TECHNICAL SPECIFICATIONS
FOR
THREE PHASE ENERGY METER
Technical Specifications for Three Phase Energy Meter
The equipment covered by these broad specifications shall conform to the
requirements stated in latest editions of relevant Indian/ IEC Standards and
Regulations.
2.0 STANDARDS APPLICABLE:
Unless specified elsewhere in this specification, the performance & testing of the
meters should conform to the following Indian/International standards, to be
read with up to date and latest amendments/revisions along with additional
requirements at Annexure-I.
S.
No.
Reference Detail Reference Title
1 IS 13779 (1999) A.C. Static Watt hour meter class 1.0 and 2.0
2 CEA Regulation
(2006)
Installation and operation of meters Dtd: 17/03/2006
3 CBIP – TR No. 325 Guide on A.C.Static Electrical Energy Meters -
Specification (latest amendment).
4 IS 9000 Basic Environmental testing procedure for electrical
and electronic items.
5 IS 12346 (1999) Specification for testing equipment for A.C.Electrical
energy meter.
6 IS11000 (1984 Fire hazard testing
7 IEC 62052-11
(2003)
Electricity Requirements (AC) General Requirements
Tests and Test conditions for A.C.Static Watt hour
meter for active energy Class 1.0 and 2.0.
8 IEC 62053-21
(2003)
A.C.Static Watt hour meter for active energy Class 1.0
and 2.0
9 IS 15707 (2006) Testing Evaluation installation and maintenance of AC
Electricity
Meters- Code of practice.
10 IEC 60068 Environmental testing
2.0 GENERAL TECHNICAL REQUIREMENTS:
Sl.
No.
Particulars Standard Specification
1 Type of the meter
Three phase four wire, whole current meter ,
direct reading type
2 Accuracy Class 1.0
3
Basic Current (Ib) & rated
max. current (Imax)
Ib =20 Amp, Imax= 100 Amp
4 Operating Voltage
Voltage +20 % to -40 % of Vref. However
the meter should withstand the maximum
system voltage
5 Operating Frequency F= 50 Hz ± 5 %
6 Power consumption per phase As per IS
7 Starting Current 0.2 % of Ib
8 Short time over current 3000 A for 0.01 sec
9 Influence of heating
External surface of the meter shall not
exceed 20 K at 45° C ambient temperature
10
Rated impulse withstand
voltage
8 KV
11
AC withstand voltage for 1
minute
4 KV
12 Insulation resistance
a
Between Frame & voltage &
current Circuit
5 M Ohm
b
Between each current Circuit
& other circuit
50 M Ohm
13 Mechanical requirement As per Clause of 12.3 of IS 13779
14 Resistance to heat & fire
Shall not be ignited by thermal overload &
material shall be fire retardant
15
Protection against penetration
of dust & water
Degree of protection IP: 51 as per IS 12063
w/o suction in meter
16
Resistance against climatic
influence
Clause 12.6 of IS: 13779
17 Electromagnetic compatibility
Requirement shall be as per CBIP technical
report no. 325
18 Power factor range Zero Lag - Unity- zero Lead
19 Energy measurement
Fundamental energy + Energy due to
harmonics
20 Test Output Device Flashing LED visible from the front
21 Billing Data
a) Meter serial number, Date and time, KWh,
KVAh, Power factor, MD in KW & KVA,
History of KWh, KVAh & MD of both for last 6
months along with TOD readings. KVAh is
computed based on KVARh and KWh. If
Power factor is 1 or leading then, KVAh shall
be treated equal to KWH
b) All these data shall be accessible for
reading, recording, and spot billing by
downloading through optical port on CMRI or
Laptop computers at site.
22 MD registration
a) Meter shall store MD in every 30 minutes
period along with date & time. At the end of
every 30 minutes new MD shall be previous
MD and store whichever is higher and the
same shall be displayed.
(b) it should be possible to reset MD
automatically on the defined date.
23 Auto reset of MD
The MD resetting shall be automatic at the
1st
of the month i.e. 0000 hours of 1st of the
month. Manual MD reset button shall not be
available. Provision shall be made to change
MD reset date through MRI even after
installation of meter on site.
24 TOD metering
Meter shall be capable doing TOD metering
for KWH, KVAH & MD in KW & KVA with 6
time zones wherever applicable. It shall be
possible to reconfigure the meters for TOD
Tariff, billing date, RTC etc. through proper
authentication process via communication
port.
25 Climatic condition
The meter should function satisfactorily with
temperature ranging from 0-600
C and
humidity upto 95%
26 Calibration
Meter shall be calibrated at factory and
modification in calibration shall not be
possible at site by any means. Certified by
manufacture
27 Meter Sealing
As per IS 13779 & CEA metering regulation
2006
28 Memory
Non-volatile memory independent of battery
backup, memory should be retained upto 10
year in case of power failure.
29 Battery
In case battery removal or total discharge
same should not affect the working &
memory of the meter
30 Load Survey
60 Days Load Survey for KW, KVA, Voltage,
Current of each phase, with 30 minutes
integration period
31 Connection diagram Shall be provided on terminal cover
32 Initial Startup of meter
Within 5 sec after ref voltage is applied to
the meter terminal
33
(a)
internal dia of the terminal
hole
As per CBIP
33
(b)
Depth of the terminal hole 25 mm
34
Clearance between adjacent
terminal
10 mm
35 Display
LCD (6 Digit ), Height 10 mmX6 mm, pin
type, viewing angle min 160 degrees
36 Security feature
Programmable facility to restrict the access
to the information recorded at different
security level such as read communication,
communication write etc.
37
Software/ Communication
Compatibility/ Communication
port
Optical port with RS 232 compatible to
transfer the data locally through CMRI &
remote through PSTN / Optical fiber / GSM /
CDMA / RF / any other technology to the
main computer.
The Supplier shall supply Software required
for CMRI (Atleast for Analogic & SANDS
make) & for the connectivity to AMR
modules. The software should be compatible
to Microsoft Windows systems. The software
should have polling feature with optional
selection of parameters to be downloaded for
AMR application.
The Supplier shall provide meter reading
protocols.
Annexure-I
Additional Requirement for Three Phase Whole Current Energy Meter
S.No.
Feature in addition to BIS
Features Requirement
1
Functional
 Starting current
 0.2 % of Ib
2 Measuring Parameters
 Real time & Date
 Cumulative kWh
 Other energy kVAh (Lag), kVArh( lead) &
kVArh (lag)
 Current Maximum demand in kW & KVA
 Inst V,I & Power Factor
 Maximum Demand
 Six month energy history
 Load Survey
 Time of Day tariff
 On/ Off hours
3
Anti Tamper And Anti-
Fraud Features
 Reverse Phase Energy
 Phase sequence reversal
 Detection of missing potential
 Current Coil shorting
 Welded meter body
 Tamper History
 Energy computation during missing potential
 Power On/Off
 Abnormal Power Off
 Snap-on parameters
 Protection against HV spark/ ESD
 Low voltage event
 Low Power factor recording
 Top cover open
 Write Transactions
 Neutral Disturbance
 Only two Phase (One phase and one neutral
missing)
4
Additional
Features(Optional)
 Mid night data
 Temperature
 Net Metering

More Related Content

PDF
Omnik Hybrid Inverter 3k TL2
PPT
CWS - Professional Weather Stations
PDF
Datasheet Fluke 1621. Hubungi PT. Siwali Swantika 021-45850618
PPT
Wireless weather station(eee499.blogspot.com)
PDF
Brosur Gossen Metrawatt LINAX PQ5000 MOBILE
PDF
Zigbee based weather monitoring system
PPT
Grain-Watch® ENG
PDF
Normative mongolia (catalog) 917
Omnik Hybrid Inverter 3k TL2
CWS - Professional Weather Stations
Datasheet Fluke 1621. Hubungi PT. Siwali Swantika 021-45850618
Wireless weather station(eee499.blogspot.com)
Brosur Gossen Metrawatt LINAX PQ5000 MOBILE
Zigbee based weather monitoring system
Grain-Watch® ENG
Normative mongolia (catalog) 917

What's hot (19)

PDF
ACTAS 2016
PDF
Wireless Open Weather (WOW)
PDF
IEEE Electrical Engineering projects for Bangalore Students for Academic year...
PDF
Katalog fluke-1621-earth-ground-tester-by-tridinamika
PDF
Wireless Weather Station monitoring System
DOCX
Home appliances controller using wireless controller area network (1)
PDF
Growatt 50000 80000
PPT
Wood Composite Industry Psc Presentation
PPTX
Light level and gas monitoring system
PDF
GPS Embedded Passive Helix Antenna
PDF
C062010012
PPT
PROJECT - " PROGRAMMABLE ENERGY METER CALCULATOR"
PDF
Sci 801 smart air quality sensor
PPTX
Ribs - final -compressed.pptx
PDF
Fire Fighting Robot
PDF
Solar Edge Load Switching Devices
PDF
Air quality monitor as510
PDF
Ppb rae 3000
ACTAS 2016
Wireless Open Weather (WOW)
IEEE Electrical Engineering projects for Bangalore Students for Academic year...
Katalog fluke-1621-earth-ground-tester-by-tridinamika
Wireless Weather Station monitoring System
Home appliances controller using wireless controller area network (1)
Growatt 50000 80000
Wood Composite Industry Psc Presentation
Light level and gas monitoring system
GPS Embedded Passive Helix Antenna
C062010012
PROJECT - " PROGRAMMABLE ENERGY METER CALCULATOR"
Sci 801 smart air quality sensor
Ribs - final -compressed.pptx
Fire Fighting Robot
Solar Edge Load Switching Devices
Air quality monitor as510
Ppb rae 3000
Ad

Similar to Technical specifications for three phase meters (20)

PDF
Technical specification for 3.ph 4 wire stw 12 02-11
DOCX
K.kufa meter test - c
PDF
Electrical measuring-instruments
PPT
SEMA 2016 - AMI Certification Before, During and After Deployment
PDF
Iskra MC 760 Network Analyzer - Datasheet Manual
PDF
Iskra Electrical Measuring Instruments
PDF
Electrical measuring instruments
PDF
energymeter-170418133103.pdf energy mete
PPT
Energy meter
PPTX
AMI Meter Certification Before, During and After Deployment
PDF
umar_ijaz_amr_report - compile_1 - Copy_hed_up
PDF
Iskra MC 640 Multifunction Meter Datasheet Manual
PDF
Edmi mk10 a
PDF
Smart meter parameters for smart grid
PPTX
Single Phase Meter Testing Overview
PPTX
Calibration & Testing of Electronic Meters
PDF
Select-Info Packet Power, Power Meter With Mesh Wi-Fi Data Transmission
PPT
Vietnam vision 1
PPT
IS-Utilities AMI Overview - v 1.0000.ppt
DOCX
AC SMART MEASURING POWER DEVICE
Technical specification for 3.ph 4 wire stw 12 02-11
K.kufa meter test - c
Electrical measuring-instruments
SEMA 2016 - AMI Certification Before, During and After Deployment
Iskra MC 760 Network Analyzer - Datasheet Manual
Iskra Electrical Measuring Instruments
Electrical measuring instruments
energymeter-170418133103.pdf energy mete
Energy meter
AMI Meter Certification Before, During and After Deployment
umar_ijaz_amr_report - compile_1 - Copy_hed_up
Iskra MC 640 Multifunction Meter Datasheet Manual
Edmi mk10 a
Smart meter parameters for smart grid
Single Phase Meter Testing Overview
Calibration & Testing of Electronic Meters
Select-Info Packet Power, Power Meter With Mesh Wi-Fi Data Transmission
Vietnam vision 1
IS-Utilities AMI Overview - v 1.0000.ppt
AC SMART MEASURING POWER DEVICE
Ad

Recently uploaded (20)

PDF
Digital Logic Computer Design lecture notes
PPTX
Welding lecture in detail for understanding
PPTX
bas. eng. economics group 4 presentation 1.pptx
PDF
Well-logging-methods_new................
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PPTX
CH1 Production IntroductoryConcepts.pptx
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPT
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
PDF
PPT on Performance Review to get promotions
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
additive manufacturing of ss316l using mig welding
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPT
Project quality management in manufacturing
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPTX
UNIT 4 Total Quality Management .pptx
PPTX
Geodesy 1.pptx...............................................
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
Digital Logic Computer Design lecture notes
Welding lecture in detail for understanding
bas. eng. economics group 4 presentation 1.pptx
Well-logging-methods_new................
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
CH1 Production IntroductoryConcepts.pptx
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
PPT on Performance Review to get promotions
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
additive manufacturing of ss316l using mig welding
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Project quality management in manufacturing
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
Operating System & Kernel Study Guide-1 - converted.pdf
Model Code of Practice - Construction Work - 21102022 .pdf
UNIT 4 Total Quality Management .pptx
Geodesy 1.pptx...............................................
UNIT-1 - COAL BASED THERMAL POWER PLANTS
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx

Technical specifications for three phase meters

  • 2. Technical Specifications for Three Phase Energy Meter The equipment covered by these broad specifications shall conform to the requirements stated in latest editions of relevant Indian/ IEC Standards and Regulations. 2.0 STANDARDS APPLICABLE: Unless specified elsewhere in this specification, the performance & testing of the meters should conform to the following Indian/International standards, to be read with up to date and latest amendments/revisions along with additional requirements at Annexure-I. S. No. Reference Detail Reference Title 1 IS 13779 (1999) A.C. Static Watt hour meter class 1.0 and 2.0 2 CEA Regulation (2006) Installation and operation of meters Dtd: 17/03/2006 3 CBIP – TR No. 325 Guide on A.C.Static Electrical Energy Meters - Specification (latest amendment). 4 IS 9000 Basic Environmental testing procedure for electrical and electronic items. 5 IS 12346 (1999) Specification for testing equipment for A.C.Electrical energy meter. 6 IS11000 (1984 Fire hazard testing 7 IEC 62052-11 (2003) Electricity Requirements (AC) General Requirements Tests and Test conditions for A.C.Static Watt hour meter for active energy Class 1.0 and 2.0. 8 IEC 62053-21 (2003) A.C.Static Watt hour meter for active energy Class 1.0 and 2.0 9 IS 15707 (2006) Testing Evaluation installation and maintenance of AC Electricity Meters- Code of practice. 10 IEC 60068 Environmental testing 2.0 GENERAL TECHNICAL REQUIREMENTS: Sl. No. Particulars Standard Specification 1 Type of the meter Three phase four wire, whole current meter , direct reading type 2 Accuracy Class 1.0 3 Basic Current (Ib) & rated max. current (Imax) Ib =20 Amp, Imax= 100 Amp 4 Operating Voltage Voltage +20 % to -40 % of Vref. However the meter should withstand the maximum system voltage 5 Operating Frequency F= 50 Hz ± 5 %
  • 3. 6 Power consumption per phase As per IS 7 Starting Current 0.2 % of Ib 8 Short time over current 3000 A for 0.01 sec 9 Influence of heating External surface of the meter shall not exceed 20 K at 45° C ambient temperature 10 Rated impulse withstand voltage 8 KV 11 AC withstand voltage for 1 minute 4 KV 12 Insulation resistance a Between Frame & voltage & current Circuit 5 M Ohm b Between each current Circuit & other circuit 50 M Ohm 13 Mechanical requirement As per Clause of 12.3 of IS 13779 14 Resistance to heat & fire Shall not be ignited by thermal overload & material shall be fire retardant 15 Protection against penetration of dust & water Degree of protection IP: 51 as per IS 12063 w/o suction in meter 16 Resistance against climatic influence Clause 12.6 of IS: 13779 17 Electromagnetic compatibility Requirement shall be as per CBIP technical report no. 325 18 Power factor range Zero Lag - Unity- zero Lead 19 Energy measurement Fundamental energy + Energy due to harmonics 20 Test Output Device Flashing LED visible from the front 21 Billing Data a) Meter serial number, Date and time, KWh, KVAh, Power factor, MD in KW & KVA, History of KWh, KVAh & MD of both for last 6 months along with TOD readings. KVAh is computed based on KVARh and KWh. If Power factor is 1 or leading then, KVAh shall be treated equal to KWH b) All these data shall be accessible for reading, recording, and spot billing by downloading through optical port on CMRI or Laptop computers at site.
  • 4. 22 MD registration a) Meter shall store MD in every 30 minutes period along with date & time. At the end of every 30 minutes new MD shall be previous MD and store whichever is higher and the same shall be displayed. (b) it should be possible to reset MD automatically on the defined date. 23 Auto reset of MD The MD resetting shall be automatic at the 1st of the month i.e. 0000 hours of 1st of the month. Manual MD reset button shall not be available. Provision shall be made to change MD reset date through MRI even after installation of meter on site. 24 TOD metering Meter shall be capable doing TOD metering for KWH, KVAH & MD in KW & KVA with 6 time zones wherever applicable. It shall be possible to reconfigure the meters for TOD Tariff, billing date, RTC etc. through proper authentication process via communication port. 25 Climatic condition The meter should function satisfactorily with temperature ranging from 0-600 C and humidity upto 95% 26 Calibration Meter shall be calibrated at factory and modification in calibration shall not be possible at site by any means. Certified by manufacture 27 Meter Sealing As per IS 13779 & CEA metering regulation 2006 28 Memory Non-volatile memory independent of battery backup, memory should be retained upto 10 year in case of power failure. 29 Battery In case battery removal or total discharge same should not affect the working & memory of the meter 30 Load Survey 60 Days Load Survey for KW, KVA, Voltage, Current of each phase, with 30 minutes integration period 31 Connection diagram Shall be provided on terminal cover 32 Initial Startup of meter Within 5 sec after ref voltage is applied to the meter terminal 33 (a) internal dia of the terminal hole As per CBIP 33 (b) Depth of the terminal hole 25 mm
  • 5. 34 Clearance between adjacent terminal 10 mm 35 Display LCD (6 Digit ), Height 10 mmX6 mm, pin type, viewing angle min 160 degrees 36 Security feature Programmable facility to restrict the access to the information recorded at different security level such as read communication, communication write etc. 37 Software/ Communication Compatibility/ Communication port Optical port with RS 232 compatible to transfer the data locally through CMRI & remote through PSTN / Optical fiber / GSM / CDMA / RF / any other technology to the main computer. The Supplier shall supply Software required for CMRI (Atleast for Analogic & SANDS make) & for the connectivity to AMR modules. The software should be compatible to Microsoft Windows systems. The software should have polling feature with optional selection of parameters to be downloaded for AMR application. The Supplier shall provide meter reading protocols.
  • 6. Annexure-I Additional Requirement for Three Phase Whole Current Energy Meter S.No. Feature in addition to BIS Features Requirement 1 Functional  Starting current  0.2 % of Ib 2 Measuring Parameters  Real time & Date  Cumulative kWh  Other energy kVAh (Lag), kVArh( lead) & kVArh (lag)  Current Maximum demand in kW & KVA  Inst V,I & Power Factor  Maximum Demand  Six month energy history  Load Survey  Time of Day tariff  On/ Off hours 3 Anti Tamper And Anti- Fraud Features  Reverse Phase Energy  Phase sequence reversal  Detection of missing potential  Current Coil shorting  Welded meter body  Tamper History  Energy computation during missing potential  Power On/Off  Abnormal Power Off  Snap-on parameters  Protection against HV spark/ ESD  Low voltage event  Low Power factor recording  Top cover open  Write Transactions  Neutral Disturbance  Only two Phase (One phase and one neutral missing) 4 Additional Features(Optional)  Mid night data  Temperature  Net Metering