SlideShare a Scribd company logo
LOGISTICS PROJECT OCTOBER 2017
LODZ UNIVERSITY OF TECHNOLOGY
ABC CLASSIFICATION:
How to reduce the cost of the jacket
-By Eleni Neromylioti
LOGISTICS PROJECT OCTOBER 2017
LODZ UNIVERSITY OF TECHNOLOGY
Problem
The product of this ABC classification is a jacket which is made by a small-medium
company. Our object is to generate savings and reduce its cost of production. For
that reason, we will define the cost of every component/material of this product.
Introduction
This table consists of 5 columns (No for number of each component, components
for the name of each, value for the cost of each, share for the percentage of the
cost of each component in the total price and the cumulated share ) and 21 rows
for the elements. Furthermore, ee will analyze the most important components of
this table which are the first five ( Group A) and some of the Group B.
LOGISTICS PROJECT OCTOBER 2017
LODZ UNIVERSITY OF TECHNOLOGY
Elements:
As we see above, our jacket consists of 21 elements. So we need to collect many
elements to have a good quality of leather jackets. The cost for now is 139,884
pln.
LOGISTICS PROJECT OCTOBER 2017
LODZ UNIVERSITY OF TECHNOLOGY
ABC Grouping:
All those elements are separated in 3 individual groups. The groups are divided in
this way:
GROUPS CUMULATIVE SHARE
A < 80%
B >80%- <98%
C >98%
• Group A: (Vital Area)
The vital area consists of 5 components like the material, the lining, the metal
zipper, some fur elements and some extra leather elements. Those elements
constitute only the 23% of the components and the 75,71% of the final price of
the product.
• Group B:(Undecided Area)
The undecided area consists of 6 components: the patches for the back, zip
fastener, buttons, silicon glue,the box and the twines. All those share a 28,57%
of the elements and 21,45% of the total price.
• Group C: (Trivial Area)
The trivial area consists of 10 elements as packing paper, nap into the pocket,
hanging strap, price tag, box stickers, yellow thread, blue thread, material
inside the pockets, price tags rope and ink. All those 10 elements constitute
the rest 47,61% of all the materials and only the 2,84% of the total price of the
jacket.
LOGISTICS PROJECT OCTOBER 2017
LODZ UNIVERSITY OF TECHNOLOGY
The Analysis
• Analysis for group A
-Material:
The material is the most basic component of this jacket so it is something that
cannot change easily as our customers are used to this material or to similar
ones.
Alternative options: 1. Discuss on the price with the supplier, 2. Change the
material.
The material is the most important factor for the quality of the jacket, so it is
difficult to replace it since quality is the first thing that customers want in their
products. So, negotiating about a lower price for bigger quantity of material
would be perfect.
Ex. 5%-10% discount for buying more material (bigger storage) = savings from
1,535 pln to 3,70 pln!
-Lining:
Lining is as basic factor as the material. That's why best solution between the
two (2) alternative options (1. Discuss on the price with the supplier, 2. Change
the material. ) we choose to discuss about the price with our current supplier.
Ex. 10% discount = savings of 2,94 pln /product.
-Metal Zipper:
The zipper for a jacket is a really important element. It is used many times by
the customer/user per day. It means that our zipper needs to be good quality.
LOGISTICS PROJECT OCTOBER 2017
LODZ UNIVERSITY OF TECHNOLOGY
Alternative options: 1. Change material –to plastic, 2. Change material –to
nylon coil, 3. Change to "invisible" type of zippers
If we choose the first or the second option, we can reduce the cost for almost
20% = savings of 4,06 pln / product. And for the third option we can reduce the
cost for 12 % = savings of 2,436 pln/ product.
So we prefer alternative No.1 and No.2 !
-Fur elements:
We use fur elements inside the collar of the jacket and inside the sleeves. It's
more a decorating/seasonal/fashion trend element and not as basic as the
others. In that way, we don’t need to use the fur for all the seasons because
fashion trends change. So, we can't negotiate for many things.
• Analysis for group B
In this group of contents, the most important are the patches and the boxes.
-Patches:
The patches are a latest fashion trend that decorate many clothes. As a fashion
trend that someday will fade away, we cannot make a long-term deals or ask
for more product for a lower price.
Alternative options: 1. Cancel usage of patches, 2. Change supplier.
In this case, the first option can affect the satisfaction/desirability of our
customers which is also not the best solution to our problem. The second
option can make some quality changes to the product. Between those two
options the first would be better, because quality matters most in this
company. Savings of 11,3 pln /product.
-Boxes:
LOGISTICS PROJECT OCTOBER 2017
LODZ UNIVERSITY OF TECHNOLOGY
The boxes that we use to transfer the products are important for the
good/convenient transportation of our clothes to the stores.
Alternative options: 1. Lower price for more products (bigger storage), 2.
Storage more products in one box.
Boxes is the only sure thing/component used for every product that has to be
delivered. So, making a big storage of boxes would be a wise solution in
reducing the price of the jacket. Negotiating for a discount of 10-15% for some
extra boxes will save us some little amount of money(0,3 pln).
CONCLUSIONS
If we reduce the cost of at least three elements of cost production may cause
the reduction of production cost by 10,7 pln (7,6% of the total price). In that
way, our new price of the product will be 139,884-10,7= 129,184. To reduce
the price for 10,7 pln we have to be careful in our negotiations because the
items that we talk about, have to be high qualified.
In case we want to reduce the price more we can widen the storage boxes and
also, we can stop using patches as they are only some decorating details. For
that reasons, we can reduce some extra cost 11,6 pln (8,2%). In that case, the
price shapes up to 117,584 pln.
Decisions
• Negotiate price with our current supplier for buying more material.
• Discuss about the price with our current supplier for the lining.
• Replace the metal zipper with a high-quality plastic or nylon coil one.
• Cancel using patches
• Buy more boxes from the supplier for less price.
LOGISTICS PROJECT OCTOBER 2017
LODZ UNIVERSITY OF TECHNOLOGY

More Related Content

PPTX
Lx 01 without effect
DOCX
ACT 333__Cost accounting report on fountain
PDF
Packing Improvement by using of Quality Function Deployment Method: A Case St...
PPT
bbb
DOCX
Product design factors
DOCX
Assignment 21. Given that atomic radius is 0.143 nm and crys.docx
PDF
Product Design Portfolio
DOCX
Business Plan
Lx 01 without effect
ACT 333__Cost accounting report on fountain
Packing Improvement by using of Quality Function Deployment Method: A Case St...
bbb
Product design factors
Assignment 21. Given that atomic radius is 0.143 nm and crys.docx
Product Design Portfolio
Business Plan

Similar to The ABC classification- Example and analysis (20)

PDF
Dressmaking 9 Weeks 1-7.pdf
PDF
175035 apparel assignment cutting
PDF
dressmaking-9-weeks-1-7.pdf
DOCX
Compare and Contrast Essay AssignmentLength At least three fu.docx
DOCX
PROTFOLIO -Noyon Shikder
PPTX
Itb solutions presentation 3.7.22
PPS
Honecore Eco-Friendly packaging
PDF
[글로벌퓨처임팩트컨퍼런스] 세션2_Amorpol Huvanandana(Moreloop)
 
PPTX
gcse product design coursework
PDF
Protective Packaging Systems 2016
PDF
Packing
PPTX
Plastic 3R project (update-31-oct 2022)_.pptx
PDF
3 r on pen final
PPT
Ny presentation
PDF
Speaker / Lamp
PDF
PVC volume cost, How to use Fillers judicously
PDF
IRS151 Group 3 Presentation (1).pdf
PDF
Material Efficiency of Packaging in Comparison .pdf
PDF
Assignment 2 scamper
PDF
Design project 2 brief sept 2015
Dressmaking 9 Weeks 1-7.pdf
175035 apparel assignment cutting
dressmaking-9-weeks-1-7.pdf
Compare and Contrast Essay AssignmentLength At least three fu.docx
PROTFOLIO -Noyon Shikder
Itb solutions presentation 3.7.22
Honecore Eco-Friendly packaging
[글로벌퓨처임팩트컨퍼런스] 세션2_Amorpol Huvanandana(Moreloop)
 
gcse product design coursework
Protective Packaging Systems 2016
Packing
Plastic 3R project (update-31-oct 2022)_.pptx
3 r on pen final
Ny presentation
Speaker / Lamp
PVC volume cost, How to use Fillers judicously
IRS151 Group 3 Presentation (1).pdf
Material Efficiency of Packaging in Comparison .pdf
Assignment 2 scamper
Design project 2 brief sept 2015
Ad

Recently uploaded (20)

DOCX
Final. 150 minutes exercise agrumentative Essay
PDF
Best Accounting Outsourcing Companies in The USA
PDF
2012_The dark side of valuation a jedi guide to valuing difficult to value co...
PDF
Statistics for Management and Economics Keller 10th Edition by Gerald Keller ...
PDF
HCWM AND HAI FOR BHCM STUDENTS(1).Pdf and ptts
PDF
Management Accounting Information for Decision-Making and Strategy Execution ...
DOCX
BUSINESS PERFORMANCE SITUATION AND PERFORMANCE EVALUATION OF FELIX HOTEL IN H...
PPTX
PPT-Lesson-2-Recognize-a-Potential-Market-2-3.pptx
PDF
5-principles-of-PD-design.pdfvvvhvjvvcjcxhhcjb ggfvjhvjjhbvbbbvccxhgcxzzghjbv...
PDF
THE EFFECT OF FOREIGN AID ON ECONOMIC GROWTH IN ETHIOPIA
PDF
Buy Verified Payoneer Accounts for Sale - Secure and.pdf
PDF
Principal of magaement is good fundamentals in economics
PPTX
Lesson Environment and Economic Growth.pptx
PDF
Financial discipline for educational purpose
PPTX
Module5_Session1 (mlzrkfbbbbbbbbbbbz1).pptx
PDF
2018_Simulating Hedge Fund Strategies Generalising Fund Performance Presentat...
PDF
GVCParticipation_Automation_Climate_India
PDF
DTC TRADIND CLUB MAKE YOUR TRADING BETTER
PDF
USS pension Report and Accounts 2025.pdf
PDF
Pitch Deck.pdf .pdf all about finance in
Final. 150 minutes exercise agrumentative Essay
Best Accounting Outsourcing Companies in The USA
2012_The dark side of valuation a jedi guide to valuing difficult to value co...
Statistics for Management and Economics Keller 10th Edition by Gerald Keller ...
HCWM AND HAI FOR BHCM STUDENTS(1).Pdf and ptts
Management Accounting Information for Decision-Making and Strategy Execution ...
BUSINESS PERFORMANCE SITUATION AND PERFORMANCE EVALUATION OF FELIX HOTEL IN H...
PPT-Lesson-2-Recognize-a-Potential-Market-2-3.pptx
5-principles-of-PD-design.pdfvvvhvjvvcjcxhhcjb ggfvjhvjjhbvbbbvccxhgcxzzghjbv...
THE EFFECT OF FOREIGN AID ON ECONOMIC GROWTH IN ETHIOPIA
Buy Verified Payoneer Accounts for Sale - Secure and.pdf
Principal of magaement is good fundamentals in economics
Lesson Environment and Economic Growth.pptx
Financial discipline for educational purpose
Module5_Session1 (mlzrkfbbbbbbbbbbbz1).pptx
2018_Simulating Hedge Fund Strategies Generalising Fund Performance Presentat...
GVCParticipation_Automation_Climate_India
DTC TRADIND CLUB MAKE YOUR TRADING BETTER
USS pension Report and Accounts 2025.pdf
Pitch Deck.pdf .pdf all about finance in
Ad

The ABC classification- Example and analysis

  • 1. LOGISTICS PROJECT OCTOBER 2017 LODZ UNIVERSITY OF TECHNOLOGY ABC CLASSIFICATION: How to reduce the cost of the jacket -By Eleni Neromylioti
  • 2. LOGISTICS PROJECT OCTOBER 2017 LODZ UNIVERSITY OF TECHNOLOGY Problem The product of this ABC classification is a jacket which is made by a small-medium company. Our object is to generate savings and reduce its cost of production. For that reason, we will define the cost of every component/material of this product. Introduction This table consists of 5 columns (No for number of each component, components for the name of each, value for the cost of each, share for the percentage of the cost of each component in the total price and the cumulated share ) and 21 rows for the elements. Furthermore, ee will analyze the most important components of this table which are the first five ( Group A) and some of the Group B.
  • 3. LOGISTICS PROJECT OCTOBER 2017 LODZ UNIVERSITY OF TECHNOLOGY Elements: As we see above, our jacket consists of 21 elements. So we need to collect many elements to have a good quality of leather jackets. The cost for now is 139,884 pln.
  • 4. LOGISTICS PROJECT OCTOBER 2017 LODZ UNIVERSITY OF TECHNOLOGY ABC Grouping: All those elements are separated in 3 individual groups. The groups are divided in this way: GROUPS CUMULATIVE SHARE A < 80% B >80%- <98% C >98% • Group A: (Vital Area) The vital area consists of 5 components like the material, the lining, the metal zipper, some fur elements and some extra leather elements. Those elements constitute only the 23% of the components and the 75,71% of the final price of the product. • Group B:(Undecided Area) The undecided area consists of 6 components: the patches for the back, zip fastener, buttons, silicon glue,the box and the twines. All those share a 28,57% of the elements and 21,45% of the total price. • Group C: (Trivial Area) The trivial area consists of 10 elements as packing paper, nap into the pocket, hanging strap, price tag, box stickers, yellow thread, blue thread, material inside the pockets, price tags rope and ink. All those 10 elements constitute the rest 47,61% of all the materials and only the 2,84% of the total price of the jacket.
  • 5. LOGISTICS PROJECT OCTOBER 2017 LODZ UNIVERSITY OF TECHNOLOGY The Analysis • Analysis for group A -Material: The material is the most basic component of this jacket so it is something that cannot change easily as our customers are used to this material or to similar ones. Alternative options: 1. Discuss on the price with the supplier, 2. Change the material. The material is the most important factor for the quality of the jacket, so it is difficult to replace it since quality is the first thing that customers want in their products. So, negotiating about a lower price for bigger quantity of material would be perfect. Ex. 5%-10% discount for buying more material (bigger storage) = savings from 1,535 pln to 3,70 pln! -Lining: Lining is as basic factor as the material. That's why best solution between the two (2) alternative options (1. Discuss on the price with the supplier, 2. Change the material. ) we choose to discuss about the price with our current supplier. Ex. 10% discount = savings of 2,94 pln /product. -Metal Zipper: The zipper for a jacket is a really important element. It is used many times by the customer/user per day. It means that our zipper needs to be good quality.
  • 6. LOGISTICS PROJECT OCTOBER 2017 LODZ UNIVERSITY OF TECHNOLOGY Alternative options: 1. Change material –to plastic, 2. Change material –to nylon coil, 3. Change to "invisible" type of zippers If we choose the first or the second option, we can reduce the cost for almost 20% = savings of 4,06 pln / product. And for the third option we can reduce the cost for 12 % = savings of 2,436 pln/ product. So we prefer alternative No.1 and No.2 ! -Fur elements: We use fur elements inside the collar of the jacket and inside the sleeves. It's more a decorating/seasonal/fashion trend element and not as basic as the others. In that way, we don’t need to use the fur for all the seasons because fashion trends change. So, we can't negotiate for many things. • Analysis for group B In this group of contents, the most important are the patches and the boxes. -Patches: The patches are a latest fashion trend that decorate many clothes. As a fashion trend that someday will fade away, we cannot make a long-term deals or ask for more product for a lower price. Alternative options: 1. Cancel usage of patches, 2. Change supplier. In this case, the first option can affect the satisfaction/desirability of our customers which is also not the best solution to our problem. The second option can make some quality changes to the product. Between those two options the first would be better, because quality matters most in this company. Savings of 11,3 pln /product. -Boxes:
  • 7. LOGISTICS PROJECT OCTOBER 2017 LODZ UNIVERSITY OF TECHNOLOGY The boxes that we use to transfer the products are important for the good/convenient transportation of our clothes to the stores. Alternative options: 1. Lower price for more products (bigger storage), 2. Storage more products in one box. Boxes is the only sure thing/component used for every product that has to be delivered. So, making a big storage of boxes would be a wise solution in reducing the price of the jacket. Negotiating for a discount of 10-15% for some extra boxes will save us some little amount of money(0,3 pln). CONCLUSIONS If we reduce the cost of at least three elements of cost production may cause the reduction of production cost by 10,7 pln (7,6% of the total price). In that way, our new price of the product will be 139,884-10,7= 129,184. To reduce the price for 10,7 pln we have to be careful in our negotiations because the items that we talk about, have to be high qualified. In case we want to reduce the price more we can widen the storage boxes and also, we can stop using patches as they are only some decorating details. For that reasons, we can reduce some extra cost 11,6 pln (8,2%). In that case, the price shapes up to 117,584 pln. Decisions • Negotiate price with our current supplier for buying more material. • Discuss about the price with our current supplier for the lining. • Replace the metal zipper with a high-quality plastic or nylon coil one. • Cancel using patches • Buy more boxes from the supplier for less price.
  • 8. LOGISTICS PROJECT OCTOBER 2017 LODZ UNIVERSITY OF TECHNOLOGY