• A complex design was required to place
geogrids around the bridge structure piles.
• Slopes and water management systems had to
respect archeologically-sensitive sites.
• Vegetation and supporting landscapes were
implemented wherever possible, rather than
precast walls.
Solutions
Two-Stage MSE Wall Systems
A two-stage wall system was recommended in
response to the site’s extremely poor soils.
SierraScape, combined with geotextile, served
as the permanent wall face for the Stage One
wall due to its tolerance of seismic activity and
settlement. It was also the best option to save the
client time and money on installation and material.
The ARES pre-cast concrete panel system was
recommended as Stage Two, as it was the
preferred aesthetic in some areas.
Sierra Slope Vegetated MSE Walls
Sierra Slope walls were recommended where
land was available, to reduce cost and the carbon
footprint. These systems are flexible, tolerate
differential settlement well and are much less
expensive than steel and rock-face systems.
Additionally, they can be built over sensitive sites
because there is no need to excavate the base.
SierraScape Rock-Face MSE Walls
Similar to Sierra Slope, SierraScape MSE systems
are tolerant of differential settlement and are
cost effective compared to precast walls. As the
transition to Sierra Slope walls, they combine an
appealing rock and vegetation aesthetic ideal for a
project with high public visibilty.
South Fraser Perimeter Road (SFPR)
Geotextiles & Geogrids for Road Construction
Nilex recommended nonwoven geotextile (Nilex
4551) to prevent the subgrade sand and gravel
road structure from mixing.
That separation layer was combined with TriAx
Geogrid (TX160) as a reinforcement layer for
subgrade stabilization, base reinforcement, and
pavement optimization due to the soft subgrades
in the Burns bog area.
SmartDitch Water Conveyance Structures
An above-ground water conveyance structure
built with additional soils was brought in to create
a berm, and SmartDitch was used to line this new
above-ground channel. This allowed water to pass
from an outlet to the river, above a sensitive site.
SmartDitch offered additional advantages for
this project, other than the ability to create a
unique above-ground, low-disturbance channel. Its
lightweight and durable design meant it could be
brought to site easily and off-loaded with minimal
disturbance to the surrounding construction and
existing soils. It has flow-rate predictability and
watertight seams, making it ideal for this project.
Erosion Control & Vegetation Establishment
North American Green SC250 Turf Reinforcement
Mat (TRM) was recommended to protect the
upslopes and downslopes of the new roadway,
and establish vegetation on tricky glacial till
soils. The mat protected the seed and soils and
improved germination.
South Fraser Perimeter Road (SFPR)
Installation
SierraScape for Preload Stage One Walls
A granular base course levelling pad minimized
contracting forces and maintained alignment
during the initial placement of the wire wall.
Tensar Uniaxial Geogrids provided the prime soil
reinforcement. Heavy-duty galvanized SierraScape
wire forms were used as facing elements and were
wrapped along the backside with geotextile fabric.
Sierra Slope Vegetated MSE Walls
Nilex provided local engineering and construction
support for the project’s significant design
challenges and incorporated Sierra Slope MSE.
Sierra Slope systems require less area for laydown
and material storage and minimize the need for
cranes, which are mandatory for systems with
steel mesh soil reinforcement. It provides an
excellent vegetated appearance as a complement
to the SierraScape Rock-Face walls.
SierraScape Rock-Face
For permanent wall applications like public
highways, a facing stone rock-fill is required and
placed immediately behind the cage. This eases
installation, and provides better overall alignment
of the final facing system. The facing stone is
separated from the structural backfill (river sand
in this case), by a nonwoven geotextile separator
(Nilex 4551). Approximately 25,000 m2
of
SierraScape with rock-fill was installed.
ARES Two Stage MSE Walls
Once the engineer confirmed the settlement
of the first stage, 5,250 m2
of ARES pre-cast
concrete panels were attached as a false fascia to
complete the abutment wall system.
South Fraser Perimeter Road (SFPR)
Water Management
The SmartDitch system was installed above-
ground due to the sensitive soils between the
road surface and the river several metres away.
A drainage pipe from the road and MSE wall ran
to the SmartDitch channel. The channel itself
was installed using earth anchors driven into the
fill soil that was hauled to site. Each section of
SmartDitch was unloaded without the use of a
crane, making them easy to position. Since the
sections overlap to create a snug fit, only self-
tapping screws and weather-resistant adhesive
were required to complete the installation.
Roads
The portions of SFPR built over poor soils
required 287 rolls of TriAx TX160 and geotextile
(approximately 21,525 meters in total) after
preloading with sand on top of the subgrade. This
helped ensure any possible settlement occurred
prior to establishing final grade elevations.
Erosion Control & Vegetation Establishment
To address short-term erosion control and ensure
long-term structural stability, 1,500 rolls of TRM
were installed on slopes using 250 mm (10-inch)
pins and washers.
Results
Nilex’s expertise and product knowledge played
an important role in the successful completion
of the South Fraser Perimeter Road, which
opened six months ahead of schedule and was
the first major project outside the U.S. to receive
Greenroads certification.
The design of a four-lane, 40 km-long road
presents many challenges in any environment, but
the soil conditions in this area of B.C. proved tricky
for all aspects of the work: Roads, walls,
abutments, slopes, erosion and sediment control
and water management.
Creative, cost-effective and environmentally-
sensitive solutions are the hallmark of this project,
reducing the need for fill material, and in turn,
reducing the carbon emissions from the haul
trucks that material would have required.
South Fraser Perimeter Road (SFPR)
South Fraser Perimeter Road (SFPR)
Rev. 03/2016
Using Nilex’s Innovation Calculator, it was
possible to show that geotextile and geosythetic
construction choices saved the client $810,000
and eliminated 605 tonnes of CO2
emissions.
The durability of the products chosen will further
reduce emissions from maintenance vehicles, and
thus reduce the related interruptions to drivers.
The Nilex Advantage
Nilex is committed to unearthing better results.
Whether it’s for a civil, resource or environmental
project, we offer the latest engineered and
technically-superior materials and techniques to
save our customers time and money, minimize the
need to move or remove earth, and reduce the
need for granular materials.
With over 35 years of experience, a long-standing
commitment to the environment and highly-
qualified staff, Nilex delivers the products and
technologies that give clients an economic
advantage with environmental benefits.

More Related Content

PDF
Rd cs steele_county
PDF
Typical Applications for Cementitious Grout
PDF
Mitigating foundation distress
PPTX
Thrasher Commercial Group
DOC
Dam engineering i 3
PPTX
ABC in Nebraska: Belden to Laurel Bridge
PDF
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
DOC
Nikolai Tim (01-24-11) (3)
Rd cs steele_county
Typical Applications for Cementitious Grout
Mitigating foundation distress
Thrasher Commercial Group
Dam engineering i 3
ABC in Nebraska: Belden to Laurel Bridge
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Nikolai Tim (01-24-11) (3)

What's hot (20)

PDF
Melbourne Pipeline Protection
PDF
Pile footing
PPTX
My student soil test geotechnical work experience tokurah majid age6543
DOCX
PDF
Emin sg sistema dimension caso west hynes tank farm
PDF
Dim cs whynes_12.07
DOCX
Foundation Stabilization for Reservoir Geomembrane, India
PDF
Assessing and constructing a cost effective bridge replacement christopher si...
PPTX
Low Density Cellular Concrete
PPT
Dubaidib Wellfield Sdc Presentation July2011
PDF
GeoEng12334
PPT
GE Presentation 6th October 2010
PDF
OCPW Wintersburg Channel Deep Soil Mixing
PDF
Geoweb solutions-for-dikes-dams-spillways
PDF
Geoweb løsninger til diger damme afløb
PDF
124 مبادرة #تواصل_تطوير -المركبات البوليمرية الجيوتقنية و تطبيقاتها في الهندس...
PPTX
Proper Maintenance for the Long Life of Concrete Pavements
PPTX
Salus Passive House PresentationNV
PDF
Canada: BC: Infiltration Rain Garden
PDF
AM undertaken projects
Melbourne Pipeline Protection
Pile footing
My student soil test geotechnical work experience tokurah majid age6543
Emin sg sistema dimension caso west hynes tank farm
Dim cs whynes_12.07
Foundation Stabilization for Reservoir Geomembrane, India
Assessing and constructing a cost effective bridge replacement christopher si...
Low Density Cellular Concrete
Dubaidib Wellfield Sdc Presentation July2011
GeoEng12334
GE Presentation 6th October 2010
OCPW Wintersburg Channel Deep Soil Mixing
Geoweb solutions-for-dikes-dams-spillways
Geoweb løsninger til diger damme afløb
124 مبادرة #تواصل_تطوير -المركبات البوليمرية الجيوتقنية و تطبيقاتها في الهندس...
Proper Maintenance for the Long Life of Concrete Pavements
Salus Passive House PresentationNV
Canada: BC: Infiltration Rain Garden
AM undertaken projects
Ad

Similar to SFPR-Project-Profile_0 (20)

PDF
Southeast Stoney Trail Project Profile
PDF
Ec smx cs_va_roanoke
PDF
Ec smx cs_va_roanoke
PDF
Tensar mining brochure
PDF
Emin SG Proyecto Rehabilitacion Vias Ferreas CSX Rail Line
PDF
Dim cs whynes_12.07-2
PDF
Soil cement walls for excavation support
DOCX
Sustainable Storm-water Management Report
PDF
Dowel Bar Retrofit: Restore Load Transfer in Concrete Pavement
PPTX
Ground Treatment
PPTX
HoCoWSA Permeable Hardscapes Presentation
PDF
Whitemud Drive Retaining Wall
PPT
Lawrence Park PIC 3 slides
PDF
Innovative Slope Stabilisation
PPTX
precast concrete pavement in india as well as in foreign .pptx
PDF
EMIN SG - North American Green C350 Channel Stabilization (ingles)
PDF
Deep foundation construction in bouldery bed an over view
PDF
Emin SG Proyecto Rehabilitacion Vias Ferreas ST Charles Avenue
PDF
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
Southeast Stoney Trail Project Profile
Ec smx cs_va_roanoke
Ec smx cs_va_roanoke
Tensar mining brochure
Emin SG Proyecto Rehabilitacion Vias Ferreas CSX Rail Line
Dim cs whynes_12.07-2
Soil cement walls for excavation support
Sustainable Storm-water Management Report
Dowel Bar Retrofit: Restore Load Transfer in Concrete Pavement
Ground Treatment
HoCoWSA Permeable Hardscapes Presentation
Whitemud Drive Retaining Wall
Lawrence Park PIC 3 slides
Innovative Slope Stabilisation
precast concrete pavement in india as well as in foreign .pptx
EMIN SG - North American Green C350 Channel Stabilization (ingles)
Deep foundation construction in bouldery bed an over view
Emin SG Proyecto Rehabilitacion Vias Ferreas ST Charles Avenue
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
Ad

SFPR-Project-Profile_0

  • 1. Nilex provides multiple solutions for the new four-lane highway along Vancouver’s Fraser River. South Fraser Perimeter Road in Metro Vancouver, also called Highway 17, is a new four-lane highway along the Fraser River, connecting southwest Delta to North Surrey. Nilex assisted in the design and onsite installation of sections of this 40 km-long road and supplied multiple products for its construction. This included geogrids and geotextiles for a few sections of road, along with systems for Mechanically Stabilized Earth (MSE) walls and slopes, erosion and sediment control and water management. Challenges As a new roadway system, this multi-year project had many grade separation challenges. Roads and walls were required in and over areas of poor soils with a high likelihood of settlement caused by proximity to the Fraser River and Burns Bog. In one location, a drainage pipe from the above- grade roadway required an outlet to the river, several meters away. The chosen conveyance structure had to respect the sensitive terrain in this area as it moved water from the pipe to the outlet without extensive excavation. LOCATION: Delta and Surrey, British Columbia PRODUCTS: SierraScape, Sierra Slope & ARES MSE Systems TriAx® Geogrid & Nonwoven Geotextile SmartDitch Turf Reinforcement Mats PROJECT PARTNERS: Owner BC Ministry of Transportation Consultant Stantec, Buckland & Taylor, exp and Associated Engineering Contractor FTG Constructors Group, Kan Retain-it, Sea-Jae Builders Ltd, B&B Contracting, M2K Construction, Tyam Group, Stanco Landscaping Completion Date January 2014 THE NILEX ADVANTAGE: Cost Savings CO2 Saved Nearly $810,000 605 tonnes South Fraser Perimeter Road (SFPR) PROJECT PROFILE MSE WALLS & SLOPES
  • 2. Additional challenges: • Pile-supported MSE walls were originally specified with steel reinforcement, rather than High Density Polyethylene (HDPE). • Two-stage bridge abutments were required, but the panels had to be installed after the structure over top had been opened to traffic. • A complex design was required to place geogrids around the bridge structure piles. • Slopes and water management systems had to respect archeologically-sensitive sites. • Vegetation and supporting landscapes were implemented wherever possible, rather than precast walls. Solutions Two-Stage MSE Wall Systems A two-stage wall system was recommended in response to the site’s extremely poor soils. SierraScape, combined with geotextile, served as the permanent wall face for the Stage One wall due to its tolerance of seismic activity and settlement. It was also the best option to save the client time and money on installation and material. The ARES pre-cast concrete panel system was recommended as Stage Two, as it was the preferred aesthetic in some areas. Sierra Slope Vegetated MSE Walls Sierra Slope walls were recommended where land was available, to reduce cost and the carbon footprint. These systems are flexible, tolerate differential settlement well and are much less expensive than steel and rock-face systems. Additionally, they can be built over sensitive sites because there is no need to excavate the base. SierraScape Rock-Face MSE Walls Similar to Sierra Slope, SierraScape MSE systems are tolerant of differential settlement and are cost effective compared to precast walls. As the transition to Sierra Slope walls, they combine an appealing rock and vegetation aesthetic ideal for a project with high public visibilty. South Fraser Perimeter Road (SFPR)
  • 3. Geotextiles & Geogrids for Road Construction Nilex recommended nonwoven geotextile (Nilex 4551) to prevent the subgrade sand and gravel road structure from mixing. That separation layer was combined with TriAx Geogrid (TX160) as a reinforcement layer for subgrade stabilization, base reinforcement, and pavement optimization due to the soft subgrades in the Burns bog area. SmartDitch Water Conveyance Structures An above-ground water conveyance structure built with additional soils was brought in to create a berm, and SmartDitch was used to line this new above-ground channel. This allowed water to pass from an outlet to the river, above a sensitive site. SmartDitch offered additional advantages for this project, other than the ability to create a unique above-ground, low-disturbance channel. Its lightweight and durable design meant it could be brought to site easily and off-loaded with minimal disturbance to the surrounding construction and existing soils. It has flow-rate predictability and watertight seams, making it ideal for this project. Erosion Control & Vegetation Establishment North American Green SC250 Turf Reinforcement Mat (TRM) was recommended to protect the upslopes and downslopes of the new roadway, and establish vegetation on tricky glacial till soils. The mat protected the seed and soils and improved germination. South Fraser Perimeter Road (SFPR)
  • 4. Installation SierraScape for Preload Stage One Walls A granular base course levelling pad minimized contracting forces and maintained alignment during the initial placement of the wire wall. Tensar Uniaxial Geogrids provided the prime soil reinforcement. Heavy-duty galvanized SierraScape wire forms were used as facing elements and were wrapped along the backside with geotextile fabric. Sierra Slope Vegetated MSE Walls Nilex provided local engineering and construction support for the project’s significant design challenges and incorporated Sierra Slope MSE. Sierra Slope systems require less area for laydown and material storage and minimize the need for cranes, which are mandatory for systems with steel mesh soil reinforcement. It provides an excellent vegetated appearance as a complement to the SierraScape Rock-Face walls. SierraScape Rock-Face For permanent wall applications like public highways, a facing stone rock-fill is required and placed immediately behind the cage. This eases installation, and provides better overall alignment of the final facing system. The facing stone is separated from the structural backfill (river sand in this case), by a nonwoven geotextile separator (Nilex 4551). Approximately 25,000 m2 of SierraScape with rock-fill was installed. ARES Two Stage MSE Walls Once the engineer confirmed the settlement of the first stage, 5,250 m2 of ARES pre-cast concrete panels were attached as a false fascia to complete the abutment wall system. South Fraser Perimeter Road (SFPR)
  • 5. Water Management The SmartDitch system was installed above- ground due to the sensitive soils between the road surface and the river several metres away. A drainage pipe from the road and MSE wall ran to the SmartDitch channel. The channel itself was installed using earth anchors driven into the fill soil that was hauled to site. Each section of SmartDitch was unloaded without the use of a crane, making them easy to position. Since the sections overlap to create a snug fit, only self- tapping screws and weather-resistant adhesive were required to complete the installation. Roads The portions of SFPR built over poor soils required 287 rolls of TriAx TX160 and geotextile (approximately 21,525 meters in total) after preloading with sand on top of the subgrade. This helped ensure any possible settlement occurred prior to establishing final grade elevations. Erosion Control & Vegetation Establishment To address short-term erosion control and ensure long-term structural stability, 1,500 rolls of TRM were installed on slopes using 250 mm (10-inch) pins and washers. Results Nilex’s expertise and product knowledge played an important role in the successful completion of the South Fraser Perimeter Road, which opened six months ahead of schedule and was the first major project outside the U.S. to receive Greenroads certification. The design of a four-lane, 40 km-long road presents many challenges in any environment, but the soil conditions in this area of B.C. proved tricky for all aspects of the work: Roads, walls, abutments, slopes, erosion and sediment control and water management. Creative, cost-effective and environmentally- sensitive solutions are the hallmark of this project, reducing the need for fill material, and in turn, reducing the carbon emissions from the haul trucks that material would have required. South Fraser Perimeter Road (SFPR)
  • 6. South Fraser Perimeter Road (SFPR) Rev. 03/2016 Using Nilex’s Innovation Calculator, it was possible to show that geotextile and geosythetic construction choices saved the client $810,000 and eliminated 605 tonnes of CO2 emissions. The durability of the products chosen will further reduce emissions from maintenance vehicles, and thus reduce the related interruptions to drivers. The Nilex Advantage Nilex is committed to unearthing better results. Whether it’s for a civil, resource or environmental project, we offer the latest engineered and technically-superior materials and techniques to save our customers time and money, minimize the need to move or remove earth, and reduce the need for granular materials. With over 35 years of experience, a long-standing commitment to the environment and highly- qualified staff, Nilex delivers the products and technologies that give clients an economic advantage with environmental benefits.