PROFESSIONAL SUMMARY: 20 Years of mechanical design and project engineering including: ASME
Section VIII Pressure Vesseland equipment design, heater equipment design and piping layout, nuclear power
plant engineering/design change modification packages; 6 Years financial/sales and marketing related skills.
PROFESSIONAL EXPERIENCE:
SIGMA THERMAL,Project Engineer February 2015--July 2016
 Perform all mechanical engineering tasks required for industrial process heating system projects.
Comprising P&ID and equipment general arrangement review; ASME Section VIII vesseldesign;
B31.1, B31.3 piping design; pumps, fans,burners and fuel trains review and specificaion; pipe stress
analysis.
 Responsible for ensuring that projects are processed through the engineering group on schedule while
maintaining quality and sound engineering practices.
 Ensuring equipment is designed and supplied as specified by the customer and the Sales Engineer.
 Monitoring of each project's engineering performance to budget.
ALTRAN,Senior Mechanical Engineer June 2011--November 2014
 Performed flow accelerated corrosion (FAC) system susceptibility evaluations, EPRI
CHECWORKS™ SFA modeling and model updates, Inspection location selections, inspection scope
optimizations, on-site outage support for FAC activities including NDE data analysis, component
structural qualification, and remaining life evaluations for numerous US nuclear power stations.
 Performed design requirement traceability analysis on system requirements specifications, software
requirements specifications, software design descriptions, and logic diagrams for China’s Hainan and
Fuqing Nuclear Power Plants’ digital reactor protection system software utilizing IBM Rational
DOORS.
 Participated in the Pre-FAT testing at client’s facility in Beijing, China. Responsibilities included on-
site support for the execution of the Factory Acceptance Testing; served as chair of Anomaly Review
Board to ensure technical accuracy,compliance, completeness and risk mitigation, and closing
Anomaly Items (AIs); and tracked and reported progress to management in the US office.
ENERCON SERVICES INC,Mechanical Engineer May 2008--June 2011
 Designed new alternate reactor coolant pump sealinjection system consisting high pressure pump and
piping system, with independent diesel generator for Harris nuclear power plant.
 Generated Main Condenser Tube Bundle Procurement Specification for Robinson Nuclear Plant.
 Prepared Engineering Change package for the replacement of circulating water piping system from
red brass to stainless steelto eliminate single point vulnerability at nuclear power plant.
 Performed engineering study that included engineering/budget/planning/schedule to replace liquid
H₂, O₂, and N₂ storage and supply systems for the Hydrogen Water Chemistry Injection System at
Hatch Nuclear Power Plant.
 Performed walkdown at Grand Gulf Nuclear Station for evaluation and disposition of potential gas
accumulation in the emergency core cooling system piping in response to NRC’s Generic 2008-01
(Gas Accumulation/Intrusion in Piping Systems) letter mandate.
 Performed System Susceptible Evaluations, CHECWORKS™ SFA power up-rates and Susceptible
Non-Modeled evaluations. Prepared CHECWORKS™ SFA model updates for Fermi Unit 2
Measurement Uncertainty Recapture (MUR),Limerick Unit 2 MUR CHECWORKS™ SFA model
updates, LaSalle County Generating Station MUR, and completed updating Sequoyah Unit 2
CHECWORKS™ SFA model due to operating conditions.
 Prepared FAC piping replacement Engineering Change packages for Grand Gulf Nuclear Station.
GTS ENERGY INC, Proposal/Project Engineer April 2006--April 2008
 Managed scheduling, design, fabrication support, and delivery of thermal fluid heating systems.
 Calculate required sizes of burners, coils, pumps, pressure relief valves and other process equipment
for Water Bath Heaters and ThermalOil Heaters.
 Review customer specifications; coordinate with Sales, Project management and Manufacturing to
generate accurate budget proposals, resulting in higher profit margin on projects.
 Maintain compliance with Safety Codes and Standards: ASME Section VIII-Div 1, ASME B31.1,
ASME B31.3, API 520/521.
 Procurement and performing as expeditor of process equipments including heat exchangers and pump
skid assemblies from subcontractors.
 Performed as technical liaison in identifying and selecting qualified China manufacturers as
subcontractors.
TOMCO EQUIPMENTCOMPANY,MechanicalProject Engineer 1996--1999
 Design ASME pressure vesseland equipment for liquid CO2 industry, including DOT specification
cargo tanks, process piping, safety relief device sizing and selection, and refrigeration sizing.
 Coordinated production schedules with project management, and generated design specifications to
production personnel.
 Provided technical support to sales team and customers. Developed strong relationship with customer
by working jointly in acquiring American Bureau of Shipping design approval.
 Managed the pressure vesselfabricator’s QA Manual as a Quality Assurance team member, directed
Non-Destructive Testing, interacted with Insurance Authorized Inspectors and ASME regulatory
authorities.
THE KINNECORP.,Mechanical Project Engineer 1989--1996
 Design ASME Section VIII pressure vesseland equipment for liquid carbon dioxide industry.
 Worked in the design and detailing of ductwork and piping systems for various boiler recovery
systems, chemical process plants, and steel fabricators.
 Obtained data utilizing precision instrumentation for the design and modification of an existing
HVAC system in a commercial Atlanta high-rise.
 Worked with client in design of titanium dioxide sample mixing stations with capture hood using full
size model.
 Programmed and customized CAD software to improve drawing production efficiency
BRANDT ENVIRONMENTAL CORP.,MechanicalEngineer 1987--1989
 Performed process calculations and detail designs of fabric filtration and dust collection conveyor
systems for a wide range of pollution control projects.
ONLINE TRAINING APPLICATION UNLIMITED,Sales/Marketing Manager 2004--2005
 Performed selling and marketing of online training software.
U.S. FOODSERVICE, Territory Manager 2003--2004
 Obtained and managed foodservice customers on a daily basis. Consult and fully servicing the
customers’ needs along with managing credit terms and balances.
SELF EMPLOYED,Securities Trader 1999--2003
 Managed, Analyzed and Traded NASDAQ and NYSE securities.
EDUCATION: Bachelor of Mechanical Engineering, GEORGIA INSTITUTEOF TECHNOLOGY,1987
COMPUTER EXPERIENCE: Autodesk Inventor, Microsoft Dynamics, CAEPIPE, COMPRESS (ASME
Pressure VesselDesign software), CHECWORKS™ SFA,FAC Manager,IBM Rational DOORS, AutoCAD,
Navision, APV Code Calc design software.
SUPPLEMENT INFORMATION: US Citizen. Fluent in Mandarin Chinese

More Related Content

DOC
Saeidi-Abbas-Resume April 2015-updated
PDF
EdwardRueblingResume-7-20-16
DOCX
Resume01
DOCX
Kobe Galloway2 _10-2014
DOC
BK2014
DOCX
CA_2016_MASTER Rev 1
PDF
Robert Zachowski Mechanical Engineer Resume 10-25-16
DOC
RESUME _2016 Rev (A1)
Saeidi-Abbas-Resume April 2015-updated
EdwardRueblingResume-7-20-16
Resume01
Kobe Galloway2 _10-2014
BK2014
CA_2016_MASTER Rev 1
Robert Zachowski Mechanical Engineer Resume 10-25-16
RESUME _2016 Rev (A1)

What's hot (20)

DOC
Resume - Tarun Sharma - Pipe stress engineer
PDF
khalid mowafy CV
DOC
John P Chan II
DOC
Mohammed vasil k.
DOC
SVResume -Lead Mch Enginer June16
DOC
abhinav rawat
DOC
abhinav rawat resume
PDF
John P Henderson Resume- Jan 2016PDF
DOC
JG Mech Eng CV
DOC
Akshay Updated CV
PDF
Anil Pachpande-CV2016
DOCX
Ronald Bray Resume
PDF
Muhammad Asif Iqbal_Resume - RYK updated
DOC
Mohsin Hashmi_Resume
PDF
Abdul ahad shahzad resume
DOCX
LarrySmock Resume 3_24_2015
PDF
DKSHAH RESUME
DOCX
Senthil Nathan Senior Piping Stress Engineer
DOC
Praveen Kumar (Resume)
DOC
RashidFaruqi_Resume_Current
Resume - Tarun Sharma - Pipe stress engineer
khalid mowafy CV
John P Chan II
Mohammed vasil k.
SVResume -Lead Mch Enginer June16
abhinav rawat
abhinav rawat resume
John P Henderson Resume- Jan 2016PDF
JG Mech Eng CV
Akshay Updated CV
Anil Pachpande-CV2016
Ronald Bray Resume
Muhammad Asif Iqbal_Resume - RYK updated
Mohsin Hashmi_Resume
Abdul ahad shahzad resume
LarrySmock Resume 3_24_2015
DKSHAH RESUME
Senthil Nathan Senior Piping Stress Engineer
Praveen Kumar (Resume)
RashidFaruqi_Resume_Current
Ad

Similar to Steve Chu resume (20)

DOC
Sam Sun_Sr. Mechanical Engineer
DOC
Resume 5 13 16 months
DOC
Resume - Tarun Sharma - Pipe stress engineer
PDF
Ashwin_L&T
PDF
CV Jalaj Verma
PDF
Resume-Brandon Rhodes-May 2015
DOCX
JNJ CV _OilAndGas rev02
PDF
Alzagon engineering solutions dec 2017a
DOC
Steve Davidson Engineering Resume
PDF
Danielle krysiak mech engineer 5 5-2016
PDF
Danielle Krysiak Mech Engineer 5-5-2016
PDF
Work Experience
DOC
Marshall Steve (pm)
DOC
vinoth-projects
DOC
Cameron
PDF
Jose Ruiz resume
DOCX
LuceyResume0515
DOC
VMarschner Resume 05-2015
PDF
Sathishkumar mechanical engineer - 2016
PDF
Nazmy Markos
Sam Sun_Sr. Mechanical Engineer
Resume 5 13 16 months
Resume - Tarun Sharma - Pipe stress engineer
Ashwin_L&T
CV Jalaj Verma
Resume-Brandon Rhodes-May 2015
JNJ CV _OilAndGas rev02
Alzagon engineering solutions dec 2017a
Steve Davidson Engineering Resume
Danielle krysiak mech engineer 5 5-2016
Danielle Krysiak Mech Engineer 5-5-2016
Work Experience
Marshall Steve (pm)
vinoth-projects
Cameron
Jose Ruiz resume
LuceyResume0515
VMarschner Resume 05-2015
Sathishkumar mechanical engineer - 2016
Nazmy Markos
Ad

Steve Chu resume

  • 1. STEVE CHU 3986 FORRESTAL DRIVE, ATLANTA, GA 30341 chu_s@bellsouth.net (404) 992-1380 PROFESSIONAL SUMMARY: 20 Years of mechanical design and project engineering including: ASME Section VIII Pressure Vesseland equipment design, heater equipment design and piping layout, nuclear power plant engineering/design change modification packages; 6 Years financial/sales and marketing related skills. PROFESSIONAL EXPERIENCE: SIGMA THERMAL,Project Engineer February 2015--July 2016  Perform all mechanical engineering tasks required for industrial process heating system projects. Comprising P&ID and equipment general arrangement review; ASME Section VIII vesseldesign; B31.1, B31.3 piping design; pumps, fans,burners and fuel trains review and specificaion; pipe stress analysis.  Responsible for ensuring that projects are processed through the engineering group on schedule while maintaining quality and sound engineering practices.  Ensuring equipment is designed and supplied as specified by the customer and the Sales Engineer.  Monitoring of each project's engineering performance to budget. ALTRAN,Senior Mechanical Engineer June 2011--November 2014  Performed flow accelerated corrosion (FAC) system susceptibility evaluations, EPRI CHECWORKS™ SFA modeling and model updates, Inspection location selections, inspection scope optimizations, on-site outage support for FAC activities including NDE data analysis, component structural qualification, and remaining life evaluations for numerous US nuclear power stations.  Performed design requirement traceability analysis on system requirements specifications, software requirements specifications, software design descriptions, and logic diagrams for China’s Hainan and Fuqing Nuclear Power Plants’ digital reactor protection system software utilizing IBM Rational DOORS.  Participated in the Pre-FAT testing at client’s facility in Beijing, China. Responsibilities included on- site support for the execution of the Factory Acceptance Testing; served as chair of Anomaly Review Board to ensure technical accuracy,compliance, completeness and risk mitigation, and closing Anomaly Items (AIs); and tracked and reported progress to management in the US office. ENERCON SERVICES INC,Mechanical Engineer May 2008--June 2011  Designed new alternate reactor coolant pump sealinjection system consisting high pressure pump and piping system, with independent diesel generator for Harris nuclear power plant.  Generated Main Condenser Tube Bundle Procurement Specification for Robinson Nuclear Plant.  Prepared Engineering Change package for the replacement of circulating water piping system from red brass to stainless steelto eliminate single point vulnerability at nuclear power plant.  Performed engineering study that included engineering/budget/planning/schedule to replace liquid H₂, O₂, and N₂ storage and supply systems for the Hydrogen Water Chemistry Injection System at Hatch Nuclear Power Plant.  Performed walkdown at Grand Gulf Nuclear Station for evaluation and disposition of potential gas accumulation in the emergency core cooling system piping in response to NRC’s Generic 2008-01 (Gas Accumulation/Intrusion in Piping Systems) letter mandate.  Performed System Susceptible Evaluations, CHECWORKS™ SFA power up-rates and Susceptible Non-Modeled evaluations. Prepared CHECWORKS™ SFA model updates for Fermi Unit 2 Measurement Uncertainty Recapture (MUR),Limerick Unit 2 MUR CHECWORKS™ SFA model updates, LaSalle County Generating Station MUR, and completed updating Sequoyah Unit 2 CHECWORKS™ SFA model due to operating conditions.  Prepared FAC piping replacement Engineering Change packages for Grand Gulf Nuclear Station. GTS ENERGY INC, Proposal/Project Engineer April 2006--April 2008  Managed scheduling, design, fabrication support, and delivery of thermal fluid heating systems.  Calculate required sizes of burners, coils, pumps, pressure relief valves and other process equipment for Water Bath Heaters and ThermalOil Heaters.
  • 2.  Review customer specifications; coordinate with Sales, Project management and Manufacturing to generate accurate budget proposals, resulting in higher profit margin on projects.  Maintain compliance with Safety Codes and Standards: ASME Section VIII-Div 1, ASME B31.1, ASME B31.3, API 520/521.  Procurement and performing as expeditor of process equipments including heat exchangers and pump skid assemblies from subcontractors.  Performed as technical liaison in identifying and selecting qualified China manufacturers as subcontractors. TOMCO EQUIPMENTCOMPANY,MechanicalProject Engineer 1996--1999  Design ASME pressure vesseland equipment for liquid CO2 industry, including DOT specification cargo tanks, process piping, safety relief device sizing and selection, and refrigeration sizing.  Coordinated production schedules with project management, and generated design specifications to production personnel.  Provided technical support to sales team and customers. Developed strong relationship with customer by working jointly in acquiring American Bureau of Shipping design approval.  Managed the pressure vesselfabricator’s QA Manual as a Quality Assurance team member, directed Non-Destructive Testing, interacted with Insurance Authorized Inspectors and ASME regulatory authorities. THE KINNECORP.,Mechanical Project Engineer 1989--1996  Design ASME Section VIII pressure vesseland equipment for liquid carbon dioxide industry.  Worked in the design and detailing of ductwork and piping systems for various boiler recovery systems, chemical process plants, and steel fabricators.  Obtained data utilizing precision instrumentation for the design and modification of an existing HVAC system in a commercial Atlanta high-rise.  Worked with client in design of titanium dioxide sample mixing stations with capture hood using full size model.  Programmed and customized CAD software to improve drawing production efficiency BRANDT ENVIRONMENTAL CORP.,MechanicalEngineer 1987--1989  Performed process calculations and detail designs of fabric filtration and dust collection conveyor systems for a wide range of pollution control projects. ONLINE TRAINING APPLICATION UNLIMITED,Sales/Marketing Manager 2004--2005  Performed selling and marketing of online training software. U.S. FOODSERVICE, Territory Manager 2003--2004  Obtained and managed foodservice customers on a daily basis. Consult and fully servicing the customers’ needs along with managing credit terms and balances. SELF EMPLOYED,Securities Trader 1999--2003  Managed, Analyzed and Traded NASDAQ and NYSE securities. EDUCATION: Bachelor of Mechanical Engineering, GEORGIA INSTITUTEOF TECHNOLOGY,1987 COMPUTER EXPERIENCE: Autodesk Inventor, Microsoft Dynamics, CAEPIPE, COMPRESS (ASME Pressure VesselDesign software), CHECWORKS™ SFA,FAC Manager,IBM Rational DOORS, AutoCAD, Navision, APV Code Calc design software. SUPPLEMENT INFORMATION: US Citizen. Fluent in Mandarin Chinese