This document discusses the installation of a 425 kW turbine by TurboTech Precision Engineering at the captive power plant of Ballarpur Industries Limited (BILT) in Maharashtra, India. BILT operates a 60 MW thermal power plant to provide steam and power for its large-scale paper manufacturing facility. The installed turbine utilizes low pressure extraction steam to generate 425 kW of additional power. This has resulted in estimated energy savings of 136 lakh kWh and cost savings of 5.44 crore rupees over the past 4 years since installation. The turbine also supports environmental efforts by reducing 18,000 tons of carbon dioxide emissions compared to burning fossil fuels for the same power generation.