Summer student work atSummer student work at
the Source Facilitythe Source Facility
20152015
Presentation byPresentation by
Nicholai MauritzsonNicholai Mauritzson
Source Facility April 2015
- no good place to work outside the interlocked area
Interlocked area
- cramped working space
- close to source
- not ideal
Clean-up and installation of:
- Safety equipment
- Networking cable
Arrival of rack system for networking
- NAS, Switch, UPS
- Local Wi-Fi
- 3 router/server computers
- filtered power
- fabrication of platform
3D model
- SketchUp MAKE (free software)
- Less than 8h of work
- To scale (+/- 10mm)
- Allows visualisation before purchase of new equipment
- Easy 2D projections
2D projection
sourcefacility4
sourcefacility4
sourcefacility4
Design and fabrication of patch-boxes
- Wallmounted
- 10 x LEMO
- 10 x BNC
- 5 x SHV
- 2 x RS232
Racks for the DAQ systems
Flooring
- No glue, No tools
- Comfortable
- Easy to put down, easy to replace
- Anti-slip
Facility in use
In summary
- Clean-up and reorganisation
- Set-up and configuration of network and server
- Installation of safety equipment and basic infrastructure
- 3D model of Source Facility and equipment
- Design, construction and installation of Patch-boxes
- Floor installation
To come…
- Additional patch-box (16 x BNC, 16 x SHV)
Thank you!

More Related Content

PPTX
Software-Defined Networking
PPS
If Love were easy...!
PDF
Servidores Virtuais
PDF
Bandotuduy van
PDF
Web-controlled Christmas Lights
PPTX
NSA Capstone Presentation
PPTX
Gluing the IoT world with Java and LoRaWAN
Software-Defined Networking
If Love were easy...!
Servidores Virtuais
Bandotuduy van
Web-controlled Christmas Lights
NSA Capstone Presentation
Gluing the IoT world with Java and LoRaWAN

Similar to sourcefacility4 (20)

DOC
CV yousif
PPTX
Ppt
PPTX
Cloud computing
PPTX
NetDevOps for the Network Dude: How to get started with API's, Ansible and Py...
PDF
Cloud in examples—(how to) benefit from modern technologies in the cloud
PDF
blueMarine a desktop app for the open source photographic workflow
PPTX
IPv4 to IPv6 network transformation
PPTX
Designing It infrastructure
PDF
3 Ways to Connect to the Oracle Cloud
PPTX
Mellanox's Technological Advantage
DOC
Cyb 360 cyb360 cyb 360 education for service uopstudy.com
DOC
Cyb 360 cyb360 cyb 360 best tutorials guide uopstudy.com
PPT
Session29 Arc
PPTX
SD-WAN features and proposed in details.pptx
PDF
iBwave: the in-building Wireless Standard
PDF
JowilGallenito (UPDATED)
PPTX
Green cloud computing
PDF
NSO: Network Service Orchestrator enabled by Tail-f Hands-on Lab
PDF
Final project report
CV yousif
Ppt
Cloud computing
NetDevOps for the Network Dude: How to get started with API's, Ansible and Py...
Cloud in examples—(how to) benefit from modern technologies in the cloud
blueMarine a desktop app for the open source photographic workflow
IPv4 to IPv6 network transformation
Designing It infrastructure
3 Ways to Connect to the Oracle Cloud
Mellanox's Technological Advantage
Cyb 360 cyb360 cyb 360 education for service uopstudy.com
Cyb 360 cyb360 cyb 360 best tutorials guide uopstudy.com
Session29 Arc
SD-WAN features and proposed in details.pptx
iBwave: the in-building Wireless Standard
JowilGallenito (UPDATED)
Green cloud computing
NSO: Network Service Orchestrator enabled by Tail-f Hands-on Lab
Final project report
Ad

sourcefacility4

  • 1. Summer student work atSummer student work at the Source Facilitythe Source Facility 20152015 Presentation byPresentation by Nicholai MauritzsonNicholai Mauritzson
  • 2. Source Facility April 2015 - no good place to work outside the interlocked area Interlocked area - cramped working space - close to source - not ideal
  • 3. Clean-up and installation of: - Safety equipment - Networking cable
  • 4. Arrival of rack system for networking - NAS, Switch, UPS - Local Wi-Fi - 3 router/server computers - filtered power - fabrication of platform
  • 5. 3D model - SketchUp MAKE (free software) - Less than 8h of work - To scale (+/- 10mm) - Allows visualisation before purchase of new equipment - Easy 2D projections
  • 10. Design and fabrication of patch-boxes - Wallmounted - 10 x LEMO - 10 x BNC - 5 x SHV - 2 x RS232
  • 11. Racks for the DAQ systems
  • 12. Flooring - No glue, No tools - Comfortable - Easy to put down, easy to replace - Anti-slip
  • 14. In summary - Clean-up and reorganisation - Set-up and configuration of network and server - Installation of safety equipment and basic infrastructure - 3D model of Source Facility and equipment - Design, construction and installation of Patch-boxes - Floor installation To come… - Additional patch-box (16 x BNC, 16 x SHV)