Signalling Internship
23 December 2015
Sharing Segments
1. Legacy Signalling System
2. Thales Signalling System
3. General Learning Experiences
Legacy Signalling System
Automatic Sub-Systems
Automatic Train
Operation (ATO)
Automatic Train
Protection (ATP)
Automatic Train
Supervision (ATS)
Westinghouse Signalling
System
Interlocking
OCC
Legacy System Visits
1. Night Work with YCK SMO
2. Signal Equipment Rooms
3. OCC ATS
Night Work (PM/CM)
YCK Signal Maintenance Office (SMO)
(4/12/15)
Dynamic Nature Of Plans
• Maintenance plans are never cast in stone.
Can change at eleventh hour.
• CM supersedes PM.
SBW Point
PM
WDL Track
Circuit Fault
AMK ATO
Tripping
AMK ATO Tripping
1 December 2015
(1630)
• Could restart in CM
1 December 2015
(1704)
• Failed several times to
restart in CM
• Had to RM to AMK SB
Approach
Check Relay
Room
Check Track
Circuit Wiring
Check ATP Loop
Feed Cable/DB
Check Relay Room
• Used the Track Circuit Monitoring Unit
(TCMU) to check carrier frequency of track
circuit.
• Checked relays.
• Pull out then replace speed code pins.
No anomalies
Check Track Circuit Wiring
• Checked for any loose
connections between tuning
unit and rails.
No anomalies
Check ATP Loop Feed Cable/DB
• Only applicable to N700 SRTC
• Codes are send through LFU
instead of the track circuit
itself.
• Checked LFU and DB
connections
No anomalies
Inconclusive Outcome
• No leads to find the true reason for ATO trip.
• Problem could now lie in train-borne
equipment (antenna? Processors?)
• Typical experiences for maintenance crew.
• Justifies the difficulty of their job.
Signal Equipment Rooms
AMK, MSL, RDH, CT, East Relay Room
Platform-ATO Communicator
Dwell Time At Station
Platform ATO
Communicator
(PAC)
Train Sends
• Positive Train
Identification (PTI)
• Train Door Status
PAC Sends
• Detailed track profile
for next 2 interstation
runs
• Door Close command
• PSD Status
OCC
Victoria St
Environment
Legacy ATS System
Schedule
Compiler
LPU
OCC
Allocation
Table
IL/S
LPU LPU
I/S
IL/S IL/S
I/S I/S I/S I/S I/S
IL/S – Interlocking Station
I/S – Intermediate Station
Legacy Schedule Compiler
• Compiles Weekday, Weekend
and Special Schedules.
• Must define track layout and
station stopping positions.
• Conflicts must be resolved
manually.
• Revisions are done as and
when needed.
• Demand-driven schedule
formulation
Dwell Time Problems
Real Life Problems with ATS and
ATO
Dwell Time Problems
• PSDs cannot close properly.
• Train-borne ATO or PAC may not be
communicating door status properly to the
train.
Dwell Time Problems
https://youtu.be/Bg1LYEQF4TU
Consequences
• Train timings deviates from schedule.
• Peak hour schedules that barely passed
schedule feasibility checks will now be
unfeasible.
• Increase likelihood of schedule conflicts due
to delayed trains.
Potential Solutions
• PSD Health Monitoring System
• Monitoring times when PAC didn’t receive or
send the Door Open/Close signal properly.
Thales CBTC System
Automatic Sub-Systems
ATO
Automatic Train
Supervision (ATS)
Thales
CBTC System
Interlocking
OCC
Train-Borne
PMI MAU
Zone Controller
ATP
ATO
ATP
VOBC
Thales CBTC System Visits
1. QUE WRU PICO
2. CBTC Train Testing
Installation Procedures
Signal Light
1. Prelim
2. PICO DB
3. Install/Cut-In
4. PICO everything
5. SAT
Other Equipment
1. Install
2. PICO
3. Cut-In
4. SAT
QUE WRU PICO
WB Trackside
QUE WRU PICO
• Check out the conditions
of the wayside WRUs.
Casing and circuitry.
• Check earthing of
equipment
• Used Cable Tester (VSWR)
(AP broadcasting) and
Spectral Analyser (power
supply)
Overall Experience
• Working in imminent rain conditions.
• Extreme care towards WRU setup.
• WRU ponding issue due to condensation.
• Breather valve.
Static and Dynamic Testing
KHI 097/098
Static Test
• Check if the correct
outcomes happen when
controls are set in a certain
way.
• Copy and paste the
command code into
computer which connects
to VOBC.
Dynamic Test
• Test the train’s performance
in various driving modes.
• Test the 2 VOBCs ability to
control train in DTO.
• Test the stopping accuracy.
Overall Experience
• First time experiencing the new ATO system.
• It is teamwork to test trains.
General Learning Experiences
First Internship
Learning Experiences
• System Management and Maintenance
• Keeping records of the day’s proceedings
• Better picture of my future role in rail
industry.
Internship Experience
• Insightful and fulfilling
• Free and easy exploring nature.
Thank You

More Related Content

PDF
Cbtc brochure
PDF
Culver Test Track
PDF
CBTC World Congress paper on creating safe CBTC system without secondary dete...
PPTX
ERTMS Presentation
PPTX
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
PDF
India modern rail service for public
PPT
Basics of railway principles
PPTX
Cbtc brochure
Culver Test Track
CBTC World Congress paper on creating safe CBTC system without secondary dete...
ERTMS Presentation
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
India modern rail service for public
Basics of railway principles

What's hot (20)

PPTX
PDF
India railway and green infra smart move 2018
PDF
Strategic analysis of communications based train control systems in the weste...
PPTX
Train sense
PDF
FEAS_Poster_2016_WNCS_Tina
PDF
RTD FasTracks - INCOSE Colorado Front Range Chapter Presentation - Dec, 2014
PDF
Need for platform-to-track intrusion detection systems in automated metro lines
PDF
CBTC fitting strategies and challenges for maintenance vehicles
PDF
Dubai metro paper in ASPECT Conference
PPTX
ERTMS and Brexit
PPTX
THE FINAL
PPTX
Towards railway virtual coupling
PDF
Automated railway level crossing protection system-track circuit
PDF
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
PPT
Sro Project Brief
DOCX
CONCEPT AND WORKING OF WILD (Wheel Impact Load Detector)
PPTX
RDSO Training ppt
PDF
Ieeepro techno solutions 2013 ieee embedded project - adaptive traffic sig...
PPTX
AJAY CHAUHAN ppt
PDF
3 gpp lte-pdcp
India railway and green infra smart move 2018
Strategic analysis of communications based train control systems in the weste...
Train sense
FEAS_Poster_2016_WNCS_Tina
RTD FasTracks - INCOSE Colorado Front Range Chapter Presentation - Dec, 2014
Need for platform-to-track intrusion detection systems in automated metro lines
CBTC fitting strategies and challenges for maintenance vehicles
Dubai metro paper in ASPECT Conference
ERTMS and Brexit
THE FINAL
Towards railway virtual coupling
Automated railway level crossing protection system-track circuit
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
Sro Project Brief
CONCEPT AND WORKING OF WILD (Wheel Impact Load Detector)
RDSO Training ppt
Ieeepro techno solutions 2013 ieee embedded project - adaptive traffic sig...
AJAY CHAUHAN ppt
3 gpp lte-pdcp
Ad

Viewers also liked (17)

DOCX
FDA Internship Review
PPTX
goodreadppt
PDF
KUFRE'S CV 1
PDF
ResumeDec2015
PPT
Ppt0000003
PDF
JoannaBergerMScDissertation
PPTX
Eastern Bloc vehicles
PPTX
Rolling stock by manufacturer CSR rolling stock corporation limited china
PDF
Atagg 2015 Test automation and effective continuous integration
PDF
Pdf buoi1 2-on-page-tran-ngoc-chinh-mastercode.vn
PDF
Smart Lock for Password @ Game DevFest Bangkok 2015
PDF
Pokemon GO 101@Nextzy
PDF
Pd fbuoi7 8--tongquanseo-mastercode.vn
PPTX
online hotel management system
PPT
Blending with deltav
PDF
Summit72_extremedreams
PDF
US9314934B2
FDA Internship Review
goodreadppt
KUFRE'S CV 1
ResumeDec2015
Ppt0000003
JoannaBergerMScDissertation
Eastern Bloc vehicles
Rolling stock by manufacturer CSR rolling stock corporation limited china
Atagg 2015 Test automation and effective continuous integration
Pdf buoi1 2-on-page-tran-ngoc-chinh-mastercode.vn
Smart Lock for Password @ Game DevFest Bangkok 2015
Pokemon GO 101@Nextzy
Pd fbuoi7 8--tongquanseo-mastercode.vn
online hotel management system
Blending with deltav
Summit72_extremedreams
US9314934B2
Ad

Similar to SMRT Internship Sharing_V2 (6)

PPTX
ATS System - Copy.pptx
PPTX
S&T Presentation.pptx
PDF
ENIF - A Supplier's View_Antonio Bravo - IRSE
PPT
Signalling Maintanance
DOCX
PATERSON.PAUL.CV 2014
PPTX
Signaling system principle
ATS System - Copy.pptx
S&T Presentation.pptx
ENIF - A Supplier's View_Antonio Bravo - IRSE
Signalling Maintanance
PATERSON.PAUL.CV 2014
Signaling system principle

SMRT Internship Sharing_V2