SlideShare a Scribd company logo
2
Most read
3
Most read
Simple Decision Tree Analysis
Published: February 6, 2016
Introduction
Oil and gas projects are risky business with significant uncertainties in prices and the ability to
produce the forecasted or estimated oil and gas where the revenue created from the commodity
is dependent upon the demand, the production and its financial motives for pursuing a project
(Inkpen and Moffett, 2011).
Operational uncertainties
Suslick, Schiozer and Rodriguez (2009, p.33) argued, “Uncertainty refers to the range of
probabilities in which some conditions may exist or occur.” The Point Thompson is an onshore
drilling project in Alaska operated by ExxonMobil with several major IOC partners that have
and estimated reserve of eight trillion cubic feet of gas and two hundred million of barrels of
condensate that will be transported to market through the Trans-Alaska Pipeline Systems
(TAPS) (Bradner, 2015).
After the Valdez accident in 1989, ExxonMobil suspended its exploration activities in Alaska.
They resumed their exploration activities in 2009 after two years battling court cases with the
Department of Natural Resources (DNR) due to Exxon's inability to start drilling and produce
within the time frame set and were asked to relinquish its acres to the government or start
drilling (Petroleum News, 2009). They did settle with DNR, and two wells were approved, i.e.
PTU-15 and PTU 16 and completed in 2010 (Loy, 2010).
The Point Thomson project has multiple uncertainties due to its high pressure wells, technology
and materials (i.e. well casings and tubular), infrastructure and environmental permits, (i.e.
dependent on winter roads and use of permafrost advantages for not destroying the environment
and waterway access for supplies during summer months) and is dependent upon high-level
competence. Moreover, the new requirement from DNR in regards to reinjection of the gas
also invites to significant challenges as to the use of new high-pressure technologies and
materials that must separate the gas from the condensate for then to reinject the gas and
transport the condensate to Prudhoe Bay and through a new TAPS pipeline to market. This
cycle methodology is highly uncertain, as there is no history to track previous performances
under such circumstances (Bradner, 2015).
Decision Tree Analysis
After a license have been awarded an IOC for the right to drill. IOC’s would usually perform
geological surveys, seismic and drill wildcat wells and conduct an appraisal after testing before
making a final decision on a field development program. In the Point Thomson project case,
and since there are not much information available on the paper, the decision tree below in
figure 1 is based on highly hypothetical data ($000m):
 Sell rights = 300M
 Drill Immediately = 160M
 Probability of finding oil, first drilling = 50 - 50%
 Value of recovered oil after first drilling = 3000M
 Geological Surveys = 35M
 Probability, finding a reservoir = 2/3
 Oil found, after review, sell rights = 600M or go for the drilling
 If recovered = 14000M (or 3.5 x invested capital of $4000M)
 Abandonment cost, intentionally not taken into account, exploration wells
Fig. 1 Point Thomson Project Decision Tree
Source: Sudenius (2016)
As we can see from the above decision tree is; even if we find a reservoir or do not find a
reservoir, the decision will not change, we will still go for drilling the wells and not sell the
rights even before or after discovery.
Investment decisions in projects
The decision tree is used in this case, but there are other analytical decision tools commonly
employed in the oil and gas business domain to determine risk probabilities distribution and
uncertainties in exploration activities like options pricing of the sales with “futures, call
options, risk-free bonds” according to (Smith and McCardle, 1999). The Monte Carlo
simulation tool performs probabilistic analysis as opposed to a deterministic analysis (Finch,
Macmillan and Simpson, 2002). It is used at different stages during exploration that gives
management the “expected value” (i.e. market value or value to shareholders) and where the
decision tree and Monte Carlo tool provides you with the discounted rates and option pricing
provides you with the “risk neutral probabilities.” However, the first step is to find net present
values based on worst, median and best scenario with pre-set criteria that the project life cycle
is established, and no new development are determined without regards to market price
variations of the petroleum. On the other hand, in our day to day environment, management
have to change these values and its variable factors due to uncertainties. Those factors must be
sequences and taken into consideration over time to give multiple scenarios (Suslick, Schiozer
and Rodriguez, 2009: Galli, Armstrong and Jehl, 1999).
Conclusion
The Point Thomson project is a significant investment of $4 billion and has a high degree of
uncertainties due to its characteristics of high-pressure wells, new technologies, transportation
to market with pipelines, and its delays could have an impact and may force the operator to
increase the storage capacity at Prudhoe Bay. It is, therefore, crucial for management to use all
decision-making procedures that is commonly available, i.e. quantitative analysis, holistic
views, discounted cash flows, Monte Carlo for simulating reserves, and the decision trees
(Finch, Macmillan and Simpson, 2002).
References:
Bradner, M. (2015) ‘Point Thomson: Alaska's big Arctic project,' Alaska Business Monthly,
31 (3), pp.124-128.
Finch, J.H., Macmillan, F.E. & Simpson, G.S. (2002) ‘On the diffusion of probabilistic
investment appraisal and decision-making procedures in the UK’s upstream oil and gas
industry,' Research Policy, 31 (6), pp.969-988.
Galli, A.G., Armstrong, M. & Jehl, B. (1999) ‘Comparison of three methods for evaluating
oil projects’, Journal of Petroleum Technology, 51 (10), pp.44-49.
Inkpen, A.C. & Moffett, M.H. (2011) The global oil & gas industry: management, strategy &
finance. Tulsa, OK: PennWell [Online]. Available
from:http://library.liv.ac.uk.ezproxy.liv.ac.uk/record=b2632439~S8 (Accessed: 5 February
2016).
Loy, W. (2010) ‘First Point Thomson well reaches the target,' Petroleum News, Vol. 15, No.
7, February 14, [Online]. Available from:
http://www.petroleumnews.com/pnads/611076461.shtml (Accessed: 5 February 2016).
Petroleum News. (2009) The Explorers 2009: ExxonMobil, Petroleum News, Vol. 14, No.
46, November 15, pp. 1 – 124, [Online]. Available from:
http://www.petroleumnews.com/pnads/171091570.shtml (Accessed: 5 February 2016)
Smith, J. E., & McCardle, K., F. (1999) Options in the Real World: Lessons Learned in
Evaluating Oil and Gas Investments, Operations Research, 47(1), pp. 1 – 15.
Suslick, S., Schiozer, D. & Rodriguez, M.R. (2009) ‘Uncertainty and risk analysis in
petroleum exploration and production,' Terræ, 6 (1), pp.30-41 [Online]. Available
from: http://www.ige.unicamp.br/terrae/V6/PDF-N6/T-a3i.pdf (Accessed: 6 February 2016).

More Related Content

PDF
Chapter 5 - Undersaturated oil reservoirs.pdf
PDF
Artificial Lift Screening and Selection
PPTX
Oil & Gas Decommissioning
PPT
Presentation 10
PDF
PETROLEUM RESERVES AND RESOURCES: Standardization of Petroleum Resources Cl...
PPT
4 1 reservoir-drive_mechanisms
PDF
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
PPT
Overview Of Oil & Gas Accounting
Chapter 5 - Undersaturated oil reservoirs.pdf
Artificial Lift Screening and Selection
Oil & Gas Decommissioning
Presentation 10
PETROLEUM RESERVES AND RESOURCES: Standardization of Petroleum Resources Cl...
4 1 reservoir-drive_mechanisms
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Overview Of Oil & Gas Accounting

What's hot (20)

PPTX
Geomechanics services
PDF
PDF
Q921 re1 lec11 v1
PPT
Material balance Equation
PDF
Well Teste Interpretation
PDF
Guidelines for field development plan
PDF
Reservoir evaluation method 101
PPTX
Drill stem test
PPTX
Skin Effects
PPTX
Contracts and psc
PPT
reservoir engineering
DOCX
Petroleum economics
PPTX
Crude oil prices fudamentals
PPTX
Fundamentals of Petroleum Engineering Module-1
PPTX
Well Test Analysis in Horizontal Wells
PDF
Life Cycle of Oil & Gas Wells
PDF
Applied reservoir eng
PDF
SIMULACIÓN DE YACIMIENTOS
PPT
Estmation of oil & gas proven probable posiible
PPT
OVERVIEW OF THE OIL & GAS EXPLORATION AND [Autosaved]
Geomechanics services
Q921 re1 lec11 v1
Material balance Equation
Well Teste Interpretation
Guidelines for field development plan
Reservoir evaluation method 101
Drill stem test
Skin Effects
Contracts and psc
reservoir engineering
Petroleum economics
Crude oil prices fudamentals
Fundamentals of Petroleum Engineering Module-1
Well Test Analysis in Horizontal Wells
Life Cycle of Oil & Gas Wells
Applied reservoir eng
SIMULACIÓN DE YACIMIENTOS
Estmation of oil & gas proven probable posiible
OVERVIEW OF THE OIL & GAS EXPLORATION AND [Autosaved]
Ad

Viewers also liked (13)

PPTX
83 learningdecisiontree
PDF
Using Social Networks To Build Valuable Business Relationships
ODP
FFH TECHNICAL DRAWING II
PPTX
Decision tree
PDF
Decision making in the oil and gas industry
PPT
Chapter 19 decision-making under risk
PDF
Risk vs. reward decision matrix
PDF
Decision tree lecture 3
PPTX
Decision tree
PPTX
Decision Tree Analysis
PPTX
Decision tree
PDF
Decision tree
PPTX
How to develop an effective Business Development Strategy
83 learningdecisiontree
Using Social Networks To Build Valuable Business Relationships
FFH TECHNICAL DRAWING II
Decision tree
Decision making in the oil and gas industry
Chapter 19 decision-making under risk
Risk vs. reward decision matrix
Decision tree lecture 3
Decision tree
Decision Tree Analysis
Decision tree
Decision tree
How to develop an effective Business Development Strategy
Ad

Similar to Simple Decision Tree Analysis (20)

PDF
Guide to Valuation and Value Creation: Natural Resources Projects
PDF
Sample
PDF
Webinar Exploration Valuation And Decision Analysis
PDF
Energold Corporate Presentation
PPT
Impact of Mobility Technologies in Oil and Gas
PDF
Risk modelling in the Exploration and Production Industry
PDF
Webinar investment analysis final
PDF
Decision theory & decisiontrees
PPTX
Overview of the problem.pptx
PDF
Oil And Gas Company Valuations Business Valuation Review
PDF
Oil And Gas Company Valuations Business Valuation Review
PPT
Ia final presentation
PDF
Eagle drilling venture 2019 LP
PDF
Strategy for E&P Companies
DOCX
Business processes and risk management -former to business
PDF
Canadian Unconventionals: The Low(er) Hanging Fruit
PDF
Gis Company Introduction Presentation
PPT
analysis 2018
PDF
Energold Corporate Presentation
PDF
On Call 2012
Guide to Valuation and Value Creation: Natural Resources Projects
Sample
Webinar Exploration Valuation And Decision Analysis
Energold Corporate Presentation
Impact of Mobility Technologies in Oil and Gas
Risk modelling in the Exploration and Production Industry
Webinar investment analysis final
Decision theory & decisiontrees
Overview of the problem.pptx
Oil And Gas Company Valuations Business Valuation Review
Oil And Gas Company Valuations Business Valuation Review
Ia final presentation
Eagle drilling venture 2019 LP
Strategy for E&P Companies
Business processes and risk management -former to business
Canadian Unconventionals: The Low(er) Hanging Fruit
Gis Company Introduction Presentation
analysis 2018
Energold Corporate Presentation
On Call 2012

More from Kjell Sudenius MSc - Project Management (8)

PDF
PDF
A View of Corporate Strategy and Risk
PDF
Thoughts - Renewable Energy
DOCX
Risk Factors and Risk Appraisals – HH Field Development Project
DOCX
Simple Work Breakdown Structure for Exploration for Petroleum Resources
DOCX
Project Financing Thoughts
A View of Corporate Strategy and Risk
Thoughts - Renewable Energy
Risk Factors and Risk Appraisals – HH Field Development Project
Simple Work Breakdown Structure for Exploration for Petroleum Resources
Project Financing Thoughts

Recently uploaded (20)

PDF
Solaris Resources Presentation - Corporate August 2025.pdf
PDF
Charisse Litchman: A Maverick Making Neurological Care More Accessible
PDF
Tata consultancy services case study shri Sharda college, basrur
PDF
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
PDF
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
PDF
Technical Architecture - Chainsys dataZap
PDF
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...
PPTX
Astra-Investor- business Presentation (1).pptx
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
PDF
Introduction to Generative Engine Optimization (GEO)
PDF
IFRS Notes in your pocket for study all the time
PDF
How to Get Funding for Your Trucking Business
PDF
Blood Collected straight from the donor into a blood bag and mixed with an an...
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
Building a Smart Pet Ecosystem: A Full Introduction to Zhejiang Beijing Techn...
PPTX
Negotiation and Persuasion Skills: A Shrewd Person's Perspective
PPTX
Principles of Marketing, Industrial, Consumers,
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PPTX
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
Solaris Resources Presentation - Corporate August 2025.pdf
Charisse Litchman: A Maverick Making Neurological Care More Accessible
Tata consultancy services case study shri Sharda college, basrur
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
Technical Architecture - Chainsys dataZap
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...
Astra-Investor- business Presentation (1).pptx
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Digital Marketing & E-commerce Certificate Glossary.pdf.................
Introduction to Generative Engine Optimization (GEO)
IFRS Notes in your pocket for study all the time
How to Get Funding for Your Trucking Business
Blood Collected straight from the donor into a blood bag and mixed with an an...
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Building a Smart Pet Ecosystem: A Full Introduction to Zhejiang Beijing Techn...
Negotiation and Persuasion Skills: A Shrewd Person's Perspective
Principles of Marketing, Industrial, Consumers,
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx

Simple Decision Tree Analysis

  • 1. Simple Decision Tree Analysis Published: February 6, 2016 Introduction Oil and gas projects are risky business with significant uncertainties in prices and the ability to produce the forecasted or estimated oil and gas where the revenue created from the commodity is dependent upon the demand, the production and its financial motives for pursuing a project (Inkpen and Moffett, 2011). Operational uncertainties Suslick, Schiozer and Rodriguez (2009, p.33) argued, “Uncertainty refers to the range of probabilities in which some conditions may exist or occur.” The Point Thompson is an onshore drilling project in Alaska operated by ExxonMobil with several major IOC partners that have and estimated reserve of eight trillion cubic feet of gas and two hundred million of barrels of condensate that will be transported to market through the Trans-Alaska Pipeline Systems (TAPS) (Bradner, 2015). After the Valdez accident in 1989, ExxonMobil suspended its exploration activities in Alaska. They resumed their exploration activities in 2009 after two years battling court cases with the Department of Natural Resources (DNR) due to Exxon's inability to start drilling and produce within the time frame set and were asked to relinquish its acres to the government or start drilling (Petroleum News, 2009). They did settle with DNR, and two wells were approved, i.e. PTU-15 and PTU 16 and completed in 2010 (Loy, 2010). The Point Thomson project has multiple uncertainties due to its high pressure wells, technology and materials (i.e. well casings and tubular), infrastructure and environmental permits, (i.e. dependent on winter roads and use of permafrost advantages for not destroying the environment and waterway access for supplies during summer months) and is dependent upon high-level competence. Moreover, the new requirement from DNR in regards to reinjection of the gas also invites to significant challenges as to the use of new high-pressure technologies and materials that must separate the gas from the condensate for then to reinject the gas and transport the condensate to Prudhoe Bay and through a new TAPS pipeline to market. This
  • 2. cycle methodology is highly uncertain, as there is no history to track previous performances under such circumstances (Bradner, 2015). Decision Tree Analysis After a license have been awarded an IOC for the right to drill. IOC’s would usually perform geological surveys, seismic and drill wildcat wells and conduct an appraisal after testing before making a final decision on a field development program. In the Point Thomson project case, and since there are not much information available on the paper, the decision tree below in figure 1 is based on highly hypothetical data ($000m):  Sell rights = 300M  Drill Immediately = 160M  Probability of finding oil, first drilling = 50 - 50%  Value of recovered oil after first drilling = 3000M  Geological Surveys = 35M  Probability, finding a reservoir = 2/3  Oil found, after review, sell rights = 600M or go for the drilling  If recovered = 14000M (or 3.5 x invested capital of $4000M)  Abandonment cost, intentionally not taken into account, exploration wells Fig. 1 Point Thomson Project Decision Tree Source: Sudenius (2016)
  • 3. As we can see from the above decision tree is; even if we find a reservoir or do not find a reservoir, the decision will not change, we will still go for drilling the wells and not sell the rights even before or after discovery. Investment decisions in projects The decision tree is used in this case, but there are other analytical decision tools commonly employed in the oil and gas business domain to determine risk probabilities distribution and uncertainties in exploration activities like options pricing of the sales with “futures, call options, risk-free bonds” according to (Smith and McCardle, 1999). The Monte Carlo simulation tool performs probabilistic analysis as opposed to a deterministic analysis (Finch, Macmillan and Simpson, 2002). It is used at different stages during exploration that gives management the “expected value” (i.e. market value or value to shareholders) and where the decision tree and Monte Carlo tool provides you with the discounted rates and option pricing provides you with the “risk neutral probabilities.” However, the first step is to find net present values based on worst, median and best scenario with pre-set criteria that the project life cycle is established, and no new development are determined without regards to market price variations of the petroleum. On the other hand, in our day to day environment, management have to change these values and its variable factors due to uncertainties. Those factors must be sequences and taken into consideration over time to give multiple scenarios (Suslick, Schiozer and Rodriguez, 2009: Galli, Armstrong and Jehl, 1999). Conclusion The Point Thomson project is a significant investment of $4 billion and has a high degree of uncertainties due to its characteristics of high-pressure wells, new technologies, transportation to market with pipelines, and its delays could have an impact and may force the operator to increase the storage capacity at Prudhoe Bay. It is, therefore, crucial for management to use all decision-making procedures that is commonly available, i.e. quantitative analysis, holistic views, discounted cash flows, Monte Carlo for simulating reserves, and the decision trees (Finch, Macmillan and Simpson, 2002). References: Bradner, M. (2015) ‘Point Thomson: Alaska's big Arctic project,' Alaska Business Monthly, 31 (3), pp.124-128. Finch, J.H., Macmillan, F.E. & Simpson, G.S. (2002) ‘On the diffusion of probabilistic investment appraisal and decision-making procedures in the UK’s upstream oil and gas industry,' Research Policy, 31 (6), pp.969-988. Galli, A.G., Armstrong, M. & Jehl, B. (1999) ‘Comparison of three methods for evaluating oil projects’, Journal of Petroleum Technology, 51 (10), pp.44-49. Inkpen, A.C. & Moffett, M.H. (2011) The global oil & gas industry: management, strategy & finance. Tulsa, OK: PennWell [Online]. Available from:http://library.liv.ac.uk.ezproxy.liv.ac.uk/record=b2632439~S8 (Accessed: 5 February 2016). Loy, W. (2010) ‘First Point Thomson well reaches the target,' Petroleum News, Vol. 15, No. 7, February 14, [Online]. Available from: http://www.petroleumnews.com/pnads/611076461.shtml (Accessed: 5 February 2016).
  • 4. Petroleum News. (2009) The Explorers 2009: ExxonMobil, Petroleum News, Vol. 14, No. 46, November 15, pp. 1 – 124, [Online]. Available from: http://www.petroleumnews.com/pnads/171091570.shtml (Accessed: 5 February 2016) Smith, J. E., & McCardle, K., F. (1999) Options in the Real World: Lessons Learned in Evaluating Oil and Gas Investments, Operations Research, 47(1), pp. 1 – 15. Suslick, S., Schiozer, D. & Rodriguez, M.R. (2009) ‘Uncertainty and risk analysis in petroleum exploration and production,' Terræ, 6 (1), pp.30-41 [Online]. Available from: http://www.ige.unicamp.br/terrae/V6/PDF-N6/T-a3i.pdf (Accessed: 6 February 2016).