SlideShare a Scribd company logo
GOING REMOTE
With Ark Sciences
THE REMOTE BUILD
V1 Planning a Theoretical Production
MDIA
Sponsored Conditions
THEORETICAL
PRODUCTION
ARK CONDUIT
ASSIMILATED LIKE DIGITAL
DEFINE TEST OF
PARAMETRIC
9/27/2021
Brij Consulting, LLC, Jean Marshall 2
V1 Planning a Theoretical Production
1. Use filler instead of density and grow
the beam at the site, transport via glass
2. Add menus and switches
3. Facade style changes
Glass Mechanics for Remote Building Glass Model for Remote Building
1. Concept machine as approved by
engineering is acceptable with proprietary
secants and encrypted as Intellectual
Property (fingerprint.)
2. Remote capability is subject to general
development of Ark Media and may depend
on timing of it (limited by glass conduit.)
Economic Value is a stable fact in Glass, since the Glass System can not be subject to 1.
availability of product supply or demand 2. the volatility of markets 3. a currency valuation
4. Technological obsolescence is held at bay by causing the build method to be based on
the lower constructs until the product is refined and replaced automatically; Most
importantly the longevity (long-lived nature) and continuity of the product is ensured by
the Plan of God 5. Economy of scale is increased by the plait and scalable nature of glass.
To Do:
Devise a Theoretical
Production and simulate the
remote process prior to the
availability of an ark media
Assume pipe and
plait concepts
assimilated in Ark
Redefine
the Load
Engineering
Plan from
“The Glass
House”
9/27/2021
Brij Consulting, LLC, Jean Marshall 3
Project Plan is stated at its Market Value
Concepts of…
Facts added to Glass Mechanics
1. Use filler instead of density and grow
the beam at the site, transport via glass
2. Add menus and switches 3. Facade style changes
DENSITY FUNCTION
•NOT Replication
•Secant Guided Process sponsored by a Tool
•When filler is used as a replacement for the density
function until transport, the filler assumes the
characteristics of the density requirement per its
confected production at Z
Menus and
Switches
•Used to unlock and
move beams until parked
and locked.
•Beams can not be put
back to plait media state
•Menus can be used for
repair and rebalancing
Façade Style
changes
•Added into the fill
pocket of the beam
•Produced with a Machine
tool
•Once the Façade is
added can be repaired
but not replaced
Is there on-site access to tools and
production capability-see limitations?
See Additional Facts for Menus and Facades
9/27/2021
Brij Consulting, LLC, Jean Marshall 4
Storyboard
◦ Theoretical Production
needs to be devised to
take advantage of each
step in the process
◦ We’re doing this to
construct the Value of
each Revision and have
some run rate for the
project
R-P1
Hedge Measures
t/b/d= to be
determined
9/27/2021
Brij Consulting, LLC, Jean Marshall 5
Engineering Changes
Increasing units of Production impacts
growth and yield with economic change
x2
Valuation
Measures inclusive
Adding Change Value to the Project altered the
relevant range of the Standards
Slide 5 correlation
How do these
changes appear
in the Plan?
9/27/2021
Brij Consulting, LLC, Jean Marshall 6
reloaded
◦ 7W P1 Theoretical Production for Storyboard R-P1-RC, includes Product Media to approximate remote cost
The greater part of the 4% increase is coming
from supporting industry, only .48% is
Architectural
Used to
develop
the price
α
9/27/2021
Brij Consulting, LLC, Jean Marshall 7
Developing the
Theoretical Production
The Theoretical Production for the P-1
Architecture is shown as calculated next…
Uses the Y-Intercept set
α
9/27/2021
Brij Consulting, LLC, Jean Marshall 8
◦ 7W P1 Theoretical Production for Storyboard R-P1-IH, exclusive of Product Media to approximate inhouse cost
Per slide 8
9/27/2021
Brij Consulting, LLC, Jean Marshall 9
Additional Facts for
Menus and
Facades
◦ Menus and Switches (Modules)
◦ Two Types
◦ Vendor Only or
◦ Customer Facing
◦ Types
◦ Customer: color change and specific motionable properties
without impairment of structural supports
◦ Specifications: somewhat similar to the digital mechanic in
that the placement within the product affects its final operation
upon final assembly (must be well-defined and tested.)
◦ Color changes and repairs to facades/ building surfaces are
capable through modules within the Glass system and altered
remotely
Discussed in “The Glass Build”
9/27/2021
Brij Consulting, LLC, Jean Marshall 10
V2 Ark Conduit mimics Site Simulation
◦ Coming next…
◦ Pipes and Plaits have similar functions in ARK MODE although scale is quite different than digital
◦ We will introduce Pipes and Plaits and continue to work on the theory of
secant development
◦ In V3 we will also begin to define the parametric order of operations
Next…
9/27/2021
Brij Consulting, LLC, Jean Marshall 11
What is Required
Architectural Plans, Digital Glass Model
The Glass Modeling System, Ark Mode
3- Dimensional Media Model
Storyboards to describe…
Process Plan
Integral Materials
Organization of Instances of
Building (Preludes)
Secant Construction and Engineering
Building Organization for Ark Mode
Methods, Tools and Utilities
The Design of
the whole
process will be
an extended
period of
listening about
this subject. But
we will spend
our time in our
next paper
organizing
Secant
Processes
Monks of Norcia - Donations - EN - Monastero di San Benedetto in Monte (nursia.org)
12
9/27/2021
Brij Consulting, LLC, Jean Marshall
Our papers
13
This paper is THE REMOTE BUILD
V3 and V4
holds all
contents
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for
Media to write and produce in Ark Science and Dimensional Systems, Introduction
of the Story “Eru finds a Golden Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and
Remix specifications, beginning crosswalk and encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use
of Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to include
Ark encryptions and design considerations
5. THE GLASS HOUSE: Magi and Marcus Engineering plans to invest in a Plait
Glass facility for building and research in remote Ark Science. Start of
Tooling and Secant Design for the Construction Industry
https://www.slideshare.net/Marshallja/presentations
See next slide for list of the preceding
Digital Plait content
9/27/2021
Brij Consulting, LLC, Jean Marshall
Planning a Theoretical Production for untried Architecture
14
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants
and Wheels for the “cube-ified glass” engineering of Imaging, sound and motion
characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional
Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional
systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at basic product
ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a
Digital Portal Production System using appliances gained through Plait Object and Gate
driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of
product, learning to specify material, looking for union of Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to depict …Motivated
by sound it creates a means by sound to cascade light for safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck
(Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new
(Dialogue paper)
^Mu Sic, see The Corner of Mu Sic
To Change
Digital Plait Papers with Content
Description (Reverse Order)
9/27/2021
Brij Consulting, LLC, Jean Marshall

More Related Content

PDF
The Remote Build V2 Ark Conduit Assimilation
PDF
The Glass House V3 The Economics of Glass in Ark Mode
PDF
The Corner of Mu sic in Digital Glass and Ark Mode
PDF
The Glass House V2 Matrix Expansion
PDF
The Remote Build V3 Parametric Testing
PDF
The Glass House V1 Building with Synthesis
PDF
Bridging the Instance V3 Parametric Simulation
PDF
Glass Mix Z Form V1 Glass Mix Concepts
The Remote Build V2 Ark Conduit Assimilation
The Glass House V3 The Economics of Glass in Ark Mode
The Corner of Mu sic in Digital Glass and Ark Mode
The Glass House V2 Matrix Expansion
The Remote Build V3 Parametric Testing
The Glass House V1 Building with Synthesis
Bridging the Instance V3 Parametric Simulation
Glass Mix Z Form V1 Glass Mix Concepts

What's hot (20)

PDF
Architectural Builds and Design V1 Yield to the Mix
PDF
Crossover Conveyance V1 Glass Path
PDF
Bridging The Instance V2 Trees and Leaves
PDF
Converge, the Remote Build, Phase I
PDF
Remote Build, Phase III V1,V2, V3.pdf
PDF
Bridging the Instance V1 Marks and Encryptions
PDF
The Corner of Mu Sic (Addendum 1)
PDF
Glass Mix Z-Form V1 thru V3
PDF
Branch Sound and Image Construction Summary version v1,v2,v3
PDF
Architectural Builds and Design V3 Land Fabrications
PDF
Pipes and Plaits in Ark Mode Design V1 Pi, Pi(m), Pi(n) with Comments
PDF
Pipes and Plaits in Ark Mode Design V4 Pipe Stream Mechanics
PDF
Pipes and Plaits in Ark Mode Design V2 and V3 Glass Warehouse and Title
PDF
Architectural Builds and Design V2 Number Theory
PDF
Adrian Navarro Architectural Technologist Portfolio
PDF
DavidG_CV 2017
PDF
Architectural technologist & cad technician portfolio
PDF
Session 11- Comparative study of design software tools acce(i) ses session 11...
PDF
Kreetec - Graphic concrete reference book
PDF
Computer aided analysis_and_design_of_multi-storeyed_buildings
Architectural Builds and Design V1 Yield to the Mix
Crossover Conveyance V1 Glass Path
Bridging The Instance V2 Trees and Leaves
Converge, the Remote Build, Phase I
Remote Build, Phase III V1,V2, V3.pdf
Bridging the Instance V1 Marks and Encryptions
The Corner of Mu Sic (Addendum 1)
Glass Mix Z-Form V1 thru V3
Branch Sound and Image Construction Summary version v1,v2,v3
Architectural Builds and Design V3 Land Fabrications
Pipes and Plaits in Ark Mode Design V1 Pi, Pi(m), Pi(n) with Comments
Pipes and Plaits in Ark Mode Design V4 Pipe Stream Mechanics
Pipes and Plaits in Ark Mode Design V2 and V3 Glass Warehouse and Title
Architectural Builds and Design V2 Number Theory
Adrian Navarro Architectural Technologist Portfolio
DavidG_CV 2017
Architectural technologist & cad technician portfolio
Session 11- Comparative study of design software tools acce(i) ses session 11...
Kreetec - Graphic concrete reference book
Computer aided analysis_and_design_of_multi-storeyed_buildings
Ad

Similar to The Remote Build V1 Planning a Theoretical Production (20)

PDF
Time and Motion Motion in Ark Glass V1 Abandoning Paraphernalia.pdf
PDF
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
PDF
Cascading in Green Part I
PDF
Dimensional Building V3 Interdimensional Positions
PDF
Comments on How to Value Virtual Machines and other IP Stuff.pdf
PDF
Dimensional Building in Ark Design.pdf
PDF
Dimensional Building v2 Digital Strength in Z Properties
PDF
Summary of Comments on Glass Big Push.pdf
PDF
Comments on IP Procurement Reconvene Part IV.pdf
PDF
Comments on Conference Theme Arrangements.pdf
PDF
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdf
PDF
Converge: Remote Build, Phase III.pdf
PDF
Ark in Glass V1 Schema in Ark Mode Simulation
PDF
Glass Impact.pdf
PDF
Glass Impact.pdf
PDF
Comments on Portal Compositions Part I.pdf
PDF
Comments on Glass Conference IP Procurement & Development.pdf
PDF
Glass Big Push Part I.pdf
PDF
Glass and Steel in a Union w-Addendum.pdf
PDF
Why Quantum Anywhere, Parts I and II, plus Intro
Time and Motion Motion in Ark Glass V1 Abandoning Paraphernalia.pdf
CALENDAR CARTOGRAPHY V1 Calendars and Tasks.pdf
Cascading in Green Part I
Dimensional Building V3 Interdimensional Positions
Comments on How to Value Virtual Machines and other IP Stuff.pdf
Dimensional Building in Ark Design.pdf
Dimensional Building v2 Digital Strength in Z Properties
Summary of Comments on Glass Big Push.pdf
Comments on IP Procurement Reconvene Part IV.pdf
Comments on Conference Theme Arrangements.pdf
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdf
Converge: Remote Build, Phase III.pdf
Ark in Glass V1 Schema in Ark Mode Simulation
Glass Impact.pdf
Glass Impact.pdf
Comments on Portal Compositions Part I.pdf
Comments on Glass Conference IP Procurement & Development.pdf
Glass Big Push Part I.pdf
Glass and Steel in a Union w-Addendum.pdf
Why Quantum Anywhere, Parts I and II, plus Intro
Ad

More from Brij Consulting, LLC (20)

PDF
Crystal Cloud and Energy Star Performance.pdf
PDF
Comments on Crystal Cloud and Energy Star.pdf
PDF
How to Value Virtual Machines and other IP Stuff.pdf
PDF
Rise of the Build Division, Conquering the Curve.pdf
PDF
Comments on Rise of the Build Division.pdf
PDF
Concept Topology in Architectural Build Addendum.pdf
PDF
Comments on Concept Topology in Architectural Build Addendum.pdf
PDF
Comments on Concept Topology- Architectural Build Design.pdf
PDF
Concept topology- Architectural Build Design.pdf
PDF
Comments on Writing the House Addendum.pdf
PDF
Summary of Comments on Writing the House, Parts I & II.pdf
PDF
Comments on Architecture that Advances Parts I and II Review and Lab Curricul...
PDF
Architecture that Advances Parts I and II Review and Lab Curriculum.pdf
PDF
Comments on Architecture that Advances Part I.pdf
PDF
Architecture that Advances Part I Review.pdf
PDF
Conference 2 notes for Car and Home Show Parts I & II.pdf
PDF
Comments on Conference 2 notes for Car and Home Show Parts I & II.pdf
PDF
Summary of Comments on Conference 2 Notes for Car and Home Show.pdf
PDF
Conference 2 Notes for Car and Home Show.pdf
PDF
GLASS COMMUNITIES SSE ADDENDUM All Versions.pdf
Crystal Cloud and Energy Star Performance.pdf
Comments on Crystal Cloud and Energy Star.pdf
How to Value Virtual Machines and other IP Stuff.pdf
Rise of the Build Division, Conquering the Curve.pdf
Comments on Rise of the Build Division.pdf
Concept Topology in Architectural Build Addendum.pdf
Comments on Concept Topology in Architectural Build Addendum.pdf
Comments on Concept Topology- Architectural Build Design.pdf
Concept topology- Architectural Build Design.pdf
Comments on Writing the House Addendum.pdf
Summary of Comments on Writing the House, Parts I & II.pdf
Comments on Architecture that Advances Parts I and II Review and Lab Curricul...
Architecture that Advances Parts I and II Review and Lab Curriculum.pdf
Comments on Architecture that Advances Part I.pdf
Architecture that Advances Part I Review.pdf
Conference 2 notes for Car and Home Show Parts I & II.pdf
Comments on Conference 2 notes for Car and Home Show Parts I & II.pdf
Summary of Comments on Conference 2 Notes for Car and Home Show.pdf
Conference 2 Notes for Car and Home Show.pdf
GLASS COMMUNITIES SSE ADDENDUM All Versions.pdf

Recently uploaded (20)

PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PDF
Technical Architecture - Chainsys dataZap
PPTX
operations management : demand supply ch
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PDF
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
IFRS Notes in your pocket for study all the time
PPTX
sales presentation، Training Overview.pptx
PDF
How to Get Funding for Your Trucking Business
PDF
Tata consultancy services case study shri Sharda college, basrur
PDF
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PDF
Keppel_Proposed Divestment of M1 Limited
PDF
How to Get Business Funding for Small Business Fast
PDF
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
PDF
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
PDF
1911 Gold Corporate Presentation Aug 2025.pdf
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
PPTX
Negotiation and Persuasion Skills: A Shrewd Person's Perspective
PDF
Cours de Système d'information about ERP.pdf
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Technical Architecture - Chainsys dataZap
operations management : demand supply ch
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
IFRS Notes in your pocket for study all the time
sales presentation، Training Overview.pptx
How to Get Funding for Your Trucking Business
Tata consultancy services case study shri Sharda college, basrur
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
Keppel_Proposed Divestment of M1 Limited
How to Get Business Funding for Small Business Fast
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
1911 Gold Corporate Presentation Aug 2025.pdf
Solaris Resources Presentation - Corporate August 2025.pdf
Negotiation and Persuasion Skills: A Shrewd Person's Perspective
Cours de Système d'information about ERP.pdf

The Remote Build V1 Planning a Theoretical Production

  • 1. GOING REMOTE With Ark Sciences THE REMOTE BUILD V1 Planning a Theoretical Production MDIA
  • 2. Sponsored Conditions THEORETICAL PRODUCTION ARK CONDUIT ASSIMILATED LIKE DIGITAL DEFINE TEST OF PARAMETRIC 9/27/2021 Brij Consulting, LLC, Jean Marshall 2 V1 Planning a Theoretical Production
  • 3. 1. Use filler instead of density and grow the beam at the site, transport via glass 2. Add menus and switches 3. Facade style changes Glass Mechanics for Remote Building Glass Model for Remote Building 1. Concept machine as approved by engineering is acceptable with proprietary secants and encrypted as Intellectual Property (fingerprint.) 2. Remote capability is subject to general development of Ark Media and may depend on timing of it (limited by glass conduit.) Economic Value is a stable fact in Glass, since the Glass System can not be subject to 1. availability of product supply or demand 2. the volatility of markets 3. a currency valuation 4. Technological obsolescence is held at bay by causing the build method to be based on the lower constructs until the product is refined and replaced automatically; Most importantly the longevity (long-lived nature) and continuity of the product is ensured by the Plan of God 5. Economy of scale is increased by the plait and scalable nature of glass. To Do: Devise a Theoretical Production and simulate the remote process prior to the availability of an ark media Assume pipe and plait concepts assimilated in Ark Redefine the Load Engineering Plan from “The Glass House” 9/27/2021 Brij Consulting, LLC, Jean Marshall 3 Project Plan is stated at its Market Value Concepts of…
  • 4. Facts added to Glass Mechanics 1. Use filler instead of density and grow the beam at the site, transport via glass 2. Add menus and switches 3. Facade style changes DENSITY FUNCTION •NOT Replication •Secant Guided Process sponsored by a Tool •When filler is used as a replacement for the density function until transport, the filler assumes the characteristics of the density requirement per its confected production at Z Menus and Switches •Used to unlock and move beams until parked and locked. •Beams can not be put back to plait media state •Menus can be used for repair and rebalancing Façade Style changes •Added into the fill pocket of the beam •Produced with a Machine tool •Once the Façade is added can be repaired but not replaced Is there on-site access to tools and production capability-see limitations? See Additional Facts for Menus and Facades 9/27/2021 Brij Consulting, LLC, Jean Marshall 4
  • 5. Storyboard ◦ Theoretical Production needs to be devised to take advantage of each step in the process ◦ We’re doing this to construct the Value of each Revision and have some run rate for the project R-P1 Hedge Measures t/b/d= to be determined 9/27/2021 Brij Consulting, LLC, Jean Marshall 5
  • 6. Engineering Changes Increasing units of Production impacts growth and yield with economic change x2 Valuation Measures inclusive Adding Change Value to the Project altered the relevant range of the Standards Slide 5 correlation How do these changes appear in the Plan? 9/27/2021 Brij Consulting, LLC, Jean Marshall 6 reloaded
  • 7. ◦ 7W P1 Theoretical Production for Storyboard R-P1-RC, includes Product Media to approximate remote cost The greater part of the 4% increase is coming from supporting industry, only .48% is Architectural Used to develop the price α 9/27/2021 Brij Consulting, LLC, Jean Marshall 7
  • 8. Developing the Theoretical Production The Theoretical Production for the P-1 Architecture is shown as calculated next… Uses the Y-Intercept set α 9/27/2021 Brij Consulting, LLC, Jean Marshall 8
  • 9. ◦ 7W P1 Theoretical Production for Storyboard R-P1-IH, exclusive of Product Media to approximate inhouse cost Per slide 8 9/27/2021 Brij Consulting, LLC, Jean Marshall 9
  • 10. Additional Facts for Menus and Facades ◦ Menus and Switches (Modules) ◦ Two Types ◦ Vendor Only or ◦ Customer Facing ◦ Types ◦ Customer: color change and specific motionable properties without impairment of structural supports ◦ Specifications: somewhat similar to the digital mechanic in that the placement within the product affects its final operation upon final assembly (must be well-defined and tested.) ◦ Color changes and repairs to facades/ building surfaces are capable through modules within the Glass system and altered remotely Discussed in “The Glass Build” 9/27/2021 Brij Consulting, LLC, Jean Marshall 10
  • 11. V2 Ark Conduit mimics Site Simulation ◦ Coming next… ◦ Pipes and Plaits have similar functions in ARK MODE although scale is quite different than digital ◦ We will introduce Pipes and Plaits and continue to work on the theory of secant development ◦ In V3 we will also begin to define the parametric order of operations Next… 9/27/2021 Brij Consulting, LLC, Jean Marshall 11
  • 12. What is Required Architectural Plans, Digital Glass Model The Glass Modeling System, Ark Mode 3- Dimensional Media Model Storyboards to describe… Process Plan Integral Materials Organization of Instances of Building (Preludes) Secant Construction and Engineering Building Organization for Ark Mode Methods, Tools and Utilities The Design of the whole process will be an extended period of listening about this subject. But we will spend our time in our next paper organizing Secant Processes Monks of Norcia - Donations - EN - Monastero di San Benedetto in Monte (nursia.org) 12 9/27/2021 Brij Consulting, LLC, Jean Marshall
  • 13. Our papers 13 This paper is THE REMOTE BUILD V3 and V4 holds all contents 1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for Media to write and produce in Ark Science and Dimensional Systems, Introduction of the Story “Eru finds a Golden Pen.” 2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and Remix specifications, beginning crosswalk and encryptions 3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use of Secants to Build tooling 4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to include Ark encryptions and design considerations 5. THE GLASS HOUSE: Magi and Marcus Engineering plans to invest in a Plait Glass facility for building and research in remote Ark Science. Start of Tooling and Secant Design for the Construction Industry https://www.slideshare.net/Marshallja/presentations See next slide for list of the preceding Digital Plait content 9/27/2021 Brij Consulting, LLC, Jean Marshall Planning a Theoretical Production for untried Architecture
  • 14. 14 1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants and Wheels for the “cube-ified glass” engineering of Imaging, sound and motion characteristics. 2. The New Stone: Simulations and Re-instancing to package, confect and view glass media 3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional Matrices. 4. The Dynamic Instance: Product Media Discussed 5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional systems 6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos 7. Art of the Science: What can be made? Assimilation discussed, look at basic product ideas 8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper) 9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit 10. The Digital Plait Position: Engineering Design of the Load and Thruput 11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads 12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a Digital Portal Production System using appliances gained through Plait Object and Gate driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances 13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process 14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of product, learning to specify material, looking for union of Vector 15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis 16. The Glass Wall: This is a very difficult staging of advanced engineering to depict …Motivated by sound it creates a means by sound to cascade light for safe and wireless power 17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum 18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper) 19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck (Dialogue paper) 20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new (Dialogue paper) ^Mu Sic, see The Corner of Mu Sic To Change Digital Plait Papers with Content Description (Reverse Order) 9/27/2021 Brij Consulting, LLC, Jean Marshall