1. 1). A does the work in 10 days and B does the same work in 15 days. In how many days together they will
do the same work ? 5 Days 6 Days 7 Days 9 Days
1). A उस कार्य को 10 दिनोों में करता है और B उसी कार्य को 15 दिनोों में करता है। वे एक साथ दमलकर उसी कार्य
को दकतने दिनोों में पूरा करेंगे? 5 दिन 6 दिन 7 दिन 9 दिन
2. 2). A and B can complete the piece of work in 4 days. If A alone can complete the same work in 12 days. In
how many days can B alone complete that work ? 5 Days 6 Days 8 Days 9 Days
2). A और B कार्य क
े टुकडे को 4 दिनोों में पूरा कर सकते हैं। र्दि A अक
े ले उसी कार्य को 12 दिनोों में पूरा कर सकता
है। B अक
े ले उस कार्य को दकतने दिनोों में पूरा कर सकता है? 5 दिन 6 दिन 8 दिन 9 दिन
3. A can finish a work in 18 days and B can do the same work in half the time taken by A. Then, working
together, what part of the same work they can finish in a day ? (S.S.C., 2002)
(a) 1/6 (b) 1/9 (c) 2/5 (d) 2
A एक कार्य को 18 दिनोों में पूरा कर सकता है और B उसी कार्य को A द्वारा दलए गए आधे समर् में कर सकता है।
दिर, एक साथ काम करते हुए, उसी काम का कौन सा दहस्सा वे एक दिन में पूरा कर सकते हैं? (एस.एस.C., 2002)
(a) 1/6 (b) 1/9 (c) 2/5 (d) 2
4. 4) A tyre has two punctures. The first puncture alone would have made the tyre flat in 9 minutes and
the second alone would have done it in 6 minutes. If air leaks out at a constant rate, how long does it
take both the punctures together to make it flat ?
(a) 1 1/2 minutes (b) 3 1/2 minutes (c) 3 3/5 minutes (d) 1 1/4 minutes
एक टार्र में िो पोंचर होते हैं। अक
े ले पहला पोंचर टार्र को 9 दमनट में फ्लैट कर दिर्ा होगा और िूसरे अक
े ले इसे 6
दमनट में दकर्ा होगा। र्दि हवा एक स्थथर िर से बाहर दनकलती है, तो र्ह कब तक करता है इसे फ्लैट बनाने क
े दलए
िोनोों पोंचर को एक साथ लें? (a) 1 1/2 दमनट (b) 3 1/2 दमनट (c) 3 3/5 दमनट(d) 1 4 दमनट
5. then in how many days will they knit two pairs of socks? (R.R.B., 2004)
(a) 3 days (b) 4 days (c) 4 1/2 days (d) 5 days
5) A 3 दिनोों में मोजे की एक जोडी बुन सकता है। B बुनना कर सकता है 9 दिनोों में एक ही जोडी। र्दि वे एक साथ
बुनाई कर रहे हैं, तो दकतने दिनोों में वे दकतने दिनोों में िो जोडे बुनना होगा मोजे? (आर.आर.B., 2004)
(a) 3 दिन (b) 4 दिन (c)4 1 2 दिन (d) 5 दिन
6. 6) A can complete a work in 6 days while B can complete the same work in 12 days. If they work
together and complete it, the portion of the work done by A is (a) 1/3 (b) ¼ (c) 1/2 (d) 2/3
6). A एक कार्य को 6 दिनोों में पूरा कर सकता है जबदक B कर सकता है उसी काम को 12 दिनोों में पूरा करें। अगर वे
काम करते हैं एक साथ और इसे पूरा करें, काम का दहस्सा A द्वारा दकर्ा गर्ा है (a) 1/3 (b) ¼ (c) 1/2 (d) 2
7. 7) A man can do a job in 15 days. His father takes 20 days and his son finishes it in 25 days. How long will
they take to complete the job if they all work together? (a) Less than 6 days (b) Exactly 6 days (c)
Approximately 6.4 days (d) More than 10 day.
7) एक आिमी एक काम को 15 दिनोों में कर सकता है। उसक
े दपता 20 लेते हैं दिन और उसका बेटा इसे 25 दिनोों में
पूरा करता है। कब तक चलेगा वे काम पूरा करने क
े दलए ले अगर वे सभी एक साथ काम करते हैं? (a) 6 दिनोों से कम
(b) ठीक 6 दिन (c) लगभग 6.4 दिन (d) 10 दिनोों से अदधक
8. 8) Amit and Sumit can plough a field in 4 days. Sumit alone can plough the field in 6 days. In how many
days will Amit alone plough the field? (R.R.B., 2006) (a) 10 days (b) 12 days (c) 14 days (d) 15 days
8) अदमत और सुदमत एक खेत को 4 दिनोों में जोत सकते हैं। सुदमत अक
े ले 6 दिनोों में खेत की जुताई कर सकते हैं।
दकतने में दिन अदमत अक
े ले खेत की जुताई करेगा? (आर.आर.B., 2006) (a) 10 दिन (b) 12 दिन (c) 14 दिन (d) 15
दिन
9. 9)X, Y and Z complete a work in 6 days. X or Y alone can do the same work in 16 days. In how many days
Z alone can finish the same work?(R.R.B., 2026) (a) 12 (b) 16 (c) 24 (d) 36
9)X, Y और Z एक कार्य को 6 दिनोों में पूरा करते हैं। अक
े ले X र्ा Y एक ही काम को 16 दिनोों में पूरा कर सकते हैं।
दकतने में दिन Z अक
े ले एक ही काम को पूरा कर सकता है? (आर.आर.B., 2006)
(a) 12 (b) 16 (c) 24 (d) 36
10. (10) Reena, Aastha and Shloka can independently complete a piece of work in 6 hours, 4 hours and 12
hours respectively. If they work together, how much time will they take to complete that piece of work?
(Bank P.O., 2004) (a) 2 hours (b) 5 hours (c) 6 hours (d) 8 hours (e) None of these
10) रीiना, आथथा और श्लोका स्वतोंत्र रूप से कर सकते हैं एक कार्य को 6 घोंटे, 4 घोंटे और क्रमशः 12 घोंटे। र्दि वे
एक साथ काम करते हैं, तो क
ै से बहुत समर् वे उस टुकडे को पूरा करने क
े दलए ले जाएगा काम? (बैंक पीओ, 2004)
(a) 2 घोंटे (b) 5 घोंटे (c) 6 घोंटे (d) 8 घोंटे (e) इनमें से कोई नहीों
11. 11) A can complete 1/3 of a work in 5 days and B, 2/5of the work in 10 days. In how many days both A and
B together can complete the work? (S.S.C., 2010; P.C.S., 2009) (a) 7 ½ (b) 8 4/5 (c) 9 3/8 (d) 10
11) A एक कार्य का 1/3 भाग 5 दिनोों में और B, 2/5 दिनोों में पूरा कर सकता है10 दिनोों में काम करते हैं। दकतने दिनोों
में िोनोों क्या A और B एक साथ काम को पूरा कर सकते हैं? (एस.एस.C., 2010; पी.C.एस., 2009)
(a) 7 1/2 (b) 8 4/5 (c) 9 3/8 (d) 10
12. 12) A man and a boy together can do a certain amount of digging in 40 days. Their speeds in digging are
in the ratio of 8 : 5. How many days will the boy take to complete the work if engaged alone?
(a) 52 days (b) 68 days (c) 80 days (d) 104 day
12) एक आिमी और एक लडका एक साथ एक दनदित रादश कर सकते हैं 40 दिनोों में खुिाई। खुिाई में उनकी गदत
क्या है? 8 : 5 क
े अनुपात में। लडक
े को दकतने दिन दमलेंगे काम को पूरा करने क
े दलए ले अगर अक
े ले लगे हुए हैं?
(आर.आर.B., 2005) (a) 52 दिन (b) 68 दिन (c) 80 दिन (d) 104 दिन
13. 13). A takes twice as much time as B or thrice as much time as C to finish a piece of work.
Working together, they can finish the work in 2 days. B can do the work alone in : (S.S.C., 2002)
(a) 4 days (b) 6 days (c) 8 days (d) 12 days
14. 14). Two workers A and B are engaged to do a work. A working alone takes 8 hours more to complete
the job than if both worked together. If B worked alone, he would need 142 hours more to complete the job
than they both working together. What time would they take to do the work together ?(M.A.T., 2010)
(a) 4 hours (b) 5 hours (c) 6 hours (d) 7 hours
15. 15) A works twice as fast as B. If B can complete a work in 12 days independently, the number of
days in which A and B can together finish the work is
(a) 4 days (b) 6 days (c) 8 days (d) 18 days
16. 16).A is twice as good a workman as B. If they work together, they can complete a job in 18 days. If A
alone does the job, in how many days he will complete the job? (Hotel Management, 2010)
(a) 27 days (b) 36 days(c) 40 days (d) 54 days
17. 17)To do a piece of work, B takes 3 times as long as A and C together and C twice as long as A
and B together. If A, B and C together can complete the work in 10 days, how long would A take
alone to complete it? (a) 24 days (b) 30 days (c) 36 days (d) 40 days
18. 18). P can complete a work in 12 days working 8 hours a day. Q can complete the same work in 8
days working 10 hours a day. If both P and Q work together, working 8 hours a day, in how many
days can they complete the work ? (a) 55/11 (b) 65/11(c) 56/11 (d) 66/11(e) None of these
19. 19). A and B together can complete a work in 12 days, B and C together can complete the same
work in 8 days and A and C together can complete it in 16 days. In total, how many days do A, B
and C together take to complete the same work? (Bank P.O., 2009)
(a) 53/12 (b) 93/13(c) 57/12 (d) 57/13 (e) None of these
20. 20).A can do a piece of work in 4 hours, B and C together in 3 hours, and A and C together in 2
hours. How long will B alone take to do it? (S.S.C., 2005)
(a) 8 hours (b) 10 hours(c) 12 hours (d) 24 hours
21. 21). A and B can do a work in 8 days, B and C can do the same work in 12 days. A, B and C together can
finish it in 6 days. A and C together will do it in(S.S.C., 2006)
(a) 4 days (b) 6 days (c) 8 days (d) 12 days
22. 22)A and B can do a piece of work in 5 days; B and C can do it in 7 days; A and C can do it in 4
days. Who among these will take the least time if put to do it alone ?(a) A (b) B (c) C (d) Data
inadequate
23. 23).A and B can do a piece of work in 12 days, B and C in 8 days and C and A in 6 days. How
long would B take to do the same work alone? (S.S.C., 2007) (a) 24 days (b) 32 days(c) 40 days
(d) 48 days
24. 24).A can do a piece of work in 4 hours, B and C together in 3 hours, and A and C together in 2
hours. How long will B alone take to do it? (S.S.C., 2005)
(a) 8 hours (b) 10 hours (c) 12 hours (d) 24 hours
25. 25)A and B can do a work in 8 days, B and C can do the same work in 12 days. A, B and C
together can finish it in 6 days. A and C together will do it in(S.S.C., 2006)
(a) 4 days (b) 6 days (c) 8 days (d) 12 days
26. 26)A and B together can do a job in 2 days; B and C can do it in 4 days; A and C in 2 2 days. 5
The number of days required for A to do the job alone is (M.B.A., 2011) (a) 1 (b) 3(c) 6 (d) 12
27. 27)A can build a wall in the same time in which B and C together can do it. If A and B together
could do it in 25 days and C alone in 35 days, in what time could B alone do it? (N.M.A.T., 2008)
(a) 90 days (b) 100 days (c) 175 days (d) None of these
28. 28)A takes 5 days more than B to do a certain job and 9 days more than C; A and B together can
do the job in the same time as C. How many days A would take to do it? (a) 5 (b) 10 (c) 15 (d) 20
29. 29)A and B can do a job together in 7 days. A is 3 1/4times as efficient as B. The same job can be
done by A alone in : (S.S.C., 2003) (a) 1/3 9 days (b) 11 days (c) ¼ 12 days (d) 1/16 days
30. 30) Kamal can do a work in 15 days. Bimal is 50% more efficient than Kamal. The number of
days, Bimal will take to do the same piece of work, is (C.P.O., 2006) (a) 1/2 7(b) 10 (c) 12 (d) 14
31. 31)A does 20% less work than B. If A can complete a piece of work in 1 72 hours, then B can do it
in(S.S.C., 2006) (a) 5 hours (b) 1/25 hours(c) 6 hours (d) 1/6 hours
32. 32) A is 30% more efficient than B. How much time will they, working together, take to complete a
job which A alone could have done in 23 days ?
(a) 11 days (b) 13 days (c) 3 20 days 17 (d) None of these
33. 33) A does half as much work as B in one-sixth of the time. If together they take 10 days to
complete a work, how much time shall B alone take to do it? (S.S.C., 2005)
(a) 30 days (b) 40 days (c) 50 days (d) 70 days
34. 34)A is 50% as efficient as B. C does half of the work done by A and B together. If C alone does
the work in 40 days, then A, B and C together can do the work in:
(a) 1 13 days 3 (b) 15 days (c) 20 days (d) 30 days
35. 35).A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the
fraction of the work that is left is : (a) 1/4 (b) 1/10(c) 7/15 (d) 8/15
36. 36).A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A
can finish the remaining work in (R.R.B., 2004) (a) 2 days (b) 3 days (c) 5 days (d) 10 days
37. 37) A and B can complete a work in 18 days and 15 days respectively. They started doing the work
together but after 3 days A had to leave and B alone completed the remaining work. The whole
work was completed in (a) 3 9 days 4 (b) 1 10 days 4(c) 1 12 days 2 (d) 3 12 days
38. 38).A, B and C can separately do a work in 12, 15 and 20 days respectively. They started to work
together but C left after 2 days. The remaining work will be finished in (R.R.B., 2006)
(a) 4 days (b) 5 days (c) 6 days (d) 15 days
39. 39) A can complete a piece of work in 18 days, B in 20 days and C in 30 days. B and C together
start the work and are forced to leave after 2 days. The time taken by A alone to complete the
remaining work is (S.S.C., 2010) (a) 10 days (b) 12 days (c) 15 days (d) 16 days
40. 40) A can complete a piece of work in 10 days, B in 15 days and C in 20 days. A and C worked
together for 2 days and then A was replaced by B. In how many days, altogether, was the work
completed? (C.P.O., 2007) (a) 6 (b) 8 (c) 10 (d) 12
41. 41). A and B can do a piece of work in 30 days, while B and C can do the same work in 24 days
and C and A in 20 days. They all work together for 10 days when B and C leave. How many days
more will A take to finish the work ? (a) 18 days (b) 24 days (c) 30 days (d) 36 day
42. 42) X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone
and then after 4 days Y joined him till the completion of the work. How long did the work last ?
(a) 6 days (b) 10 days (c) 15 days (d) 20 days
43. 43) A completes 710 of a work in 15 days. Then he completes the remaining work with the help of
B in 4 days. The time required for A and B together to complete the entire work is (S.S.C., 2005)
(a) 1 8 days 4 (b) 1 10 days 2(c) 2 12 days 3 (d) 1 13 days
44. 44) A man and a boy can do a piece of work in 24 days. If the man works alone for the last 6 days,
it is completed in 26 days. How long would the boy take to do it alone? (S.S.C., 2005)
(a) 20 days (b) 24 days (c) 36 days (d) 72 days
45. 45) A and B can together finish a work in 30 days. They worked together for 20 days and then B
left. After another 20 days, A finished the remaining work. In how many days A alone can finish
the job ?(S.S.C., 2003) (a) 40 (b) 50 (c) 54 (d) 60
46. 46) X can do a piece of work in 40 days. He works at it for 8 days and then Y finished it in 16
days. How long will they together take to complete the work ? (a) 1 13 days 3 (b) 15 days (c) 20
days (d) 56 days
47. 47) A, B and C together can complete a piece of work in 10 days. All the three started working at it
together and after 4 days A left. Then B and C together completed the work in 10 more days. A alone could
complete the work in : (a) 15 days (b) 16 days (c) 25 days (d) 50 days
48. 48) A does 45 of a work in 20 days. He then calls in B and they together finish the remaining work
in 3 days. How long B alone would take to do the whole work ?
(a) 23 days (b) 37 days (c) 1 37 days 2 (d) 40 days
49. 49) A and B together can do a piece of work in 30 days. A having worked for 16 days, B finishes
the remaining work alone in 44 days. In how many days shall B finish the whole work alone ?
(a) 30 days (b) 40 days (c) 60 days (d) 70 days
50. (a) 16 (b) 24 (c) 36 (d) 48
50) A और B एक साथ एक काम को 12 दिनोों में कर सकते हैं, दजसे B और C दमलकर 16 दिनोों में कर सकते हैं। A
द्वारा 5 दिनोों क
े दलए और B द्वारा 7 दिनोों क
े दलए कार्य करने क
े बाि, C इसे 13 दिनोों में समाप्त करता है। C अक
े ले
काम को दकतने दिनोों में पूरा करेगा?
(a) 16 (b) 24 (c) 36 (d) 48
51. 51) A and B can do a piece of work in 28 and 35 days respectively. They began to work together
but A leaves after some time and B completed the remaining work in 17 days. After how many
days did A leave?
(a) 5/7 days (b) 8 days (c) 9 days
(d) 14 2/5 days
. A और B एक कार्य को क्रमशः 28 और 35 दिनोों में कर सकते हैं। उन्ोोंने एक साथ काम करना शुरू दकर्ा
लेदकन A क
ु छ समर् बाि छोड िेता है और B शेष कार्य को 17 दिनोों में पूरा करता है। A ने दकतने दिनोों क
े
बाि छोड दिर्ा? (a) 5/7 दिन (b) 8 दिन (c) 9 दिन (d) 14 2/5 दिन
52. 52) A, B and C can complete a work in 10, 12 and 15 days respectively. They started the work
together. But A left the work 5 days before its completion. B also left the work 2 days after A left.
In how many days was the work completed? (C.P.O., 2007) (a) 4 (b) 5 (c) 7 (d) 8
53. 53)A and B together can complete a work in 12 days. A alone can complete it in 20 days. If B
does the work only for half a day daily, then in how many days A and B together will complete the
work ? (a) 110 days (b) 11 days (c) 15 days (d) 20 days
54. 54) A and B can separately do a piece of work in 20 and 15 days respectively. They worked togfor
6 days, after which B was replaced by C. If the work was finished in next 4 days, then the number
of days in which C alone could do the work will be (a) 30 (b) 35 (c) 40 (d) 60
Are 20 days B =15torys
,
- ten
60
↳B
↳2 1895.5 = 4.5
-To her
is AB At
10p had and 1 I
= .
•who
ct.5--1hs
55. 55) A, B and C can do a piece of work in 36, 54 and 72 days respectively. They started the work
but A left 8 days before the completion of the work while B left 12 days before the completion.
The number of days for which C worked is
(a) 4 (b) 8 (c) 12 (d) 24
56. 56) A and B can complete a piece of work in 12 and 18 days respectively. A begins to do the work
and they work alternatively one at a time for one day each. The whole work will be completed in
(S.S.C., 2007)(a) 14 1/3 days (b) 15 2/3 days (c) 16 1/3days (d) 8 1/2 days
57. 57). A, B and C can do a piece of work in 11 days, 20 days and 55 days respectively, working alone. How
soon can the work be done if A is assisted by B and C on alternate days ?
(a) 7 days (b) 8 days (c) 9 days (d) 10 days
57). A, B और C एक कार्य को क्रमशः 11 दिनोों, 20 दिनोों और 55 दिनोों में कर सकते हैं, अक
े ले काम कर सकते हैं।
र्दि A को B और C द्वारा वैकस्िक दिनोों में सहार्ता प्रिान की जाती है, तो कार्य को दकतनी जल्दी पूरा दकर्ा जा
सकता है? (a) 7 दिन (b) 8 दिन (c) 9 दिन (d) 10 दिन
58. 58)A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the
work if he is assisted by B and C on every third day? (a) 12 days (b) 15 days (c) 16 days (d) 18 days
58)A, B और C एक कार्य को क्रमशः 20, 30 और 60 दिनोों में कर सकते हैं। र्दि प्रत्येक तीसरे दिन B और C द्वारा
सहार्ता प्राप्त की जाती है, तो A उस कार्य को दकतने दिनोों में पूरा कर सकता है?
(a) 12 दिन (b) 15 दिन (c) 16 दिन (d) 18 दिन
59. 59) A and B can finish a work, working on alternate days, in 19 days, when A works on the first day.
However, they can finish the work, working on alternate days, in 19 5/6 days, when B works on the first
day. How many days does A alone take to finish the work? (a) 11 1/2 days (b) 15 days (c ) 18 days (d ) 21
days
59) A और B एक कार्य को 19 दिनोों में वैकस्िक दिनोों में पूरा कर सकते हैं, जब A पहले दिन कार्य करता है।
हालाोंदक, वे काम को पूरा कर सकते हैं, वैकस्िक दिनोों पर काम करते हुए, 19 5/6 दिनोों में, जब बी पहले दिन काम
करता है। A अक
े ले कार्य को पूरा करने में दकतने दिन लेता है? (a) 11 1/2 दिन (b) 15 दिन (c) 18 दिन (d) 21 दिन
60. 60)A, B and C together earn ` 300 per day, while A and C together earn ` 188 and B and C
together earn ` 152. The daily earning of C is : (a) ' 40 (b) ' 68 (c) ' 112 (d) 150
60)A, B और C दमलकर प्रदत दिन 300 रुपर्े कमाते हैं, जबदक A और C दमलकर 188 रुपर्े कमाते हैं और
B और C दमलकर 152 रुपर्े कमाते हैं। C की िैदनक आर् है: (a) ` 40 (b) ` 68 (c) ` 112 (d) 150
61. 61) A, B and C are employed to do a piece of work for 529. A and B together are supposed to do 19/23 of
the work and B and C together 8/23 of the work. What amount should A be paid ?
(a) ` 315 (b) ` 345 (c) ` 355 (d) ` 375
61)A, B और C को 529 क
े दलए काम करने क
े दलए दनर्ोदजत दकर्ा जाता है। A और B को एक साथ कार्य का 19/23
भाग और B और C को एक साथ कार्य क
े 8/23 को करना है। A को दकतनी रादश का भुगतान दकर्ा जाना चादहए?
(a) 315 '(b) 345 '(c) ' 355 (d) ' 375
62. 62). Kim can do a work in 3 days while David can do the same work in 2 days. Both of them finish the
work together and get ` 150. What is the share of Kim ? (a) ` 30 (b) ` 60 (c) ` 70 (d) ` 75
62). दकम एक काम को 3 दिनोों में कर सकता है जबदक डेदवड उसी काम को 2 दिनोों में कर सकता है। वे िोनोों एक
साथ काम को पूरा करते हैं और 150 रुपर्े प्राप्त करते हैं। दकम का दहस्सा क्या है? (a) 30 रुपर्े (b) 60 (c) ' 70 (d) '
75
63. 63)If A can do 1/4 of a work in 3 days and B can do 1/6 of the same work in 4 days, how much will A get if
both work together and are paid ` 180 in all? (a) ` 36 (b) ` 60 (c) ` 108 (d) ` 120
63) र्दि A एक कार्य का 1/4 भाग 3 दिनोों में कर सकता है और B उसी कार्य का 1/6 भाग 4 दिनोों में कर सकता है, तो
A को दकतना प्राप्त होगा र्दि िोनोों एक साथ कार्य करते हैं और क
ु ल दमलाकर 180 रुपर्े का भुगतान दकर्ा जाता है?
(a) 36 '(b) ' 60 (c) ' 108 (d) ' 120
64. efficiency in the work was three times that of the boy. What are the daily wages of the boy?
(S.S.C., 2005) (a) ` 40 (b) ` 44 (c) ` 56 (d) ` 76
64) एक आिमी और एक लडक
े को उस काम क
े दलए 5 दिनोों क
े दलए मजिू री क
े रूप में 800 रुपर्े प्राप्त
हुए जो उन्ोोंने एक साथ दकए थे। काम में आिमी की िक्षता लडक
े की तुलना में तीन गुना थी। लडक
े की
िैदनक मजिू री क्या है? (एस.एस.C., 2005) (a) ' 40 (b) ' 44 (c) ' 56 (d) ' 76
65. 65) A man and a boy received ` 800 as wages for 5 days for the work they did together. The man’s
efficiency in the work was three times that of the boy. What are the daily wages of the boy? (S.S.C., 2005)
(a) ` 40 (b) ` 44 (c) ` 56 (d) ` 76
65) एक आिमी और एक लडक
े को उस काम क
े दलए 5 दिनोों क
े दलए मजिू री क
े रूप में 800 रुपर्े प्राप्त हुए जो
उन्ोोंने एक साथ दकए थे। काम में आिमी की िक्षता लडक
े की तुलना में तीन गुना थी। लडक
े की िैदनक मजिू री क्या
है? (एस.एस.C., 2005) (a) ' 40 (b) ' 44 (c) ' 56 (d) ' 76
66. 66) A can do a piece of work in 10 days; B in 15 days. They work for 5 days. The rest of the work was
finished by C in 2 days. If they get ` 1500 for the whole work, the daily wages of B and C are (M.A.T.,
2005) (a) ` 150 (b) ` 225 (c) ` 250 (d) ` 300
66) A एक कार्य को 10 दिनोों में कर सकता है; B 15 दिनोों में। वे पाोंच दिनोों तक काम करते हैं। शेष कार्य को C द्वारा 2
दिनोों में पूरा दकर्ा गर्ा था। र्दि उन्ें पूरे कार्य क
े दलए 1500 रुपर्े दमलते हैं, तो B और C की िैदनक मजिू री
(M.A.T., 2005) (a) ' 150 (b) ' 225 (c) ' 250 (d) ' 300 है
67. 67)The daily wages of a worker are ` 100. Five workers can do a work in 10 days. If you pay ` 20 more
daily, they agree to do 25% more work daily. If the proposal is accepted, then the total amount that could
be saved is (a) ` 200 (b) ` 250 (c) ` 300 (d) ` 500
67)एक कामगार की िैदनक मजिू री 100 रुपर्े है। पाोंच कमयचारी एक काम को 10 दिनोों में कर सकते हैं। र्दि आप
20 रुपर्े अदधक िैदनक भुगतान करते हैं, तो वे िैदनक रूप से 25% अदधक काम करने क
े दलए सहमत हैं। र्दि
प्रस्ताव स्वीकार कर दलर्ा जाता है, तो बचत की जा सकने वाली क
ु ल रादश (a) ' 200 (b) ' 250 (c) ' 300 (d) ' 500 है
68. 68)A, B and C completed a work costing ` 1800. A worked for 6 days, B for 4 days and C for 9 days. If
their daily wages are in the ratio of 5 : 6 : 4, how much amount will be received by A? (S.S.C., 2007)
(a) ` 600 (b) ` 750 (c) ` 800 (d) ` 900
68)A, B और C ने 1800 रुपर्े की लागत से एक कार्य पूरा दकर्ा। A ने 6 दिनोों क
े दलए, B ने 4 दिनोों क
े दलए और C ने
9 दिनोों क
े दलए काम दकर्ा। र्दि उनकी िैदनक मजिू री 5 : 6 : 4 क
े अनुपात में है, तो A को दकतनी रादश प्राप्त होगी?
(एस.एस.C., 2007) (a) ₹ 600 (b) 750 (c) ' 800 (d) 900 रुपर्े