Th14 - How Much Testing is Enough? Achieving the Optimum Balance  2 december 2010
Introduction ISEB Practitioner Lean Six sigma green belt Over 12 years experience within testing area
Agenda  Introduction Test improvement based on ECL* Identify current position Define goal: Next position Define and implement measures * Economic Conformance Level
Agenda  Introduction Test improvement based on ECL Identify current position Define goal: Next position Define and implement measures
The question is: How to convince the project/organization of the added value of testing?
Inspired by Joseph Juran Lived from 1904 - 2008 One of the Quality gurus  Specialized in managing quality Pioneer of Six sigma  The Lean approach Founder of the pareto principle
Six sigma LSL USL
Lean approach – avoid wastes Waste Examples of translation to testing Overproduction Good enough testing Waiting Minimize gaps between cause and detect of a problem Transport Deployment of software / Effective Test data and infrastructure management Extra processing Avoid extra testruns and “ Unconscious”  redundancy of test Inventory Avoid to much test capacity / Clear and effective reporting  Motion Monitoring the total process Defects Prevent instead of detect or correct / Standardize and Simplify  human potential Effective use of human capabilities
Jurans curve Conformance
Agenda  Introduction Test improvement based on ECL Identify current position Define goal: Next position Define and implement measures
TMM 1. Initial 2. Managed Test policy and strategy Test planning Test monitoring and control Test design and execution Test environment 3. Integration Test organisation Test training program Test life cycle and integration Non-functional testing Peer reviews 4. Management and measurement Test management Software Quality evaluation Advanced peer reviews 5. Optimisation Defect prevention Test process optimisation Quality control Correct Detect Prevent
Six sigma approach Define -> Improvement goals  & cost of poor quality Measure -> current process & establish metrics Analyse -> problems and causes within process & hypothetic testing Improve -> by identifying and piloting solutions & verify solution Control -> by standardization and monitoring
Reach the balance E. Improve D.  Analyse B.  Measure F. Control C.  Define Detailed A.  Define Global
Agenda  Introduction Traditional test improvement Test improvement based on ECL Identify current position Define goal: Next position Define and implement measures
Software quality Maturity levels Corrective  costs Preventive and  Appraisal costs Total costs on  software quality Reactive Passive Balanced (Over)Active
Quality measures Corrective Measures taken to correct the failure itself, correct  damage and reduce the cost/damage of failures Measurement: Categories the failures on cost: Effort needed to correct the failure + Cost needed to correct the loss of image + Financial damage (downtime, lost of turnover) Appraisal Measures taken to detect the failures, before going live Cost: Effort and other costs needed to find the bugs Benefit: Corrective cost saved on the bugs Preventive Measure taken to prevent failures/bugs Cost: Effort needed to prevent the bugs Benefit: Corrective cost saved on the bugs
Calculation ECL: Corrective is Appraisal plus Preventive Corrective: # of issues * average corrective costs Direct costs to correct the issues Costs on non productive employees Financial costs    (lost of image, extra letters to be sended,    lost of turnover, wrong calculations, downtime of website, etc.)  Detective (Appraisal) and Preventive: # of issues prevented/detected * costs per issue To be calculated per  TEST TYPE  and  issue  CATEGORY  !
Example * Defect Detection Percentage Start N<8 AND MAN=TRUE M>6 OR L<65 End Statement coverage (SC) Condition coverage (CC) Decision coverage (DC) Modified Condition/Decision coverage (MCDC) Branche Condition combination coverage (BCCC) #  Average DDP* 2 25 – 55 % 2/3 60 – 80 % 3 60 – 80 % 4 80 – 85 % 16 90 – 95 %
Agenda  Introduction Test improvement based on ECL Identify current position Define goal: Next position Define and implement measures
Optimizing the balance Reactive Passive Balanced (Over)Active
Optimizing the balance Move towards optimum via Increasing/decreasing test coverage  Introduction/reduction of appraisal measures Introduction/reduction of preventive measures: Configuration management Requirement management Change/release management Document review Other measures
Optimizing the efficiency Reactive Passive Balanced (Over)Active
Optimizing the efficiency Being more efficient in quality management by Detecting bugs in an earlier stage Testautomation Reducing the time needed to detect the bugs by: Selecting more efficient test specification techniques Reduce the number of test deliverables    (or content of test deliverables) Increase the re-usability of testware Decrease the time needed to maintain testware. Optimising the cooperation between the testtypes and    involved parties Avoiding  8 wastes
Real life Example  Current position: Corrective about 7,5 FTE (inclusive correction) Preventive/Appraisal: 2 FTE + 1 FTE = 3 FTE Additional problems: No overall process documentation available Large number of ‘Technical’ failures during system test Large number of minor releases Passive
Optimisation suggestions Some of the suggestions: Formalising the review process (based on evaluations)  Introduction of UAT*  regression testing (including process descriptions) Formalising Unit testing “ Informalising” System testing Reducing number of releases * UAT = User Acceptance Test Pragmatic and tailor made
Expected results Higher testcoverage Reduction of number of changes and issues Reduction of number of production failures Reduction of test execution costs Reduction of time needed for breaking in new employees  Expected: Appraisal/Preventive:  + 0,5 FTE = 3,5 FTE Corrective:  - 2,0 FTE =  5,5 FTE Difference: - 1,5 FTE
Reconsidering the Boehm curve
Sharing the experience Company/project culture has to be leading Testing less can also be effective Optimizing is measuring (using metrics) Quality is not only testing Being an added value is being proactive and pragmatic Optimizing is a continuous process Prove the added value of testing
Questions

More Related Content

PDF
Edwin Van Loon - How Much Testing is Enough - EuroSTAR 2010
PPTX
Make a difference with Evaluations
PPT
John Brennen - Red Hot Testing in a Green World
PPT
Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...
PPT
Test Metrics
PPT
Closed Loop Corrective Action
PPTX
'Growing to a Next Level Test Organisation' by Tim Koomen
PPT
Ane Clausen - Success with Automated Regression Test revised
Edwin Van Loon - How Much Testing is Enough - EuroSTAR 2010
Make a difference with Evaluations
John Brennen - Red Hot Testing in a Green World
Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...
Test Metrics
Closed Loop Corrective Action
'Growing to a Next Level Test Organisation' by Tim Koomen
Ane Clausen - Success with Automated Regression Test revised

What's hot (20)

PPTX
Testing Process
PPT
Gitte Ottosen - Agility and Process Maturity, Of Course They Mix!
PPTX
Comparison of automation and manual testing pixel values technolabs
PDF
Clive Bates - A Pragmatic Approach to Improving Your Testing Process - EuroST...
PDF
Test performance indicators
PDF
Andrew Goslin - TMMi, What is Not in the Text Book - EuroSTAR 2010
PPTX
Fundamental Test Process
PPT
Mats Grindal - Risk-Based Testing - Details of Our Success
PPTX
Overview of test process improvement frameworks
PDF
Thomas Axen - Lean Kaizen Applied To Software Testing - EuroSTAR 2010
PDF
Julie Gardiner - Branch out using Classification Trees for Test Case Design -...
PDF
Beata Karpinska - Testing and Lean Principles - EuroSTAR 2010
PDF
[Paul Holland] Bad Metrics and What You Can Do About It
PPT
Johan Jonasson - Introducing Exploratory Testing to Save the Project
PDF
Torben Hoelgaard - Implementing Change - EuroSTAR 2011
PPT
Hans-Henrik Olesen - What to Automate and What not to Automate
PDF
Root Cause Analysis for Software Testers
PPTX
Software Test Metrics and Measurements
PPT
Martin Koojj - Testers in the Board of Directors
PPT
Fusion Testing - Maximizing Software Test Execution
Testing Process
Gitte Ottosen - Agility and Process Maturity, Of Course They Mix!
Comparison of automation and manual testing pixel values technolabs
Clive Bates - A Pragmatic Approach to Improving Your Testing Process - EuroST...
Test performance indicators
Andrew Goslin - TMMi, What is Not in the Text Book - EuroSTAR 2010
Fundamental Test Process
Mats Grindal - Risk-Based Testing - Details of Our Success
Overview of test process improvement frameworks
Thomas Axen - Lean Kaizen Applied To Software Testing - EuroSTAR 2010
Julie Gardiner - Branch out using Classification Trees for Test Case Design -...
Beata Karpinska - Testing and Lean Principles - EuroSTAR 2010
[Paul Holland] Bad Metrics and What You Can Do About It
Johan Jonasson - Introducing Exploratory Testing to Save the Project
Torben Hoelgaard - Implementing Change - EuroSTAR 2011
Hans-Henrik Olesen - What to Automate and What not to Automate
Root Cause Analysis for Software Testers
Software Test Metrics and Measurements
Martin Koojj - Testers in the Board of Directors
Fusion Testing - Maximizing Software Test Execution
Ad

Similar to Th14 Balanced Testing Presentation (20)

PPTX
PMP Training - 08 project quality management
PPT
Six Sigma Process Improvement
PPT
June2008 Hdi Quality Presentation
PDF
Measure Customer and Business Feedback to Drive Improvement
PPT
ISTQB / ISEB Foundation Exam Practice - 5
PPT
C12 quality
PPT
C12 quality
PPT
L07 quality management
PPT
Asq toronto10 jan2007effectcorraction
PPT
Quality Management
PDF
2 anton muzhailo - formal test process improvement. how to invest to the te...
PDF
Nesma autumn conference 2015 - Functional testing miniguide - Ignacio López C...
PPT
Testing Framework
PPT
Testing Centre Of Excellence From AppLabs
PPTX
Risk Management Training
PDF
Six Sigma for Beginners- Yellow and Green Belt
PPT
Managing Quality
PPT
PPTX
Quality management
PPT
ISTQB / ISEB Foundation Exam Practice - 2
PMP Training - 08 project quality management
Six Sigma Process Improvement
June2008 Hdi Quality Presentation
Measure Customer and Business Feedback to Drive Improvement
ISTQB / ISEB Foundation Exam Practice - 5
C12 quality
C12 quality
L07 quality management
Asq toronto10 jan2007effectcorraction
Quality Management
2 anton muzhailo - formal test process improvement. how to invest to the te...
Nesma autumn conference 2015 - Functional testing miniguide - Ignacio López C...
Testing Framework
Testing Centre Of Excellence From AppLabs
Risk Management Training
Six Sigma for Beginners- Yellow and Green Belt
Managing Quality
Quality management
ISTQB / ISEB Foundation Exam Practice - 2
Ad

Th14 Balanced Testing Presentation

  • 1. Th14 - How Much Testing is Enough? Achieving the Optimum Balance 2 december 2010
  • 2. Introduction ISEB Practitioner Lean Six sigma green belt Over 12 years experience within testing area
  • 3. Agenda Introduction Test improvement based on ECL* Identify current position Define goal: Next position Define and implement measures * Economic Conformance Level
  • 4. Agenda Introduction Test improvement based on ECL Identify current position Define goal: Next position Define and implement measures
  • 5. The question is: How to convince the project/organization of the added value of testing?
  • 6. Inspired by Joseph Juran Lived from 1904 - 2008 One of the Quality gurus Specialized in managing quality Pioneer of Six sigma The Lean approach Founder of the pareto principle
  • 8. Lean approach – avoid wastes Waste Examples of translation to testing Overproduction Good enough testing Waiting Minimize gaps between cause and detect of a problem Transport Deployment of software / Effective Test data and infrastructure management Extra processing Avoid extra testruns and “ Unconscious” redundancy of test Inventory Avoid to much test capacity / Clear and effective reporting Motion Monitoring the total process Defects Prevent instead of detect or correct / Standardize and Simplify human potential Effective use of human capabilities
  • 10. Agenda Introduction Test improvement based on ECL Identify current position Define goal: Next position Define and implement measures
  • 11. TMM 1. Initial 2. Managed Test policy and strategy Test planning Test monitoring and control Test design and execution Test environment 3. Integration Test organisation Test training program Test life cycle and integration Non-functional testing Peer reviews 4. Management and measurement Test management Software Quality evaluation Advanced peer reviews 5. Optimisation Defect prevention Test process optimisation Quality control Correct Detect Prevent
  • 12. Six sigma approach Define -> Improvement goals & cost of poor quality Measure -> current process & establish metrics Analyse -> problems and causes within process & hypothetic testing Improve -> by identifying and piloting solutions & verify solution Control -> by standardization and monitoring
  • 13. Reach the balance E. Improve D. Analyse B. Measure F. Control C. Define Detailed A. Define Global
  • 14. Agenda Introduction Traditional test improvement Test improvement based on ECL Identify current position Define goal: Next position Define and implement measures
  • 15. Software quality Maturity levels Corrective costs Preventive and Appraisal costs Total costs on software quality Reactive Passive Balanced (Over)Active
  • 16. Quality measures Corrective Measures taken to correct the failure itself, correct damage and reduce the cost/damage of failures Measurement: Categories the failures on cost: Effort needed to correct the failure + Cost needed to correct the loss of image + Financial damage (downtime, lost of turnover) Appraisal Measures taken to detect the failures, before going live Cost: Effort and other costs needed to find the bugs Benefit: Corrective cost saved on the bugs Preventive Measure taken to prevent failures/bugs Cost: Effort needed to prevent the bugs Benefit: Corrective cost saved on the bugs
  • 17. Calculation ECL: Corrective is Appraisal plus Preventive Corrective: # of issues * average corrective costs Direct costs to correct the issues Costs on non productive employees Financial costs (lost of image, extra letters to be sended, lost of turnover, wrong calculations, downtime of website, etc.) Detective (Appraisal) and Preventive: # of issues prevented/detected * costs per issue To be calculated per TEST TYPE and issue CATEGORY !
  • 18. Example * Defect Detection Percentage Start N<8 AND MAN=TRUE M>6 OR L<65 End Statement coverage (SC) Condition coverage (CC) Decision coverage (DC) Modified Condition/Decision coverage (MCDC) Branche Condition combination coverage (BCCC) # Average DDP* 2 25 – 55 % 2/3 60 – 80 % 3 60 – 80 % 4 80 – 85 % 16 90 – 95 %
  • 19. Agenda Introduction Test improvement based on ECL Identify current position Define goal: Next position Define and implement measures
  • 20. Optimizing the balance Reactive Passive Balanced (Over)Active
  • 21. Optimizing the balance Move towards optimum via Increasing/decreasing test coverage Introduction/reduction of appraisal measures Introduction/reduction of preventive measures: Configuration management Requirement management Change/release management Document review Other measures
  • 22. Optimizing the efficiency Reactive Passive Balanced (Over)Active
  • 23. Optimizing the efficiency Being more efficient in quality management by Detecting bugs in an earlier stage Testautomation Reducing the time needed to detect the bugs by: Selecting more efficient test specification techniques Reduce the number of test deliverables (or content of test deliverables) Increase the re-usability of testware Decrease the time needed to maintain testware. Optimising the cooperation between the testtypes and involved parties Avoiding 8 wastes
  • 24. Real life Example Current position: Corrective about 7,5 FTE (inclusive correction) Preventive/Appraisal: 2 FTE + 1 FTE = 3 FTE Additional problems: No overall process documentation available Large number of ‘Technical’ failures during system test Large number of minor releases Passive
  • 25. Optimisation suggestions Some of the suggestions: Formalising the review process (based on evaluations) Introduction of UAT* regression testing (including process descriptions) Formalising Unit testing “ Informalising” System testing Reducing number of releases * UAT = User Acceptance Test Pragmatic and tailor made
  • 26. Expected results Higher testcoverage Reduction of number of changes and issues Reduction of number of production failures Reduction of test execution costs Reduction of time needed for breaking in new employees Expected: Appraisal/Preventive: + 0,5 FTE = 3,5 FTE Corrective: - 2,0 FTE = 5,5 FTE Difference: - 1,5 FTE
  • 28. Sharing the experience Company/project culture has to be leading Testing less can also be effective Optimizing is measuring (using metrics) Quality is not only testing Being an added value is being proactive and pragmatic Optimizing is a continuous process Prove the added value of testing

Editor's Notes

  • #6: Martin luther king . Don’t pretent to be as big as he is. Also don’t want to perform an act/speech about the power of testers .. The swedish ladies did better in there fun session about supertesters, than I could ever do. But I have a dream …. About testers considered as equal as other project members. I was wonder … why ….. The added value of testing is still discussed within projects. The introduction of risk based testing improved the value of testing, but we still can not answer the question about what depth of testing is the most efficience depth …. We often stop testing when we are out of budget or time … but did we achieve the best quality level? So the question is not whether we should test of not (we already convinced the project/organisation of the need for testing) … but what is the optimum balance / most optimum value of testing.
  • #7: - In the top list of quality gurus next to Deming and Shewhart (Plan do check act cycle), Philip Crosby (Quality is free) - Pareto principle: by doing the job 20%, 80% of the advance of the entire job can be created. Or 80% of the problems are produced by 20% of the causes - Six sigma: performance improvement methodology. Toolbox. Six sigma levels represents 3,4 defects per million opportunities (Five sigma 233 defects) - Lean approach: produce what is needed and avoid wastes. 8 wastes: (overproduction, waiting, transport, extra processing, inventory, motion, defects, waste of human potential)
  • #8: Histogram. Lower specification Limit, Higher specification limit. 68.27 percent of any normal population lies between + or – 1 sigma of the average. Sigma is the standard deviation. 95,45 between 2 sigma …. Etc. Define: scope, critical to quality, cost of poor quality, process map Measure: Identify process variables, current measurement system Analyse: Identiy causes of variation, conduct hypothesis testing Improve: identify possible solutions, verify solutions Control: Implement and sustain
  • #16: Reactive QA maturity (far left block) On this level mostly corrective measures are present. Failures are found in the production-environment after going life. Next to the direct costs of correcting the failures the costs of marketing to correct the damage/decreased image are also high. The total cost of quality is much too high and can be reduced by 30-50 percent. The organisation/project only reacts on failures that occur. 2. Passive QA maturity (corrective and detective measures at a late stage) The focus within the level lies on finding the failures on the right side of the V-model during dynamic testing (often during the acceptance test). Testing is present but often only in a unstructured and ineffective way. Almost no preventive measures are present. 3. (Over)active QA maturity (far right block) Lots of preventive and detective measures are taken. Lots of test types are present and less defects are found after going life..... But testing and QA are too expensive. Finding a defect will take more time than correcting them. The damage occurred by the remaining defects is almost null. So: Too much detective and preventive measures in relation to the corrective measures. The total costs of quality can be reduced by reducing the number of preventive and detective measures (or by defining more efficient measures). 4. Balanced QA maturity The level in which the right balance between the quality measures is reached and proven via the collected metrics.
  • #25: High lead time to train new testers.