The document summarizes the challenges faced in providing power to an exhibition using diesel generators after heavy rainfall caused flooding at the site. Key points:
- The team worked to reduce the diesel generator order from 56.3MVA to 39.7MVA, achieving cost savings of 60 lacs INR.
- Installing and commissioning 80 diesel generators within 3 days for the exhibition was a difficult task completed through team effort.
- Heavy rainfall the night before the exhibition caused the site to flood, making the electricity infrastructure underwater and posing an "impossible task".
- Through cooperation between teams, the exhibition was inaugurated on time despite the challenges, though some generator issues affected exhibitors initially.