E4-E5 (E&WS) Rev. Date 16.03.11
SYNCHRONIZATION
OF
TELECOM NETWORK
BSNL India For Internal Circulation Only 1
E4-E5 (E&WS) Rev. Date 16.03.11
Synchronization
Telecom traffic is constantly increasing both in fixed as well as in mobile (including new
3G systems) telephone network. More and more information is being transported at
higher and higher data speeds and therefore the Synchronization of the traffic in the
networks is becoming increasingly important. Telecommunications’ reliability is based
on the data signals being synchronized and clocked using the same clock everywhere in
the network. Network synchronization is one important part in network planning,
especially on SDH network.
The basic clock in the SDH networks is called E1, and it must be exactly 2.048 MHz. In a
fully synchronized SDH network, there is a very stable and accurate atomic (caesium)
clock of 2.048 MHz that functions as a "master clock" or primary reference clock (PRC).
The quality of PRC clock always accuracy better than 10exp-12. The PRC is distributed
throughout the network using the transmission backbone comprising of DWDM and SDH
transport network. The clock is regenerated in the network’s nodes in “slave clocks”
called as synchronization supply units (SSUs). The SSUs are clock generator and
distributor of the accuracy better than 10exp-11. The SSUs can also temporarily (up to
hold over time) be used as PRCs if the input connection from the master clock is
interrupted. The SSUs regenerate and distribute the clock thus received from PRC
through a chain of SECs (SDH Equipment Clocks). The SECs are the clocks in the
network elements (see Figure below).
This clock regeneration is never completely perfect; rather, each regenerated clock will
have variations in frequency and phase. The more nodes passed "en route", the less stable
the clock will be. The same is shown as given below:
BSNL India For Internal Circulation Only 2
E4-E5 (E&WS) Rev. Date 16.03.11
Synchronization Planning: while extending PRC clock from one node to other
node through transmission network of SDH and DWDM few guidelines are required to
be kept in mind. This is essential as the clock quality keeps on getting deteriorated as and
when it crosses number of nodes. Following is the salient planning rules:
• From one PRC maximum 10 numbers of SSUs can be supported.
• Between two SSUs maximum 20 NE can be placed.
• In total maximum 60 numbers of NEs can be supported in one PRC chain.
However, the above figures are theoretical figures and as such they may be adjusted as
per the quality of transmission network, so that the quality of clock in the network always
remains comparable to PRC clock i.e. better than 10exp-12 accuracy.
BSNL India For Internal Circulation Only 3
PRC: Primary Resource Clock
SEC: SDH Equipment Clock
E4-E5 (E&WS) Rev. Date 16.03.11
BSNL Synchronization Plan:
It is proposed to have 21 numbers of PRCs with two caesium tubes (mostly at all Level-1
TAX locations) for geographical diversity and for ensuring the minimum nodes slippage.
However, in view of the requirement for the orderly distribution of the PRC clock
throughout the transmission network, it is proposed to locate the SSUs at the convergent
nodes of the existing DWDM backbone rings. Overlapping with DWDM network
enables to transport the clock on a number of SDH rings to as many district head
quarters, where SSUs are proposed to be located. Most of these nodes are co-located with
the Level –I TAX stations. Thus these 21 PRCs are expected to supply clock for all the
Transmission, Switching and Access elements in the transmission geographic area, also
called as the PRC timing Island. The SSU at the PRC location depends on the PRC itself
for the first master clock input. In case of failure or deterioration of the PRC, the SSU
depends on the other three PRC clock inputs received from the nearest three PRCs. In the
event of complete failure of the PRC inputs or in the event of the deterioration of clock
quality all the PRCs below the GPS standard, the SSU draws the clock from the GPS
BSNL India For Internal Circulation Only 4
SS
U
K=1
PRS
SSU
SSU
Rule 1
K < 10 SSUs
N < 60 SECs
SEC (NE with SONET/SDH Equipment Clock)
Rule 2
N < 20 SECs
K=2
K=3
SSU
Co-located PRS & TSG
SSUK=1
1
20
1
2
0 PR
S
1
2
0
SSU K=1
1
2
0
1
20
201
2
0
1
1
2
0
SSU K=2
PRS
E4-E5 (E&WS) Rev. Date 16.03.11
clock, which shall be in-built in SSU. It is proposed to place at least one SSU at each of
the SSA Headquarter. Thus at least 322 SSUs shall be required for distributing the clock.
In the cities, where more than 3 lakh DELs are available, there will be at least 3 SSUs in
the same city for distributing the clock across the city network. Similarly in all the cities
with more than one Lakh DELs but less than 3 Lakh DELs two SSUs are proposed in the
same city for distributing the clock.
BSNL India For Internal Circulation Only 5
E4-E5 (E&WS) Rev. Date 16.03.11
clock, which shall be in-built in SSU. It is proposed to place at least one SSU at each of
the SSA Headquarter. Thus at least 322 SSUs shall be required for distributing the clock.
In the cities, where more than 3 lakh DELs are available, there will be at least 3 SSUs in
the same city for distributing the clock across the city network. Similarly in all the cities
with more than one Lakh DELs but less than 3 Lakh DELs two SSUs are proposed in the
same city for distributing the clock.
BSNL India For Internal Circulation Only 5

More Related Content

PPTX
Trunking Theory
PPT
Lec 1 introduction to wireless communication(1)
PDF
Lecture psk qam, digital modulation
PPT
Common channel Signalling System No 7 ppt
PDF
Multiband Transceivers - [Chapter 4] Design Parameters of Wireless Radios
PPT
microwave communication
PDF
Multiband Transceivers - [Chapter 1]
PDF
Digital modulation
Trunking Theory
Lec 1 introduction to wireless communication(1)
Lecture psk qam, digital modulation
Common channel Signalling System No 7 ppt
Multiband Transceivers - [Chapter 4] Design Parameters of Wireless Radios
microwave communication
Multiband Transceivers - [Chapter 1]
Digital modulation

What's hot (20)

PDF
Propagation Model
PPT
operation-of-cellular-systems.ppt
PPTX
Moving target indicator radar (mti)part2
PPT
PPT
Small scale fading
PDF
PPT
RF transmitter & receiver
PPT
Mimo dr. morsi
PPTX
GMSK with GSM
PPT
Dsss final
PPT
Chapter 7 multiple access techniques
PPTX
Microwave
PPTX
PPTX
Introduction to Wireless Communication
PPT
Microwave hybrid circuits
PDF
Cellular Network -Ground Reflectio (Two Ray) Model.pdf
PPT
The cellular concept
PDF
Wireless channels
PPTX
Large scale path loss 1
PPT
Chapter10 switching
Propagation Model
operation-of-cellular-systems.ppt
Moving target indicator radar (mti)part2
Small scale fading
RF transmitter & receiver
Mimo dr. morsi
GMSK with GSM
Dsss final
Chapter 7 multiple access techniques
Microwave
Introduction to Wireless Communication
Microwave hybrid circuits
Cellular Network -Ground Reflectio (Two Ray) Model.pdf
The cellular concept
Wireless channels
Large scale path loss 1
Chapter10 switching
Ad

Similar to Synchronization of telecom network (6)

PDF
Synchronisation
PDF
Synchronization Overview
PPT
Synchronization and timing loop presentation -mapyourtech
PDF
why time synchronization is important in power generation, transmission and ...
PPTX
Synchronization in packet based mobile backhaul networks
DOCX
Assign3
Synchronisation
Synchronization Overview
Synchronization and timing loop presentation -mapyourtech
why time synchronization is important in power generation, transmission and ...
Synchronization in packet based mobile backhaul networks
Assign3
Ad

Recently uploaded (20)

PDF
Electronic commerce courselecture one. Pdf
PPTX
Machine Learning_overview_presentation.pptx
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
Encapsulation theory and applications.pdf
PDF
Network Security Unit 5.pdf for BCA BBA.
PPTX
MYSQL Presentation for SQL database connectivity
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PPTX
A Presentation on Artificial Intelligence
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PDF
Unlocking AI with Model Context Protocol (MCP)
PDF
Machine learning based COVID-19 study performance prediction
PPT
Teaching material agriculture food technology
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
Electronic commerce courselecture one. Pdf
Machine Learning_overview_presentation.pptx
The Rise and Fall of 3GPP – Time for a Sabbatical?
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
Encapsulation theory and applications.pdf
Network Security Unit 5.pdf for BCA BBA.
MYSQL Presentation for SQL database connectivity
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
Reach Out and Touch Someone: Haptics and Empathic Computing
A Presentation on Artificial Intelligence
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
Dropbox Q2 2025 Financial Results & Investor Presentation
Building Integrated photovoltaic BIPV_UPV.pdf
Unlocking AI with Model Context Protocol (MCP)
Machine learning based COVID-19 study performance prediction
Teaching material agriculture food technology
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Advanced methodologies resolving dimensionality complications for autism neur...
Diabetes mellitus diagnosis method based random forest with bat algorithm

Synchronization of telecom network

  • 1. E4-E5 (E&WS) Rev. Date 16.03.11 SYNCHRONIZATION OF TELECOM NETWORK BSNL India For Internal Circulation Only 1
  • 2. E4-E5 (E&WS) Rev. Date 16.03.11 Synchronization Telecom traffic is constantly increasing both in fixed as well as in mobile (including new 3G systems) telephone network. More and more information is being transported at higher and higher data speeds and therefore the Synchronization of the traffic in the networks is becoming increasingly important. Telecommunications’ reliability is based on the data signals being synchronized and clocked using the same clock everywhere in the network. Network synchronization is one important part in network planning, especially on SDH network. The basic clock in the SDH networks is called E1, and it must be exactly 2.048 MHz. In a fully synchronized SDH network, there is a very stable and accurate atomic (caesium) clock of 2.048 MHz that functions as a "master clock" or primary reference clock (PRC). The quality of PRC clock always accuracy better than 10exp-12. The PRC is distributed throughout the network using the transmission backbone comprising of DWDM and SDH transport network. The clock is regenerated in the network’s nodes in “slave clocks” called as synchronization supply units (SSUs). The SSUs are clock generator and distributor of the accuracy better than 10exp-11. The SSUs can also temporarily (up to hold over time) be used as PRCs if the input connection from the master clock is interrupted. The SSUs regenerate and distribute the clock thus received from PRC through a chain of SECs (SDH Equipment Clocks). The SECs are the clocks in the network elements (see Figure below). This clock regeneration is never completely perfect; rather, each regenerated clock will have variations in frequency and phase. The more nodes passed "en route", the less stable the clock will be. The same is shown as given below: BSNL India For Internal Circulation Only 2
  • 3. E4-E5 (E&WS) Rev. Date 16.03.11 Synchronization Planning: while extending PRC clock from one node to other node through transmission network of SDH and DWDM few guidelines are required to be kept in mind. This is essential as the clock quality keeps on getting deteriorated as and when it crosses number of nodes. Following is the salient planning rules: • From one PRC maximum 10 numbers of SSUs can be supported. • Between two SSUs maximum 20 NE can be placed. • In total maximum 60 numbers of NEs can be supported in one PRC chain. However, the above figures are theoretical figures and as such they may be adjusted as per the quality of transmission network, so that the quality of clock in the network always remains comparable to PRC clock i.e. better than 10exp-12 accuracy. BSNL India For Internal Circulation Only 3 PRC: Primary Resource Clock SEC: SDH Equipment Clock
  • 4. E4-E5 (E&WS) Rev. Date 16.03.11 BSNL Synchronization Plan: It is proposed to have 21 numbers of PRCs with two caesium tubes (mostly at all Level-1 TAX locations) for geographical diversity and for ensuring the minimum nodes slippage. However, in view of the requirement for the orderly distribution of the PRC clock throughout the transmission network, it is proposed to locate the SSUs at the convergent nodes of the existing DWDM backbone rings. Overlapping with DWDM network enables to transport the clock on a number of SDH rings to as many district head quarters, where SSUs are proposed to be located. Most of these nodes are co-located with the Level –I TAX stations. Thus these 21 PRCs are expected to supply clock for all the Transmission, Switching and Access elements in the transmission geographic area, also called as the PRC timing Island. The SSU at the PRC location depends on the PRC itself for the first master clock input. In case of failure or deterioration of the PRC, the SSU depends on the other three PRC clock inputs received from the nearest three PRCs. In the event of complete failure of the PRC inputs or in the event of the deterioration of clock quality all the PRCs below the GPS standard, the SSU draws the clock from the GPS BSNL India For Internal Circulation Only 4 SS U K=1 PRS SSU SSU Rule 1 K < 10 SSUs N < 60 SECs SEC (NE with SONET/SDH Equipment Clock) Rule 2 N < 20 SECs K=2 K=3 SSU Co-located PRS & TSG SSUK=1 1 20 1 2 0 PR S 1 2 0 SSU K=1 1 2 0 1 20 201 2 0 1 1 2 0 SSU K=2 PRS
  • 5. E4-E5 (E&WS) Rev. Date 16.03.11 clock, which shall be in-built in SSU. It is proposed to place at least one SSU at each of the SSA Headquarter. Thus at least 322 SSUs shall be required for distributing the clock. In the cities, where more than 3 lakh DELs are available, there will be at least 3 SSUs in the same city for distributing the clock across the city network. Similarly in all the cities with more than one Lakh DELs but less than 3 Lakh DELs two SSUs are proposed in the same city for distributing the clock. BSNL India For Internal Circulation Only 5
  • 6. E4-E5 (E&WS) Rev. Date 16.03.11 clock, which shall be in-built in SSU. It is proposed to place at least one SSU at each of the SSA Headquarter. Thus at least 322 SSUs shall be required for distributing the clock. In the cities, where more than 3 lakh DELs are available, there will be at least 3 SSUs in the same city for distributing the clock across the city network. Similarly in all the cities with more than one Lakh DELs but less than 3 Lakh DELs two SSUs are proposed in the same city for distributing the clock. BSNL India For Internal Circulation Only 5