After all details are finalized and upgrade design strategy complete, the implementation of the
network upgrade will transpire with minimal or no downtime within IIS. As part of our
implementation plan, an initial network test will occur. This will be done during off-hours to
minimize possible problems; however, the final test will be done during normal business hours to
completely evaluate the network upgrade performance. The following items below will be
completely under evaluation:
 Verify the designupgrade meets key business and technical goals.
 Validate LAN and WAN technology and device selections.
 Verify the service provider provides the agreed-upon service.
Testing before Installation
Test the redundancy of the network.
 Analyze the effects on performance during network link failures.
 Determine the optimization techniques to meet performance and other technical goals.
 Analyze the effects on performance while the upgrade of network links or devices is under
construction ("what-if analyses").
 Identify any risks that can impede implementation and determine the plans for contingencies.
The following are considerations to experience while a "live" test is under implementation:
 Warn users in advance about the timing of tests so they can expect some performance degradation,
but ask the users to work as they typically do to avoid invalidating the test by abnormal behavior.
Moreover, have the users report any issues that arise during the live test.
 Warn network administrators and other designers in advance to avoid the possibility that they
could be running tests at the same time.
 Warn network managers in advance, so they are not confused by unexpected alarms on network-
management consoles, and so they can account for test traffic when documenting load and
availability statistics.
 If possible, we will run multiple, short (less than 2-minute) tests to minimize user impact and
lessen the effects on baseline measurements.
 Monitor test results and discontinue them when test objectives are met, or the production network
is severely impacted or fails.
Furthermore, we will provide a follow-up after implementation. We will follow up every day until all
issues have been resolved and the design/upgrade has been fully completed
 Identify any bottlenecks or connectivity problems
Installation Details
IIS WAN will contain connections between each branch office and the headquarters. Fiber optic
cable will be laid between each office. Cabling distances were determined using the distances
between cities. IIS will lay their own cable,
Network Documentation Details
The network is designed to meet the following requirements:
Security. The network has been designed to prevent unauthorized access, both logically and
physically.
Speed. The network has enough bandwidth to meet demand during periods of peak usage.
Reliability. The network has redundancy to ensure that the failure of one system will not bring the
entire network down.
Scalability. The network is capable of sustaining scalability without the need to rebuild the entire
network. Changes and updates must be easy to implement.
Schedule
1. Preparation 25 days
1.1 Site Survey 10 days
1.2 Establish Organization and Business requirements 10 days
2. Planning 30 days
2.1 Characterizing Existing Network 10 days
2.2 Identifying Network and User Requirements 10 days
2.3 Analysis of Areas where the network will 10 days
be installed
2.4 Identification of user who will require network services 5 days
3. Design 40 days
3.1 Network Analysis 10 days
3.2 Creating Physical Network Design 10 days
3.3 Identification of user who will require network services 10 days
4. Implementation 50 days
4.1 Pre-implementation (during off hours) 15 days
4.1 Post-implementation 10 days
4.3 Training 10 days
4.4 Network Support and
Maintenance 10 days

More Related Content

PPTX
5 benefits of OpManager
PPTX
5 ways you can strengthen and secure your network infrastructure with Firewal...
PPTX
Network Configuration Management - Mumbai Seminar
PPTX
Network Management
PPTX
IT Solutions Provider in Kosovo uses Bandwidth monitoring, NetFlow Analyzer
PPT
Hydra connect2015 security-accessibility-changemanagement-final
PPTX
5 reasons to use OpManager Plus
PPTX
Global Airline giant's application performance monitoring solution!
5 benefits of OpManager
5 ways you can strengthen and secure your network infrastructure with Firewal...
Network Configuration Management - Mumbai Seminar
Network Management
IT Solutions Provider in Kosovo uses Bandwidth monitoring, NetFlow Analyzer
Hydra connect2015 security-accessibility-changemanagement-final
5 reasons to use OpManager Plus
Global Airline giant's application performance monitoring solution!

What's hot (20)

PPTX
Leading American Entertainment Company implements OpManager
PPTX
Network fault management and IT automation training
PDF
Enterprise network management
PPTX
Carrier grade linux maintenance
PPTX
Opmanager technical overview
PDF
Net Rounds Product Sheet
PPTX
5 Ways NCM Can Save You From A Disaster
PPTX
Low-Cost ICS Network Performance Testing
PDF
CIO Technical Series - Solving Scan Gun Performance Issues
PPTX
Gulf Chemicals & Metallurgy manages 1700 interfaces with OpManager
PPTX
Top 5 IT challenges for 2017
PPTX
OpManager - Technical overview
PDF
02_ElectricalEngineering
PPT
OpManager 7
PPTX
Server and application monitoring webinars [Applications Manager] - Part 2
PDF
Monitoring active-directory
PPTX
Why Configuration Management Matters
PPTX
Free Netflow analyzer training - diagnosing_and_troubleshooting
PPTX
5 reasons why you need a network monitoring tool
PPT
ITA Presentation 2010
Leading American Entertainment Company implements OpManager
Network fault management and IT automation training
Enterprise network management
Carrier grade linux maintenance
Opmanager technical overview
Net Rounds Product Sheet
5 Ways NCM Can Save You From A Disaster
Low-Cost ICS Network Performance Testing
CIO Technical Series - Solving Scan Gun Performance Issues
Gulf Chemicals & Metallurgy manages 1700 interfaces with OpManager
Top 5 IT challenges for 2017
OpManager - Technical overview
02_ElectricalEngineering
OpManager 7
Server and application monitoring webinars [Applications Manager] - Part 2
Monitoring active-directory
Why Configuration Management Matters
Free Netflow analyzer training - diagnosing_and_troubleshooting
5 reasons why you need a network monitoring tool
ITA Presentation 2010
Ad

Similar to Solution scope (20)

DOCX
Cilent to server network plan
PPTX
Requirement analysis
PPTX
M03-Build-a-small-wireless-Local AN.pptx
PDF
Top Down Network Design - ebrahma.com
PPTX
How Tomorrow Moves
PPT
Chapter02
PPT
Chapter 2 - Analyzing Technical Goals and Tradeoffs.ppt
PPTX
Network design 1
DOCX
final doc
PPTX
Accessing network needs
PPT
PPTX
Assessing Network Readiness
PDF
Network Analysis & Design
PPTX
shawn.rainbolt.it241.week1.2
PPT
Chapter12
DOCX
CPIN 269 Final Documentation
DOCX
THEORY
PPTX
Chapternetworkdesign d1 [Autosaved].pptx
PPT
Cp7101 design and management of computer networks-requirements analysis 2
Cilent to server network plan
Requirement analysis
M03-Build-a-small-wireless-Local AN.pptx
Top Down Network Design - ebrahma.com
How Tomorrow Moves
Chapter02
Chapter 2 - Analyzing Technical Goals and Tradeoffs.ppt
Network design 1
final doc
Accessing network needs
Assessing Network Readiness
Network Analysis & Design
shawn.rainbolt.it241.week1.2
Chapter12
CPIN 269 Final Documentation
THEORY
Chapternetworkdesign d1 [Autosaved].pptx
Cp7101 design and management of computer networks-requirements analysis 2
Ad

Recently uploaded (20)

PDF
Enhancing emotion recognition model for a student engagement use case through...
PPTX
Programs and apps: productivity, graphics, security and other tools
PDF
project resource management chapter-09.pdf
PDF
Hybrid model detection and classification of lung cancer
PDF
Unlocking AI with Model Context Protocol (MCP)
PDF
MIND Revenue Release Quarter 2 2025 Press Release
PDF
A novel scalable deep ensemble learning framework for big data classification...
PDF
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
PDF
Web App vs Mobile App What Should You Build First.pdf
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PDF
NewMind AI Weekly Chronicles - August'25-Week II
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PPTX
TLE Review Electricity (Electricity).pptx
PDF
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
PDF
August Patch Tuesday
PPTX
A Presentation on Touch Screen Technology
PDF
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
PDF
Mushroom cultivation and it's methods.pdf
PPTX
1. Introduction to Computer Programming.pptx
PDF
Zenith AI: Advanced Artificial Intelligence
Enhancing emotion recognition model for a student engagement use case through...
Programs and apps: productivity, graphics, security and other tools
project resource management chapter-09.pdf
Hybrid model detection and classification of lung cancer
Unlocking AI with Model Context Protocol (MCP)
MIND Revenue Release Quarter 2 2025 Press Release
A novel scalable deep ensemble learning framework for big data classification...
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
Web App vs Mobile App What Should You Build First.pdf
Group 1 Presentation -Planning and Decision Making .pptx
NewMind AI Weekly Chronicles - August'25-Week II
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
TLE Review Electricity (Electricity).pptx
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
August Patch Tuesday
A Presentation on Touch Screen Technology
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
Mushroom cultivation and it's methods.pdf
1. Introduction to Computer Programming.pptx
Zenith AI: Advanced Artificial Intelligence

Solution scope

  • 1. Solutions Details After all details are finalized and upgrade design strategy complete, the implementation of the network upgrade will transpire with minimal or no downtime within IIS. As part of our implementation plan, an initial network test will occur. This will be done during off-hours to minimize possible problems; however, the final test will be done during normal business hours to completely evaluate the network upgrade performance. The following items below will be completely under evaluation:  Verify the designupgrade meets key business and technical goals.  Validate LAN and WAN technology and device selections.  Verify the service provider provides the agreed-upon service. Testing before Installation Test the redundancy of the network.  Analyze the effects on performance during network link failures.  Determine the optimization techniques to meet performance and other technical goals.  Analyze the effects on performance while the upgrade of network links or devices is under construction ("what-if analyses").  Identify any risks that can impede implementation and determine the plans for contingencies. The following are considerations to experience while a "live" test is under implementation:  Warn users in advance about the timing of tests so they can expect some performance degradation, but ask the users to work as they typically do to avoid invalidating the test by abnormal behavior. Moreover, have the users report any issues that arise during the live test.  Warn network administrators and other designers in advance to avoid the possibility that they could be running tests at the same time.  Warn network managers in advance, so they are not confused by unexpected alarms on network- management consoles, and so they can account for test traffic when documenting load and availability statistics.  If possible, we will run multiple, short (less than 2-minute) tests to minimize user impact and lessen the effects on baseline measurements.
  • 2.  Monitor test results and discontinue them when test objectives are met, or the production network is severely impacted or fails. Furthermore, we will provide a follow-up after implementation. We will follow up every day until all issues have been resolved and the design/upgrade has been fully completed  Identify any bottlenecks or connectivity problems Installation Details IIS WAN will contain connections between each branch office and the headquarters. Fiber optic cable will be laid between each office. Cabling distances were determined using the distances between cities. IIS will lay their own cable, Network Documentation Details The network is designed to meet the following requirements: Security. The network has been designed to prevent unauthorized access, both logically and physically. Speed. The network has enough bandwidth to meet demand during periods of peak usage. Reliability. The network has redundancy to ensure that the failure of one system will not bring the entire network down. Scalability. The network is capable of sustaining scalability without the need to rebuild the entire network. Changes and updates must be easy to implement. Schedule 1. Preparation 25 days 1.1 Site Survey 10 days 1.2 Establish Organization and Business requirements 10 days 2. Planning 30 days 2.1 Characterizing Existing Network 10 days 2.2 Identifying Network and User Requirements 10 days 2.3 Analysis of Areas where the network will 10 days be installed 2.4 Identification of user who will require network services 5 days 3. Design 40 days 3.1 Network Analysis 10 days
  • 3. 3.2 Creating Physical Network Design 10 days 3.3 Identification of user who will require network services 10 days 4. Implementation 50 days 4.1 Pre-implementation (during off hours) 15 days 4.1 Post-implementation 10 days 4.3 Training 10 days 4.4 Network Support and Maintenance 10 days