Standard costing short tutorial (MAS/COST)<br />NB: These are shortcut techniques; please refer to textbooks for basic knowledge. :)<br /> <br />Assumptions if the problem is silent:<br />VOH hours = DL hours<br />Actual quantity purchased = Actual quantity used<br />Actual Fixed OH = Budgeted Fixed OH<br />Normal capacity = Budgeted production<br /> <br />*If the given amount is 'per unit' then it is a standard.<br />*If the given amount is in 'total' then it is a budget.<br /> <br />A-A-S Formula (Can be used for Materials, Labor, and Variable Overhead) <br />Actual cost (AQ x AP)                                                      Price/Rate/Spending Variance<br />Actual Qty/hrs x Standard price/rate (AQ x SP)<br />Standard cost (SQ x SP)                      Quantity/Efficiency Variance<br /> <br />*Standard quantity- The quantity that should have been incurred for ACTUAL PRODUCTION. E.g. You actually produced 10,000 units and the standard 'materials' for such is 2kg per unit, the standard amount is 20,000 (10,000 x 2kg).<br />If Actual cost is greater than the “AQxSP” then it is UNFAVORABLE spending variance
If the “AQxSP” is greater than the standard cost, then it is UNFAVORABLE efficiency variance*Materials issue: What if Materials used in production ≠ Materials purchased<br />ANS: If the question is Materials price variance alone, use materials purchased. However, if the question is the Net Materials variance, use materials used in production.<br />A-B-S Formula (Can be used for Fixed Overhead)Fixed OH VarianceFixed Spending VarianceActual Fixed Overhead<br />Capacity/Volume VarianceBudgeted Fixed Overhead<br />Standard Fixed Overhead<br />*Same rules as above in case of standard cost/quantity. Budgeted fixed OH is usually given; else use actual hours/quantity.<br />*There is no “fixed efficiency variance” because fixed cost is not dependent on variable cost drivers.<br />3-way and 2-way analyses (for further explanation)-same computations as above, 3-way and 2-way are just compressed versions of the 4-way analysis.  After getting the results from the 4 way analysis, you can now easily get the answers for 3-way and 2-way.<br />4-way analysis                3-way analysis  2-way analysis<br />Controllable VarianceOverhead Spending VarianceVariable Spending Variance<br />Efficiency VarianceFixed Spending Variance<br />Volume VarianceVariable Efficiency Variance<br />Volume Variance / Non-controllable varianceTotal Overhead VarianceVolume Variance<br />Sample Problem:<br />Materials and Labor VariancesHelp Me Company began operations in 2010. In 2011, the company manufactured only one product. The 2011 standard cost per unit is as follows:<br />Materials: two kilos of plastic at P2  P 4.00<br />Direct labor 1.6 hours at P4   6.40<br />Actual data for the month of December are as follows:<br />Production = 4,900 units<br />Materials purchased = 10,000 kilos at P1.90 per kilo<br />Materials used = 9,900 kilos<br />Direct labor = 8,000 hours at P4.10/hr<br />Reqd: Compute the Materials and Labor variances.<br />SUGGESTED SOLUTION:<br />MATERIALS<br />Materials Price variance:  P1000 FActual cost of purchase:  10,000 x 1.90 = 19,000<br />AQ purchased x SP : 10,000 x 2.00 =         20,000<br />Materials Price variance:  P990 FActual cost of used: 9,900 x 1.90 =          18,810<br />Materials Quantity variance:  P200 UAQ used x SP: 9,900 x 2.00     =                19,800<br />Standard cost: 4,900 units x 2 kgs x 2 =  19,600<br />Total materials variance:  P790 F<br />***Take note that there were two amounts for materials price variance. The first amount (P1000 F) will be the answer if the question is solely “Materials Price variance.” However, the second computation (P990 F) will be used if the question is “Total Materials variance.”<br />***The standard cost for materials was computed using the actual units produced. Remember, standard cost means the cost that should have been incurred for the actual production. <br />LABOR<br />Labor rate variance:  P 800 UA: 8000 hrs x 4.10 = P 32,800<br />Labor efficiency variance:  P 640 UA: 8000 hrs x 4.00 =    32,000<br />Total labor variance:  P 1440 US: 7840 hrs x 4.00 =    31,360<br />*7,840 hrs: 4900 units multiplied by the standard hours per unit of 1.6hrs/unit.<br />2. Overhead variances<br />Don’t Worry Company applies variable overhead at a rate of P1.50 per direct labor hour and fixed overhead at a rate of P1.75 per direct labor hour. The company budgets two direct labor hours for each of the 5,900 units that are scheduled for production. Simon incurred actual variable overhead totaling P18,750 and actual fixed overhead totaling P21,500 last year for the production of 6000 units. In addition, 11,800 direct labor hours were actually incurred. <br />Reqd: Variable and fixed overhead variances.<br />SUGGESTED SOLUTION: <br />VARIABLE OVERHEAD<br />Variable spending variance:  P 1,050 UActual cost:               18,750<br />Variable efficiency variance:  P 300 FA (11,800 x 1.50):    17,700<br />Variable overhead variance:  P 750 US (6000 x 2 x 1.50):  18,000<br />FIXED OVERHEAD<br />Fixed spending variance:  P 850 UActual cost:             21,500<br />Volume variance:  P 350 FBudgeted  (5,900 x 2 x 1.75):        20,650<br />Fixed overhead variance:  P500 UStandard   (6000 x 2 x 1.75):         21,000<br />*Legend: <br />AQ = Actual quantity/hrs<br />AP = Actual price/rate<br />SQ = Standard quantity/hrs<br />SP = Standard price<br />U = Unfavorable<br />F = Favorable<br />PS: The questions were based from the handouts of CPAR for MAS Standard Costing and Variance Analysis.<br />Questions? PM me! <br />-adjustingentries.tumblr.com<br />
Standard costing short tutorial
Standard costing short tutorial

More Related Content

PPT
Variance analysis
PPT
Variance Analysis
PDF
Stdcostingppt
PDF
Standard costing and Variance Analysis
PPTX
Standard cost, labor & material variance
PPT
Akaun Chapter 11
PPT
Standard costing
PPT
Standard Costing Operational Performance Measures And
Variance analysis
Variance Analysis
Stdcostingppt
Standard costing and Variance Analysis
Standard cost, labor & material variance
Akaun Chapter 11
Standard costing
Standard Costing Operational Performance Measures And

What's hot (20)

PPTX
Budgetory Control System and Cost Control
PPT
Standrad costing
PPT
Amresh management accounting
PPT
Standard Costing
PPTX
Standard costs and variance analysis
PPT
Ca chap 13 standard costing&variance analysis(2)
PPT
Variance Analysis
PPT
Standard Costing
DOCX
Management accounting overhead variance
PPT
Standard costing
PPT
Financial%20&%20 management%20accounting%20 %20chapter%2022%20(standard%20cos...
PPTX
Standard Costing
PPT
Standard Costing Day2
PPT
Standard costing presentation
PPT
Standard cost
PPTX
Standard Costing & Variances
PPTX
Standard Costing:The complete concept.
PPTX
standard costing &amp; variances analysis
PPT
Standard costing technique 1
PDF
Variance Formulae
Budgetory Control System and Cost Control
Standrad costing
Amresh management accounting
Standard Costing
Standard costs and variance analysis
Ca chap 13 standard costing&variance analysis(2)
Variance Analysis
Standard Costing
Management accounting overhead variance
Standard costing
Financial%20&%20 management%20accounting%20 %20chapter%2022%20(standard%20cos...
Standard Costing
Standard Costing Day2
Standard costing presentation
Standard cost
Standard Costing & Variances
Standard Costing:The complete concept.
standard costing &amp; variances analysis
Standard costing technique 1
Variance Formulae
Ad

Viewers also liked (9)

PPT
A tutorial for Year 4 Engineering Students
PPTX
Forms of energy tutorials
PPTX
Project 01 Tutorial power point
PDF
Chemthink: Chemical Reactions Tutorial guide
PPT
Chapter 14 management (10 th edition) by robbins and coulter
PDF
Ms project 2010 tutorial 1
PPT
Cash Flow Statement
PDF
Formulae of financial management
PPT
Cash Flow Statement with examples
A tutorial for Year 4 Engineering Students
Forms of energy tutorials
Project 01 Tutorial power point
Chemthink: Chemical Reactions Tutorial guide
Chapter 14 management (10 th edition) by robbins and coulter
Ms project 2010 tutorial 1
Cash Flow Statement
Formulae of financial management
Cash Flow Statement with examples
Ad

Similar to Standard costing short tutorial (20)

PDF
Standard costing summary
PPT
Standard Costing & Variance Analysis.PPT
PPT
Standard Costing & Variance Analysis.PPT
PPTX
moderatie ing liber Standard costing (2).pptx
PPT
Flexible budgets & overhead costs
PPT
Standard-Costing-Variance-Analysis.ppt
PPT
management accounting
PPT
GNChap010.ppt
PDF
ch 9 Standard Costs and BSC.pdf
PDF
chap10notes.pdf
PPT
chap10notes.ppt
PPT
Advancedcostaccounting 140417192903-phpapp02
PPTX
STANDARD COSTING & VARIANCE ANALYSIS (4).pptx
DOCX
Chapter 10
PPTX
Projecto variance
PPTX
Cost Accounting Presentationn Minhaj University Lahore
PPT
Topic 11(short)
PDF
770857396-Absorption-Costing-and-Variable-Costing.pdf
DOC
Hca14 sm ch08
PPT
Topic 11
Standard costing summary
Standard Costing & Variance Analysis.PPT
Standard Costing & Variance Analysis.PPT
moderatie ing liber Standard costing (2).pptx
Flexible budgets & overhead costs
Standard-Costing-Variance-Analysis.ppt
management accounting
GNChap010.ppt
ch 9 Standard Costs and BSC.pdf
chap10notes.pdf
chap10notes.ppt
Advancedcostaccounting 140417192903-phpapp02
STANDARD COSTING & VARIANCE ANALYSIS (4).pptx
Chapter 10
Projecto variance
Cost Accounting Presentationn Minhaj University Lahore
Topic 11(short)
770857396-Absorption-Costing-and-Variable-Costing.pdf
Hca14 sm ch08
Topic 11

Recently uploaded (20)

PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PDF
Trump Administration's workforce development strategy
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
advance database management system book.pdf
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
Hazard Identification & Risk Assessment .pdf
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
Computing-Curriculum for Schools in Ghana
PDF
Indian roads congress 037 - 2012 Flexible pavement
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PPTX
20th Century Theater, Methods, History.pptx
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
Weekly quiz Compilation Jan -July 25.pdf
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
Trump Administration's workforce development strategy
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
advance database management system book.pdf
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Hazard Identification & Risk Assessment .pdf
Chinmaya Tiranga quiz Grand Finale.pdf
Paper A Mock Exam 9_ Attempt review.pdf.
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
Computing-Curriculum for Schools in Ghana
Indian roads congress 037 - 2012 Flexible pavement
FORM 1 BIOLOGY MIND MAPS and their schemes
AI-driven educational solutions for real-life interventions in the Philippine...
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
20th Century Theater, Methods, History.pptx
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf

Standard costing short tutorial

  • 1. Standard costing short tutorial (MAS/COST)<br />NB: These are shortcut techniques; please refer to textbooks for basic knowledge. :)<br /> <br />Assumptions if the problem is silent:<br />VOH hours = DL hours<br />Actual quantity purchased = Actual quantity used<br />Actual Fixed OH = Budgeted Fixed OH<br />Normal capacity = Budgeted production<br /> <br />*If the given amount is 'per unit' then it is a standard.<br />*If the given amount is in 'total' then it is a budget.<br /> <br />A-A-S Formula (Can be used for Materials, Labor, and Variable Overhead) <br />Actual cost (AQ x AP) Price/Rate/Spending Variance<br />Actual Qty/hrs x Standard price/rate (AQ x SP)<br />Standard cost (SQ x SP) Quantity/Efficiency Variance<br /> <br />*Standard quantity- The quantity that should have been incurred for ACTUAL PRODUCTION. E.g. You actually produced 10,000 units and the standard 'materials' for such is 2kg per unit, the standard amount is 20,000 (10,000 x 2kg).<br />If Actual cost is greater than the “AQxSP” then it is UNFAVORABLE spending variance
  • 2. If the “AQxSP” is greater than the standard cost, then it is UNFAVORABLE efficiency variance*Materials issue: What if Materials used in production ≠ Materials purchased<br />ANS: If the question is Materials price variance alone, use materials purchased. However, if the question is the Net Materials variance, use materials used in production.<br />A-B-S Formula (Can be used for Fixed Overhead)Fixed OH VarianceFixed Spending VarianceActual Fixed Overhead<br />Capacity/Volume VarianceBudgeted Fixed Overhead<br />Standard Fixed Overhead<br />*Same rules as above in case of standard cost/quantity. Budgeted fixed OH is usually given; else use actual hours/quantity.<br />*There is no “fixed efficiency variance” because fixed cost is not dependent on variable cost drivers.<br />3-way and 2-way analyses (for further explanation)-same computations as above, 3-way and 2-way are just compressed versions of the 4-way analysis. After getting the results from the 4 way analysis, you can now easily get the answers for 3-way and 2-way.<br />4-way analysis 3-way analysis 2-way analysis<br />Controllable VarianceOverhead Spending VarianceVariable Spending Variance<br />Efficiency VarianceFixed Spending Variance<br />Volume VarianceVariable Efficiency Variance<br />Volume Variance / Non-controllable varianceTotal Overhead VarianceVolume Variance<br />Sample Problem:<br />Materials and Labor VariancesHelp Me Company began operations in 2010. In 2011, the company manufactured only one product. The 2011 standard cost per unit is as follows:<br />Materials: two kilos of plastic at P2 P 4.00<br />Direct labor 1.6 hours at P4 6.40<br />Actual data for the month of December are as follows:<br />Production = 4,900 units<br />Materials purchased = 10,000 kilos at P1.90 per kilo<br />Materials used = 9,900 kilos<br />Direct labor = 8,000 hours at P4.10/hr<br />Reqd: Compute the Materials and Labor variances.<br />SUGGESTED SOLUTION:<br />MATERIALS<br />Materials Price variance: P1000 FActual cost of purchase: 10,000 x 1.90 = 19,000<br />AQ purchased x SP : 10,000 x 2.00 = 20,000<br />Materials Price variance: P990 FActual cost of used: 9,900 x 1.90 = 18,810<br />Materials Quantity variance: P200 UAQ used x SP: 9,900 x 2.00 = 19,800<br />Standard cost: 4,900 units x 2 kgs x 2 = 19,600<br />Total materials variance: P790 F<br />***Take note that there were two amounts for materials price variance. The first amount (P1000 F) will be the answer if the question is solely “Materials Price variance.” However, the second computation (P990 F) will be used if the question is “Total Materials variance.”<br />***The standard cost for materials was computed using the actual units produced. Remember, standard cost means the cost that should have been incurred for the actual production. <br />LABOR<br />Labor rate variance: P 800 UA: 8000 hrs x 4.10 = P 32,800<br />Labor efficiency variance: P 640 UA: 8000 hrs x 4.00 = 32,000<br />Total labor variance: P 1440 US: 7840 hrs x 4.00 = 31,360<br />*7,840 hrs: 4900 units multiplied by the standard hours per unit of 1.6hrs/unit.<br />2. Overhead variances<br />Don’t Worry Company applies variable overhead at a rate of P1.50 per direct labor hour and fixed overhead at a rate of P1.75 per direct labor hour. The company budgets two direct labor hours for each of the 5,900 units that are scheduled for production. Simon incurred actual variable overhead totaling P18,750 and actual fixed overhead totaling P21,500 last year for the production of 6000 units. In addition, 11,800 direct labor hours were actually incurred. <br />Reqd: Variable and fixed overhead variances.<br />SUGGESTED SOLUTION: <br />VARIABLE OVERHEAD<br />Variable spending variance: P 1,050 UActual cost: 18,750<br />Variable efficiency variance: P 300 FA (11,800 x 1.50): 17,700<br />Variable overhead variance: P 750 US (6000 x 2 x 1.50): 18,000<br />FIXED OVERHEAD<br />Fixed spending variance: P 850 UActual cost: 21,500<br />Volume variance: P 350 FBudgeted (5,900 x 2 x 1.75): 20,650<br />Fixed overhead variance: P500 UStandard (6000 x 2 x 1.75): 21,000<br />*Legend: <br />AQ = Actual quantity/hrs<br />AP = Actual price/rate<br />SQ = Standard quantity/hrs<br />SP = Standard price<br />U = Unfavorable<br />F = Favorable<br />PS: The questions were based from the handouts of CPAR for MAS Standard Costing and Variance Analysis.<br />Questions? PM me! <br />-adjustingentries.tumblr.com<br />